ML19291F842

From kanterella
Jump to navigation Jump to search
Requests Status Rept on Allegations Raised in Congressman Markey Re Hayward-Tyler Pump Co QA Program
ML19291F842
Person / Time
Issue date: 12/16/1981
From: Ahearne J
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To:
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
Shared Package
ML19291F843 List:
References
FOIA-82-117 NUDOCS 8202240328
Download: ML19291F842 (1)


Text

.

[gu nuo,#'o UNITED STATES

' '?,

NUCLEAR REGULATORY COMMISSION yN

(

E WASHINGTON, D.C. 20555

\\

5.Ek ((y'^/

a-f December 16, 1981

'(

ar RICE OF THL cOMMISSIO N L R

[

MEMORANDUM FOR:

Executive Directbr for Operations /

Y FROM:

John Ahearne f j/ '

u p.. A _..

\\

SUBJECT:

IIAYWARD TYLER PUMP COMPANY L-On December 11 Congressman Markey submitted information on the quality assurance program of the Ilayward Tyler Pump Company.

Mr. Markey says that his staff has been in contact with Region IV on this matter.

I woulu appreciate a status report on the issues raised by Mr. Markey.

A

@IM cc:

Chairmari Palladino gd OCA pisIS p P'g tM ss\\ V Ag f

gaf #g y;s,s.h1v/h' A'j%

ssg(b coa fr e s 'y,W A

es a

,e l.N y V, op r*1W 9

i#

  1. y.lt 110 8202240328 820126 CF SUBJ OLM-6-1 CF

,a

\\

\\

l1.

' \\,

i

,m

- [.

ACTION CONTROL DATES CONTROL NO 1304 FROM:

COMPL DEADLINE i

afe,i Coraiss10 Der AhCarDO AC KN OWLE DG MENT DATE OF DOCUMENT 12/1hfb1 INT ERIM hEPLY PF3PA il FOR SIGNATURE 10:

p FINAL REPl Y

[{

M CHAIRMAN DirCks FILE LOCATION

/.p l g) ExtCUTivt DinECTOR OTHER DESCRIPTION O LET1ER gj MEMO O REPO RT C 01HER SPECI AL INSTRUCTIONS OR REMARKS Request status report on issues raised if this is amenable to a sh.1rt oee or two by ConJressman !!arkey in his ltr of paragraph background / Status report which 12/11/31 concerning Hayward Tyler Pump can be received by EDO by 12/28/81 - do it.

Company Otherwise, provide w/ response to Markey 1tr which is due 1/4/32. (The ltr say be self CXplanatory, in WhlCh CaSO no report CLASSIFIED DAT A II Ie90kIOde)

DOCUMENT / COPY NO.

C LAM t F IC Al lON

IAEckK

,i NUMUE R OF PAGL5 C P1 EGOHy sos r AL ac Gisinv No.

O Nsi O no O rno PRIOMTY t/

ASSIGNED TO:

DATE INFORMATION ROUTING LEGAL REVIEW O F IN AL 0 COPY ACstGNED To:

DATE NO LEG AL OU IECllONS

-Co111asr41V-1 2/1B/61-Dircks centon NOTIF Y:

Cornell shapar O too AouiN gOnnEnn COMME.NTS NOTIFY:

j ext. _ 4 bOYOM9 JCAE NOTIFICATION HECOMMENDED:

O VES O NO y

I RC t onM 23?

FXECUTIVE DIRECTOR FOH OPER ATIONS DO /VO T RL MO'._ TH/5 COPY g i

PRINCIPAL CORRESPONDENCE CONTROL

=

b e