ML19249E918

From kanterella
Jump to navigation Jump to search

Notifies Util That Response to NRC Re Potential for Reactor Cavity Annulus Seal Ring to Become Destructive Missile During LOCA Acceptably Resolves Problem
ML19249E918
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 09/18/1979
From: Schwencer A
Office of Nuclear Reactor Regulation
To: Reed C
COMMONWEALTH EDISON CO.
References
TAC-11846, NUDOCS 7910020702
Download: ML19249E918 (2)


Text

T E rz YA

'-(

pn *Ecu o

UNITED STATES

-[%.

',i NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 o, A s

% +..../

SEPTEMBER 1 S 1979 W

Docket Nos. 50-295 and 50-304 Mr. Cordell Reed Assistant Vice President Commonwealth Edison Company Post Office Box 767 Chicago, Illinois 60690

Dear Mr. Reed:

RE:

REACTOR CAVITY SEAL RING GENERIC ISSUE (PWR)

We have completed our review of your response to our letter of February 2, 1978, in regard to the potential for the reactor cavity annulus seal ring to become a destructive missile in the event of a loss-of-coolant accident pipe break inside the reactor cavity.

Your response acceptably resolves this issue for Zion Station, Unit Nos.

1 and 2.

Sincerely,

] t'MYV A. Schwencer, Chief Operating Reactors Branch #1 Disision of Operatirg Reactors cc:

See next page 1073 246 7910020 702P

tr. Corcell Reed Commonwealth Edison Company cc: Robert J. Vollen, Esquire 109 North Dearborn Street Chicago, Illinois 60602 Dr. Cecil Lue-Hing Director of Research and Development Metropolitan Sanitary District of Greater Chicago 100 East Erie Street Chicago, Illinois 60611 Zion-Benton Public Library District 2600 Emmaus Avenue Zion, Illinois 60099 Mr. Phillip P. Steptoe Isham, Lincoln and Beale Counselors at Law One First National Plaza 42nd Floor Chicago, Illinois 60603 Susan N. Sekuler, Esquire Assistant Attorney General Environmental Control Division 188 West Randolph Street, Suite 2315 Chicago, Illinois 60601 1073 247