ML19150A542

From kanterella
Jump to navigation Jump to search
Submittal of Updated Final Safety Analysis Report, Revision 28; Fire Protection Program, Revision 17; 10 CFR 54.37(b) Aging Management Review; Technical Specification Bases Changes, Revision 90
ML19150A542
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/10/2019
From: Jim Barstow
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML19150A453 List: ... further results
References
Download: ML19150A542 (2)


Text

200 Exelon Way Exelon Generation Kennett Square, PA 19348 www.exeloncorp.com 10 CFR 50.71 (e) 10 CFR 54.37(b)

May 10, 2019 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 R.E. Ginna Nuclear Power Plant Renewed Facility Operating License No. DPR-18 NRC Docket No. 50-244

Subject:

Updated Final Safety Analysis Report (UFSAR) Revision 28 Fire Protection Program (FPP) Revision 17 10 CFR 54.37(b) Aging Management Review Technical Specification Bases Changes, Revision 90 In accordance with 10 CFR 50.71 (e) and 10 CFR 50.4(b)(6), enclosed is Revision 28 of the Updated Final Safety Analysis Report (UFSAR) and Revision 17 of the Fire Protection Program (FPP) for the R.E. Ginna Nuclear Power Plant (Ginn a) (Enclosure 1). The enclosed UFSAR Revision 28 and FPP Revision 14 are being provided to the NRC in electronic format on CD-ROM and are being submitted in their entirety, constituting a total replacement copy. Additionally, Enclosure 2 contains supporting reference drawings for Revision 28 of the UFSAR in electronic format on CO-ROM.

10 CFR 50.71(e)(4) stipulates subsequent revisions must be filed annually or 6 months after each refueling outage, provided the interval between successive updates does not exceed 24 months, and the revisions must reflect all changes up to a maximum of 6 months prior to the date of filing. Revision 28 of the UFSAR incorporates applicable changes for the required updating period. The previous revision (i.e., Revision 27) of the Ginna UFSAR and Revision 12 of the FPP was submitted on November 14, 2017. provides a summary of the changes incorporated into UFSAR Revision 28 and FPP Revision 17. Attachment 2 includes file directory structure information identifying directory path, filename, and size of the individual files on the enclosed CD-ROMs.

In accordance with Technical Specification 5.5.13, Technical Specification Bases Control Program, Ginna's Technical Specifications Bases, Revision 90, is enclosed in Enclosure 3 and incorporates changes made since November 14, 2017. Change bars indicate revisions to information which have been incorporated in the Bases pursuant to commission requirements.

Submittal of Rev. 28 to the UFSAR, 10 CFR 54.37(b) Aging Management Review, and Bases Changes May 10, 2019 Page2 In addition, pursuant to the requirements of 10 CFR 54.37(b) and the guidance specified in Regulatory Issue Summary 2007-16, Revision 1, "Implementation of the Requirements of 10 CFR 54.37(b) for Holders of Renewed Licenses," the UFSAR update required by 10 CFR 50.71 (e) must include any Structures, Systems, or Components (SSCs) newly identified that would have been subject to an aging management review or evaluation of time-limited aging analyses in accordance with 10 CFR 54.21. The UFSAR update must describe how the licensee will manage the effects of aging in order to effectively maintain the intended function(s) of newly-identified SSCs. An evaluation was completed to determine whether any newly-identified SSCs existed in support of submitting UFSAR Revision 28 for Ginna. As a result of this evaluation, there were no newly identified SSCs for which aging management reviews or time-limited aging analyses would apply.

Should you have any questions concerning this letter, please contact Jessie Hodge at (610) 765-5532.

I declare under penalty of perjury that the foregoing is true and correct. Executed on the 101h day of May 2019.

Respectfully, James Barstow Director - Licensing & Regulatory Affairs Exelon Generation Company, LLC Attachments: (1) Summary of Changes, Revision 28 (2) Electronic File Directory, UFSAR Revision 28

Enclosures:

(1) CD-ROM, Ginna UFSAR, Revision 28 and Fire Protection Program, Revision 17 (2) CD-ROM, Ginna Reference Drawings (3) CD-ROM, Technical Specification Bases, Revision 90 cc: NRC Regional Administrator, Region I NRC Senior Resident Inspector, Ginna NRC Project Manager - NRA A. L. Peterson, NYSERDA