ML20339A054

From kanterella
Jump to navigation Jump to search
9 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance, Table of Contents
ML20339A054
Person / Time
Site: Ginna Constellation icon.png
Issue date: 11/20/2020
From:
Exelon Generation Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20339A309 List: ... further results
References
Download: ML20339A054 (2)


Text

GINNA/UFSAR 17 QUALITY ASSURANCE 1 17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUC- 2 TION 17.1.1 ORGANIZATION 2 17.1.2 QUALITY ASSURANCE PROGRAM 2 17.1.2.1 General 2 17.1.2.2 Rochester Gas and Electric Corporation 2 17.1.2.3 Westinghouse 3 17.1.2.3.1 General 3 17.1.2.3.2 Westinghouse Organization 4 17.1.2.3.3 Components Supplied By Westinghouse 4 17.1.2.3.4 Supplier Evaluation 5 17.1.2.3.5 Equipment Specifications 5 17.1.2.3.6 Purchase Order Review 6 17.1.2.3.7 Supplier Surveillance 6 17.1.2.3.8 Instrumentation and Control Equipment 7 17.1.2.3.9 Shipment of Components 8 17.1.2.3.10 Inspection and Installation of Equipment in the Field 9 17.1.2.3.11 Nonconforming Components or Material 10 17.1.2.3.12 Quality Control Records 10 17.1.2.4 Gilbert Associates, Inc 10 17.1.2.5 Bechtel Corporation 11 17.1.2.5.1 General 11 17.1.2.5.2 Material Certification 11 17.1.2.5.3 Backfill 12 17.1.2.5.4 Containment Liner 12 17.1.2.5.5 Piping 12 17.1.2.5.6 Stainless Steel Liners 12 17.1.2.5.7 Containment Tendons 12 17.1.2.5.8 Reinforcing Bar and Cadwelds 13 17.1.2.5.9 Machinery Setting and Alignment 13 Page 1 of 2 Revision 29 11/2020

GINNA/UFSAR 17 QUALITY ASSURANCE 1 17.1.2.5.10 Concrete 13 17.1.2.5.11 Documentation 14 17.1.2.5.12 Site Cleanliness 14 17.1.3 QUALITY CONTROL ORGANIZATION FOR REACTOR CON- 14 TAINMENT STRUCTURE DESIGN AND ERECTION 17.1.3.1 General 14 17.1.3.2 Rochester Gas and Electric Corporation 14 17.1.3.3 Westinghouse Electric Corporation 15 17.1.3.4 Gilbert Associates, Inc 15 17.1.3.5 Pittsburgh Testing Laboratory 16 17.1.3.6 Dames & Moore 16 17.1.3.7 Bechtel Corporation 16 17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE 18 FIGURES Figure 17.1-1 Quality Control Relationships During Construction Page 2 of 2 Revision 29 11/2020