GINNA/UFSAR 13 CONDUCT OF OPERATIONS 1 13.1 ORGANIZATIONAL STRUCTURE OF GINNA NUCLEAR GENERATING 2 STATION 13.1.1 ORIGINAL CONSTRUCTION ORGANIZATION 2 13.1.1.1 Design and Construction Activities (Project Phase) 2 13.1.1.2 Preoperational Activities 2 13.1.2 CORPORATE NUCLEAR OPERATIONS ORGANIZATION 2 13.1.2.1 President and Chief Executive Officer, CENG (CEO) 2 13.1.2.2 Senior Vice President - Nuclear Operations Chief Nuclear Officer CENG 3 (COO/ CNO) 13.1.2.3 DELETED 13.1.3 GINNA OPERATING ORGANIZATION 3 13.1.3.1 Site Vice President (SVP) 3 13.1.3.2 Plant Manager 3 13.1.3.3 Director, Site Engineering 3 13.1.3.3.1 Engineering Supervision 4 13.1.3.3.1.1 Department Engineer(s) 4 13.1.3.4 Director, Site Work Management 4 13.1.3.5 Director, Site Training 4 13.1.3.6 Manager, Site Security 5 13.1.3.7 Director, Site Operations 5 13.1.3.7.1 Shift Operations Superintendent 5 13.1.3.7.1.1 Shift Managers 5 13.1.3.7.1.2 Operating Shift Crews 5 13.1.3.7.2 Senior Manager Operations Support and Services 6 13.1.3.7.2.1 Fire Marshal 6 13.1.3.7.3 Reactor Engineer(s) 6 13.1.3.8 Manager, Site Radiation Protection 6 13.1.3.8.1 Radiation Protection Staff 6 13.1.3.9 Manager, Site Chemistry, Environment and Radwaste 7 13.1.3.9.1 Radiochemistry Staff 7 13.1.3.9.2 Secondary Chemistry 7 13.1.3.10 Director, Site Maintenance 8 13.1.4 QUALIFICATIONS OF PLANT PERSONNEL 8 13.1.4.1 Qualifications of Plant Staff 8 13.1.4.2 Qualifications of Incumbent Plant Personnel 8 13.2 TRAINING PROGRAM 10 Page 1 of 3 Revision 29 11/2020

GINNA/UFSAR 13.2.1 PLANT STAFF TRAINING PROGRAM 10 13.2.1.1 Objectives 10 13.2.1.2 Initial Training Programs (Historical) 10 13.2.1.2.1 Personnel Selection 10 13.2.1.2.2 Nuclear Theory 10 13.2.1.2.3 Plant Systems and Operations 11 13.2.1.2.4 Final Phase 11 13.2.1.3 Onsite Training Prior to Startup 12 13.2.2 REPLACEMENT AND RETRAINING OF PERSONNEL 13 13.2.2.1 Licensed Operator Replacement and Requalification Training 13 13.2.2.2 Replacement and Retraining of Unlicensed Personnel 13 13.2.2.3 General Employee Training 13 REFERENCES FOR SECTION 13.2 15 Table 13.2-1 INITIAL GINNA STATION PERSONNEL TRAINING 16 13.3 EMERGENCY PLANNING 17 13.4 REVIEW AND AUDIT 18 13.4.1 ONSITE REVIEW 18 13.4.2 INDEPENDENT REVIEW 18 13.4.3 AUDIT PROGRAM 18 13.4.3.1 Nuclear Safety Review Board 18 13.4.3.2 Nuclear Oversight (NOS) 18 13.5 PLANT PROCEDURES 19 13.5.1 ADMINISTRATIVE PROCEDURES 19 13.5.1.1 Conformance With Regulatory Guide 1.33 19 13.5.1.2 Preparation of Procedures 19 13.5.1.3 Description of Administrative Procedures 19 13.5.2 OPERATING AND MAINTENANCE PROCEDURES 19 13.5.2.1 Control Room Operating Procedures 19 13.5.2.2 Site Contingency Procedures 20 13.5.2.2.1 General 20 13.5.2.2.2 Adverse Weather Conditions 20 13.5.2.2.2.1 High Winds 20 13.5.2.2.2.2 Tornadoes 20 13.5.2.2.2.3 Ice Storms 20 13.5.2.2.3 High Water or Flood Emergency Plan 21 13.5.2.2.4 Earthquake Emergency Plan 21 13.5.2.2.5 Fire Emergency Plan 21 13.5.2.3 Other Procedures 22 REFERENCES FOR SECTION 13.5 24 Page 2 of 3 Revision 29 11/2020

GINNA/UFSAR 13.6 INDUSTRIAL SECURITY 25 FIGURES Figure 13.1-1 Site Vice President Figure 13.1-2 Plant Manager Figure 13.1-3 Site Engineering Figure 13.1-4 Site Work Management Figure 13.1-5 Site Training Figure 13.1-6 Site Operations Figure 13.1-7 Site Radiation Protection Figure 13.1-8 Site Chemistry, Environment and Radwaste Figure 13.1-9 Site Maintenance Page 3 of 3 Revision 29 11/2020