Category:Drawing
MONTHYEARML20339A0472020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 11, Figures ML20339A0412020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis, Figures ML20339A0432020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems, Figures ML20339A0352020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems, Figures ML20339A0372020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2A, Probable Maximum Flood and Low Water Conditions, Figures ML20339A0152020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 3, Appendix B, Figures ML20339A0522020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, Drift and Dispersion Characteristics of Lake Ontario Near Shore Waters, Figures ML20339A0162020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System, Figures ML20339A0342020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Figures ML20339A0632020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations, Figures ML19150A4392019-05-10010 May 2019 Revision 28 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, Figures ML19150A4762019-05-10010 May 2019 Revision 28 to Updated Final Safety Analysis Report, Chapter 08, Figures ML19150A4662019-05-10010 May 2019 Revision 28 to Updated Final Safety Analysis Report, Chapter 5, Figures ML19150A4542019-05-10010 May 2019 Revision 28 to Updated Final Safety Analysis Report, Chapter 3, Appendix B, Figures - Design of Large Opening Reinforcements for Containment Vessel ML19150A4422019-05-10010 May 2019 Revision 28 to Updated Final Safety Analysis Report, Chapter 2, Figures ML19150A4412019-05-10010 May 2019 Revision 28 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2C, Figures ML19150A4372019-05-10010 May 2019 Revision 28 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2A, Figures ML19150A4932019-05-10010 May 2019 Revision 28 to Updated Final Safety Analysis Report, Chapter 13, Figures ML19150A4992019-05-10010 May 2019 Revision 28 to Updated Final Safety Analysis Report, Chapter 15, Figures ML18186A2052018-07-0505 July 2018 R. E. Ginna - Drawing 0521-066, Reactor Containment Vessel Steam Gen. Coolant Pump & Pressurizer Bracket & Support-Locations & Orientation. ML18143B0222018-05-23023 May 2018 R. E. Ginna - Plate G-I, Seismic Refraction Profile I ML18143B1932018-05-23023 May 2018 R. E. Ginna - Plate 5.2-7, Surficial Geologic Map Showing Areas of Active Erosion. ML18143B1912018-05-23023 May 2018 R. E. Ginna - Chart 2, Brookwood Site Environs, Numbers in Squares Refer to Water Well Locations ML18143B1902018-05-23023 May 2018 R. E. Ginna - Chart 4, Layout and Topography ML18143B1872018-05-23023 May 2018 R. E. Ginna - Chart 11, Genesee River Turbidity ML18143B1832018-05-23023 May 2018 R. E. Ginna - Sketch of the East Side of the Pit Excavation, Showing Stratigraphy of Surficial Deposits, Till Stacking, Bedrock Faults, and Glacial Shears ML18143B0372018-05-23023 May 2018 R. E. Ginna - Plate D-1A, Cross Section Showing Contact Surface Between Grey Clay and Red Till in Postulated Vicinity of Intersection of Faulting with Shoreline. ML18143B1242018-03-14014 March 2018 R. E. Ginna - Drawing E, Correlation and Geologic Interpretation from West to East in Central Portion of the Site. ML18143B1222018-03-14014 March 2018 R. E. Ginna - Plate A-78, Correlation and Geologic Interpretation from North to South in the Central Portion of the Site. ML18143B1302018-03-14014 March 2018 R. E. Ginna - Plate 85, North-South Profile Showing Fresh Bedrock Surface in the Fault Area Between Borings 113 and 210. ML18025A9852018-01-23023 January 2018 Attachment 3 - Ginna Flooding Focused Evaluation Audit Documentation ML18025A9872018-01-23023 January 2018 Attachment 1 - Ginna Flooding Focused Evaluation Audit Documentation ML16180A1362016-05-0505 May 2016 Revision 26 to the Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Appendix 2A, Probable Maximum Flood and Low Water Conditions ML16180A1312016-05-0505 May 2016 Revision 26 to the Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant, Figure 1.2-1 ML16180A1482016-05-0505 May 2016 Revision 26 to the Updated Final Safety Analysis Report, Chapter 03, Design of Structures, Components, Equipment, and Systems, Figures 3.7-1 Through 3.11-1 ML16180A1392016-05-0505 May 2016 Revision 26 to the Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Figures 2.1-1 Through 2.5-3 ML0515304512004-06-0202 June 2004 Drawing 1 of 4, Ginna Site Boundary Survey, Rev. 1 ML0515304532004-06-0202 June 2004 Drawing 2 of 4, Building Details, Rev 1 ML0515304542004-06-0202 June 2004 Drawing 3 of 4, Site Detail, Rev. 1 ML0515304572004-06-0202 June 2004 Drawing 4 of 4, Station 13A Site Survey Map, Rev. 2 ML0412110062004-02-16016 February 2004 Drawing 33013-3102, Rev. 0, Control Room East Wall Penetrations for Creats Ducts. Sheet 1 ML0412110042004-02-11011 February 2004 Drawing 33013-3100, Rev. 0, Relay Room Annex Roof Penetrations and Creats Ducts. ML0405502742004-02-11011 February 2004 Drawing No. 33013-3000, Revision 2, Control Room HVAC Control Room Emergency Air Treatment System (Creats) and Emergency Cooling System, Modification P & Id. ML0222105382002-03-15015 March 2002 Drawing 33013-1275, Rev 4, Waste Disposal -- Gas Hydrogen Recombiner (Wd) P & Id Sheet 2 of 2-LR ML0222101972002-03-11011 March 2002 Drawing 33013-1248-LR, Rev 27, Auixilary Cooling Spent Fuel Pool Cooling (AC) P & Id ML0222105282002-03-0101 March 2002 Drawing 33013-1272, Rev 11, Waste Disposal -- Liquid Rc Drain Tank (Wd) P & Id Sheet 2 of 2 ML0222105332002-03-0101 March 2002 Drawing 33013-1274-LR, Rev 17, Waste Disposal -- Gas Hydrogen & Nitrogen (Wd) P & Id ML0222102962002-02-27027 February 2002 Drawing 33013-1258-LR, Rev. 23, Reactor Coolant Pressurizer (Rc) P & Id ML0222402702002-02-23023 February 2002 Drawing 33013-1885, Rev 30, Circulating Water P & Id Sheet 2 of 2-LR ML0222103092002-02-22022 February 2002 Drawing 33013-1260-LR, Rev 21, Reactor Coolant (Rc) P & Id 2020-11-20
[Table view] Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML20339A0532020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3E Thru 3F ML20339A0232020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 2, Appendices ML20339A0582020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Table of Contents ML20339A0652020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features, Sections 6.1 Through 6.6 ML20339A0552020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems, Section 3.8, Design of Seismic Category I Structures ML20339A0472020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 11, Figures ML20339A1782020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program, Sections 14.1 Thru 14.6 ML20339A0542020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance, Table of Contents ML20339A0992020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Fire Protection Program (FPP) Revision 18, Technical Specification Bases Changes, Revision 101, Summary of 50.59 Evaluations and 72.48 Evaluations ML20339A0422020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance, Sections 17.1 Thru 17.2 ML20339A0412020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis, Figures ML20339A0452020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management, Sections 11.1 Through 11.5 ML20339A0372020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2A, Probable Maximum Flood and Low Water Conditions, Figures ML20339A0292020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 2, Appendix C Report, Figures ML20339A0162020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System, Figures ML20339A0382020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations, Table of Contents ML20339A0512020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3C, Containment Shell Stress Calculation Results ML20339A0692020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 4, Reactor, Table of Contents ML20339A0282020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features, Table of Contents ML20339A0272020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls, Sections 7.1 Through 7.7 ML20339A2972020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses, Table of Contents ML20339A0682020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems, Table of Contents ML20339A0312020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3D, Containment Tendon Anchorage Hardware Capacity Tests ML20339A0322020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection, Figure 12.5-1 ML20339A0252020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems, Sections 9.1 Through 9.5 ML20339A0212020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.1-1 Electrical Distribution System & Figure 8.2-1 Transmission Connections ML20339A0202020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems, Sections 3.1 Through 3.7 ML20339A0142020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 17, Figure 17.1-1, Quality Control Relationships During Construction ML20339A0502020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations, Sections 13.1 Through 13.6 ML20339A0332020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Sections 2.1 Through 2.5 ML20339A0462020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems, Table of Contents ML20339A0572020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems, Sections 3.9 Through 3.11 ML20339A0602020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 18, Updated Final Safety Analysis Report Supplement for License Renewal, Sections 18.1 Through 18.4 ML20339A0342020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Figures ML20339A0562020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management, Table of Contents ML20339A0392020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 8, Electric Power, Table of Contents ML20339A0402020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System, Sections 10.1 Thru 10.7 ML20339A1012020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses ML20339A0262020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 18, Table of Contents ML20339A0352020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems, Figures ML20339A0132020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems, Section 5.1 Thru 5.8 ML20339A0302020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection, Table of Contents ML20339A0642020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System, Table of Contents ML20339A0612020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems, Table of Contents ML20339A0632020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations, Figures ML20339A0522020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, Drift and Dispersion Characteristics of Lake Ontario Near Shore Waters, Figures ML20339A2402020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program, Table of Contents ML20339A0432020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems, Figures ML20339A0442020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 1, Table of Content ML20339A0622020-11-20020 November 2020 9 to Updated Final Safety Analysis Report, Chapter 8, Electric Power, Sections 8.1 Through 8.3 2020-11-20
[Table view] |