ML19150A482

From kanterella
Jump to navigation Jump to search
8 to Updated Final Safety Analysis Report, Chapter 10, Figures
ML19150A482
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/10/2019
From:
Exelon Generation Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML19150A453 List: ... further results
References
Download: ML19150A482 (5)


Text

Figure 10.2-1 Turbine Control and Protection System GINNA/UFSAR CHAPTER 10 STEAM AND POWER CONVERSION SYSTEM Revision 28 5/2019

Figure 10.6-1 Sheet 1 - Figure DELETED GINNA/UFSAR CHAPTER 10 STEAM AND POWER CONVERSION SYSTEM Revision 28 5/2019

Figure 10.6-1 Sheet 2 - Figure DELETED GINNA/UFSAR CHAPTER 10 STEAM AND POWER CONVERSION SYSTEM Revision 28 5/2019

Figure 10.6-2 Screen House Area Plot Plan GINNA/UFSAR CHAPTER 10 STEAM AND POWER CONVERSION SYSTEM Revision 28 5/2019

Figure 10.6-3 Circulating Water Intake Cross Section GINNA/UFSAR CHAPTER 10 STEAM AND POWER CONVERSION SYSTEM Revision 28 5/2019