NRC 2019-0002, Refueling Outage U2R36 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations

From kanterella
(Redirected from ML19024A095)
Jump to navigation Jump to search
Refueling Outage U2R36 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations
ML19024A095
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 01/24/2019
From: Schultz E
Point Beach
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC 2019-0002
Download: ML19024A095 (5)


Text

NEXTera ENERGY.

POINT BEACH January 24, 2019 NRC 2019-0002 10 CFR 50.55a U.S . Nuclear Regulatory Commission ATTN: Document Control Desk Washington , DC 20555 Point Beach Nuclear Plant, Unit 2 Docket 50-301 Renewed License No. DPR-27 Refueling Outage U2R36 Owner's Activity Report for Class 1. 2. 3 and MC lSI Examinations NextEra Energy Point Beach, LLC (NextEra) is submitting inservice inspection summary reports for inspections conducted prior to and during the Point Beach Nuclear Plant (PBNP) refueling outage U2R36 that concluded on October 26, 2018. The enclosed report is submitted pursuant to the requirements of Subarticle IWA-6240 of Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code and ASME Code Case N-532-5.

The Enclosure to this letter contains the summary report, Form OAR-1, "Owner's Activity Report" for inservice inspections for Class 1, 2, 3 and MC components. The report is for the third outage of the second period of the fifth ten-year interval for Class 1, 2, 3 systems and the second outage of the first period of the third ten-year interval for MC components at PBNP Unit 2.

Sincerely, NextEra Energy Point Beach, LLC Eric Schultz Licensing Manager Enclosure

  • cc: . Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW Kim Schmitt, DSPS Boilers, State of Wisconsin NextEra Energy Point Beach, LLC 6610 Nuclear Road, Two Rivers, WI 54241

ENCLOSURE NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNIT 2 OAR-1, OWNER'S ACTIVITY REPORT FOR INSERVICE INSPECTION, FOR CLASS 1, 2, 3 AND MC COMPONENTS 3 pages follow

Attachment 1 EC292351 Engineering Evaluation: 2018-0027 I

I Page 1 of 3 r FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number: ISI-PB-U2R36-2018 Plant: NextEra Energy Point Beach Nuclear Plant I

6610 Nuclear Road Twin Rivers. Wisconsin 54241 Commercial Service Date: October 1, 1972 Refueling Outage No.: U2R36 Current Inspection Interval: lSI- Fifth Interval and IWE- Third Interval Current Inspection Period: lSI- Second Period and IWE- First Period Edition and Addenda of Section XI applicable to the inspection plans:

lSI Fifth Interval- 2007 Edition through 2008 Addenda and IWE Third Interval- 2007 Edition through 2008 Addenda Date and Revision of inspection plans: lSI- November 15, 2017. Revision 15 and IWE- March 13,2017 Revision 1 Edition and Addenda of Section XI applicable to repairs and replacements, if different than the inspection plan: Same Code Cases used for inspection and evaluation: N-532-5, N-706-1, N-722-1, & N-770-2, N729-4.

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations su in the completion of U2R36 conform to the requirements of Section XI.

Signed -

Owner or Owner's Designee, Title Date /Z/tt ~ F CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Wisconsin and employed by Hartford Steam Boiler Inspection and Insurance Company have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

"lll ) ...,

aM_~~~U!M!.tt.==-~=::::u...----- Commissions

---,.....rc; Wl 929625, NB 12692 A,N,I ctftnepeetor'SSJgr1~ture National Board, State, Province, and Endorsements Date l J""tf---1(

1 of 3

Attachment 1 EC292351 Engineering Evaluation: 2018-0027 Page 2 of3 FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE U2R36 -lSI- 5th Interval, 2ND Period U2R36 - IWE 3rd Interval, 1st Period Examination Category and Item Description Evaluation Description Item Number None None None 2 of 3

Attachment 1 EC292351 Engineering Evaluation: 2018-0027 Page 3 of3 FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE U2R36- lSI -5th Interval, 2ND Period U2R36 - IWE 3rd Interval, 1st Period Repair/

Date Replacement Code Class Item Description Description of Work Completed Plan Number None None None None None 3 of 3