IR 05000397/2018002

From kanterella
(Redirected from ML18206A167)
Jump to navigation Jump to search
NRC Integrated Inspection Report 05000397/2018002 and Independent Spent Fuel Storage Installation Inspection Report 07200035/2018001
ML18206A167
Person / Time
Site: Columbia  Energy Northwest icon.png
Issue date: 07/24/2018
From: Mark Haire
NRC/RGN-IV/DRP/RPB-A
To: Sawatzke B
Energy Northwest
Haire M
References
IR 2018001, IR 2018002
Download: ML18206A167 (30)


Text

uly 24, 2018

SUBJECT:

COLUMBIA GENERATING STATION - NRC INTEGRATED INSPECTION REPORT 05000397/2018002 AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION INSPECTION REPORT 07200035/2018001

Dear Mr. Sawatzke:

On June 30, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an integrated inspection at your Columbia Generating Station. On July 12, 2018, the NRC inspectors discussed the results of this inspection with Mr. G. Hettel, and other members of your staff. The results of this inspection are documented in the enclosed report.

NRC inspectors documented one finding of very low safety significance (Green) in this report.

This finding involved a violation of NRC requirements. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.

If you contest the violation or significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; and the NRC Resident Inspector at the Columbia Generating Station.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; and the NRC Resident Inspector at the Columbia Generating Station. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Mark S. Haire, Chief Project Branch A Division of Reactor Projects Docket Nos. 50-397;72-035 License No. NPF-21

Enclosure:

Inspection Report 05000397/2018002 and 07200035/2018001 w/Attachments 1. Documents Reviewed 2. O

Inspection Report

Docket Numbers: 05000397; 07200035 License Numbers: NPF-21 Report Numbers: 05000397/2018002; 07200035/2018001 Enterprise Identifier: I-2018-002-0020; 1-2018-001-0091 Licensee: Energy Northwest Facility: Columbia Generating Station and Independent Spent Fuel Storage Installation Location: Richland, Washington Inspection Dates: April 1, 2018 to June 30, 2018 Inspectors: G. Kolcum, Senior Resident Inspector L. Brandt, Resident Inspector L. Brookhart, Senior Inspector L. Carson II, Senior Health Physicist J. ODonnell, CHP, Health Physicist Approved By: M. Haire, Branch Chief Project Branch A Division of Reactor Projects Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Columbia Generating Station in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. Findings and violations being considered in the NRCs assessment are summarized in the table below.

List of Findings and Violations Failure to Maintain Configuration Control in the Diesel Generator 2 Diesel Cooling Water System Cornerstone Significance Cross-cutting Report Aspect Section Mitigating Green H.12 - Avoid 71111.15 Systems NCV 05000397/2018002-01 Complacency Closed The inspectors reviewed a self-revealed, Green, non-cited violation of Technical Specification 5.4.1.a for the licensees failure to perform maintenance in accordance with written procedures appropriate to the circumstances. Specifically, on April 9, 2018, the licensee inadvertently bumped and partially opened a diesel cooling water valve, DCW-V-8B2, while operating a nearby demineralized water valve, DW-V-14B2, as part of work activities under Work Request (WR) 29127677, and rendered diesel generator 2 inoperable and unavailable.

PLANT STATUS

The plant began the inspection period at 100 percent rated thermal power. On April 19, 2018, the reactor unit was down powered to 98 percent due to feedwater heater 2C level control failure. On April 20, 2018, the unit was down powered further to 85 percent for troubleshooting.

The unit returned to rated thermal power on April 21, 2018.

On April 27, 2018, the reactor unit was down powered to 85 percent for economic dispatch from Bonneville Power Administration. The unit returned to rated thermal power on April 30, 2018.

On May 18, 2018, the reactor unit automatically scrammed due to a load reject from a grid disturbance. The unit was restarted and synched to the grid on May 24, 2018. Reactor power was raised to 65 percent on May 25, 2018, and remained at 65 percent for economic dispatch from Bonneville Power Administration. The unit returned to rated thermal power on June 11, 2018.

On June 12, 2018, the unit was down powered to 98 percent due to trip of the 2C feedwater heater. On June 14, 2018, the unit was down powered to 85 percent to repair the 2C feedwater level controller. On June 15, 2018, the unit was down powered to 78 percent due to subsequent trips of the 3C and 4C feedwater heaters. After maintenance, the reactor returned to rated thermal power on June 15,

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515 Appendix D, Plant Status and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01Adverse Weather Protection Summer Readiness

The inspectors evaluated summer readiness of offsite and alternate alternating current power systems.

71111.04Equipment Alignment Partial Walkdown

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) diesel generator 1 jacket water system on April 9, 2018
(2) diesel generator 2 jacket water system on April 9, 2018
(3) diesel generator 3 jacket water system on April 9, 2018
(4) low pressure core spray system on June 1, 2018

71111.05AQFire Protection Annual/Quarterly Quarterly Inspection

The inspectors evaluated fire protection program implementation in the following selected areas:

(1) Fire Areas RC-14/1, RC-8/2, RC-5/1, and RC-6/2; Divisions 1 and 2 switchgear and battery rooms; on April 6, 2018
(2) Fire Areas RC-4/1, RC-7/2, RC-9/2, and RC-19/2; Divisions 1 and 2 electrical equipment and reactor protection system rooms, remote shutdown room, and vital island corridor; on April 6, 2018
(3) Fire Area TG1/2, reactor feed pump rooms, on April 18, 2018
(4) Fire Area RC-2/1, cable spreading room, on May 10, 2018

71111.06Flood Protection Measures Internal Flooding

The inspectors evaluated internal flooding mitigation protections in the reactor building 471 ft. level on June 22, 2018.

71111.11Licensed Operator Requalification Program and Licensed Operator Performance Operator Requalification

The inspectors observed and evaluated a licensed operator requalification evaluated scenario on April 16, 2018.

Operator Performance (1 Sample)

The inspectors observed and evaluated:

(1) down power to 85 percent due to failure of feedwater heater 2C, on April 20, 2018
(2) startup to power increase, on May 24, 2018

71111.12Maintenance Effectiveness Routine Maintenance Effectiveness

The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:

(1) HT-TE-SW71/2, high pressure core spray heat tracing replacement, on April 23, 2018
(2) E-RLY-86TM, main generator lockout relay, on May 22, 2018
(3) RPS-RLY-K10F for EOC-RPT, maintenance to disable end of cycle recirculation pump trip relay, on May 30, 2018

71111.13Maintenance Risk Assessments and Emergent Work Control

The inspectors evaluated the risk assessments for the following planned and emergent work activities:

(1) yellow risk for heavy lifts at circulating water pump house on April 26, 2018
(2) yellow risk for standby gas treatment train A maintenance, week of May 14, 2018

71111.15Operability Determinations and Functionality Assessments

The inspectors evaluated the following operability determinations and functionality assessments:

(1) diesel generator 1 fuel oil pump 1B on April 1, 2018
(2) diesel generator 2 unplanned inoperability and unavailability for drain of jacket water on April 9, 2018
(3) standby service water 'B' pump house door gearbox on April 17, 2018
(4) high pressure core spray power panel 4A voltage near minimum 120VAC on April 17, 2018
(5) residual heat removal pump 1B relief valve on May 4, 2018
(6) main steam relief valve 1B dual indication on May 18, 2018
(7) standby service water A spray ring header on May 24, 2018
(8) condensate pump 2C elevated water in oil, on May 24, 2018

71111.18Plant Modifications

The inspectors evaluated the following temporary or permanent modifications:

(1) EC 17224, main transformer 1, 2, 3 alarm and trip function, on May 22, 2018
(2) EC 17227, main transformer horizontal links bolting, on May 22, 2018

71111.19Post Maintenance Testing

The inspectors evaluated the following post maintenance tests:

(1) diesel generator 1 fuel oil pump 1B, on April 1, 2018
(2) residual heat removal loop B operability test on April 1, 2018
(3) reactor building ventilation system operation on April 3, 2018
(4) high pressure core spray reactor coolant system interface valve leakage pressure monitor on April 5, 2018
(5) wetwell exhaust isolation valve 3A maintenance for post-accident monitoring position indication on April 13, 2018
(6) power panel 4A transformer replacement on May 4, 2018
(7) main transformer 1, 2, 3 relay testing on May 22, 2018
(8) main transformer 1 Buchholz relay testing on May 22, 2018

71111.20Refueling and Other Outage Activities

The inspectors evaluated forced outage activities following the load reject grid disturbance from May 18, 2018 to May 25, 2018.

71111.22Surveillance Testing The inspectors evaluated the following surveillance tests: Routine

(1) ISP-SEIS-M201, Seismic System Channel Check, Revision 6, on April 23, 2018
(2) OSP-ELEC-M703, HPCS Diesel Generator Monthly Operability Test, Revision 66, on April 25, 2018
(3) ISP-RPS-S901, RPS (Channel A1) and EOC Recirc Pump Trip - TGV Fast Closure RPS-PS-5A - CFT/CC, Revision 0, on May 7, 2018; and ISP RPS-S902, RPS (Channel A2) and EOC Recirc Pump Trip - TGV Fast Closure RPS-PS-5C - CFT/CC, Revision 0, on May 9, 2018

In-service (1 Sample)

(1) OSP-HPCS/IST-Q701, HPCS System Operability Test, Revision 53, on April 23, 2018

Reactor Coolant System Leak Detection (1 Sample)

(1) daily reactor coolant system leak checks, shift and daily instrument checks (Modes 1, 2, 3) on June 25, 2018

71114.06Drill Evaluation Drill/Training Evolution

The inspectors evaluated the emergency preparedness training drill on May 15,

RADIATION SAFETY

71124.02Occupational As Low As Reasonably Achievable (ALARA) Planning and Controls Radiological Work Planning

The inspectors evaluated the licensees radiological work planning by reviewing the following activities:

(1) RWP 30004209, EDR Tank-5 Desludge
(2) RWP 30004210, EDR Tank-5 Desludge High Risk
(3) RWP 30003882, Main Steam Relief Valves
(4) RWP 30003098, Wetwell Cleanup and Inspection
(5) RWP 30003873, Drywell Shielding Verification of Dose Estimates and Exposure Tracking Systems (1 Sample)

The inspectors evaluated dose estimates and exposure tracking.

71124.04Occupational Dose Assessment Source Term Characterization

The inspectors evaluated the licensees source term characterization.

External Dosimetry (1 Sample)

The inspectors evaluated the licensees external dosimetry program.

Internal Dosimetry (1 Sample)

The inspectors evaluated the licensees internal dosimetry program.

Special Dosimetric Situations (1 Sample)

The inspectors evaluated the licensees performance for special dosimetry situations.

OTHER ACTIVITIES - BASELINE

71151Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

(1) MS06: Emergency AC Power Systems (07/01/2017-06/30/2018)
(2) MS07: High Pressure Injection Systems (07/01/2017-06/30/2018)
(3) MS08: Heat Removal Systems (07/01/2017-06/30/2018)
(4) MS09: Residual Heat Removal Systems (07/01/2017-06/30/2018)
(5) MS10: Cooling Water Support Systems (07/01/2017-06/30/2018)

71152Problem Identification and Resolution Semiannual Trend Review

The inspectors reviewed the licensees corrective action program for trends that might be indicative of a more significant safety issue. The inspectors reviewed a negative trend in human performance and documented one observation.

Annual Follow-up of Selected Issues (1 Sample)

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1) Independent Spent Fuel Storage Installation cask stuck in reactor building, on April 7, 2018

71153Follow-up of Events and Notices of Enforcement Discretion Events

The inspectors evaluated the plant scram from a load reject due to a grid disturbance and the licensees response on May 18,

OTHER ACTIVITIES

- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL 60855.1 - Operation of an Independent Spent Fuel Storage Installation at Operating Plants The inspectors evaluated the licensees operation of the Independent Spent Fuel Storage Installation (ISFSI) from April 2 through April 5, 2018, on-site at Columbia Generating Station (CGS).

The CGS ISFSI was licensed as a general Part 72 license and utilized the Holtec HI-STORM 100 System, approved under Certificate of Compliance 1014, License Amendment 9, Revision 1, and Final Safety Analysis Report (FSAR), Revision 13. The CGS had been loading HI-STORM 100S Version 243 overpacks containing the Multi-Purpose Canister, MPC-68, and more recently the MPC-68M. CGSs ISFSI contained a total of 39 HI-STORM overpacks at the time of the routine inspection. CGS was in the middle of its 2018 loading campaign. Inspectors were onsite to observe loading activities associated with cask Number 40. The CGS planned to complete an additional 5 canisters by the end of the campaign, increasing the total number of casks to 45 at the ISFSI.

The ISFSI activities specifically reviewed during the on-site inspection and the subsequent in-office review included:

(1) Evaluated and observed cask transportation operations.
(2) Reviewed the licensee's loading, processing, and heavy load procedures associated with their current dry fuel storage campaign.
(3) Reviewed the licensees corrective action program implementation for ISFSI operations since the last routine ISFSI inspection, which was completed in July 2016.
(4) Reviewed quality assurance (QA) program implementation, including recent QA audits, surveillances, receipt inspection, and quality control activities.
(5) Reviewed documentation related to Technical Specification (TS) required operational surveillance activities and FSAR required annual maintenance activities.
(6) Reviewed the licensees radiological monitoring data for the calendar years 2016 and 2017.
(7) Reviewed spent fuel documentation for the canisters loaded since the last routine ISFSI inspection (Canisters 37-40) to confirm the fuel met all TS requirements for storage at the ISFSI.
(8) Reviewed annual maintenance activities for heavy lifting components which included special lifting devices, the vertical cask transporter, and the sites single-failure proof cask handling crane.
(9) Reviewed all 72.48 safety evaluations/screenings for changes made to the licensees ISFSI operations in accordance with Inspection Procedure 60857 since the last routine ISFSI inspection.
(10) Reviewed all changes made to the licensees 72.212 Report from Revision 9 to Revision 10 under the licensees 72.48 program in accordance with Inspection Procedure 60857.

The inspectors did not identify any issues of concerns requiring documentation.

INSPECTION RESULTS

Failure to Maintain Configuration Control in the Diesel Generator 2 Diesel Cooling Water System Cornerstone Significance Cross-cutting Report Aspect Section Mitigating Green H.12 - Avoid 71111.15 Systems NCV 05000397/2018002-01 Complacency Closed The inspectors reviewed a self-revealed, Green, non-cited violation of Technical Specification 5.4.1.a for the licensees failure to perform maintenance in accordance with written procedures appropriate to the circumstances. Specifically, on April 9, 2018, the licensee inadvertently bumped and partially opened a diesel cooling water valve, DCW-V-8B2, while operating a nearby demineralized water valve, DW-V-14B2, as part of work activities under Work Request (WR) 29127677, and rendered diesel generator 2 inoperable and unavailable.

Description:

On April 9, 2018, while operating demineralized water valve DW-V-14B2, maintenance personnel inadvertently bumped and partially opened diesel cooling water valve DCW-V-8B2. The maintenance personnel completed their work activities, cleaned up the work area, and returned to the shop, unaware that their actions resulted in the partial opening of DCW-V-8B2. Meanwhile, the accidental opening of this diesel cooling water valve caused the diesel generator 2 diesel cooling water expansion tank to drain into a nearby floor drain.

Approximately 40 minutes later, the main control room received a diesel generator 2 local panel trouble alarm. Operations personnel responded to the alarm, found the diesel cooling water valve out of position (partially open), and closed the valve. During this event, the tank level reached -4.5 inches, which is outside the normal standby lineup band of +2 to +6 inches.

This rendered diesel generator 2 inoperable and caused an unplanned entry into Technical Specification 3.8.1 for one required diesel generator inoperable. The licensee restored the required water level within 40 minutes of declaring the diesel inoperable. The licensee then verified the diesel was in the proper standby lineup and restored the diesel to operable status approximately 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> later. Subsequently, the licensee initiated an investigation of the event that stated the diesel generator was rendered unavailable because it would not have been able to complete its 24-hour mission time with the open diesel cooling water valve. The diesel generator would have started, loaded, and overheated in approximately 10 minutes without a credited cooling water makeup source. Total unavailability time accrued was 86 minutes.

Procedure 1.3.81, Maintaining Plant Component Status Control, Revision 12, ensures plant component status control is maintained. Step 5.5.2 states that personnel performing work in the plant that are given permission to manipulate the plant are required to accept responsibility for, and are accountable for, maintaining plant component status control. Step 6.6.2.d states, in part, that electrical, mechanical, and instrumentation and control maintenance personnel manipulate components only as specified in approved procedures and work packages that have been authorized by the shift manager or designee.

The inspectors noted that step 6.1 of Procedure MI-1.8, Conduct of Maintenance, Revision 70, directs all maintenance personnel to use and adhere to the station error prevention tools as described in Procedure STANDARD-01. Procedure STANDARD-01, Worker Error Prevention Tools, Revision 10, step 3.3 states, in part, that station personnel are responsible for performing work activities using the error prevention tools in accordance with this standard. Section 4.0 details the fundamental human performance tools workers apply during work activities to help them maintain positive control, regardless of their perception of the risk. For example, Section 4.2 describes the Take 2 error prevention tool.

Step 4.2.1 states, in part, that Take 2 is a jobsite review done when first arriving at the jobsite.

The worker develops an accurate understanding of the work environment by taking time to become acquainted with the immediate work area. Step 4.2.4.a instructs the worker to review the Take 2 lanyard or job aid. The Take 2 job aid lists several questions to engage the worker. Question 7 asks, Is there a component misposition or bump hazard in the work area (2 ft zone)? If yes, engage Operations. The licensees event investigation indicated that the maintenance personnel conducted a Take 2 upon arriving at the jobsite but did not refer to their Take 2 job aid.

Notwithstanding the plant procedure for preventing inadvertent operation of equipment, the inspectors noted that WR 29127677 did not contain the necessary controls to ensure that safety-related equipment was not adversely affected during maintenance.

Corrective Actions: The licensees corrective actions included immediately closing the diesel cooling water valve, replenishing the diesel cooling water level, restoring diesel generator 2 to operable status, and completing an event investigation.

Corrective Action Reference(s): Action Request 378835

Performance Assessment:

Performance Deficiency: The failure to perform maintenance in accordance with documented instructions appropriate to the circumstances was a performance deficiency.

Screening: The performance deficiency was more than minor, and therefore a finding, because it was associated with the configuration control attribute of the Mitigating Systems Cornerstone and adversely affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences (i.e., core damage). Specifically, on April 9, 2018, the licensee inadvertently bumped and partially opened a diesel cooling water valve, DCW-V-8B2, while operating a nearby demineralized water valve, DW-V-14B2, as part of work activities under WR 29127677, and rendered diesel generator 2 inoperable and unavailable.

Significance: The inspectors assessed the significance of the finding using Inspection Manual Chapter 0609, Attachment 04, Initial Characterization of Findings, and Appendix A, The Significance Determination Process (SDP) for Findings At-Power, Exhibit 2, Mitigating Systems Screening Questions, dated June 19, 2012. The inspectors determined the finding was of very low safety significance (Green) because all of the screening questions were answered in the negative.

Cross-cutting Aspect: This finding has a cross-cutting aspect in the area of human performance, avoid complacency, in that the licensee failed to implement appropriate error reduction tools and recognize and plan for the possibility of mistakes, latent issues, and inherent risk, even while expecting successful outcomes. Specifically, licensee staff failed to implement the guidance found in the Take 2 card which demonstrated complacency in the perceived lack of intrusiveness of the work [H.12].

Enforcement:

Violation: Technical Specification 5.4.1.a requires, in part, that written procedures shall be established, implemented, and maintained covering the applicable procedures recommended in Appendix A of Regulatory Guide 1.33, Revision 2. Section 9.a of Appendix A of Regulatory Guide 1.33, Revision 2, requires, in part, that maintenance that can affect the performance of safety-related equipment should be performed in accordance with documented instructions appropriate to the circumstances. The licensee established Procedure 1.3.81, Maintaining Plant Component Status Control, Revision 12, to meet the Regulatory Guide 1.33 requirement. Step 6.6.2.d states, in part, that electrical, mechanical, and instrumentation and control maintenance personnel manipulate components only as specified in approved procedures and work packages that have been authorized by the shift manager or designee.

Contrary to the above, on April 9, 2018, the licensee did not manipulate components only as specified in approved procedures and work packages that had been authorized by the shift manager or designee. Specifically, the licensee inadvertently bumped and partially opened diesel cooling water valve DCW-V-8B2 as part of work activities under WR 29127677, and rendered diesel generator 2 inoperable and unavailable.

Disposition: This violation is being treated as a non-cited violation, consistent with Section 2.3.2.a of the NRC Enforcement Policy.

Observation

71152 - Semiannual Trend Review

The inspectors performed an in-depth review of the licensees evaluation and corrective actions related to human performance issues. Since the end of refueling outage RF23 in June 2017, the licensee has initiated multiple condition reports documenting human performance errors. The licensee had also identified an adverse trend as documented in Action Requests 377654, 377416, and 378892.

This review focused on condition reports that documented plant component status control errors and failures to follow procedures. While many of the human performance issues were of minor significance, several resulted in NRC documented findings:

  • NCV 05000397/2018002-01, Failure to Maintain Configuration Control in the Diesel Generator 2 Diesel Cooling Water System. (Section 71111.15 of this report)

The inspectors noted that the licensee appropriately considered extent of condition and cause when scheduling corrective action assignments. These actions included a site-wide initiative to identify and eliminate any potential plant component status control hazards and a supervisor observation blitz that focused on human performance behaviors such as pre-job briefs, use of the Take 2 card, procedure use and adherence, and supervisory oversight. The inspectors assessed the licensees problem identification threshold, cause analyses, and compensatory actions. The inspectors verified that the licensee appropriately prioritized the planned corrective actions and that these actions were adequate to correct the condition.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

The inspectors confirmed that proprietary information was controlled to protect from public disclosure.

On April 5, 2018, the inspectors presented the results from the routine ISFSI inspection to Mr. G. Hettel, Vice President of Operations (title at the time of the ISFSI inspection, but subsequently assumed the title of Senior Vice President and Chief Nuclear Officer), and other members of the licensee staff.

On May 24, 2018, the inspectors presented the baseline radiation protection inspection results to Mr. G. Hettel, Senior Vice President and Chief Nuclear Officer, and other members of the licensee staff.

On July 12, 2018, the inspectors presented the quarterly resident inspector inspection results to Mr. G. Hettel, Senior Vice President and Chief Nuclear Officer, and other members of the licensee staff.

DOCUMENTS REVIEWED

71111.01 - Adverse Weather Protection

Action Requests

379022 381176

Procedures

(Number) Title Revision

13.1.1 Classifying the Emergency 049

13.1.1A Classifying the Emergency - Technical Bases 033

ABN-ELEC-GRID Degraded Off Site Power Grid 010

SOP-HOTWEATHER-OPS Hot Weather Operations 006

SOP-WARMWEATHER- Warm Weather Operations 015

OPS

71111.04 - Equipment Alignment

Procedures

(Number) Title Revision

5.5.1 Overriding ECCS Valve Logic to Allow Throttling 006

RPV Injection

OSP-LPCS-M102 LPCS Valve Lineup 002

SOP-LPCS-LU LPCS Valve and Breaker Lineup 003

SOP-LPCS-STBY Placing LPCS in Standby Status 002

SOP-DG-DCW Emergency Diesel Generator Jacket Water Cooling 014

SOP-DG1-LU Emergency Diesel Generator (Div 1) Valve and 006

Power Supply Lineup

SOP-DG2-LU Emergency Diesel Generator (Div 2) Valve and 006

Power Supply Lineup

SOP-DG3-LU High Pressure Core Spray Diesel Generator Valve 007

and Power Supply Lineup

Miscellaneous Documents

(Number) Title Revision

Final Safety Analysis Report 064

71111.05AQ - Fire Protection Annual/Quarterly

Action Requests

378829 379167 379972

Procedures

(Number) Title Revision

1.3.10C Control of Transient Combustibles 020

PFP-RW-467 Radwaste 467 005

PFP-RW-484-487 Radwaste 484-487 005

1.3.10A Control of Ignition Sources 017

FPP-1.6 Combustible Loading Calculation Control 002

FPP-2.2.12 Annual Fire Door Operability Test 005

FPP-2.2.7 Fire Protection Water System Inspections 006

PFP-TG-441-456 Turbine Generator 441-456 008

Miscellaneous Documents

(Number) Title Revision

FSAR Fire Hazards Analysis

BIP 17-0613 Barrier Impairment Permit

BIP 17-0614 Barrier Impairment Permit

BIP 17-0615 Barrier Impairment Permit

BIP 17-0616 Barrier Impairment Permit

BIP 17-0643 Barrier Impairment Permit

BIP 17-0662 Barrier Impairment Permit

BIP 18-0096 Barrier Impairment Permit

BIP 18-0097 Barrier Impairment Permit

BIP 18-0111 Barrier Impairment Permit

BIP 18-0017 Barrier Impairment Permit

BIP 18-0018 Barrier Impairment Permit

BIP 18-0019 Barrier Impairment Permit

BIP 18-0029 Barrier Impairment Permit

BIP 18-0031 Barrier Impairment Permit

BIP 18-0037 Barrier Impairment Permit

BIP 18-0041 Barrier Impairment Permit

BIP 18-0050 Barrier Impairment Permit

CALC FP-02-85-03 Combustible Loading Calculation 010

71111.06 - Flood Protection Measures

Action Requests

378764

Procedures

(Number) Title Revision

ABN-FLOODING Flooding 020

ME-02-02-02 Calculation for Reactor Building Flooding Analysis 004

PFP-RB-572 Reactor 572 004

71111.11 - Licensed Operator Requalification Program and Licensed Operator Performance

Action Requests

379240

Procedures

(Number) Title Revision

13.1.1 Classifying the Emergency 048

OI-09 Operations Standards and Expectations 064

1.3.1 Operating Policy, Programs, and Practices 126

5.1.1 RPV Control 021

5.2.1 Primary Containment Control 027

5.3.1 Secondary Containment Control 020

Miscellaneous Documents

(Number) Title Revision

LR002398 Cycle 18-2 Evaluated Scenario 001

Crew F Evaluated Scenario Cycle 18-2 000

4.0 Critique Summary

71111.12 - Maintenance Effectiveness

Action Requests

380427

Work Orders

2094222 02128788 29142758

Procedures

(Number) Title Revision

1.5.11 Maintenance Rule Program 015

OI-53 Offsite Power 014

SOP-RPS-OPS Reactor Protection System Operation 015

SOP-RPS-START Reactor Protection System Startup 007

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Work Orders

2085935

Procedures

(Number) Title Revision

1.3.83 Protected Equipment Program 026

1.5.14 Risk Assessment and Management for 040

Maintenance/Surveillance Activities

1.5.11 Maintenance Rule Program 015

WCI-4 Online Work Control Process 048

1.3.76 Integrated Risk Management 050

Miscellaneous Documents

(Number) Title Date

High Risk Work Plan for Underwater Diving in 01/16/2018

Support of CW-P-1C

71111.15 - Operability Determinations and Functionality Assessments

Action Requests

306206 371516 378475 378835

378990 379120 379244 379504

380257 380307

Work Orders

2123413 02126245

Procedures

(Number) Title Revision

1.3.66 Operability and Functionality Evaluation 034

10.25.53 Inspection of Lighting Panels and Power Panels 013

OI-09 Operations Standards and Expectation 069

OI-14 Columbia Generating Station Operational 016

Challenges and Risk Program

OSP-ELEC-W102 Electrical Distribution Subsystem Breaker 031

Alignment and Power Availability Verification

OSP-ELEC-W101 Offsite Station Power Alignment Check 031

Miscellaneous Documents

(Number) Title Date

EC 17110 EVAL DO-P-1B Failed to Start when Selected 06/13/2018

71111.18 - Plant Modifications

Action Requests

380372 380404

Procedures

(Number) Title Revision

ENG-DES-02 Columbia Generating Station Plant Modification 019

Process

SWP-DES-01 Plant Modification and Configuration Control 017

71111.19 - Post Maintenance Testing

Action Requests

378475 378488 378990 379191

379244

Work Orders

2118434 02126245 02126307 02126372

2126372 02128700 02326309 29142042

Procedures

(Number) Title Revision

OI-41 Operations Work Control Expectations 063

SWP-TST-01 Post Maintenance Testing Program 017

71111.20 - Refueling and Other Outage Activities

Procedures

(Number) Title Revision

9.3.6 Estimated Critical Position Calculation 005

9.3.7 Reactor Shutdown and Startup Calculations 002

OCC-01 Outage Control Center Norms 006

OI-09 Operator Standards and Expectations 069

1.3.84 Reactivity Management Control 004

3.1.1 Master Startup Checklist 058

3.1.2 Reactor Plant Startup 084

3.2.1 Normal Plant Shutdown 088

3.3.1 Reactor Scram 065

SOP-RHR-SDC RHR Shutdown Cooling 028

71111.22 - Surveillance Testing

Work Orders

2114669 02118974 02118950 02122396

2122397

Procedures

(Number) Title Revision

RPS-PS-5A Instrument Master Data Sheet 013

OSP-INST-H101 Shift and Daily Instrument Checks (Modes 1,2,3) 089

Miscellaneous Documents

(Number) Title Revision

CALC E/I-02-94-1334 Setting Range Determination for Instrument Loop 001

MS-LIS-24B

LDCN 373682, License Document Change Notice SR 1.3.7.6.2

LDCN-17-028 (LCS) Frequency Change per SFCP

STI-AR 365016 Surveillance Test Interval Change Form, Turbine

Valve Surveillance

71114.06 - Drill Evaluation

Procedures

(Number) Title Revision

13.10.1 Control Room Operation and Shift Manager Duties 035

13.10.2 TSC Manager Duties 035

13.2.1 Emergency Exposure Levels, Protective Action 022

Guides

13.2.2 Determining Protective Actions 020

13.4.1 Emergency Notifications 043

13.5.1 Local, Protected Area, or Site Evacuation 029

13.9.1 Environmental Field Monitoring Operations 045

13.10.9 Operations Support Center Manager and Staff 049

Duties

13.11.1 EOF Manager Duties 044

13.13.1 Reentry Operations 010

13.13.3 Intermediate Phase MUDAC Operations 018

13.13.4 After Action Reporting 010

13.14.9 Drill and Exercise Program 018

71124.02Occupational As Low As Reasonably Achievable (ALARA) Planning and Controls

Action Requests

370540 377573 377743 377911

379078 354266 354320 375379

376734 365777

Procedures

(Number) Title Revision

11.2.13.8 Airborne Radioactivity Surveys 019

11.2.7.1 Area Posting 043

HPI-0.19 Radiation Protection Standards and 017

Expectations

HPI-6.4 Administering an Occupational Radiation 025

Exposure History File

SWP-RPP-01 Radiation Protection Program 016

GEN-RPP-01 ALARA Program Description 009

GEN-RPP-02 Radiological Planning and Control Process 034

GEN-RPP-13 Senior Site ALARA Committee 013

GEN-RPP-14 Control of Temporary Shielding 014

PPM 11.2.2.7 ALARA Procedure Analysis 012

PPM 11.2.2.8 ALARA Engineering Analysis 007

Procedures

(Number) Title Revision

PPM 11.2.2.11 Exposure Evaluations for Maintaining TEDE 008

ALARA

PPM 11.2.2.12 Radiological Risk Assessment and 008

Management

PPM 11.2.2.13 Flushing and Shielding Evaluations 002

PPM 11.2.2.14 Radiological Planning and Reviews 004

PPM 11.2.8.2 Radiation Work Permit Preparation and Use 001

Audits and Self-

Assessments (Number) Title Date

AR-SA No. 375350 Annual Radiation Protection Program Review 03/30/2018

SR-18-01 Continuous Monitoring Report 03/07/2018

SR-17-04 Continuous Monitoring Report 11/02/2017

374279 Self-Assessment: 71124.02 ALARA 02/15/2018

Radiation Work Permits

(Number) Title Revision

RWP 30004209 2018 EDR Tank-5 Desludge 001

RWP 30004210 2018 EDR Tank-5 Desludge High Risk 002

RWP 30003882 Main Steam Relief Valves 001

RWP 30003098 Wetwell Cleanup and Inspection 001

RWP 30003873 Drywell Shielding 001

ALARA Planning,

In-Progress Reviews, and

Post-Job Reviews

(Number) Title Date

WO 2117848 Clean EDR Tank-5 02/11/2018

WO 2088288 Suppression Pool Cleanup

WO 2088287 Chemical Decon Cleanup

WO 2077319 Drywell Shielding

Miscellaneous Documents

Senior Site ALARA Committee EDR Tank-5 Desludge

2017 CGS Dose Report to the NRC

05-2018 CGS 5 Year CRE Reduction Plan

R23 CRE Outage Report

71124.04Occupational Dose Assessment

Action Requests

357564 360494 361631 365110

365545 365692 366701 367779

369181 374380 375624 376342

376403 377080 378436

Procedures (Number) Title Revision

11.2.13.8 Airborne Radioactivity Surveys 019

11.2.4.5 Whole Body Counts and Daily Checks Using 016

the Renaissance FastScan

11.2.6.7 Special Dosimetry 018

11.2.7.1 Area Posting 043

GEN-RPP-06 Dosimetry Program Description 013

HPI 4.30 Processing, Evaluation, and Reporting of DLR 014

Exposure Data

HPI-0.19 Radiation Protection Standards and 017

Expectations

HPI-5.9 Evaluation of In-Vivo Bioassay Results 014

Following a Potential Intake

HPI-6.4 Administering an Occupational Radiation 025

Exposure History File

SWP-RPP-01 Radiation Protection Program 016

Audits and Self-

Assessments (Number) Title Date

Self-Assessment: 71124.04 Occupational Dose

374271 02/15/2018

Assessment

374020 Self-Assessment: Site Bioassay Program 11/15/2017

Miscellaneous Documents

(Number) Title Date

Data Verification (REIRS Submission) 03/12/2018

100518-0 NVLAP Scope and ISO 17025 Certificate for 01/01/2018

Landauer

15-02 Bases for Neutron Correction Factors for 04/03/2015

OSLN and Survey Instruments

Miscellaneous Documents

(Number) Title Date

DAC-0446 Scaling Factor Determination at Columbia 02/28/ 2018

Generating Station - 2017

VSDS_Pros-M-20171223-2 RW 487 Monthly Survey 12/23/2017

71151 - Performance Indicator Verification

Action Requests

377435 378504 379269 379591

380459 380745

Procedures

(Number) Title Revision

1.5.11 Maintenance Rule Program 015

SYS-4-22 Maintenance Rule Program 013

SYS-4-31 System and Equipment Performance Monitoring 012

and Trending Program

71152 - Problem Identification and Resolution

Action Requests

378489 378892 377416 376891

376894 375755 377654 377144

175386 373903 373313 378956

376921 372667 372847 373141

Work Orders

2108935

Procedures

(Number) Title Revision

1.3.81 Maintaining Plant Component Status Control 012

1.5.14 Risk Assessment and Management for 040

Maintenance/Surveillance Activities

6.6.5 Movement and Transfer Operations of HI-TRAC 017

and HI-STORM in the Reactor Building

SOP-DOOR/HATCH OPS Reactor Building, Turbine Building, Radwaste 013

Building, and Containment Personnel, Equipment

Access Doors, and Hatches

SOP-FLOCCULATOR-OPS Flocculator System Operation 006

SWP-CAP-01 Corrective Action Program 039

SWP-CAP-06 Corrective Action Review 024

GBP-CAP-04 Corrective Action Review Board 000

GBP-CAP-03 Trending Program 000

Miscellaneous Documents Revision

(Number) Title /Date

Ops Excellence Plan Cycle 24

60855.1-Operation of an Independent Spent Fuel Storage Installation

Action Requests

00377488 00377489 00373321 00369032

00360032

Work Orders

2100824-01 02088436-01 02119266-01 02119264-01

2119263-01 02119261-01 02115652-01 02101322-01

Procedures

(Number) Title Revision

PPM 6.6.4 HI-STORM System Site Transportation 015

PPM 6.6.5 Transfer Operations of HI-Track/HI-STORM in the 017

Reactor Building

PPM 6.6.6 MPC Fuel Loading 015

PPM 6.6.7 MPC Processing 028

PPM 6.6.12 Vacuum Drying System Operations 006

PPM 6.6.13 Helium Backfill System Operations 004

PPM 6.6.14 MPC Alternate Cooling Water System Operation 002

PPM 6.6.15 Spent Fuel Cask Loading Verification 006

PPM 6.3.23 Handling Irradiated Fuel in the Spent Fuel Pool 010

SWP-LIC-02 Licensing Basis Impact Determinations 014

OSP-SFS-D101 Storage Cask Heat Removal System Daily Checks 015

PPM 10.4.5 Reactor and Turbine Building Overhead Traveling 023

Crane Inspection, Maintenance and Testing

PPM 9.6.1 Spent Fuel Selection for Cask Storage 008

PPM 6.3.40 Determination of Fuel Assembly Condition for 006

ISFSI

Design Basis Documents

(Number) Title Revision

2.212 ISFSI 10 CFR 72.212 Evaluation 72-35 010

ISFSI FSAR HI-STORM 100 ISFSI Final Safety Analysis Report 013

CoC 1014 CoC and Technical Specifications for HI-STORM 001

100, Amendment 9

Miscellaneous Documents Revision

(Number) Title /Date

VSDS DIC 1517 Survey of ISFSI Pad and & Building 105 Quarterly 01/23/2018

AU-DC-16 ISFSI Program QA Audit Report 04/20/2016

17-VS-04 Source QA Surveillance Report - Holtec International 09/14/2017

16-VS-05 Source QA Surveillance Report - Holtec International 11/08/2016

DIC 1814.5 Cask Loading Plan for Canisters 37 - 40 March

2018

PLM 003N2471 CGS Vacuum Sipping Final Report Fall 2015 12/07/2015

Cal NE-02-00-08 Calculation for Fuel History Data 006

Cal CE-02-00-12 Analysis of the Reactor Building Railroad Bay 441 Ft 002

Elevation Slab

Cal CE-02-01-08 HI-TRAC/HI-STORM Dolly Seismic Restraint @ EL 441 002

Cal SLENW-Calc-1 Cask Transport Road Design 04/06/2001

GO2-17-091 GGS 2016 Annual Radiological Environmental Operating 05/09/2017

Report

2. 48 Screenings16-009 17-001 17-002 17-003

17-004 17-005 17-006 17-007

17-008 17-009 17-010 17-011

17-012 17-013 18-001 18-004

LDCN-14-024 LDCN-18-13

Engineering Changes

EC PDC 15708 EC EVAL 17126

The following items are requested for the

Occupational Radiation Safety Inspection

at Columbia Generating Station

May 21 thru 25, 2018

Integrated Report 2018002

Inspection areas are listed in the attachments below.

Please provide the requested information on or before May 11, 2018.

Please submit this information using the same lettering system as below. For example, all

contacts and phone numbers for Inspection Procedure 71124.01 should be in a file/folder titled

1- A, applicable organization charts in file/folder 1- B, etc.

If information is placed on ims.certrec.com, please ensure the inspection exit date entered is at

least 30 days later than the onsite inspection dates, so the inspectors will have access to the

information while writing the report.

In addition to the corrective action document lists provided for each inspection procedure listed

below, please provide updated lists of corrective action documents at the entrance meeting.

The dates for these lists should range from the end dates of the original lists to the day of the

entrance meeting.

If more than one inspection procedure is to be conducted and the information requests appear

to be redundant, there is no need to provide duplicate copies. Enter a note explaining in which

file the information can be found.

If you have any questions or comments, please contact Louis Carson at 817. 200.1221 or

louis.carson@nrc.gov and John ODonnell at 817.200.1441 or John.ODonnell@nrc.gov

PAPERWORK REDUCTION ACT STATEMENT

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget,

control number 3150-0011.

Attachment 2

2. Occupational ALARA Planning and Controls (71124.02)

Date of Last Inspection: May 26, 2017

A. List of contacts and telephone numbers for ALARA program personnel

B. Applicable organization charts

C. Copies of audits, self-assessments, and LERs, written since date of last inspection,

focusing on ALARA

D. Procedure index for ALARA Program

E. Please provide specific procedures related to the following areas noted below.

Additional Specific Procedures may be requested by number after the inspector reviews

the procedure indexes.

1. ALARA Program

2. ALARA Committee

3. Radiation Work Permit Preparation

F. A summary list of corrective action documents (including corporate and sub-tiered

systems) written since date of last inspection, related to the ALARA program. In addition

to ALARA, the summary should also address Radiation Work Permit violations,

Electronic Dosimeter Alarms, and RWP Dose Estimates

NOTE: The lists should indicate the significance level of each issue and the search

criteria used. Please provide in document formats which are searchable so that

the inspector can perform word searches.

G. List of work activities greater than 1 rem, since date of last inspection,

Include original dose estimate and actual dose.

H. Site dose totals and 3-year rolling averages for the past 3 years (based on dose of

record)

I. Outline of source term reduction strategy

J. If available, provide a copy of the ALARA outage report for the most recently completed

outages for each unit

K. Please provide your most recent Annual ALARA Report.

4. Occupational Dose Assessment (Inspection Procedure 71124.04)

Date of Last Inspection: September 1, 2016

A. List of contacts and telephone numbers for the following areas:

1. Dose Assessment personnel

B. Applicable organization charts

C. Audits, self-assessments, vendor or NUPIC audits of contractor support, and LERs

written since date of last inspection, related to:

1. Occupational Dose Assessment

D. Procedure indexes for the following areas:

1. Occupational Dose Assessment

E. Please provide specific procedures related to the following areas noted below.

Additional Specific Procedures will be requested by number after the inspector reviews

the procedure indexes.

1. Radiation Protection Program

2. Radiation Protection Conduct of Operations

3. Personnel Dosimetry Program

4. Radiological Posting and Warning Devices

5. Air Sample Analysis

6. Performance of High Exposure Work

7. Declared Pregnant Worker

8. Bioassay Program

F. List of corrective action documents (including corporate and sub-tiered systems) written

since date of last inspection, associated with:

1. National Voluntary Laboratory Accreditation Program (NVLAP)

2. Dosimetry (TLD/OSL, etc.) problems

3. Electronic alarming dosimeters

4. Bioassays or internally deposited radionuclides or internal dose

5. Neutron dose

NOTE: The lists should indicate the significance level of each issue and the search

criteria used. Please provide in document formats which are searchable so that

the inspector can perform word searches.

G. List of positive whole body counts since date of last inspection, names redacted if

desired

H. Part 61 analyses/scaling factors

I. The most recent National Voluntary Laboratory Accreditation Program (NVLAP)

accreditation report or, if dosimetry is provided by a vendor, the vendors most recent

results

ML18206A167

SUNSI Review Non-Sensitive Publicly Available Keyword:

By: MSH/RDR Sensitive Non-Publicly Available NRC-002

OFFICE SRI:DRP/A RI:DRP/A DRS/EB1 DRS/EB2 DRS/PSB2 DRS/OB DNMS:FCDB

NAME GKolcum LBrandt TFarnholtz JDrake HGepford VGaddy JKatanic

SIGNATURE /RA/ /RA/ /RA/ /RA/ /RA/ /RA/ /RA-RSB for/

DATE 07/24/18 07/23/2018 07/19/2018 07/19/2018 07/19/18 07/22/18 07/24/18

OFFICE DRS/IPAT SPE:DRP/A BC:DRP/A

NAME GGeorge RAlexander MHaire

SIGNATURE /RA/ /RA/ /RA/

DATE 07/20/2018 07/20/18 07/24/18