|
---|
Category:Drawing
MONTHYEARML23181A1702023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, Figures ML23181A1692023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, Figures ML23181A1682023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, Figures ML23181A1672023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, Figures ML21201A2652021-06-30030 June 2021 Updated Final Safety Analysis Report, Revision 21, Chapter 10 Through Chapter 19, Figures (Redacted) ML21201A2612021-06-30030 June 2021 Updated Final Safety Analysis Report, Revision 21, Chapter 2.5 Through Chapter 3, Figures (Redacted) ML21201A2662021-06-30030 June 2021 Updated Final Safety Analysis Report, Revision 21, Chapter 4 Through Chapter 9, Figures (Redacted) ML19205A2202019-06-30030 June 2019 Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 1 Thru Chapter 2.4 (Redacted) ML19205A2222019-06-30030 June 2019 Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 4 Thru Chapter 9 (Redacted) ML19205A2232019-06-30030 June 2019 Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 10 Thru Chapter 19 (Redacted) ML19205A2212019-06-30030 June 2019 Updated Final Safety Analysis Report, Revision 20, Figures, Chapter 2.5 Thru Chapter 3 (Redacted) ML18277A3032018-09-21021 September 2018 Third 10-Year Interval Inservice Inspection Program Update, Part 2 of 7 ML18194A0952018-08-0606 August 2018 Log of Boring PV-45 ML18193A8982018-08-0606 August 2018 Figure 9.2-4, Demineralized Water System Water Pretreatment Subsystem. ML18194A0872018-08-0606 August 2018 Log of Boring PV-62 ML18193A8992018-08-0606 August 2018 Figure 9.2-5, Demineralized Water System Water Demineralizer Subsystem. ML18194A0942018-08-0606 August 2018 Log of Boring PV-44 ML18192B8852018-07-30030 July 2018 Map 3-2, Proposed Palo Verde-Devers Transmission Line, Summary of Anticipated Impacts Kofa. ML18192B8872018-07-30030 July 2018 Map 3-4, Proposed Palo Verde-Devers 500KV Transmission Line, Vegetation Impacts ML18192B8862018-07-30030 July 2018 Map 3-3, Proposed Palo Verde-Devers 500KV Transmission Line, Geotechnical Sensitivity Excluding Soils. ML18192B8892018-07-30030 July 2018 Map 3-6, Proposed Palo Verde-Devers 500KV Transmission Line, Recreation Impacts. ML18193A0792018-07-30030 July 2018 Figure 10.4-8, Basic Flow Diagram Feedwater System. ML18193A0822018-07-30030 July 2018 Figure 11.2-2 P&I Diagram Liquid Radwaste System. ML18192B8922018-07-30030 July 2018 Map 3-9, Proposed Palo Verde-Devers 500kv Transmission Line, Cultural Resource Impacts. ML18192B8902018-07-30030 July 2018 Map 3-7, Proposed Palo Verde-Devers 500KV Transmission Line, Wilderness Impacts. ML18193A0802018-07-30030 July 2018 Figure 10.4-9, Auxiliary Feedwater System. ML18192B8912018-07-30030 July 2018 Map 3-8, Proposed Palo-Verde 500KV Transmission Line, Visual Impacts. ML18192B8882018-07-30030 July 2018 Map 3-5, Proposed Palo Verde-Devers 500 Kv Transmission Line, Land Use Impacts. ML18192C0052018-07-18018 July 2018 Drawing 13-E-ZJC-034, Rev. 0, Control Bldg Conduit Arrangement Plan at El 74ft Level Ab. ML18192B8372018-07-18018 July 2018 Figure 1, Red Lake Canyon - Mohave, Bridge Canyon Country Estates, Alternative Segments. ML18194A2582018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Area, 44. ML18194A1552018-07-13013 July 2018 Log of Boring PV-2 ML18194A3672018-07-13013 July 2018 Figure 2E-2, Geomorphic Profiles, A-A' and B-B'. ML18194A2542018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Area, 37. ML18194A0702018-07-13013 July 2018 Log of Boring PV-64 ML18194A2772018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Areas, 1 + 2. ML18194A1562018-07-13013 July 2018 Log of Boring PV-3 ML18194A0522018-07-13013 July 2018 Site Property ML18194A0692018-07-13013 July 2018 Log of Boring PV-63 ML18194A1582018-07-13013 July 2018 Log of Boring PV-5 ML18194A3692018-07-13013 July 2018 Figure 2E-5, Location of Gila River Terraces and Major Photo Lineaments. ML18194A0582018-07-13013 July 2018 Figure 2.5-8, Sections Through Site Vicinity. ML18194A1612018-07-13013 July 2018 Log of Boring PV-1 ML18194A2602018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Area, 32. ML18194A2612018-07-13013 July 2018 Drawing, Unit 3 Power Block Excavation, Vertical Projection of Map Area, 33 + 34. ML18194A1572018-07-13013 July 2018 Log of Boring PV-4 ML18194A1602018-07-13013 July 2018 Log of Boring PV-7 ML18194A0452018-07-13013 July 2018 Figure 2.5-27, Palo Verde Hills, Profile 3-4 ML18194A0462018-07-13013 July 2018 Figure, Profile 1-2. ML18194A0672018-07-13013 July 2018 Figure 2.5-86, Location of Gila River Terraces in Relation to Lineaments. 2023-06-30
[Table view] Category:Graphics incl Charts and Tables
MONTHYEARML18194A0772018-12-13013 December 2018 Log of Boring PV-53 ML18194A0942018-08-0606 August 2018 Log of Boring PV-44 ML18194A0952018-08-0606 August 2018 Log of Boring PV-45 ML18194A0962018-08-0606 August 2018 Log of Boring PV-46 ML18194A0922018-08-0606 August 2018 Log of Boring PV-43C ML18194A0872018-08-0606 August 2018 Log of Boring PV-62 ML18194A0912018-08-0606 August 2018 Log of Boring PV-43B ML18194A0902018-08-0606 August 2018 Log of Boring PV-43A ML18194A0892018-08-0606 August 2018 Log of Boring PV-43 ML18194A1562018-07-13013 July 2018 Log of Boring PV-3 ML18194A1032018-07-13013 July 2018 Log of Boring PV-35. ML18194A1012018-07-13013 July 2018 Log of Boring PV-34. ML18194A1592018-07-13013 July 2018 Log of Boring PV-6 ML18194A1472018-07-13013 July 2018 Log of Boring PV-12 ML18194A1402018-07-13013 July 2018 Log of Boring PV-16 ML18194A0462018-07-13013 July 2018 Figure, Profile 1-2. ML18194A0452018-07-13013 July 2018 Figure 2.5-27, Palo Verde Hills, Profile 3-4 ML18194A1452018-07-13013 July 2018 Log of Boring PV-19 ML18194A1052018-07-13013 July 2018 Log of Boring PV-36. ML18194A1382018-07-13013 July 2018 Log of Boring PV-24 ML18194A1572018-07-13013 July 2018 Log of Boring PV-4 ML18194A0372018-07-13013 July 2018 Boring Projected Onto Line of Profile ML18194A1512018-07-13013 July 2018 Log of Boring PV-9 ML18194A3512018-07-13013 July 2018 Figure 2C-4, Geophysical Drill Hole Logs, GDDH-5, Gillespie Dam Alternate Siting Area ML18194A1552018-07-13013 July 2018 Log of Boring PV-2 ML18194A0712018-07-13013 July 2018 Log of Boring PV-48 ML18194A1582018-07-13013 July 2018 Log of Boring PV-5 ML18194A0722018-07-13013 July 2018 Log of Boring PV-49 ML18194A1312018-07-13013 July 2018 Log of Boring PV-27. ML18194A1522018-07-13013 July 2018 Log of Boring PV-10 ML18194A1442018-07-13013 July 2018 Log of Boring PV-18 ML18194A1502018-07-13013 July 2018 Log of Boring PV-15 ML18194A1532018-07-13013 July 2018 Log of Boring PV-11 ML18194A1612018-07-13013 July 2018 Log of Boring PV-1 ML18194A1492018-07-13013 July 2018 Log of Boring PV-14 ML18194A1482018-07-13013 July 2018 Log of Boring PV-13 ML18194A1432018-07-13013 July 2018 Log of Boring PV-17 ML18194A1462018-07-13013 July 2018 Log of Boring PV-20 ML18194A3532018-07-13013 July 2018 Figure 2C-6, Geophysical Drill Hole Logs, GDDH-7, Gillespie Dam Alternate Siting Area ML18194A1362018-07-13013 July 2018 Log of Boring PV-23. ML18194A1352018-07-13013 July 2018 Log of Boring PV-22. ML18194A1332018-07-13013 July 2018 Log of Boring PV-21. ML18194A1602018-07-13013 July 2018 Log of Boring PV-7 ML18194A1292018-07-13013 July 2018 Log of Boring PV-26. ML18194A1272018-07-13013 July 2018 Log of Boring PV-31. ML18194A1252018-07-13013 July 2018 Log of Boring PV-30. ML18194A1232018-07-13013 July 2018 Log of Boring PV-29. ML18194A1212018-07-13013 July 2018 Log of Boring PV-25. ML18194A1192018-07-13013 July 2018 Log of Boring PV-28. ML18194A1172018-07-13013 July 2018 Log of Boring PV-42. 2018-08-06
[Table view] |
Text
PVNGS-172&3 PSAR APPENDIX 9B OUTSIDE SAMPLE ROOM I ~ SIDE SAMPLE ROOM HS Hs RP,
~(SEE NOTE 2)
ISEE NOTE 2) C I5 CIS CLOSES 6 510 CLOSES Q, Q,. 3. T 510 PI A '5 Qa s g IKT 55 155 CC HC SS 106 EDT 0'"
HOT LEG A/5 Hc I 3 Pl, LOOP I A/5 SS 203 CC ' SS 200 cc@i4 L ccgii 4 55 (0/I Hc, 4 SJ SYS 310 122 GA 8
~25
~5 RCS SJ 5YS 310 Hs IC 41 DELAY 56 55 100 CC)4
/
4 CC 3 4 4 55 102 55 103 55 104 SS 105 SS 108 Hc I 4 CVCS (0 31 9 ~ P cl05ES CO+4 55 106 SAMPLE VESSEL ASSEMBLY QHE 1 5 ~ QHE 1 T 520 PRESSURIZER A/S A 5
<<+ b/5
)2 SURGE Ll ~ E 55 204 55 201 Hc I 4 Bc 7 SJ 5YS 310 I 0 42 Rcs ID 7) 55 HO BC 3 4 4 SS )12 Bc 3/4 4 BC+34 SS 124 CI5 CLOSES p CIS CLOSES P 560 P 530 $ 4 C.l 4 HC.( 3 ED1 CVCS SJ SYS 310 122 ID 31 G~B QHS 1 -Qs Hs r s R(
T 530 Pl
<<+6/5 <<+AS 55 156 BC HC 55 123 8l 3
PRESSURIZER A/5 4
Rr 344 Hc-344 I
$3 STEAM SPACE IREI IEF) 55 2(6 sc 55 202 55 113 BC P+/ 4 sc Qi( 55 1178 Hc / 4 RDH SJ SYS 310 HO SJ SYS 310 122 G~T 55 116 55 117 CVCS (F 55 RCS (0 Fc Fc 551 5 Hs 21 55 61
,Ps 55 55 125 INSIDE CONTAINMENT OUTSIDE CONTAINMENT
~~
ESF A TRAIN SAFEGUARD 6, 55 SHUTDOWN COOLING SUCTION LINE I SIS SJ SYS 310 130 01.7) OCQ/ 2 2
2 ERR(
55 161(
4 Ccs SJ SYS 310 181 34 IG 71 Tl T 540 sc Dc Hc SS 170 SAMPLE VESSEL A55(ABLY VCT PUMP MINI FLOW LINE SS 130 55 128 HC QIB 4 SJ SYS 310 121 SJ Y53 0 IM Hc I 4 CVCS (F 7)
ESF 8 TRAIN (E 3) H~3/ 2 Ms Oc 3/4 4 50128 f
SAFEGUARD PUMP DCQI4 MINI FLOW LINE 55)/Skl SJSYS310181 e0 T 560 DC HC SJ SYS 310 130 SHUTDOWN CODLING SIS ID 3) DC Q 2 SUCTION LINE 2 SI S Y S 310 I 30 SS 162 HC+i 4 SIS (A 7) DC 5~/ 2 F 550 DC.3/4 4 55 63 VCT 55 DC Ql 4 DC Q/6 4 ,Hc I 4 PURIFICATION Hc U2 2 4 SAN)PLE EXCHANGERS HEAT ~FI SJ SYS 310 121 CVCS O+5 FILTER INLET SS 111 HC@ 4 55 152 (F 7)
Sl SYS 310 120 HC@/ 2 cvcs (E 6) 55 132 55 150 PURIFICATION RDH FILTER OUTLET ION 2 4 Hc I Hc U2 2 SJ 5YS 310 122 EXCHANG RINLET SS 33 CVCS (F 21 SS SJ SYS 310 120 Hc I 2 CVCS (E 51 Q
SS SS 134 PURIFICATION PLANT VENT 2 4 ION EXCHANGER EXHAUSTFAN 55 3G 8 0<< OUTLET Hc I/2 2 55 I )5 2 VALVE555201 202 203 204 D 3 SJSY5310120 ~V Hc 2 6 205 CAN BE OPENED ANO 55 CVCS I 0 I) SAMPLE HOOD CLOSED LOCALLY AND ONLY CLOSED FROM MAIN CONTROL 55 153 ROOM DEMINFRALIZEO WATER Hc FOR SYMBOLS 8 ABBREVIATIONS I 2 4 SI.SYS.31O150 8 SEE FIG SJ SYS 310100 DW 05 HC +3/ 4 HC11 24 55 151 SAMPLE SINK Hc1 I'24 DWDH Sl 5Y5 310 160
<<R, LWMS (Gs C8845 SAMPLING SYSTEM Figure W 0\DA 00 MT CVT SASH I PIPING AND INSTRUMENTATION DIAGRAM 9.3.2-1 August 25, 1975 9B-21 Amendment 10