MONTHYEARML18152B3571999-10-22022 October 1999 Requests Relief from Temporary Repair of Through Wall Leak Discovered on 30 Inch Component Cooling Heat Exchanger Discharge Pipe Associated with Service Water Sys Common to Surry Units 1 & 2 ML18152B3581999-10-14014 October 1999 Submits Response to Violations Noted in Insp Repts 50-280/98-201 & 50-281/98-201.Corrective Actions:Visual Insps Were Completed on Accessible Coatings Inside Containment for Both Units 1 & 2 ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML18152B3401999-09-27027 September 1999 Requests That Ma Walker Be Removed from List of Individuals Scheduled to Take Exam IAW Guidance Provided in NUREG-1021, Operator Licensing Exam Stds for Power Reactors ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML18152B3381999-09-21021 September 1999 Forwards in Triplicate,Applications for Renewal of License for Bf Jurewicz & JW Heide.Without Encls ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML18152B4521999-09-14014 September 1999 Forwards Comments on Review of Preliminary Accident Sequence Precursor Analysis of Operational Event That Occurred at Plant,On 980508,as Reported in LER 98-009 ML20216F1381999-09-0808 September 1999 Forwards Retake Exam Repts 50-280/99-302 & 50-281/99-302 on 990824.One SRO Applicant Who Received re-take Operating Test Passed re-take Exam ML18152B4501999-09-0808 September 1999 Submits in Triplicate,Application for Renewal of License for Rd Scherer,Iaw 10CFR55.57.Requests That Certification of Medical Exam by Facility Licensee,Nrc Form 396,be Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML18152B3711999-08-27027 August 1999 Forwards LER 99-005-00,per Plant TS Table 3.7.6.Rept Has Been Reviewed by Station Nuclear Safety & Operating Committee.Commitment Made by Util,Listed ML18152B3851999-08-23023 August 1999 Forwards Revised TS Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in Ufsar.Ref to Applicable UFSAR Section Included in TS Basis ML18152B3661999-08-20020 August 1999 Provides Medical Status Rept for E Washington,As Required by License Conditions.Summary of E Washington Current Physical Exam & Pertinent Lab Data Attached.Encl Withheld,Per 10CFR2.790(a)(6) ML18152B3651999-08-20020 August 1999 Requests Removal of License Condition from Sh Wightman Operator License SOP-21538.Updated NRC Form 396 Is Encl.Form NRC 396 Withheld,Per 10CFR2.790(a)(6) ML18152B3681999-08-20020 August 1999 Submits 30-day Rept Re Two Instances in Which Conditions of Approval in Coc Were Not Observed in Making Shipment.Two Type B Shipments Using Model CNS 8-120B Package Were Made After Expiration of QA Program Approval Between 990531-0628 ML18152B3801999-08-18018 August 1999 Forwards Technical Rept NE-1206,Rev 0, Surry Unit 2,Cycle 16 Startup Physics Tests Rept, Summarizing Results of Physics Testing Program Performed After Initial Criticality on 990525 ML18152B3781999-08-13013 August 1999 Forwards ISI Summary Rept for Surry Power Station,Unit 2 for 1999 Refueling Outage.Rept Provides Summary of Examination Performed During Outage for Third ISI Interval.No New Commitments Were Made ML18152B3751999-08-13013 August 1999 Forwards LER 99-004-00,IAW 10CFR50.73.Commitment Made by Util,Listed ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML18152B4001999-07-29029 July 1999 Requests Relief from Certain Impractical Requirements of ASME Section XI Code Associated with Partial Exams Conducted During 1998 Surry Unit 1 Refueling Outage.Relief Request SR-020 Encl ML18152B3981999-07-28028 July 1999 Forwards 60-day Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Commitments Contained in Ltr,Listed ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML18152B3961999-07-23023 July 1999 Forwards Preliminary,Uncertified License Application & Medical Certification for License to Operate Surry Power Station Units 1 & 2 for Ds Cobb.Encl Withheld,Per 10CFR2.790 (a)(6) ML18151A6281999-07-23023 July 1999 Forwards Revised Epips,Including Rev 19 to EPIP-4.02,rev 14 to EPIP-4.16,rev 8 to EPIP-4.21 & Rev 7 to EPIP-4.30.EP & EPIPs Continue to Meet Stds of 10CFR50.47(b) ML18152B3991999-07-23023 July 1999 Requests That License for Jz Laplante Be Canceled as License Is No Longer Required ML18152B3931999-07-16016 July 1999 Forwards Updated NRC Form 396 & Ltr,Which Documents Medical Status of Mb Gross,License SOP-20476-2.Encl Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML18152B4401999-07-0101 July 1999 Informs NRC That on 990511,Dominion Resources,Inc,Executed Amended & Restated Agreement & Plan of Merger with Consolidated Natural Gas Co ML18152B4371999-06-24024 June 1999 Forwards Response to NRC Request for Clarification of Relief Requests Submitted on 990212,requesting Relief from Performing Hydrostatic Testing for Certain Small Diameter Class 1,RCS Pressure Boundary Connections ML18152B4361999-06-22022 June 1999 Forwards Response to RAI Re Surry & North Anna Power Stations,Units 1 & 2,per GL 96-06 ML18152B4301999-06-0303 June 1999 Informs of Util Intention to Revise Schedule for Submittal of License Renewal Applications for Surry & North Anna Power Stations to March 2002 ML18152B4261999-05-28028 May 1999 Provides Formal Notification of Effect of Recent Organizational Restructuring on OLs of North Anna & Surry Power Stations,Per NRC 990513 Telcon Request ML18152B4221999-05-27027 May 1999 Forwards Info Concerning Changes to ECCS Evaluation Models & Application in Existing Licensing Analyses for Surry & North Anna Power Stations,Units 1 & 2 ML18152B4231999-05-26026 May 1999 Informs That Vepc Will Revise 180 Day Response to NRC GL 96-05,within 120 Days of Date of Ltr to Incorporate Commitment to Participate in Joint Owners Group Program as Applicable ML18152B4211999-05-25025 May 1999 Forwards Rev 1 to Relief Request P-11 to Clarify Original Intent of Request by Specifically Requesting Relief from Requirements of Section 6.1 of OM-6 ML18152A4741999-05-19019 May 1999 Forwards Completed Registration Form for Renewal of ASTs at Surry Nuclear Power Station,Iaw Section 9VAC 25-91-100.F ML18152B4171999-05-17017 May 1999 Provides Notification of Number of Steam Generator Tubes That Were Plugged During Spring 1999 Refueling Outage Planned ISI ML20217D6621999-05-14014 May 1999 Forwards NRC Operator Licensing Exams 50-280/99-301 & 50-281/99-301 (Including Completed & Graded Exams) for Tests Administered on 990329-0401 & 990412-15.Nine Candidates Passed (& One Failed) Exam ML18152A3701999-05-13013 May 1999 Submits Proposal to Use Provisions of ASME Section XI Code Case N-597 for Analytical Evaluation of Class 1,2 & 3 Carbon & Low Alloy Steel Piping Components Subjected to Wall Thinning as Result of Flow Accelerated or Other Corrosion ML18152B4121999-05-0303 May 1999 Forwards Application for Renewal of License for SV Ross. Encl Withheld Per 10CFR2.790(a)(6) ML18152B4101999-04-29029 April 1999 Forwards Scope & Objectives for 990803 Surry Power Station Emergency Exercise.Without Encls ML18152B6561999-04-23023 April 1999 Forwards Annual Radioactive Effluent Release Rept for Surry Power Station,Jan-Dec 1998, Which Includes Summary of Quantities of Radioactive Liquid & Gaseous Effluents & Solid Waste Released During CY98 ML18152B6491999-04-13013 April 1999 Forwards MOR for Mar 1999 for Surry Power Station,Units 1 & 2.MOR for Feb 1999 Incorrectly Stated Gross Electrical Energy Generated (Mwh) for Unit 2.Rept Should Have Stated Monthly Figure as 568965.0 ML18151A5851999-03-31031 March 1999 Forwards Rept on Status of Decommissioning Funding for Each of Four Nuclear Power Reactors,Per 10CFR50.75(f)(1) ML18152A2801999-03-30030 March 1999 Forwards Summary of Structural Integrity Evaluation of Thermally Induced Over Pressurization of Containment Penetration Piping During DBA for SPS & Naps,Units 1 & 2,per GL 96-06.Draft Proposed UFSAR Revised Pages,Encl ML18153A2721999-03-29029 March 1999 Forwards LER 99-002-00 Per 10CFR50.73.Listed Commitments Contained in Ltr 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML18152B3571999-10-22022 October 1999 Requests Relief from Temporary Repair of Through Wall Leak Discovered on 30 Inch Component Cooling Heat Exchanger Discharge Pipe Associated with Service Water Sys Common to Surry Units 1 & 2 ML18152B3581999-10-14014 October 1999 Submits Response to Violations Noted in Insp Repts 50-280/98-201 & 50-281/98-201.Corrective Actions:Visual Insps Were Completed on Accessible Coatings Inside Containment for Both Units 1 & 2 ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML18152B3401999-09-27027 September 1999 Requests That Ma Walker Be Removed from List of Individuals Scheduled to Take Exam IAW Guidance Provided in NUREG-1021, Operator Licensing Exam Stds for Power Reactors ML18152B3381999-09-21021 September 1999 Forwards in Triplicate,Applications for Renewal of License for Bf Jurewicz & JW Heide.Without Encls ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML18152B4521999-09-14014 September 1999 Forwards Comments on Review of Preliminary Accident Sequence Precursor Analysis of Operational Event That Occurred at Plant,On 980508,as Reported in LER 98-009 ML18152B4501999-09-0808 September 1999 Submits in Triplicate,Application for Renewal of License for Rd Scherer,Iaw 10CFR55.57.Requests That Certification of Medical Exam by Facility Licensee,Nrc Form 396,be Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML18152B3711999-08-27027 August 1999 Forwards LER 99-005-00,per Plant TS Table 3.7.6.Rept Has Been Reviewed by Station Nuclear Safety & Operating Committee.Commitment Made by Util,Listed ML18152B3851999-08-23023 August 1999 Forwards Revised TS Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in Ufsar.Ref to Applicable UFSAR Section Included in TS Basis ML18152B3651999-08-20020 August 1999 Requests Removal of License Condition from Sh Wightman Operator License SOP-21538.Updated NRC Form 396 Is Encl.Form NRC 396 Withheld,Per 10CFR2.790(a)(6) ML18152B3681999-08-20020 August 1999 Submits 30-day Rept Re Two Instances in Which Conditions of Approval in Coc Were Not Observed in Making Shipment.Two Type B Shipments Using Model CNS 8-120B Package Were Made After Expiration of QA Program Approval Between 990531-0628 ML18152B3661999-08-20020 August 1999 Provides Medical Status Rept for E Washington,As Required by License Conditions.Summary of E Washington Current Physical Exam & Pertinent Lab Data Attached.Encl Withheld,Per 10CFR2.790(a)(6) ML18152B3801999-08-18018 August 1999 Forwards Technical Rept NE-1206,Rev 0, Surry Unit 2,Cycle 16 Startup Physics Tests Rept, Summarizing Results of Physics Testing Program Performed After Initial Criticality on 990525 ML18152B3781999-08-13013 August 1999 Forwards ISI Summary Rept for Surry Power Station,Unit 2 for 1999 Refueling Outage.Rept Provides Summary of Examination Performed During Outage for Third ISI Interval.No New Commitments Were Made ML18152B3751999-08-13013 August 1999 Forwards LER 99-004-00,IAW 10CFR50.73.Commitment Made by Util,Listed ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML18152B4001999-07-29029 July 1999 Requests Relief from Certain Impractical Requirements of ASME Section XI Code Associated with Partial Exams Conducted During 1998 Surry Unit 1 Refueling Outage.Relief Request SR-020 Encl ML18152B3981999-07-28028 July 1999 Forwards 60-day Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Commitments Contained in Ltr,Listed ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML18151A6281999-07-23023 July 1999 Forwards Revised Epips,Including Rev 19 to EPIP-4.02,rev 14 to EPIP-4.16,rev 8 to EPIP-4.21 & Rev 7 to EPIP-4.30.EP & EPIPs Continue to Meet Stds of 10CFR50.47(b) ML18152B3991999-07-23023 July 1999 Requests That License for Jz Laplante Be Canceled as License Is No Longer Required ML18152B3961999-07-23023 July 1999 Forwards Preliminary,Uncertified License Application & Medical Certification for License to Operate Surry Power Station Units 1 & 2 for Ds Cobb.Encl Withheld,Per 10CFR2.790 (a)(6) ML18152B3931999-07-16016 July 1999 Forwards Updated NRC Form 396 & Ltr,Which Documents Medical Status of Mb Gross,License SOP-20476-2.Encl Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML18152B4401999-07-0101 July 1999 Informs NRC That on 990511,Dominion Resources,Inc,Executed Amended & Restated Agreement & Plan of Merger with Consolidated Natural Gas Co ML18152B4371999-06-24024 June 1999 Forwards Response to NRC Request for Clarification of Relief Requests Submitted on 990212,requesting Relief from Performing Hydrostatic Testing for Certain Small Diameter Class 1,RCS Pressure Boundary Connections ML18152B4361999-06-22022 June 1999 Forwards Response to RAI Re Surry & North Anna Power Stations,Units 1 & 2,per GL 96-06 ML18152B4301999-06-0303 June 1999 Informs of Util Intention to Revise Schedule for Submittal of License Renewal Applications for Surry & North Anna Power Stations to March 2002 ML18152B4261999-05-28028 May 1999 Provides Formal Notification of Effect of Recent Organizational Restructuring on OLs of North Anna & Surry Power Stations,Per NRC 990513 Telcon Request ML18152B4221999-05-27027 May 1999 Forwards Info Concerning Changes to ECCS Evaluation Models & Application in Existing Licensing Analyses for Surry & North Anna Power Stations,Units 1 & 2 ML18152B4231999-05-26026 May 1999 Informs That Vepc Will Revise 180 Day Response to NRC GL 96-05,within 120 Days of Date of Ltr to Incorporate Commitment to Participate in Joint Owners Group Program as Applicable ML18152B4211999-05-25025 May 1999 Forwards Rev 1 to Relief Request P-11 to Clarify Original Intent of Request by Specifically Requesting Relief from Requirements of Section 6.1 of OM-6 ML18152B4171999-05-17017 May 1999 Provides Notification of Number of Steam Generator Tubes That Were Plugged During Spring 1999 Refueling Outage Planned ISI ML18152A3701999-05-13013 May 1999 Submits Proposal to Use Provisions of ASME Section XI Code Case N-597 for Analytical Evaluation of Class 1,2 & 3 Carbon & Low Alloy Steel Piping Components Subjected to Wall Thinning as Result of Flow Accelerated or Other Corrosion ML18152B4121999-05-0303 May 1999 Forwards Application for Renewal of License for SV Ross. Encl Withheld Per 10CFR2.790(a)(6) ML18152B4101999-04-29029 April 1999 Forwards Scope & Objectives for 990803 Surry Power Station Emergency Exercise.Without Encls ML18152B6561999-04-23023 April 1999 Forwards Annual Radioactive Effluent Release Rept for Surry Power Station,Jan-Dec 1998, Which Includes Summary of Quantities of Radioactive Liquid & Gaseous Effluents & Solid Waste Released During CY98 ML18152B6491999-04-13013 April 1999 Forwards MOR for Mar 1999 for Surry Power Station,Units 1 & 2.MOR for Feb 1999 Incorrectly Stated Gross Electrical Energy Generated (Mwh) for Unit 2.Rept Should Have Stated Monthly Figure as 568965.0 ML18151A5851999-03-31031 March 1999 Forwards Rept on Status of Decommissioning Funding for Each of Four Nuclear Power Reactors,Per 10CFR50.75(f)(1) ML18152A2801999-03-30030 March 1999 Forwards Summary of Structural Integrity Evaluation of Thermally Induced Over Pressurization of Containment Penetration Piping During DBA for SPS & Naps,Units 1 & 2,per GL 96-06.Draft Proposed UFSAR Revised Pages,Encl ML18153A2721999-03-29029 March 1999 Forwards LER 99-002-00 Per 10CFR50.73.Listed Commitments Contained in Ltr ML18153A3421999-03-26026 March 1999 Provides Updated Medical Status Rept for Wb Gross in Accordance with License SOP-20476-02,Docket 55-5228,as Amended by 980320 License Amend.Informs That Gross Exhibits No Performance Problems & Will Continue on Current Medicine ML20204H0331999-03-17017 March 1999 Forwards Rev 5 to PSP for Surry & North Anna Power Stations & Associated Isfsis.Description & Justification for Changes Included with Plan Rev.Rev 5 to PSP Withheld Per 10CFR73.21 ML18153A3411999-03-15015 March 1999 Forwards Signed Applications & Medical Certificates for Initial License at Surry Power Station Units 1 & 2 for Listed Individuals.Without Encls 1999-09-08
[Table view] |
Text
e e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 December 19, 1990 United States Nuclear Regulatory Commission Serial No.90-751 Attention: Document Control Desk NO/RFB R1 Washington, D. C. 20555 Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 APPENDIX R ENGINEERING EVALUATIONS Based on telephone conversations with your staff, two issues concerning Appendix R engineering evaluations were identified as requiring additional information for resolution. These issues were reentry time into an affected fire area and multiple high impedance faults.
We have reassessed the time assumption used in previous evaluations and have been able to extend the period described in the evaluation from thirty to sixty minutes.
This information was documented in Virginia Power's letter dated July 26, 1990 (Serial No.90-404). It is our understanding that this modification to the entry time assumption resolves this issue.
The second issue concerned documentation of our evaluation of multiple high impedance faults. Attached is Appendix A of Chapter 9, Electrical Distribution System Coordination Study, of the Appendix R Report. This appendix summarizes our review of the issue of multiple high impedance faults. It is our understanding that with the inclusion of this documentation into the Appendix R Report that this issue is also completed.
If you have any questions regarding this matter, please contact us.
Very truly yours, Jl~
W. L. Stewart Senior Vice President - Nuclear Attachment r~--::::~~::-::-::-::---::--------
1 1 *~ 01227028() 901219 '\
I ~DR ADOCK 05000:280 /
cc: U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N. W.
Suite 2900 Atlanta, Georgia 30323 Mr. W. E. Holland NRC Senior Resident Inspector Surry Power Station
ATTACHMENT 10 CFR 50 APPENDIX R CHAPTER 9 APPENDIX A
e e CHAPTER 9 APPENDIX A MULTIPLE HIGH IMPEDANCE FAULTS EVALUATION
. SURRY POWER STATION - UNITS 1 and 2 PREPARED BY VIRGINIA POWER CH9-APPA Page 1 of 5 Revision 6 6/88 Approved 10/90
e e
SUMMARY
Generic letter 86-10 indicates that high impedance faults should be considered for all associated circuits located in the fire area of concern to meet the separation criteria of Sections III.G.2 and 111.G.3 of Appendix R. In this case, associated circuits are defined as circuits not required for safe shutdown but powered by necessary power supplies. The concern is that a fire expected to result in the loss of an Appendix R power supply will also result in the loss of the redundant power supply as a result of simultaneous high impedance faults (below the trip point for the breaker on each individual circuit) of associated circuits routed into that same fire area. GL-86-10 states that the phenomenon should be considered for impact on the plants' safe shutdown capability and addressed by either a circuit coordination study or by assuming the shutdown capability will be disabled and provide written procedures to clear the faults.
Virginia Power has performed an evaluation of each Appendix R power supply and determined that -the probability of loss due to simultaneous high impedance faults is either impossible in some cases or highly improbable in others for the reasons discussed in this evaluation. Therefore, no further circuit coordination study has been performed or written procedures developed.
Surry Power Station consists of two "mirror image" units. For fire scenarios in critical plant areas, it is necessary to depend on mechanical cross connects, etc. and shutdown both units with equipment from only one unit. Therefore, redundant equipment often comprises equipment from the opposite unit rather than from redundant channels. Because both units contain similar power supplies, it is not typically necessary to route an abundance of Unit 1 cable into Unit 2 areas and vice versa. This is particularly true for the emergency electrical distribution system utilized for safe shutdown. This natural separation is used as a basis in this report to state that it is assumed that a sufficient number of associated circuits are not routed into fire areas of concern and that the probability of this occurring is low.
Generally, the following sections of this evaluation will provide additional analysis to supplement this reasoning.
4160V SWITCHGEAR The 4160V switchgear buses (lH, lJ, 2H, and 2J) are not susceptible to tripping due to multiple high impedance faults. The sum of all overcurrent relay trip devices (phase and ground) on the buses' circuits is lower than that of the buses' main, offsite supply, circuit breakers. The same is true when the buses are supplied by their respective emergency diesel generator (phase only, the EDGs are ungrounded) due to the load shed of the "stub" bus supplying the Component Cooling and Residual Heat Removal pumps. The stub bus would be returned to service later to achieve cold shutdown, but this should be after clearing of any other potentially faulted circuits on the buses. Any 4160V high impedance CH9-APPA Page 2 of 5 Revision 6 6/88 Approved 10/90
fault(s) would be expected to have developed into a lower impedance fault by that time and be selectively cleared.
480V SWITCHGEAR The 480V switchgear (load center) buses (lH-1, lJ-1, 2H-l, 2J-l) are not subject to tripping due to multiple high impedance faults on associated circuits. Each 480V load center consists of one feeder breaker and, typically, six load breakers. Of the six two supply Appendix R required MCCs. Some are spared or provide only contingency service. Therefore, there are very few (0-2) energized associated circuits originating from each Appendix R required 480V load center.
As a result, the sum of the overcurrent trip devices on the Appendix R 480V load center associated circuits, including back-up, contingency breakers is less than the feeder device trip setting.
480V MOTOR CONTROL CENTERS Numerous 480V motor control centers (MCCs) are required for Appendix R, as shown on the Appendix R Evaluation Electrical One Line Diagrams for Surry Units 1 and
- 2. The required MCCs are located in either the Emergency Switchgear Rooms (Fire Areas 3, 4) or the cable vaults and tunnels (Fire Areas 1, 2) of the respective unit. For a fire in either of those areas of either unit, in general, the other unit's electrical distribution system is utilized for safe shutdown of both units.
The MCCs supply a great diversity of loads located in various plant locations.
But, it is expected that the Unit 1 and 2 MCCs supply like unit loads located in different plant areas with power often routed in different directions. Also, the MCC loads vary in frequency of operation; some, like MOV's are normally de-energized. It would be difficult to ascertain the physical locations of all MCC circuits and predict their operation. While an analysis has not been done to determine this, Electrical Engineering - Power believes that this diversity and the relatively low (SOA or less) trip ratings of many of the MCC breakers limits the potential for tripping due to multiple high impedance faults.
The ungrounded 480V system at Surry warrants that a minimum of two different phase conductors are necessary to produce fault current. A single conductor in contact with a grounded object, such as a conduit or cable tray, would not draw fault current. Two or three phase conductors are routed to each load, and in may cases, multiconductor or triplexed cables are used. To avoid severely derating power circuits, they are sometimes routed in dedicated conduit. The close proximity of the phase conductors would discourage high impedance faults because the little material existing between conductors would burn away quickly producing a lower impedance, high current, fault. The 480V MCCs at Surry have three-phase fault currents of 14,000 - 17,000 A available at the buses.
Therefore, some margin typically exists between the available fault current at CH9-APPA Page 3 of 5 Revision 6 6/88 Approved 10/90
the end of the circuit and the breaker overcurrent/trip rating. Because of the strong sources and low MCC breaker trip ratings, there should be adequate margin to selectively operate breakers supplying either low or high impedance faults.
It is unlikely that a sufficient number of high impedance faults with current lower than the individual breaker trip ratings will exist to cause operation of the MCC feeder breakers.
For these reasons, the probability of multiple high impedance faults causing misoperation is extremely low and no special precautions are necessary.
125VDC DISTRIBUTION SYSTEM The 125VDC system is an ungrounded system requiring both a positive and negative conductor from the same bus to produce a fault. Faults on this system differ from AC faults because the voltage difference between the two involved conductors is constant rather than cyclic and, therefore, DC faults would tend to be uninterrupted allowing materials between the two conductors to be bur~ed away.
This would either clear the fault or, more likely, create a low impedance fault that can be selectively cleared.
Each DC bus is simultaneously supplied by both the battery and charger. The chargers supply limited fault current and, therefore, most is supplied by the batteries. A circuit breaker between the battery charger and the bus will open for an overcurrent condition, but the batteries are connected directly to the bus. Therefore, the absence of a main bus breaker precludes the possibility of loss of power to the bus. Power will continue to be served and the faults(s) would be expected to be cleared. Though the associated DC circuits have not been traced to determine routing, the diversity of DC provided equipment and locations suggests that it is unlikely that a substantial number of circuits would be routed together in such a way to compromise the DC system. The DC distribution cabinets are further limited in exposure to faults because numerous circuits supply other panels or cabinets. Additional levels of protection are provided at those points for circuits originating from those panels, etc.
For these reasons, high impedance faults are not considered a major concern on the 125VDC system and no special precautions have been taken.
120VAC VITAL BUS SYSTEM The 120VAC Vital Buses are* normally supplied by current limiting inverters and alternately by current limiting voltage regulating transformers. The vital buses supply a limited number of loads generally located in the Control Room and Emergency Switchgear Room (including the Instrument Rack Room). Though there are a number of associated circuits, there are expected to be few circuits not directly unit related and, therefore, routed into common areas. From the Control Room and Emergency Switchgear Room circuit destinations, numerous CH9-APPA Page 4 of 5 Revision 6 6/88 Approved 10/90
~ ;
. f' *
"secondary" circuits are originated;* those circuits may be routed into various plant areas but would typically be protected from that origination point decreasing the required protective zone of the Appendix R protective devices.
The additional protective devices would increase the chances of interrupting the fault.
The automatic*transfer from the UPS inverter to the regulating transformer will increase the available fault current by a factor of five. The additional available fault current may provide the current required to selectively trip faulted branch circuits.
Additionally, at 120VAC, high impedance faults are not certain to be sustained.
For these reasons, it is considered improbable that multiple high impedance faults will result in loss of a 120VAC vital bus and no additional precautions have been taken.
MISCELLANEOUS POWER SUPPLIES Other than the several categories of Appendix R power supplies already discussed, there are a number of other miscellaneous power supplies that do not fit into those classifications.
A 120VAC "Appendix R Distribution Panel" has been installed for e~ch unit to supply the Remote Auxiliary Monitoring Panels. The Appendix R panels are not subject to multiple high impedance faults because they lack a sufficient number of associated circuits.
Communication equipment is supplied from a Unit I 120/240VAC Semi-Vital bus, a Unit I 120/240VAC heat trace panel, and a Unit 2 120VAC communications panel.
All of these are, therefore, Appendix R power supplies. These power supplies were chosen, partially, due to the fact that they are located in different areas of the plant. It is expected that many of the associated circuits supplied by these sources are local while others enter many various plant areas. For this reason, it is assumed that a sufficient number of associated circuits from one supply do not enter the redundant power supply fire area to warrant fear of multiple high impedance faults. As in other sections of this report it is expected that most faults will either be extinguished or develop into a lower impedance, high current, fault allowing proper selective tripping.
Therefore, no additional precautions or measures have been taken for any of these power supplies.
CH9-APPA Page 5 of 5 Revision 6 6/88 Approved 10/90