ML18095A383
ML18095A383 | |
Person / Time | |
---|---|
Site: | Salem |
Issue date: | 07/27/1990 |
From: | Public Service Enterprise Group |
To: | |
Shared Package | |
ML18095A382 | List: |
References | |
NUDOCS 9008030268 | |
Download: ML18095A383 (3) | |
Similar Documents at Salem | |
---|---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML18107A5171999-08-25025 August 1999
[Table view]Marked-up Tech Spec Pages Deleting Footnotes That Were Added as One Time Changes & Proposing Change Identified Subsequent to 971114 Submittal That Corrects Error Issued in Amend 69 for Salem Unit 2 ML18107A4961999-08-23023 August 1999 Proposed Tech Specs,Modifying 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. ML18107A4671999-07-29029 July 1999 Proposed Tech Specs Replacing Surveillance 4.6.1.1a with Appropriate NUREG-1431 Requirements ML18107A4601999-07-23023 July 1999 Proposed Tech Specs Pages Changing TS Surveillance Requirement 4.8.1.1.2 D 7 by Removing Restriction to Perform Test Every 18 Months During Shutdown ML18107A4241999-07-0202 July 1999 Proposed Tech Specs,Relocating TS 3/4.3.4 Lco,Surveillance Requirements & Bases from TS to UFSAR ML18107A3811999-06-10010 June 1999 Proposed Tech Specs 3/4.6.1, Containment Integrity, Clarifying When Verification of Primary Containment Integrity May Be Performed by Administrative Means ML18107A3601999-06-0404 June 1999 Non-proprietary Tech Specs Pages Re Transfer of PSEG Ownership Interests & Licensed Operating Authorities to New, Affiliated Nuclear Generating Company,Pseg Nuclear LLC ML18107A2131999-04-14014 April 1999 Proposed Tech Specs 3/4.9.12, Fhavs, Revised to Ensure Consistency Between TS Requirements for Fhavs & Sys Design Basis,As Well Better Alignment to Bases Provided in NUREG-1431 ML18106B1591999-03-31031 March 1999 Proposed Tech Specs Allowing Plant Operation to Continue to Thirteenth Refueling Outage (1R13),currently Scheduled to Begin on 990918 ML18106B0801999-02-22022 February 1999 Proposed Tech Specs Re CR Emergency Air Conditioning Sys ML18106B0641999-02-0808 February 1999 Proposed Tech Spec Pages,Modifying ECCS Subsystems Surveillance 4.5.3.2.b by Adding Option of Providing Necessary Isolation Function When Testing ML18106B0611999-02-0808 February 1999 Proposed Tech Specs SR 4.8.1.1.2.f Re Hot Restart & Definition of Standby Conditions. ML18106B0531999-02-0202 February 1999 Proposed Tech Specs 5.6.1.1,revising Max Permissible Enrichment of Stored New Fuel ML18106B0431999-01-19019 January 1999 Proposed Tech Specs Bases Section 3/4.1.2 Re Boration Sys ML18106B0241999-01-15015 January 1999 Proposed Tech Specs Re Deferral of Surveillance Requirements for Salem Generating Station,Unit 1 ML18106A9231998-10-12012 October 1998 Proposed Tech Specs Re Inserts & Marked Up Pages for LCR S98-03 ML18106A9181998-10-12012 October 1998 Proposed Tech Specs Re one-time Changes to Certain Unit 2 TS SR for Fuel Cycle 10 ML18106A8941998-09-29029 September 1998 Proposed Tech Specs Section 3/4.9.2,modified to Permit Use of Equivalent Methods to Obtain Containment Closure During Refueling Operations for Containment Equipment Hatch ML18106A8781998-09-17017 September 1998 Proposed Tech Specs Modifying 3/4.8.2.2,3/4.8.2.4 & 3/4.8.2.6 to Address Movement of Irradiated Fuel & Deleting LCO Re Requirement to Establish Containment Integrity ML18106A8371998-08-12012 August 1998 Proposed Tech Specs Modifying Allowed Continued Operation W/Inoperable Air Lock Door Provided That Operable Door Is Closed & Unlocked & Making Requirements for Inoperable Air Lock Door ML18106A7931998-07-30030 July 1998 Proposed Tech Specs,Revising Acceptance Criteria for CR Emergency Air Conditioning Sys from Maintaining CR at 1/8-inch Positive Pressure W/Respect to Adjacent Areas to Stated Phrase ML18106A6961998-07-0707 July 1998 Proposed Tech Specs Section 4.2.1 Re Aquatic Monitoring of App B for Environ Protection Plan ML18106A6631998-06-17017 June 1998 Proposed Revised Tech Specs Bases Pages 3/4.1.3,3/4.1.2, 3/4.5.5 & 3/4.9.1,ensuring Acceptable Power Distribution Limits Are Maintained,Providing Operational Flexibility & Clarifying Statements ML18106A4291998-03-26026 March 1998 Proposed Tech Specs,Changing Applicability Statement from Mode 3 to Modes 1 & 2 ML18106A4241998-03-26026 March 1998 Proposed Tech Specs Incorporating Note at Bottom of Salem Unit 2 T3/4.8.2 Into Salem 1 TS & Adding Asterisks to Word Inverters. ML18106A3221998-02-18018 February 1998 Marked-up TS Pages for Section 4.2.1 of App B ML18106A3091998-02-0202 February 1998 Revised TS Bases Pages for Specs 3/4.3.3.1,radiation Monitoring instrumentation,3/4.3.3.8,radioactive Liquid Effluent Monitoring Instrumentation & 3/4.3.3.9,radioactive Gaseous Effluent Monitoring Instrumentation ML18106A2541998-01-0808 January 1998 Proposed Tech Specs Pages,Adding Asterisk to Word Operable in LCO & Associated Note at Bottom of Page ML18106A2141997-12-15015 December 1997 Proposed Tech Specs Pages,Revising TS to Adopt Option B to 10CFR50,App J,For Type B & C Testing & Modify Existing TS Wording for Previous Adoption of Option B on Type a Testing ML18106A1961997-12-11011 December 1997 Proposed Tech Specs Re one-time Exemption to Allow Containment Purging in Modes 3 & 4 ML18102B6791997-11-14014 November 1997 Proposed Tech Specs Providing Surveillance Requirements to Codify Existing Procedural Commitments for SW Accumulator Vessels ML18102B6751997-11-14014 November 1997 Proposed Tech Specs Re Administrative & Editorial Corrections ML18102B6631997-11-0404 November 1997 Proposed Tech Specs,Deleting 4.8.1.1.2.d.1,which Calls for Diesels to Be Subjected to Insp Based on Vendor Recommendations at Least Once Per 18 Months During Shutdown ML18102B6591997-11-0404 November 1997 Proposed Tech Specs,Revising Surveillance Requirement 4.6.2.1.b to Verify That on Recirculation Flow,Containment Spray Pumps Develop Differential Pressure of Greater than or Equal to 204 Psid ML18102B6431997-10-29029 October 1997 Proposed Tech Specs Revising SR 4.8.1.1.2.d.2 Proposed in 960925 Request to Change EDG Voltage & Frequency Limits as Result of Updated EDG Load Calculations & Ambiguity in Testing Methodology for EDG Start Timing ML18102B6391997-10-29029 October 1997 Proposed Tech Specs Changing SG Insp Schedule to Require Next Insp within 24 Months of Mode 2 for Unit 2 Fuel Cycle 10 ML18102B6491997-10-24024 October 1997 Proposed Tech Specs Pages,Modifying TS 3/4.7.7, Auxiliary Building Exhaust Air Filtration Sys & Bases ML18102B6461997-10-24024 October 1997 Proposed Tech Specs Revising Containment Hydrogen Analyzer SRs of TS 4.6.4.1 ML18102B6321997-10-21021 October 1997 Proposed Tech Specs,Extending Applicability of Power Range Neutron Flux TS Trip to Require Operability & Surveillance Testing in Mode 3,when Reactor Trip Sys Breakers Are in Closed Position ML18102B6201997-10-14014 October 1997 Proposed Tech Specs Modifying Pressure Isolation Valves LCO, LCO Action Statement,Surveillance Requirement & Table 4.4-4 to Be Consistent W/Salem Unit 2 ML18102B6081997-10-0606 October 1997 Proposed Tech Specs Revising LCOs 3.1.3.1, Movable Control Assemblies & 3.1.3.2.1, Position Indication Sys. ML18102B5571997-08-27027 August 1997 Proposed Tech Specs,Providing Revised TS Bases Pages for TS 3.7.3, CCW Sys, Which States That Three CCW Pumps Required to Meet LCO ML18102B5301997-08-19019 August 1997 Proposed Tech Specs,Providing Addl Operational Flexibility to Allow Orderly Resumption of Startup & Preclude Unwarranted Power Transients at Salem Unit 2 ML18102B5341997-08-18018 August 1997 Proposed Tech Specs,Incorporating Plant Computer (P-250) Into TS Bases for Movable Control Assemblies ML18102B4891997-08-0101 August 1997 Proposed Tech Specs Section 4.2.1 Rewording Section to State Util Will Adhere to Section 7,Incidental Take Statement Approved by Natl Maring Fisheries Svc ML18102B3911997-06-12012 June 1997 Proposed Tech Specs,Representing Addition of New Spec 3/4.7.10, Chilled Water Sys - Auxiliary Bldg Subsystem. ML18102B3061997-05-14014 May 1997 Proposed Tech Specs,Revising SR 4.7.6.1.d.1,to Indicate That Specified Acceptable Filter Dp Is to Be Measured Across Filter Housing & Reflecting Filter Dp Acceptance Value Greater than 2.70 Water Gauge ML18102B2631997-05-0101 May 1997 Proposed Tech Specs,Adding New Spec 3/4.7.10, Chilled Water Sys - Auxiliary Bldg Subsystem. ML18102B2601997-05-0101 May 1997 Proposed Tech Specs 3/4.7.7 Revising Certain Allowed Outage Times & Creating 3/4.7.11 to Address Switchgear & Penetration Area Ventilation Sys ML18102B0341997-04-25025 April 1997 Proposed Tech Specs 3.5.2 Eliminating Flow Path from RHR Sys to RCS Hot Legs as Specified in LCO 3.5.2.c.2 1999-08-25 Category:TECHNICAL SPECIFICATIONS & TEST REPORTS MONTHYEARML18107A5291999-09-10010 September 1999
[Table view]Revised Event Classification Guide,Including Rev 18 to Table of Contents,Rev 10 to Attachments 6 & 7 & Rev 11 to Attachment 9 ML20211Q8771999-08-27027 August 1999 Rev 0 to Inservice Testing Manual for Pumps & Valves Program ML18107A5171999-08-25025 August 1999 Marked-up Tech Spec Pages Deleting Footnotes That Were Added as One Time Changes & Proposing Change Identified Subsequent to 971114 Submittal That Corrects Error Issued in Amend 69 for Salem Unit 2 ML18107A5121999-08-23023 August 1999 Procedure 71151, Performance Indicator Verification. ML18107A5091999-08-23023 August 1999 Attachment 21 to Procedure 71111, Safety Sys Design & Performance Capability. ML18107A4961999-08-23023 August 1999 Proposed Tech Specs,Modifying 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. ML18107A4671999-07-29029 July 1999 Proposed Tech Specs Replacing Surveillance 4.6.1.1a with Appropriate NUREG-1431 Requirements ML18107A4601999-07-23023 July 1999 Proposed Tech Specs Pages Changing TS Surveillance Requirement 4.8.1.1.2 D 7 by Removing Restriction to Perform Test Every 18 Months During Shutdown ML18107A4241999-07-0202 July 1999 Proposed Tech Specs,Relocating TS 3/4.3.4 Lco,Surveillance Requirements & Bases from TS to UFSAR ML18107A3811999-06-10010 June 1999 Proposed Tech Specs 3/4.6.1, Containment Integrity, Clarifying When Verification of Primary Containment Integrity May Be Performed by Administrative Means ML18107A3601999-06-0404 June 1999 Non-proprietary Tech Specs Pages Re Transfer of PSEG Ownership Interests & Licensed Operating Authorities to New, Affiliated Nuclear Generating Company,Pseg Nuclear LLC ML18107A2961999-05-12012 May 1999 Revised Event Classification Guide,Including Rev 16 to Table of Contents,Rev 8 to Attachment 6,rev 8 to Attachment 7 & Rev 9 to Attachment 9 ML18107A2131999-04-14014 April 1999 Proposed Tech Specs 3/4.9.12, Fhavs, Revised to Ensure Consistency Between TS Requirements for Fhavs & Sys Design Basis,As Well Better Alignment to Bases Provided in NUREG-1431 ML18106B1591999-03-31031 March 1999 Proposed Tech Specs Allowing Plant Operation to Continue to Thirteenth Refueling Outage (1R13),currently Scheduled to Begin on 990918 ML18106B0801999-02-22022 February 1999 Proposed Tech Specs Re CR Emergency Air Conditioning Sys ML18106B0641999-02-0808 February 1999 Proposed Tech Spec Pages,Modifying ECCS Subsystems Surveillance 4.5.3.2.b by Adding Option of Providing Necessary Isolation Function When Testing ML18106B0611999-02-0808 February 1999 Proposed Tech Specs SR 4.8.1.1.2.f Re Hot Restart & Definition of Standby Conditions. ML18106B0531999-02-0202 February 1999 Proposed Tech Specs 5.6.1.1,revising Max Permissible Enrichment of Stored New Fuel ML18106B0431999-01-19019 January 1999 Proposed Tech Specs Bases Section 3/4.1.2 Re Boration Sys ML18106B0241999-01-15015 January 1999 Proposed Tech Specs Re Deferral of Surveillance Requirements for Salem Generating Station,Unit 1 ML18106A9231998-10-12012 October 1998 Proposed Tech Specs Re Inserts & Marked Up Pages for LCR S98-03 ML18106A9181998-10-12012 October 1998 Proposed Tech Specs Re one-time Changes to Certain Unit 2 TS SR for Fuel Cycle 10 ML18106A8941998-09-29029 September 1998 Proposed Tech Specs Section 3/4.9.2,modified to Permit Use of Equivalent Methods to Obtain Containment Closure During Refueling Operations for Containment Equipment Hatch ML18106A8781998-09-17017 September 1998 Proposed Tech Specs Modifying 3/4.8.2.2,3/4.8.2.4 & 3/4.8.2.6 to Address Movement of Irradiated Fuel & Deleting LCO Re Requirement to Establish Containment Integrity ML18106A8371998-08-12012 August 1998 Proposed Tech Specs Modifying Allowed Continued Operation W/Inoperable Air Lock Door Provided That Operable Door Is Closed & Unlocked & Making Requirements for Inoperable Air Lock Door ML18106A7931998-07-30030 July 1998 Proposed Tech Specs,Revising Acceptance Criteria for CR Emergency Air Conditioning Sys from Maintaining CR at 1/8-inch Positive Pressure W/Respect to Adjacent Areas to Stated Phrase ML18106A6961998-07-0707 July 1998 Proposed Tech Specs Section 4.2.1 Re Aquatic Monitoring of App B for Environ Protection Plan ML18106A6631998-06-17017 June 1998 Proposed Revised Tech Specs Bases Pages 3/4.1.3,3/4.1.2, 3/4.5.5 & 3/4.9.1,ensuring Acceptable Power Distribution Limits Are Maintained,Providing Operational Flexibility & Clarifying Statements ML20216B0641998-05-0101 May 1998 Rev 1 to ECG-ATT 14, Four Hour Rept - NRC Operations & Rev 7 to ECG-HECG-TOC, Hope Creek Event Classification Guide Table of Contents/Signature Page ML18106A5571998-04-16016 April 1998 Rev 21 to EOP-CFST-1, Shutdown Margin Status Tree & Rev 10 to Table of Contents ML20239A1251998-03-31031 March 1998 Rev 11 to Salem Nuclear Generating Station Odcm ML18106A4241998-03-26026 March 1998 Proposed Tech Specs Incorporating Note at Bottom of Salem Unit 2 T3/4.8.2 Into Salem 1 TS & Adding Asterisks to Word Inverters. ML18106A4291998-03-26026 March 1998 Proposed Tech Specs,Changing Applicability Statement from Mode 3 to Modes 1 & 2 ML18106A3921998-03-13013 March 1998 Rev 9 to ECG-SECG-TOC & Rev 2 to ECG-ATT.04, General Emergency. ML18106A8281998-03-0404 March 1998 Rev 1 to Reactivity Manipulations Documentation Guide. ML18106A3221998-02-18018 February 1998 Marked-up TS Pages for Section 4.2.1 of App B ML18106A3091998-02-0202 February 1998 Revised TS Bases Pages for Specs 3/4.3.3.1,radiation Monitoring instrumentation,3/4.3.3.8,radioactive Liquid Effluent Monitoring Instrumentation & 3/4.3.3.9,radioactive Gaseous Effluent Monitoring Instrumentation ML18106A2541998-01-0808 January 1998 Proposed Tech Specs Pages,Adding Asterisk to Word Operable in LCO & Associated Note at Bottom of Page ML18106A2141997-12-15015 December 1997 Proposed Tech Specs Pages,Revising TS to Adopt Option B to 10CFR50,App J,For Type B & C Testing & Modify Existing TS Wording for Previous Adoption of Option B on Type a Testing ML18106A1961997-12-11011 December 1997 Proposed Tech Specs Re one-time Exemption to Allow Containment Purging in Modes 3 & 4 ML18102B6791997-11-14014 November 1997 Proposed Tech Specs Providing Surveillance Requirements to Codify Existing Procedural Commitments for SW Accumulator Vessels ML18102B6751997-11-14014 November 1997 Proposed Tech Specs Re Administrative & Editorial Corrections ML18102B6591997-11-0404 November 1997 Proposed Tech Specs,Revising Surveillance Requirement 4.6.2.1.b to Verify That on Recirculation Flow,Containment Spray Pumps Develop Differential Pressure of Greater than or Equal to 204 Psid ML18102B6631997-11-0404 November 1997 Proposed Tech Specs,Deleting 4.8.1.1.2.d.1,which Calls for Diesels to Be Subjected to Insp Based on Vendor Recommendations at Least Once Per 18 Months During Shutdown ML18102B6431997-10-29029 October 1997 Proposed Tech Specs Revising SR 4.8.1.1.2.d.2 Proposed in 960925 Request to Change EDG Voltage & Frequency Limits as Result of Updated EDG Load Calculations & Ambiguity in Testing Methodology for EDG Start Timing ML18102B6391997-10-29029 October 1997 Proposed Tech Specs Changing SG Insp Schedule to Require Next Insp within 24 Months of Mode 2 for Unit 2 Fuel Cycle 10 ML18102B6491997-10-24024 October 1997 Proposed Tech Specs Pages,Modifying TS 3/4.7.7, Auxiliary Building Exhaust Air Filtration Sys & Bases ML18102B6461997-10-24024 October 1997 Proposed Tech Specs Revising Containment Hydrogen Analyzer SRs of TS 4.6.4.1 ML18102B6321997-10-21021 October 1997 Proposed Tech Specs,Extending Applicability of Power Range Neutron Flux TS Trip to Require Operability & Surveillance Testing in Mode 3,when Reactor Trip Sys Breakers Are in Closed Position ML18102B6201997-10-14014 October 1997 Proposed Tech Specs Modifying Pressure Isolation Valves LCO, LCO Action Statement,Surveillance Requirement & Table 4.4-4 to Be Consistent W/Salem Unit 2 1999-09-10 |
Text
NLR-N90156 Table 1 Summary of Salem Unit 2 EDG Test Failures Per Nuclear Unit Basis (Present Technical Specifications)
Number of Failures in Last 100.Tests = 4 Resulting Test Interval = 3 days Number of Consecutive Valid Tests Required to Reduce Failure Rate Corresponding Test Interval to 3 I 100 Valid Tests = 30 7 Days to 2 I 100 Valid Tests = 34 14 Days to 1 I 100 Valid Tests = 35 31 Days Per Diesel Generator Basis (Proposed Technical Specifications):
DIESEL FAILURES TN TEST INTERVAL PER LAST 20 STARTS PROPOSED TS 2A 1 31 days 2B 0 31 days 2C 0 31 days
NI.R-N90156 ATTACHMENT 2
r '
r
- TABLE 4.8-1 DIESEL GENERATOR TEST SCHEDULE r:;-;;l Number of Failures In
~Valid Tests* Test Frequency Less 1'1.A11 or E'lwc/ ti> .$"'1 At, least once per ~days [1J Grt!!.Q fer rla.,., or ~u.t/*' 2 At least once per . days
+£- At least e"ee per 7 days -e....
~ At least o"ee per 3 days e numloer of ks.ts '4(/J Fo.,;/,,aes is
- criteria for determining number of failures and number of valid tests shall be in accordance with Regulatory Position C.2.e of Regulatory Guide 1. 108,
~~e,ef Revision 1, August 1977, where the determined on a per eMr((1'>rr-~~ea.1~~* basis. For the ptJrpeses ef this test schedule, 9Rly valid tests ceAducted afteF the Ob issuance date shall be included in the ;gmpYtatioR of the "last lQO valid tests. 11 EAtpY .inte this test schedule st:lall se made at the 31 day test freq~eney.
SALEM - UNIT 2 3/4 8-6