MONTHYEARML20217L7971999-10-20020 October 1999 Submits Results of Review of 990521 & 0709 Ltrs Which Provided Core Shroud Insp Results & Tie Rod Stabilizer Assemblies ML20217G1291999-10-15015 October 1999 Forwards Errata to Safety Evaluation for Amend 168 Issued to FOL DPR-63 on 990921.Description of Flow Control Trip Ref Cards to Be Consistent with Application for Amend ML20217K2831999-10-14014 October 1999 Submits Response to NRC Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates, for Fiscal Yrs 2000 & 2001 ML20217H3211999-10-0808 October 1999 Forwards Changed Pages for Issue 5,rev 1 of Nine Mile Point Station Physical Security & Safeguards Contingency Plan,Iaw 10CFR50.54(p).Without Encls ML20212K8601999-10-0606 October 1999 Responds to Concern in 990405 Petition Re Residual Heat Removal Alternate Shutdown Cooling Modes of Operation at Nine Mile Point Nuclear Station,Unit 2 ML20216J9311999-09-30030 September 1999 Forwards Response to NRC 981119 Suppl RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20212J4651999-09-30030 September 1999 Informs of Completion of mid-cyle PPR of Nine Mile Point Nuclear Station on 990916.Determined That Problems in Areas of Human Performance & Work Control Required Continued Mgt Attention.Historical Listing of Plant Issues Encl ML18040A3701999-09-30030 September 1999 Provides Changes to Application for Amend Re Volumes 1-11 of 981016 Submittal & Discard & Insertion Instructions Re Integration of Proposed Changes,In Response to NRC RAIs ML20212K8641999-09-30030 September 1999 Informs That During 990927 Telcon Between J Williams & J Bobka,Arrangements Were Made for Administration of Exams at Plant During Wk of Feb 14,2000.Preliminary RO & SRO License Applications Should Be Submitted 30 Days Prior Exam ML20212J8831999-09-30030 September 1999 Informs That Util 980810 & 990630 Responses to GL 98-01 & Suppl 1, Y2K Readiness of Computer Sys at NPPs Acceptable. NRC Considers Subj GL to Be Closed for Plant ML20212E9801999-09-23023 September 1999 Submits Info in Response to Request for Estimated Initial Operator Licensing Exam Needs,Per Administrative Ltr 99-03 ML20216F7101999-09-17017 September 1999 Forwards Response to NRC 990806 RAI Re USI A-46,verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors.Nrc Is Informed That Actions Required for Resolution of USI A-46 Have Been Completed ML20212B2821999-09-14014 September 1999 Responds to 990712 Correspondence Which Responded to NRC Ltr Re High Failure Rate for Generic Fundamentals Exam of 990407 for Nine Mile Point.Considers Corrective Actions Taken to Be Acceptable ML20212D8981999-09-14014 September 1999 Forwards ISI Summary Rept for Refueling Outage 15 & Flaw Indication Repts.Supporting Info Repts & Calculations, Encl ML20212B2581999-09-10010 September 1999 Requests That Name of Bm Bordenick Be Removed from Nine Mile Point,Units 1 & 2 Service List ML20211P5771999-09-10010 September 1999 Forwards Application for Amends to Licenses DPR-63 & NPF-69, to Transfer Licenses to Amergen Energy Co,Llc.Ts Pages & Proprietary Addendum,Included.Proprietary Encl Withheld ML20212A1341999-09-0707 September 1999 Forwards Summary Rept Secondary Containment Leakage Testing, Dtd June 1999 for Nine Mile Point,Unit 1,IAW TS 6.9.3.f ML20211K8141999-09-0101 September 1999 Forwards Reactor Containment Bldg Ilrt,Iaw Plant TS 6.9.3.e.Testing Confirmed That TS 3.3.3/4.3.3 & 6.16 Primary Containment Leakage Requirements Were Satisfactorily Met ML20211L9221999-09-0101 September 1999 Confirms That Licensee Will Retain Weld 32-WD-050 as IGSCC Category F Until Completion of Reinspection Program,In Response to NRC ML20211J6461999-08-30030 August 1999 Forwards Response to NRC 990625 RAI Re NMPC Responses to GL 92-01,rev 1,supplement 1, Reactor Vessel Structural Integrity ML20211K3001999-08-30030 August 1999 Forwards Semi-Annual Radioactive Effluent Release Rept for 990101-990630 & Revised ODCM, for Nine Mile Point,Unit 1. Format Used for Effluent Data Is Outlined in App B of Regulatory Guide 1.21,rev 1 ML20211K5031999-08-30030 August 1999 Responds to Ltr Addressed to Chairman Dicus, Expressing Concerns Involving 990624 Automatic Reactor Shutdown.Insp Findings & Conclusions Will Be Documented in Insp Repts 50-220/99-06 & 50-410/99-06 by mid-Sept 1999 ML20211H1921999-08-26026 August 1999 Forwards Application for Amend to License DPR-63,supporting Implementation of Noble Metal Chemical Addition by Raising Reactor Water Conductivity Limits in TSs 3.2.3.a,3.2.3.c.1 & 3.2.3.b ML20211P5161999-08-26026 August 1999 Discusses Submitted on Behalf of Niagara Mohawk Power Corp Written Comments Addressing 10CFR2.206 Petition & Request That Ltr & Attached Response Be Withheld from Public Disclosure.Request Denied ML20211G4921999-08-26026 August 1999 Advises That Info Re Comments Addressing 10CFR2.206,dtd 990405 Will Be Withheld from Public Disclosure,In Response to ML20211D7731999-08-20020 August 1999 Forwards Semiannual FFD Program Performance Data Rept Covering Period 990101 Through 990630 ML20211B9371999-08-18018 August 1999 Provides Addl Info Re Application of Method a at Nmp,Unit 1 as Described in Generic Implementation Procedure,Rev 2 (GIP-2),NRC Supplemental SER 2 & Documents Ref in GIP-2 Upon Which GIP-2 Is Based ML18040A3691999-08-16016 August 1999 Forwards Response to NRC 990510 RAI Pertaining to NMP Application for Amend Re Conversion of NMPNS Unit 2 Current TS to Its.Nrc Requested Info Re Several Sections,Including Section 3.6, Containment Sys. ML20210Q0031999-08-11011 August 1999 Informs That Due to Printing Malfunction,Some Copies of Author Ltr Dtd 990726,may Not Have Included Second Page of Encl 2 of Ltr ML20210R6661999-08-10010 August 1999 Confirms Conversation on 990721 Re Concerns of Syracuse Anti-Nuclear Effort on Status of 2.206 Petition (Filed 990524) & Upcoming NRC Performance Review Meeting on Nine Mile Point Units 1 & 2 ML20210R8101999-08-10010 August 1999 Forwards 1998 Annual Repts for NMP & co-tenants,including Rg&E,Energy East Corp/Nyse&G,Chg&E & Long Island Power Authority,Per 10CFR50.71(b) ML20210L5321999-08-0606 August 1999 Forwards List of Subjects Discussed During 990714 Telcon with Representatives of Niagara Mohawk Power Corp on Unit 1 Re USI A-46 Issue ML18041A0711999-07-30030 July 1999 Forwards Rev 1 to NMP2-ISI-006, Second Ten Year Interval ISI Program Plan for Nine Mile Point Nuclear Power Station Unit 2. Significant Changes from Rev 0 Listed ML20210J9351999-07-29029 July 1999 Informs That NMP Is Changing Completion Date for Replacement of Valves Having O Rings with Installed Life Greater than Eight Years.Replacement to Be Completed by 991031, During Hydrogen Monitoring Sys Maintenance Outage ML20216E1491999-07-26026 July 1999 Forwards Two Ltrs Received from NMPC Re Nine Mile Point Unit 1 Core Shroud Related to 10CFR2.206 ML20210E9151999-07-23023 July 1999 Discusses Evaluation of Recirculation Line Weld 32-WD-050 Indication Found During 1997 Refueling Outage (RFO14) at NMPNS Unit 1.Requests Notification of Decision to Retain Category F Classification Until Listed Conditions Satisfied ML20209G7911999-07-12012 July 1999 Provides Info Requested in NRC Re 990407 Generic Fundamentals Exam Failure Causes & Corrective Actions ML20209G3711999-07-12012 July 1999 Provides Final Root Cause Evaluation Re GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in Bwrs, for Unit 1 ML20209G2001999-07-0909 July 1999 Forwards RFO-15 Core Shroud Insp Summary Rept, as Required by GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in BWRs & BWRVIP Rept BWR Core Shroud Insp & Flaw Evaluation Guideline (BWRVIP-01) ML20209F8561999-07-0606 July 1999 Forwards Rev 1 to Nmp,Unit 1 COLR for Cycle 14. Rept Is Being Submitted to Commission in Compliance with TS 6.9.1.f.4 ML20211K5071999-07-0606 July 1999 Submits Concerns Re 990624 Event Involving Automatic Reactor Shutdown.More than 5 Failures Were Identified in Event Number 35857 ML20196J6421999-06-30030 June 1999 Discusses Completion of Licensing Action for GL 96-01, Testing of Safety-Related Logic Circuits, Issued on 960110 ML20209B7071999-06-30030 June 1999 Responds to NRC Request for Info Re Y2K Readiness at Nuclear Facilities,As Contained in GL 98-01,Supp 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Y2K Readiness Disclosure,Encl ML20211P5271999-06-29029 June 1999 Submits Written Comments Addressing Petition Dtd 990405, Submitted by R Norway as It Relates to Expressed Concerns That Involve NMPC Activities.None of Relief Requested in Petition Warranted ML20196K6461999-06-29029 June 1999 Discusses Ofc of Investigations Rept 1-98-33 Re Unqualified Senior Reactor Operator Assuming Position of Assistant Station Shift Supervisor at Unit 1 on 980616.One Violation Being Cited as Described in Encl NOV ML20209B3501999-06-25025 June 1999 Submits Torus Shell & Coupon Corrosion Rate Determination for Nmpns,Unit 1.Torus Meets ASME Code Requirements,Iaw NRC 920825 & 940811 SERs ML20212J4431999-06-25025 June 1999 Discusses Responses to RAI Re GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity ML20209B3531999-06-25025 June 1999 Informs NRC That All Actions Associated with NRC Bulletin 96-003, Potential Plugging of ECC Suction Strainers by Debris in Bwrs, Has Been Completed.Summary of Actions Completed & Other Pertinent Info Is Provided in Attachment ML20196F5721999-06-23023 June 1999 Forwards Rev 3 to NMP1-IST-003, Third Ten Year Inservice Testing Program Plan, Which Will Begin on 991226.Program Plan Conforms to Requirements of 1989 Edition of ASME Boiler & Pressure Vessel Code.Three Relief Requests,Encl ML20196G1461999-06-23023 June 1999 Informs That Actions Requested in GL 96-01, Testing of Safety-Related Logic Circuits Completed 1999-09-07
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217K2831999-10-14014 October 1999 Submits Response to NRC Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates, for Fiscal Yrs 2000 & 2001 ML20217H3211999-10-0808 October 1999 Forwards Changed Pages for Issue 5,rev 1 of Nine Mile Point Station Physical Security & Safeguards Contingency Plan,Iaw 10CFR50.54(p).Without Encls ML18040A3701999-09-30030 September 1999 Provides Changes to Application for Amend Re Volumes 1-11 of 981016 Submittal & Discard & Insertion Instructions Re Integration of Proposed Changes,In Response to NRC RAIs ML20216J9311999-09-30030 September 1999 Forwards Response to NRC 981119 Suppl RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20212E9801999-09-23023 September 1999 Submits Info in Response to Request for Estimated Initial Operator Licensing Exam Needs,Per Administrative Ltr 99-03 ML20216F7101999-09-17017 September 1999 Forwards Response to NRC 990806 RAI Re USI A-46,verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors.Nrc Is Informed That Actions Required for Resolution of USI A-46 Have Been Completed ML20212D8981999-09-14014 September 1999 Forwards ISI Summary Rept for Refueling Outage 15 & Flaw Indication Repts.Supporting Info Repts & Calculations, Encl ML20212B2581999-09-10010 September 1999 Requests That Name of Bm Bordenick Be Removed from Nine Mile Point,Units 1 & 2 Service List ML20211P5771999-09-10010 September 1999 Forwards Application for Amends to Licenses DPR-63 & NPF-69, to Transfer Licenses to Amergen Energy Co,Llc.Ts Pages & Proprietary Addendum,Included.Proprietary Encl Withheld ML20212A1341999-09-0707 September 1999 Forwards Summary Rept Secondary Containment Leakage Testing, Dtd June 1999 for Nine Mile Point,Unit 1,IAW TS 6.9.3.f ML20211K8141999-09-0101 September 1999 Forwards Reactor Containment Bldg Ilrt,Iaw Plant TS 6.9.3.e.Testing Confirmed That TS 3.3.3/4.3.3 & 6.16 Primary Containment Leakage Requirements Were Satisfactorily Met ML20211L9221999-09-0101 September 1999 Confirms That Licensee Will Retain Weld 32-WD-050 as IGSCC Category F Until Completion of Reinspection Program,In Response to NRC ML20211K3001999-08-30030 August 1999 Forwards Semi-Annual Radioactive Effluent Release Rept for 990101-990630 & Revised ODCM, for Nine Mile Point,Unit 1. Format Used for Effluent Data Is Outlined in App B of Regulatory Guide 1.21,rev 1 ML20211J6461999-08-30030 August 1999 Forwards Response to NRC 990625 RAI Re NMPC Responses to GL 92-01,rev 1,supplement 1, Reactor Vessel Structural Integrity ML20211H1921999-08-26026 August 1999 Forwards Application for Amend to License DPR-63,supporting Implementation of Noble Metal Chemical Addition by Raising Reactor Water Conductivity Limits in TSs 3.2.3.a,3.2.3.c.1 & 3.2.3.b ML20211D7731999-08-20020 August 1999 Forwards Semiannual FFD Program Performance Data Rept Covering Period 990101 Through 990630 ML20211B9371999-08-18018 August 1999 Provides Addl Info Re Application of Method a at Nmp,Unit 1 as Described in Generic Implementation Procedure,Rev 2 (GIP-2),NRC Supplemental SER 2 & Documents Ref in GIP-2 Upon Which GIP-2 Is Based ML18040A3691999-08-16016 August 1999 Forwards Response to NRC 990510 RAI Pertaining to NMP Application for Amend Re Conversion of NMPNS Unit 2 Current TS to Its.Nrc Requested Info Re Several Sections,Including Section 3.6, Containment Sys. ML20210R6661999-08-10010 August 1999 Confirms Conversation on 990721 Re Concerns of Syracuse Anti-Nuclear Effort on Status of 2.206 Petition (Filed 990524) & Upcoming NRC Performance Review Meeting on Nine Mile Point Units 1 & 2 ML20210R8101999-08-10010 August 1999 Forwards 1998 Annual Repts for NMP & co-tenants,including Rg&E,Energy East Corp/Nyse&G,Chg&E & Long Island Power Authority,Per 10CFR50.71(b) ML18041A0711999-07-30030 July 1999 Forwards Rev 1 to NMP2-ISI-006, Second Ten Year Interval ISI Program Plan for Nine Mile Point Nuclear Power Station Unit 2. Significant Changes from Rev 0 Listed ML20210J9351999-07-29029 July 1999 Informs That NMP Is Changing Completion Date for Replacement of Valves Having O Rings with Installed Life Greater than Eight Years.Replacement to Be Completed by 991031, During Hydrogen Monitoring Sys Maintenance Outage ML20209G3711999-07-12012 July 1999 Provides Final Root Cause Evaluation Re GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in Bwrs, for Unit 1 ML20209G7911999-07-12012 July 1999 Provides Info Requested in NRC Re 990407 Generic Fundamentals Exam Failure Causes & Corrective Actions ML20209G2001999-07-0909 July 1999 Forwards RFO-15 Core Shroud Insp Summary Rept, as Required by GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in BWRs & BWRVIP Rept BWR Core Shroud Insp & Flaw Evaluation Guideline (BWRVIP-01) ML20209F8561999-07-0606 July 1999 Forwards Rev 1 to Nmp,Unit 1 COLR for Cycle 14. Rept Is Being Submitted to Commission in Compliance with TS 6.9.1.f.4 ML20211K5071999-07-0606 July 1999 Submits Concerns Re 990624 Event Involving Automatic Reactor Shutdown.More than 5 Failures Were Identified in Event Number 35857 ML20209B7071999-06-30030 June 1999 Responds to NRC Request for Info Re Y2K Readiness at Nuclear Facilities,As Contained in GL 98-01,Supp 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Y2K Readiness Disclosure,Encl ML20211P5271999-06-29029 June 1999 Submits Written Comments Addressing Petition Dtd 990405, Submitted by R Norway as It Relates to Expressed Concerns That Involve NMPC Activities.None of Relief Requested in Petition Warranted ML20209B3501999-06-25025 June 1999 Submits Torus Shell & Coupon Corrosion Rate Determination for Nmpns,Unit 1.Torus Meets ASME Code Requirements,Iaw NRC 920825 & 940811 SERs ML20209B3531999-06-25025 June 1999 Informs NRC That All Actions Associated with NRC Bulletin 96-003, Potential Plugging of ECC Suction Strainers by Debris in Bwrs, Has Been Completed.Summary of Actions Completed & Other Pertinent Info Is Provided in Attachment ML20196G1461999-06-23023 June 1999 Informs That Actions Requested in GL 96-01, Testing of Safety-Related Logic Circuits Completed ML20196F5721999-06-23023 June 1999 Forwards Rev 3 to NMP1-IST-003, Third Ten Year Inservice Testing Program Plan, Which Will Begin on 991226.Program Plan Conforms to Requirements of 1989 Edition of ASME Boiler & Pressure Vessel Code.Three Relief Requests,Encl ML20209B2951999-06-22022 June 1999 Informs That Training Re Pressure Relief Panels Was Completed for Remainder of Target Population on 990226 ML20196E9231999-06-21021 June 1999 Forwards Response to NRC 990510 RAI Re NMP 981116 Application Proposing Changes to TSs to Provide Reasonable Assurance That Coupled neutronic/thermal-hydraulic Instabilities Were Detected & Suppressed in NMPN-1 Reactor ML18040A3651999-06-0707 June 1999 Forwards for Filing Original Application of Central Hudson & Gas & Electric Corp Seeking Extension of Expiration Date of Order,Dtd 980719,issued by Commission ML18040A3661999-06-0404 June 1999 Informs That Entire Attachment to Ltr NMP2L 1862 Dtd 990421, Should Be Replaced with Entire Attachment Being Sent with Present Ltr ML20195C9751999-06-0101 June 1999 Informs That Weld 32-WD-050 Will Be Reclassified Back to GL 88-01 Category a Weld & ASME Code Section XI Insps Will Be Conducted in Next Three Insp Periods ML20195C9601999-05-28028 May 1999 Provides Final Extent of Condition Evaluation Re Failed Cap Screw Beyond Upper Spring.Nmpc Continues to Conclude as Stated in That No Addl Mods Are Needed Other than Those Indicated in Ltr ML20207F1811999-05-24024 May 1999 Petitions NRC to Suspend Operating License of NMP for NMPNS Unit 1 Until Such Time as NMPC Releases Most Recent Insp Data on Plant Core Shroud & Adequate Public Review of Plant Safety Accomplished Because of Listed Concerns ML20195B1861999-05-21021 May 1999 Requests Staff Approval of Proposed Mod to Each of Four Tie Rods Per 10CFR50.55a(a)(3)(i).Summary of Tie Rod Insp Findings,Summary of Root Cause Evaluation of Failure of Cap Screw,Calculation B-13-01739-23 & Summary of Se,Encl ML20207D1541999-05-21021 May 1999 Forwards Issue 5,rev 0 of Physical Security & Safeguards Contingency Plan for Nmpns.Summary of Changes Included to Facilitate Review.Encls Withheld ML20207D5331999-05-21021 May 1999 Forwards Issue 3,Rev 1 of NMP Nuclear Security Training & Qualification Plan.Summary of Changes Is Included with Plan to Provide Basis for Individual Changes & to Facilitate NRC Review.Plan Withheld Per 10CFR2.790 ML20206S2621999-05-16016 May 1999 Expresses Concerns About Safety of Nmp,Unit 1 Nuclear Reactor.Nrc Should Conduct Insp of Reactor Including Area Besides Core Shroud Welds & Publicly Disclose Results at Least Wk Before Restart Date ML20195D5911999-05-13013 May 1999 Submits Final Copy of Open Ltr to Central Ny,With Proposals Re Nine Mile One Core Shroud Insp During Refueling Outage Which Began on 990411 ML20206P1981999-05-11011 May 1999 Forwards Response to NRC RAI Re NMP Previous Responses to GL 96-05, Periodic Verification of Design-Basis of SR Movs, for NMP Units 1 & 2 ML20206R6941999-05-10010 May 1999 Responds to 990413 & 0430 Ltrs Re Apparent Violation Noted in Investigation Rept 1-98-033.Util Agrees with Violation, But Disagrees with Characterization That Violation Was Willful or Deliberate ML20206N0291999-05-0707 May 1999 Forwards Rev 39 to NMP Site Emergency Plan & Revised Epips,Including Rev 1 to EPMP-EPP-03,rev 5 to EPIP-EPP-25 & Rev 5 to EPIP-EPP-28 ML20206G8121999-04-30030 April 1999 Forwards Comments on Draft Reg Guide DG-1083, Content of UFSAR IAW 10CFR50.71(e), Dtd Mar 1999.Util Generally Supports DG-1083 ML20206F7731999-04-22022 April 1999 Forwards Renewal Application for SPDES Permit Number NY-000-1015 for Nmpns,Units 1 & 2 1999-09-07
[Table view] |
Text
,.ACCELERAT DOCUMENT DIST VTION SYSTEM
",g r , REGULAT INFORMATION DISTRIBUTIO'. .SYSTEM (RIDS)
ACCESSION, 51BR:9406300276 DOC.DATE: 94/06/23 NOTARIZED: NO DOCKET N FACIL':50-410 Nine Mile Point Nuclear Station, Unit 2, Niagara Moha 05000410 AUTH. NAME AUTHOR AFFILIATION SYLVIA,B.R. Niagara Mohawk Power Corp.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Provides comments of evaluation of preliminary accident sequence precursor analysis.
DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: OR Submittal: General Distribution NOTES:
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PDl-1 LA 1. 1 PDl-1 PD 1 1 BRINKMAN,D 2 2 INTERNAL: ACRS 6 6 NRR/DE/EELB NRR/DORS/ONDD 1 1 NRR/DRCH/HICB NRR/DRPW 1 1 NRR/DSSA/SPLB NRR/DSSA/SPSB 1 0 NRR/DSSA/SRXB NUDOCS-ABSTRACT 1 1 OC./ DCB OGC/HDS3 1 0 GUM 01 EXTERNAL: NRC PDR 1 1 NSIC 1 1 NOTE TO ALL"RIDS" RECIPIENTS:
PLEASF. HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LTTR 23 ENCL 20
1 I
)
Nl v NIIAGARA
,. HUM~RAMK NIAGARAMOHAWKPOWER CORPORATION/NINE MILE POINT, P O. BOX 63, LYCOMING, NY 13093/TELEPHONE (3t5) 349-2882 B. Ralph Sylvia Executive Vice President Nuclear June 23, 1994 NMP2L 1478 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 RE: Nine Mile Point Unit 2 Docket No. 50-410 NPF-
Subject:
Evaluation of Preliminary Accident Sequence Precursor Analysis Gentlemen:
As requested in your May 20, 1994 letter, the Niagara Mohawk Engineering Department has reviewed the preliminary accident sequence precursor (ASP) analysis related to our Licensee Event Report 93-010 regarding the High Pressure Core Spray (HPCS) system. Overall the analysis accurately modeled Nine Mile Point 2 (NMP2) and was consistent with the Individual Plant Examination (IPE). One assumption was made, however, regarding HPCS operability that, when further data is reviewed, appears overly conservative. Niagara Mohawk's evaluation indicates that a HPCS failure rate of 4.05 E-2 per demand is more realistic than the rate of 1.0 per demand used in the preliminary ASP analysis. The attachment to this letter provides additional explanation of this conclusion.
Niagara Mohawk appreciates the opportunity to comment on this analysis. If you have any questions about the attached information, please contact our NRC Program Director, Mr. W.
D. Baker at (315) 349-4245.
Very truly yours, B. Ralp Sylvia Executive Vice President Nuclear BRS/AFZ/ksj Attachment xc: Regional Administrator, Region I Mr. B. S. Norris, Senior Resident Inspector Mr. M. L. Boyle, Acting Director, Project Directorate I-1, NRR Mr. D. S. Brinkman, Senior Project Manager, NRR Records Management PPt L,C '406300276 940623 PDR, ADOCK 05000410'"
PDR
0 I
Attachment Comments on NVIP2 HPCS Accident Sequence Precursor Evaluation Nine Mile Point Unit 2 (NMP2) Licensee Event Report (LER) 50-410/93-010 reported a failure in the High Pressure Core Spray (HPCS) system which could have rendered the HPCS system inoperable during a system initiating event while coincident with a degraded bus voltage. After receiving this LER, the NRC initiated a Probabilistic Safety Assessment (PSA) evaluation under the Accident Sequence Precursor (ASP) program. The preliminary results of this analysis have been received by NMPC.for. comment. This. document. will.provide. the. comments associated with our review of the preliminary ASP program results.
Overall, the analysis accurately modeled NMP2 and was consistent with the NMP2 Individual Plant Examination (IPE). However, one assumption was made regarding HPCS operability that, when further data is reviewed, appears overly conservative. The ASP analysis states:
"Since information was not provided concerning expected control circuit voltages at the other HPCS components, it was not possible to evaluate the likelihood that the other components would have functioned properly on demand. Therefore, a bounding analysis was performed, it was conservatively assumed that these components were not operable."
In this regard, NMPC has reviewed bus voltage data over the period of concern regarding HPCS operability. This data was collected during routine surveillance tests in accordance with plant procedures. At the 4 KV level measured voltages ranged from 4100 V. to 4400 V. Voltages at the 600 V. level were not routinely measured, but those recorded ranged from 580 V. to 630 V. This data represents a sample for the probability, at any instant in time, the system would not be operable. In accordance with the methodology outlined in calculation EC-57 Rev. 4, a voltage of 4140 V. the 4 KV level or a voltage in excess of 570.3 V. the 600 V.
level was more than sufficient for HPCS operability. Although components would be operable to some voltage below 4140 V., datapoints below this point are assumed conservatively to represent voltages at which HPCS would not operate. This is suggested since no absolute value is calculated and 4140 V. is a point where we can be confident that HPCS would operate.
During the period of concern, there were five voltage datapoints of the 240 total surveillance datapoints collected for the HPCS 4 KV bus voltage that were less than 4140 V. This would suggest that HPCS low voltage failure probability would be 5/240=2E-2. However, in some cases data was available for the 600 V. level and this reveals that for 2 of the 5 above-mentioned datapoints below 4140 V., the 600 V. readings were in excess of 580 V. Since this voltage is greater than the minimum 570.3 V. in the calculation, these 2 datapoints were censored from the suspect voltage group. The corresponding voltages at the 600 V. level for the remaining 3 instances below 4140 V. were not recorded. Under this treatment HPCS low voltage failure probability is 3/240=1.25E-2.
The NMP2 IPE calculated HPCS failure rate, for cases where offsite power is available, is 2.8E-2 per demand. Adding the low voltage probability to this value yields a value of 4.05E-2 per demand. This value represents a reasonable estimate of the actual HPCS system failure rate during the subject period. Consistent with the ASP analysis, we have not considered cases where HPCS must operate from its emergency diesel generator. This is reasonable since degraded voltage is far less likely when operating from the emergency diesel generators.
Cp Attachment - Continued Comments on NVIP2 HPCS Accident Sequence Precursor Evaluation The above estimate is conservative, although not as conservative as the original ASP estimate, due to a number of considerations. First, the three datapoints where degraded voltage existed most likely still represent conditions where HPCS would have functioned. Calculation EC-57 demonstrated margin available below the assumed lower limit. In that regard, the three assumed failures might have represented adequate. voltages.-.Also,.during-other-cases of degraded 4.160 KV bus voltage, the critical 600 V. bus voltage was adequate. None of the 78 recorded measurements at the 600 V. level were less than 580 V. If all 600 V. bus measurements had been recorded, it is likely that they too would have demonstrated adequate 600 V. bus voltage.
In summary, our single comment on the ASP evaluation is that a HPCS system failure rate of 4.05E-2 per demand is a more realistic value than 1.0 per demand.