ML18018A903
ML18018A903 | |
Person / Time | |
---|---|
Site: | Nine Mile Point |
Issue date: | 04/28/1978 |
From: | Rhode G Niagara Mohawk Power Corp |
To: | Case E Office of Nuclear Reactor Regulation |
References | |
Download: ML18018A903 (4) | |
Similar Documents at Nine Mile Point | |
---|---|
Category:Environmental Report
MONTHYEARML18018B0562018-01-18018 January 2018
[Table view]Annual Radiological Environmental Operating Report ML18018B0982018-01-18018 January 2018 Semi-Annual Radioactive Effluent Release Report July - December 1993 NMP2L2579, 2014 Annual Environmental Operating Report2015-04-10010 April 2015 2014 Annual Environmental Operating Report ML14118A0402014-04-11011 April 2014 2013 Annual Environmental Operating Report ML13074A0312013-03-12012 March 2013 Areva Np Inc., Engineering Information Record, Document No.: 51-7012651-000, Constellation Energy Nuclear Group (Ceng) Flood Hazard Reevaluation Report for Nine Mile Point (NMP) Nuclear Station, Page 2-57 Through End ML13074A0302013-03-12012 March 2013 Areva Np Inc., Engineering Information Record, Document No.: 51-7012651-000, Constellation Energy Nuclear Group (Ceng) Flood Hazard Reevaluation Report for Nine Mile Point (NMP) Nuclear Station, Cover Through Page 2-56 ML0912700582009-05-0101 May 2009 Radioactive Effluent Release Report, January - December 2008 ML0907001232009-02-24024 February 2009 2008 Annual Environmental Operating Report ML0810500362008-04-0303 April 2008 Annual Environmental Operating Report ML0612900972006-05-0101 May 2006 Enclosure (1) Nine Mile Point, Unit - Radioactive Effluent Release Report ML0613002372006-05-0101 May 2006 Enclosure 1, Nine Mile Point, Unit 2 - Radioactive Effluent Release Report ML0513002632004-12-31031 December 2004 Annual Radioactive Effluent Release Report January - December 2004 ML0423001542004-08-0606 August 2004 LLC - Application for Renewal of Operating Licenses Coastal Management Program Consistency Determination ML0414504102004-05-13013 May 2004 Annual Radiological Environmental Operating License ML0412602742004-04-22022 April 2004 Report on the Status of the New York State Pollutant Discharge Elimination System Permit - Renewal ML0513002692004-02-18018 February 2004 Attachment 12, Nine Mile Point Unit 1, Off-Site Dose Calculation Manual (ODCM) ML0609400632003-04-15015 April 2003 Cnyrpdb 2003, Website Reference Used in Chapter 2 NMP FSEIS ML0431005642003-01-0101 January 2003 Site Audit References from Nine Mile Point Nuclear Station, Units 1 and 2 - Portion from 2003 Annual Radiological Environmental Operating Report (Distance to Nearest Residence) ML0212901432002-04-30030 April 2002 Transmittal of 2001 Annual Radiological Environmental Operating Report for Nine Mile Point, Units 1 & 2 ML0213504572002-04-26026 April 2002 Transmittal of 2001 Annual Environmental Operating Report from Nine Mile Point Unit 2 ML0609403831986-10-15015 October 1986 Elliot Et Al 1986, Website Reference Used in Chapter 8 NMP FSEIS ML18018B2681978-08-31031 August 1978 Submittal of Radioactive Effluent Release Semi-Annual Report for Period of January 1, 1978 Through June 30, 1978 ML18018B2761978-05-0303 May 1978 Submittal of Addendum to the Annual Environmental Operating Report for the Period of January 1, 1977 Through December 31, 1977 ML18018A9031978-04-28028 April 1978 Letter Regarding the Report Describing the Investigations of Geology, Geomorphology, Vertical Crusted Movements and Seismicity, and Rock Stresses ML18018B0501978-02-27027 February 1978 Annual Environmental Operating Report January 1, 1977 - December 31, 1977 ML18018B0491977-02-25025 February 1977 Letter Enclosing the Annual Environmental Operating Report January 1, 1976 - December 31, 1976 ML18018B2881977-02-23023 February 1977 Submittal of Radioactive Effluent Release Report for the Period July 1, 1976 Through December 31, 1976, Including Meteorological Data in Accordance with Reg. Guide 1.23 ML18018B0651975-09-0303 September 1975 Environmental Report January 1, 1975 - June 30, 1975 ML17037C2711975-07-29029 July 1975 Letter Enclosing a Report on Environmental Qualification Test Results Applicable to the Main Steam Isolation Valve Position Switch ML17037C3181974-09-10010 September 1974 Letter Responding to August 26, 1974 Letter Concerning the Council'S Review and Evaluation of the Impact on the Biota of Lake Ontario Caused by the Operation of Unit 1 ML17037C3191974-08-26026 August 1974 Letter Requesting That the Commission Make Information Available During the Process of Review and Evaluation of the Impact on Lake Biota Caused by Unit 1 ML17037C3091973-04-0909 April 1973 Letter Regarding a Request for Additional Information for the Facility for Calendar Years 1971 and 1972 ML17037C3151972-09-0505 September 1972 Letter Forwarding Environmental Impact Documentation to Provide Information in Advance of Receipt of the Draft Environmental Statement ML18018A8781972-06-30030 June 1972 Applicant'S Environmental Report Operating License Stage Conversion to Full-Term Operating License ML18018B0511969-12-31031 December 1969 Environmental Pre-Operational Survey ML17037C3561967-12-21021 December 1967 Letter Regarding an Application for a Construction Permit and Facility License Authorizing Construction and Operation of a Reactor and Transmitting a Copy of the Fish and Wildlife Service Report on Radiological and Non-Radio .. 2018-01-18 Category:Letter MONTHYEARML24268A3382024-10-16016 October 2024
[Table view]Issuance of Amendment No. 253 Regarding the Modification of TS Surveillance Requirement 4.3.6.a Related to Adoption of TSTF-425, Revision 3 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests NMP2L2890, Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6)2024-10-0404 October 2024 Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6) ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing IR 05000220/20243022024-10-0303 October 2024 Initial Operator Licensing Examination Report 05000220/2024302 ML24190A0012024-09-26026 September 2024 Issuance of Amendment Nos. 252 and 197 Regarding the Revision to Technical Specification Design Features Section to Remove Nine Mile Point Unit 3 Project Designation NMP1L3608, Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-09-20020 September 2024 Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000220/20240052024-08-29029 August 2024 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2024005 and 05000410/2024005) IR 05000220/20240102024-08-22022 August 2024 Age-Related Degradation Inspection Report 05000220/2024010 and 05000410/2024010 NMP1L3603, Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan2024-08-20020 August 2024 Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000220/20240022024-08-0505 August 2024 Integrated Inspection Report 05000220/2024002 and 05000410/2024002 ML24215A3002024-08-0202 August 2024 Operator Licensing Examination Approval NMP1L3601, Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-07-31031 July 2024 Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation ML24213A1412024-07-31031 July 2024 Requalification Program Inspection NMP2L2883, Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations2024-07-24024 July 2024 Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations ML24198A0852024-07-16016 July 2024 Senior Reactor and Reactor Operator Initial License Examinations RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations NMP1L3584, License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2024-06-13013 June 2024 License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling IR 05000220/20244012024-05-30030 May 2024 Security Baseline Inspection Report 05000220/2024401 and 05000410/2024401(Cover Letter Only) ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 NMP1L3591, Response to Ny State Pollutant Discharge Elimination System (SPDES) Permit Request for Information & Modification Request2024-05-18018 May 2024 Response to Ny State Pollutant Discharge Elimination System (SPDES) Permit Request for Information & Modification Request NMP1L3589, Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable2024-05-16016 May 2024 Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable ML24158A2052024-05-15015 May 2024 Annual Radioactive Environmental Operating Report NMP1L3582, 2023 Annual Radioactive Environmental Operating Report for Nine Mile Point Units 1 and 22024-05-15015 May 2024 2023 Annual Radioactive Environmental Operating Report for Nine Mile Point Units 1 and 2 IR 05000220/20240012024-05-10010 May 2024 Integrated Inspection Report 05000220/2024001 and 05000410/2024001 RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-038, Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-05-0202 May 2024 Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds 05000410/LER-2024-001, Automatic Reactor Scram on Turbine Trip Due to Low Condenser Vacuum2024-05-0101 May 2024 Automatic Reactor Scram on Turbine Trip Due to Low Condenser Vacuum RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests NMP1L3581, Independent Spent Fuel Storage Installation (ISFSI) - 2023 Radioactive Effluent Release Report2024-04-30030 April 2024 Independent Spent Fuel Storage Installation (ISFSI) - 2023 Radioactive Effluent Release Report NMP2L2877, 2023 Annual Environmental Operating Report2024-04-19019 April 2024 2023 Annual Environmental Operating Report NMP2L2878, Core Operating Limits Report2024-04-16016 April 2024 Core Operating Limits Report ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24092A3352024-04-0101 April 2024 NRC Office of Investigations Case No. 1-2023-002 ML24074A2812024-03-14014 March 2024 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000220/2024010 and 05000410/2024010 NMP1L3577, Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable2024-03-13013 March 2024 Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable IR 05000220/20230062024-02-28028 February 2024 Annual Assessment Letter for Nine Mile Point Nuclear Station, Units 1 and 2, (Reports 05000220/2023006 and 05000410/2023006) IR 05000220/20230042024-02-0101 February 2024 Integrated Inspection Report 05000220/2023004 and 05000410/2023004 NMP1L3570, Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-02-0101 February 2024 Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation 05000410/LER-2023-001, Supplement to LER 2023-001-00, Automatic Reactor Scram on Low Level Due to Partial Loss of Feedwater2024-01-30030 January 2024 Supplement to LER 2023-001-00, Automatic Reactor Scram on Low Level Due to Partial Loss of Feedwater NMP1L3569, CFR 50.46 Annual Report2024-01-26026 January 2024 CFR 50.46 Annual Report ML24004A2122024-01-0808 January 2024 Senior Reactor and Reactor Operator Initial License Examinations ML23354A0012024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0059 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) 05000220/LER-2023-002, Average Power Range Monitors Declared Inoperable Due to Trip of Reactor Recirculation Pump 122023-12-15015 December 2023 Average Power Range Monitors Declared Inoperable Due to Trip of Reactor Recirculation Pump 12 NMP1L3566, Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station2023-12-14014 December 2023 Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station 2024-09-04 Category:Report MONTHYEARNMP2L2883, Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations2024-07-24024 July 2024
[Table view]Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations NMP1L3563, Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-12-0404 December 2023 Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) NMP1L3545, Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems .2023-08-0404 August 2023 Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems . NMP1L3515, Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-03-27027 March 2023 Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) NMP1L3469, Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits2022-06-30030 June 2022 Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits RS-21-001, Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping2021-01-0404 January 2021 Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping ML20303A1752020-10-23023 October 2020 Proposed Relief Request from Section XI Repair/Replacement Documentation for Bolting Replacement of Pressure Retaining Bolting ML20190A1482020-07-0808 July 2020 FAQ 20-01 NMP Scram Final Approved ML20100F6822020-04-0909 April 2020 Submittal of Analytical Evaluation of Recirculation Discharge Nozzle-to-Safe End Weld Indication ML19228A0232019-08-15015 August 2019 Proposed Alternative to Utilize Code Case N-879 NMP2L2695, Supplement Information and Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of an Emergency License Amendment Request for One Time Extension to The.2018-12-0707 December 2018 Supplement Information and Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of an Emergency License Amendment Request for One Time Extension to The. NMP1L3229, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe ...2018-08-20020 August 2018 Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe ... ML18018B2922018-01-18018 January 2018 Appendix a, Justification for Continued Operation, Component Review Summary Sheet ML18018B2912018-01-18018 January 2018 Pipe Crack Task Force Report ML18018A9652018-01-18018 January 2018 Nine Mile Point, Unit 1 - Equipment Qualification Program and Tables I - Equipment Qualification Reports and Table Ii - TMI Action Plan ML18018B0122018-01-18018 January 2018 Semi-Annual Radioactive Effluent Release Report July-December 1999 ML17251A0452017-09-20020 September 2017 - Staff Assessment of Flooding Focused Evaluation (CACs No. MG0087 and MG0088) ML17109A3652017-04-13013 April 2017 Pressure and Temperature Limits Report ML17079A3842017-03-24024 March 2017 Summary of the U.S. Nuclear Regulatory Commission Staff'S Review of the Spring 2016 Steam Generator Tube Inservice Inspections ML17037A6862017-02-0606 February 2017 Table 7.2-1 ML17037A7032017-02-0606 February 2017 Table 7.2-1 (Cont'D) ML17027A0162017-01-27027 January 2017 10 CFR 50.46 Annual Report of the Emergency Core Cooling System Evaluation Model Changes and Errors RS-16-178, High Frequency Supplement to Seismic Hazard Screening Report2016-11-0202 November 2016 High Frequency Supplement to Seismic Hazard Screening Report ML16231A4522016-08-30030 August 2016 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Phase 2 of Order EA-13-109 (Severe Accident Capable Hardened Events) ML16223A8532016-08-25025 August 2016 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Phase 2 of Order EA-13-109 (Severe Accident Capable Hardened Vents) RS-16-091, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2016-06-14014 June 2016 Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) ML16160A0942016-06-0808 June 2016 ASP ANALYSIS- REJECT- Nine Mile Point Unit 1 Automatic Reactor Scram Due to Main Steam Isolation Valve Closure (LER 220-2015-004) ML15153A6602015-06-16016 June 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Re ML15028A1492015-02-11011 February 2015 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-13-109, Severe Accident Capable Hardened Vents RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 12014-09-24024 September 2014 Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 ML15022A6612014-07-31031 July 2014 Stress Re-Evaluation of Nine Mile Point Unit 2 Steam Dryer at 115% CLTP, CDI Report No. 14-08NP, Revision 0, Non-proprietary Version ML14153A4102014-07-24024 July 2014 Staff Assessment of Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation ML14176A9612014-06-24024 June 2014 Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 ML14167A3492014-06-20020 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident (Tac. MF0249 & MF0250) ML15022A6622014-05-31031 May 2014 Acoustic and Low Frequency Hydrodynamic Loads at 115% CLTP Target Power Level on Nine Mile Point Unit 2 Steam Dryer to 250 Hz Using ACM Rev. 4.1R, C.D.I. Report No. 14-09NP, Revision 1, Non-proprietary Version ML15023A0312014-04-30030 April 2014 Computation of Cumulative Usage Factor for the 115% CLTP Power Level at Nine Mile Point Unit 2 with the Inboard RCIC Valve Closed, C.D.I. Technical Note No. 14-04NP, Revision 0, Non-proprietary Version ML14099A1962014-03-31031 March 2014 Constellation Energy Nuclear Group, LLC - Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task. ML14064A3242014-02-28028 February 2014 000N2495-R1-NP, Rev. 0, Nine Mile Point Nuclear Station Unit 2 Comparison of Mellla+ Reference Design to Cycle 15 Design Characteristics. ML14071A4782014-02-21021 February 2014 Response to Nrc'S Request for Cashflow Statements Regarding Application for Order Approving Transfer of Operating Authority and Conforming License Amendments ML14351A4272014-01-31031 January 2014 000N2528-SRLR, Revision 1, Supplemental Reload Licensing Report for Nine Mile Point 2 Reload 14 Cycle 15 Extended Power Uprate (3988 Mwt) / MELLLA (99-105% Flow). ML14064A3222014-01-31031 January 2014 00N0123-SRLR, Rev. 2, Supplemental Reload Licensing Report for Nine Mile Point 2 (NMP2) Reload 14 Cycle 15 Extended Power Uprate (Epu)/Maximum Extended Load Line Limit Plus (Mellla+). ML14024A4422014-01-0707 January 2014 Submittal of Report in Accordance with 10 CFR 26.719(c)(1) Regarding Unsatisfactory Blind Performance Sample Testing ML14064A3232013-12-31031 December 2013 000N0123-FBIR-NP, Rev. 0, Fuel Bundle Information Report for Nine Mile Point 2 Reload 14 Cycle 15. ML13225A5842013-12-19019 December 2013 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML13338A6632013-12-11011 December 2013 Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for Nine Mile Point, Unit 1, TAC No.: MF1129 ML13338A6642013-12-11011 December 2013 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Nine Mile Point, Unit 2, TAC No.: MF1130 ML13311A0542013-11-0404 November 2013 Pressure and Temperature Limits Report (PTLR) PTLR-2, Revision 0 (Draft B) ML13316B1102013-11-0101 November 2013 Attachment 9 - Global Nuclear Fuel Report GNF-0000-0156-7490-RO-NP, Gnf Additional Information Regarding the Requested Change to the Technical Specification SLMCPR, Dated August 26, 2013 (Non-proprietary) ML13311A0552013-09-30030 September 2013 Fluence Extrapolation in Support of NMP2 P-T Cure Update, MPM-913991, September 30, 2013, Attachment 3 ML13197A2222013-07-12012 July 2013 Supplemental Response to 10 CFR 50.54(f) Request for Information, Recommendation 2.3, Seismic 2024-07-24 Category:Technical MONTHYEARNMP1L3545, Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems .2023-08-0404 August 2023
[Table view]Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems . NMP1L3469, Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits2022-06-30030 June 2022 Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits RS-21-001, Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping2021-01-0404 January 2021 Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping ML20100F6822020-04-0909 April 2020 Submittal of Analytical Evaluation of Recirculation Discharge Nozzle-to-Safe End Weld Indication ML19228A0232019-08-15015 August 2019 Proposed Alternative to Utilize Code Case N-879 NMP2L2695, Supplement Information and Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of an Emergency License Amendment Request for One Time Extension to The.2018-12-0707 December 2018 Supplement Information and Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of an Emergency License Amendment Request for One Time Extension to The. NMP1L3229, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe ...2018-08-20020 August 2018 Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe ... ML18018B0122018-01-18018 January 2018 Semi-Annual Radioactive Effluent Release Report July-December 1999 ML18018A9652018-01-18018 January 2018 Nine Mile Point, Unit 1 - Equipment Qualification Program and Tables I - Equipment Qualification Reports and Table Ii - TMI Action Plan ML17109A3652017-04-13013 April 2017 Pressure and Temperature Limits Report ML17037A7032017-02-0606 February 2017 Table 7.2-1 (Cont'D) ML17037A6862017-02-0606 February 2017 Table 7.2-1 RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 12014-09-24024 September 2014 Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 ML15022A6612014-07-31031 July 2014 Stress Re-Evaluation of Nine Mile Point Unit 2 Steam Dryer at 115% CLTP, CDI Report No. 14-08NP, Revision 0, Non-proprietary Version ML14176A9612014-06-24024 June 2014 Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 ML15022A6622014-05-31031 May 2014 Acoustic and Low Frequency Hydrodynamic Loads at 115% CLTP Target Power Level on Nine Mile Point Unit 2 Steam Dryer to 250 Hz Using ACM Rev. 4.1R, C.D.I. Report No. 14-09NP, Revision 1, Non-proprietary Version ML15023A0312014-04-30030 April 2014 Computation of Cumulative Usage Factor for the 115% CLTP Power Level at Nine Mile Point Unit 2 with the Inboard RCIC Valve Closed, C.D.I. Technical Note No. 14-04NP, Revision 0, Non-proprietary Version ML14064A3242014-02-28028 February 2014 000N2495-R1-NP, Rev. 0, Nine Mile Point Nuclear Station Unit 2 Comparison of Mellla+ Reference Design to Cycle 15 Design Characteristics. ML14071A4782014-02-21021 February 2014 Response to Nrc'S Request for Cashflow Statements Regarding Application for Order Approving Transfer of Operating Authority and Conforming License Amendments ML14064A3222014-01-31031 January 2014 00N0123-SRLR, Rev. 2, Supplemental Reload Licensing Report for Nine Mile Point 2 (NMP2) Reload 14 Cycle 15 Extended Power Uprate (Epu)/Maximum Extended Load Line Limit Plus (Mellla+). ML14351A4272014-01-31031 January 2014 000N2528-SRLR, Revision 1, Supplemental Reload Licensing Report for Nine Mile Point 2 Reload 14 Cycle 15 Extended Power Uprate (3988 Mwt) / MELLLA (99-105% Flow). ML14064A3232013-12-31031 December 2013 000N0123-FBIR-NP, Rev. 0, Fuel Bundle Information Report for Nine Mile Point 2 Reload 14 Cycle 15. ML13225A5842013-12-19019 December 2013 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML13338A6632013-12-11011 December 2013 Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for Nine Mile Point, Unit 1, TAC No.: MF1129 ML13338A6642013-12-11011 December 2013 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Nine Mile Point, Unit 2, TAC No.: MF1130 ML13311A0542013-11-0404 November 2013 Pressure and Temperature Limits Report (PTLR) PTLR-2, Revision 0 (Draft B) ML13316B1102013-11-0101 November 2013 Attachment 9 - Global Nuclear Fuel Report GNF-0000-0156-7490-RO-NP, Gnf Additional Information Regarding the Requested Change to the Technical Specification SLMCPR, Dated August 26, 2013 (Non-proprietary) ML13311A0552013-09-30030 September 2013 Fluence Extrapolation in Support of NMP2 P-T Cure Update, MPM-913991, September 30, 2013, Attachment 3 ML13197A2222013-07-12012 July 2013 Supplemental Response to 10 CFR 50.54(f) Request for Information, Recommendation 2.3, Seismic ML13078A3232013-02-28028 February 2013 XGEN-2012-25-NP, Revision 1, Westinghouse Engineering Report, Technical Basis for the Inspection Frequency of the Modified Alloy 718 Jet Pump Beam, Attachment 2 ML13066A1692013-02-28028 February 2013 Units I and 2, Overall Integrated Plan for Reliable Hardened Vents ML12313A2032012-10-26026 October 2012 Attachment 1, NMP2 Extended Power Uprate, Power Ascension Test Report ML12313A2042012-10-26026 October 2012 Attachment 2, Final Steam Dryer Stress Report, Continuum Dynamics, Incorporated Report No. 12-18NP, Attachment 3, Affidavit from CDI ML12277A0902012-10-12012 October 2012 Technical Letter Report on Aging Management Program Audits at Ginna and Nine Mile Point 1 ML12284A1842012-09-30030 September 2012 Attachment 3, Final EPU Steam Dryer Load Definition CDI Report No. 12-20NP, Acoustic and Low Frequency Hydrodynamic Loads at 115% CLTP Target Power Level on Nine Mile Point, Unit 2 Steam Dryer to 250 Hz Using ACM Rev. 4.1 ML12284A1852012-06-30030 June 2012 Attachment 4, Steam Dryer Limit Curves CDI Technical Note No. 12-13NP, Limit Curves with ACM Rev. 4.1 for the 100% Power Level Basis at Nine Mile Point, Unit 2, Revision 1 ML12170A8692012-06-30030 June 2012 Transition to 10 CFR 50.48(c) - NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition ML11221A0132011-08-0505 August 2011 Attachment 3, Continuum Dynamics, Inc Technical Note No. 11-17NP, Limit Curve Analysis with ACM Rev. 4.1 for Power Ascension at Nine Mile Point Unit 2, Revision 1. (Non-Proprietary) ML11208B7732011-07-0808 July 2011 Report No. 1100539.401, Rev. 1, Nine Mile Point Unit 1, Steam Dryer Support Bracket Flaw Evaluation. ML11188A1952011-06-28028 June 2011 Calculation S0VESSELM035 (SIA File No. 1100566.301), Reactor Pressure Vessel Head Weld Flaw Evaluation, Rev. 00.00 ML11171A0602011-05-31031 May 2011 Attachment 3, CDI Report No. 11-04NP, Stress Evaluation of Nine Mile Point Unit 2 Steam Dryer Using ACM Rev. 4.1 Acoustic Loads, Revision 0. (Non-Proprietary), Attachment 4, Affidavit from Continuum Dynamics, Inc ML1108803022011-03-31031 March 2011 NEDO-33636, Fuel Storage Criticality Safety Analysis of New Fuel Storage Racks - GE14, Attachment 3, (Non-Proprietary) ML1104601602011-01-31031 January 2011 Attachment 1, CDI Report No. 10-09NP, ACM Rev. 4.1: Methodology to Predict Full Scale Steam Dryer Loads from In-Plant Measurements, Revision 3 ML12135A6232011-01-14014 January 2011 Off-Site Dose Calculation Manual (Odcm), Revision 32 ML1035003652010-12-13013 December 2010 Holtec Report No. HI-2012621 (Non-Proprietary), Criticality Safety Evaluation for the Nine Mile Point 2 Rack Installation Project ML1021702952010-07-30030 July 2010 Attachment 5, Continuum Dynamics, Inc., CDI Report No. 10-12NP, Design and Stress Evaluation of Nine Mile Point Unit 2 Steam Dryer Modifications for EPU Operation ML1021701862010-07-28028 July 2010 Attachment 4, Structural Integrity Associates, Inc., Flaw Evaluation of Indications in the Nine Mile Point Unit 2 Steam Dryer Vertical Support Plates Considering Extended Power Uprate Flow Induced Vibration Loading ML1019004492010-06-30030 June 2010 C.D.I. Report No. 10-10NP, Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Nine Mile Point Unit 2 Steam Dryer to 250 Hz Using ACM Rev. 4.1, Rev. 1 ML1021701852010-06-30030 June 2010 Attachment 3, Global Nuclear Fuel - Americas, LLC, MCNP01A, Low Enriched UO2 Pin Lattice in Water Critical Benchmark Evaluations Using ENDF/B-V Nuclear Cross-Section Data, Revision 1 ML1019004482010-06-30030 June 2010 C.D.I. Report No. 10-09NP, ACM Rev. 4.1: Methodology to Predict Full Scale Steam Dryer Loads from In-Plant Measurements, Rev. 1 (Non-Proprietary) 2023-08-04 |
Text
NRC FoRM 195 U.S. NUCLEAR REGULATORY C RISSION DOCKET NUMBER I2-76)
FILE NUMBER NRC DISTRIBUTION FoR PART 50 DOCKET MATERIAL TO: FROM: DATE OF DOCUMENT Mr, Edson G, Case Niagara Mohawk Power Corp.
Syracuse, N Y, 13202 DATE RECEIVED Gerald K. Rhode GCETTE R QNOTORIZED PROP INPUT FORM NUMBER OF COPIES RECEIVED ERW IG INAL ~UNCLASSIF I ED OCOPY DESCRIPTION ENCLOSU RE Forwarding final rept describing the geologic investigation at Subject Facilityiii Consisting of three Volumes re the investi-gations of Geology (Volume I), Geomophology, Vertical Crusted Movements and Seismicity (Volume II), and Rock Stresses (Volume III) 1p 1700p PLANT'AME 'INE MILE POINT UNIT 2 ~+pl KQAQ jcm 05/04/78 FOR ACTION/INFORMATION ENVIRONMENTAL AXAY&d ASSIGNED AD:
CH CHIEF: L~ BRANCH CHIEF:
MOORE LTR PROJECT MANAGER: L.~ R: SPY dXEl LIC. ASST:
B. HARLESS INTERNAL DISTRI BUTION FILES ~~C C. T SYSTEMS SITE SAFETY G D ENVIROiI ANALYSIS 2 L~ib DENTON G MULLER OSSICK G STAFF ENGINEERING LIT ENVIRON TECH ERNST CTORS BALLARD LOOD ANAGE'CLIENT FACTOR SAFETY TECH ROSS BAER AMMILL 2 LINS NOVAK TL R ROSZTOCZY ALYSIS CHECK VOLL>iIER LLINS LTZMAN EXTERNAL DISTRIBUTION CONTROL NUMBER LPDR E C uJC5i7A4 TIC IC REG V J. HANCHETT) 781250OO7 16 CYS SEiVT CATEGOR. to ACRS NRC FORM ISS (2 78)
0 j
NIAGARA MOHAWK POWER CORPORATION
>>i'1'~
NIAGARA MOHAWK 300 ERIE 80ULEVARD, WEST SYRACUSE, N. Y. I3202 I
CO April 28, 1978 Hw fA IJI
>O~
à penn s Mr. Edson G. Case, Acting Director ~ C; C3 Office of Nuclear Reactor Regulation goal C/l U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Ddar Mr. Case:
Re: Nine Mile Point Unit 2 Docket No. 50-410 Enclosed are 25 copies of the final report which describes the geologic investigation at the Nine Mile Point Nuclear Station Unit 2 Site. This report consists of three volumes regarding the investigations of Geology (Volume I), Geomorphology, Vertical Crusted Movements and Seismicity (Volume II), and Rock Stresses (Volume III). In addition, we have provided an Executive Summary that highlights the results of the investigation.
As a result of the comprehensive field, laboratory and analytical studies performed by Dames and Moore for this project, it is .concluded that none of the geologic structures encountered at the Site represents a seismic hazard. Additionally, an independent review of this work was conducted by our geologic,cons'ultants, Doctors S. S. Alexander, D. R. Coates and F. A. Donath. They concur with the above conclusions.
Very truly yours,,
NIAGARA MOHAWK POWER CORPORATION Gera d . Rhode, ice President System Project anagement NLR/szd g]~ 5UoQ' Enclosures (25)