MONTHYEARML14064A3232013-12-31031 December 2013 000N0123-FBIR-NP, Rev. 0, Fuel Bundle Information Report for Nine Mile Point 2 Reload 14 Cycle 15. Project stage: Request ML14002A1702014-01-0202 January 2014 Unacceptable Application with Opportunity to Supplement - Nine Mile Point Nuclear Station, Unit 2 - MF3056, License Amendment Request - Maximum Extended Load Line Limit Analysis Plus Project stage: Other ML14002A2202014-01-0202 January 2014 Revised Unacceptable Application with Opportunity to Supplement - Nine Mile Point Nuclear Station, Unit 2 - License Amendment Request - Maximum Extended Load Line Limit Analysis Plus Project stage: Other ML14023A6542014-01-21021 January 2014 License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus - Commitment Date to Provide Supplemental Information Project stage: Supplement ML14028A3982014-01-28028 January 2014 MF3056 - Acceptance of Requested Licensing Action License Amendment Request- Maximum Extended Load Line Limit Analysis Plus (Mellla+) Project stage: Acceptance Review ML14064A3222014-01-31031 January 2014 00N0123-SRLR, Rev. 2, Supplemental Reload Licensing Report for Nine Mile Point 2 (NMP2) Reload 14 Cycle 15 Extended Power Uprate (Epu)/Maximum Extended Load Line Limit Plus (Mellla+). Project stage: Request ML14051A1382014-02-14014 February 2014 Response to Request for Supplemental Information to License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus Project stage: Supplement ML14043A0062014-02-20020 February 2014 First Round of Requests for Additional Information Regarding License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus (Mella+) Project stage: RAI ML14064A3212014-02-25025 February 2014 License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus - Core Reload and Safety Limit Supplemental Information Project stage: Supplement ML14064A3242014-02-28028 February 2014 000N2495-R1-NP, Rev. 0, Nine Mile Point Nuclear Station Unit 2 Comparison of Mellla+ Reference Design to Cycle 15 Design Characteristics. Project stage: Request ML14029A0392014-03-0505 March 2014 Request for Withholding Information from Public Disclosure License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus, Dated November 1, 2013 Project stage: Withholding Request Acceptance ML14051A0152014-03-0606 March 2014 Request for Withholding Information from Public Disclosure License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus, Dated February 14, 2014 Project stage: Withholding Request Acceptance ML14071A4662014-03-10010 March 2014 License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus - Response to Srxb RAI 1 and RAI 2 Project stage: Request ML14071A2422014-03-12012 March 2014 NMP Unit 2, MF3056, 2nd Round of Draft RAIs - LAR License Amendment Request- Maximum Extended Load Line Limit Analysis Plus (Mellla+) Project stage: Draft RAI ML14083A0232014-03-31031 March 2014 Second Round of Request for Additional Information Regarding License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus (Mellla+) Project stage: RAI ML14139A4162014-05-14014 May 2014 License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus - Response to RAI STSB-1 and RAI STSB-2 Project stage: Response to RAI ML14204A3692014-08-14014 August 2014 Third Round of Request for Additional Information & Enclosure 1, Regarding License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus (Mellla+) (Tac No. MF3056) Project stage: RAI ML14072A0152014-09-0303 September 2014 Request for Withholding Information from Public Disclosure License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus, Dated March 10, 2014 Project stage: Withholding Request Acceptance ML14246A3962014-09-0303 September 2014 NMP Unit 2, MF3056, 4th Round of Draft RAIs - LAR License Amendment Request- Maximum Extended Load Line Limit Analysis Plus (Mellla+) Project stage: Draft RAI ML14065A0902014-09-0303 September 2014 Request for Withholding Information from Public Disclosure License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus, Dated February 25, 2014 (Tac No. MF3056) Project stage: Withholding Request Acceptance NMP2L2556, Response to Request for Additional Information, License Amendment Request for Maximum Extended Load Line Limit Analysis Plus2014-09-15015 September 2014 Response to Request for Additional Information, License Amendment Request for Maximum Extended Load Line Limit Analysis Plus Project stage: Response to RAI ML14260A1202014-11-0606 November 2014 Request for Withholding Information from Public Disclosure License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus, Dated September 15, 2014 (Tac No. MF3056) Project stage: Withholding Request Acceptance ML14314A2142014-11-10010 November 2014 MF3056, E-mail Capture - LAR Mellla+, Simulator Audit Plan, November 20-21, 2014 at the Plant Site Project stage: Other ML14321A0642014-11-17017 November 2014 Point Unit 2, MF3056, LAR Mellla+, Supplement to the Simulator Audit Plan Project stage: Other ML14351A4282014-12-11011 December 2014 Updated TIP Comparisons for Current Operating Conditions, GE-PPO- 1GYEF-KG1-742, Enclosure 2 Project stage: Request ML15002A1622015-01-26026 January 2015 Request for Withholding Information from Public Disclosure Submission Dated December 11, 2014, for Supplement Information for NRC Simulator Audit LAR for Mellla+ Project stage: Withholding Request Acceptance ML15033A0022015-01-30030 January 2015 MF3056, LAR - Mellla+, Revised RAI - Neutron Fluence Calculation Related Project stage: RAI ML15051A4642015-02-18018 February 2015 Response to Fifth Request for Additional Information Concerning License Amendment Request for Maximum Extended Load Line Limit Analysis Plus Project stage: Request ML15056A3792015-03-16016 March 2015 Request for Withholding Information from Public Disclosure Submission Dated February 18, 2015, for License Amendment Request Pursuant to 10 CFR 50.90 Maximum Extended Load Line Limit Analysis Plus Project stage: Withholding Request Acceptance ML15105A4432015-05-0404 May 2015 Draft Safety Evaluation for License Amendment Request - Mellla+ Project stage: Draft Approval ML15114A1602015-05-0707 May 2015 Issuance of Simulator Audit Report License Amendment Request Regarding MELLLA Plus Project stage: Approval ML15096A0762015-09-0202 September 2015 Issuance of Amendment Maximum Extended Load Line Limit Analysis Plus Project stage: Approval ML15210A3262015-09-0404 September 2015 LTR-15-0388-1 - John W. Stetkar Letter Nine Mile Point Nuclear Station Unit 2 Maximum Extended Load Line Limit Analysis Plus (Mellla+) License Amendment Request Project stage: Other 2014-03-12
[Table View] |
|
---|
Category:Report
MONTHYEARNMP2L2883, Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations2024-07-24024 July 2024 Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations NMP1L3563, Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-12-0404 December 2023 Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) NMP1L3545, Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems .2023-08-0404 August 2023 Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems . NMP1L3515, Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-03-27027 March 2023 Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) NMP1L3469, Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits2022-06-30030 June 2022 Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits RS-21-001, Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping2021-01-0404 January 2021 Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping ML20303A1752020-10-23023 October 2020 Proposed Relief Request from Section XI Repair/Replacement Documentation for Bolting Replacement of Pressure Retaining Bolting ML20190A1482020-07-0808 July 2020 FAQ 20-01 NMP Scram Final Approved ML20100F6822020-04-0909 April 2020 Submittal of Analytical Evaluation of Recirculation Discharge Nozzle-to-Safe End Weld Indication ML19228A0232019-08-15015 August 2019 Proposed Alternative to Utilize Code Case N-879 NMP2L2695, Supplement Information and Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of an Emergency License Amendment Request for One Time Extension to The.2018-12-0707 December 2018 Supplement Information and Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of an Emergency License Amendment Request for One Time Extension to The. NMP1L3229, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe ...2018-08-20020 August 2018 Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe ... ML18018B2922018-01-18018 January 2018 Appendix a, Justification for Continued Operation, Component Review Summary Sheet ML18018B2912018-01-18018 January 2018 Pipe Crack Task Force Report ML18018A9652018-01-18018 January 2018 Nine Mile Point, Unit 1 - Equipment Qualification Program and Tables I - Equipment Qualification Reports and Table Ii - TMI Action Plan ML18018B0122018-01-18018 January 2018 Semi-Annual Radioactive Effluent Release Report July-December 1999 ML17251A0452017-09-20020 September 2017 - Staff Assessment of Flooding Focused Evaluation (CACs No. MG0087 and MG0088) ML17109A3652017-04-13013 April 2017 Pressure and Temperature Limits Report ML17079A3842017-03-24024 March 2017 Summary of the U.S. Nuclear Regulatory Commission Staff'S Review of the Spring 2016 Steam Generator Tube Inservice Inspections ML17037A6862017-02-0606 February 2017 Table 7.2-1 ML17037A7032017-02-0606 February 2017 Table 7.2-1 (Cont'D) ML17027A0162017-01-27027 January 2017 10 CFR 50.46 Annual Report of the Emergency Core Cooling System Evaluation Model Changes and Errors RS-16-178, High Frequency Supplement to Seismic Hazard Screening Report2016-11-0202 November 2016 High Frequency Supplement to Seismic Hazard Screening Report ML16231A4522016-08-30030 August 2016 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Phase 2 of Order EA-13-109 (Severe Accident Capable Hardened Events) ML16223A8532016-08-25025 August 2016 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Phase 2 of Order EA-13-109 (Severe Accident Capable Hardened Vents) RS-16-091, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2016-06-14014 June 2016 Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) ML16160A0942016-06-0808 June 2016 ASP ANALYSIS- REJECT- Nine Mile Point Unit 1 Automatic Reactor Scram Due to Main Steam Isolation Valve Closure (LER 220-2015-004) ML15153A6602015-06-16016 June 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Re ML15028A1492015-02-11011 February 2015 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-13-109, Severe Accident Capable Hardened Vents RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 12014-09-24024 September 2014 Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 ML15022A6612014-07-31031 July 2014 Stress Re-Evaluation of Nine Mile Point Unit 2 Steam Dryer at 115% CLTP, CDI Report No. 14-08NP, Revision 0, Non-proprietary Version ML14153A4102014-07-24024 July 2014 Staff Assessment of Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation ML14176A9612014-06-24024 June 2014 Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 ML14167A3492014-06-20020 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident (Tac. MF0249 & MF0250) ML15022A6622014-05-31031 May 2014 Acoustic and Low Frequency Hydrodynamic Loads at 115% CLTP Target Power Level on Nine Mile Point Unit 2 Steam Dryer to 250 Hz Using ACM Rev. 4.1R, C.D.I. Report No. 14-09NP, Revision 1, Non-proprietary Version ML15023A0312014-04-30030 April 2014 Computation of Cumulative Usage Factor for the 115% CLTP Power Level at Nine Mile Point Unit 2 with the Inboard RCIC Valve Closed, C.D.I. Technical Note No. 14-04NP, Revision 0, Non-proprietary Version ML14099A1962014-03-31031 March 2014 Constellation Energy Nuclear Group, LLC - Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task. ML14064A3242014-02-28028 February 2014 000N2495-R1-NP, Rev. 0, Nine Mile Point Nuclear Station Unit 2 Comparison of Mellla+ Reference Design to Cycle 15 Design Characteristics. ML14071A4782014-02-21021 February 2014 Response to Nrc'S Request for Cashflow Statements Regarding Application for Order Approving Transfer of Operating Authority and Conforming License Amendments ML14351A4272014-01-31031 January 2014 000N2528-SRLR, Revision 1, Supplemental Reload Licensing Report for Nine Mile Point 2 Reload 14 Cycle 15 Extended Power Uprate (3988 Mwt) / MELLLA (99-105% Flow). ML14064A3222014-01-31031 January 2014 00N0123-SRLR, Rev. 2, Supplemental Reload Licensing Report for Nine Mile Point 2 (NMP2) Reload 14 Cycle 15 Extended Power Uprate (Epu)/Maximum Extended Load Line Limit Plus (Mellla+). ML14024A4422014-01-0707 January 2014 Submittal of Report in Accordance with 10 CFR 26.719(c)(1) Regarding Unsatisfactory Blind Performance Sample Testing ML14064A3232013-12-31031 December 2013 000N0123-FBIR-NP, Rev. 0, Fuel Bundle Information Report for Nine Mile Point 2 Reload 14 Cycle 15. ML13225A5842013-12-19019 December 2013 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML13338A6632013-12-11011 December 2013 Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for Nine Mile Point, Unit 1, TAC No.: MF1129 ML13338A6642013-12-11011 December 2013 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Nine Mile Point, Unit 2, TAC No.: MF1130 ML13311A0542013-11-0404 November 2013 Pressure and Temperature Limits Report (PTLR) PTLR-2, Revision 0 (Draft B) ML13316B1102013-11-0101 November 2013 Attachment 9 - Global Nuclear Fuel Report GNF-0000-0156-7490-RO-NP, Gnf Additional Information Regarding the Requested Change to the Technical Specification SLMCPR, Dated August 26, 2013 (Non-proprietary) ML13311A0552013-09-30030 September 2013 Fluence Extrapolation in Support of NMP2 P-T Cure Update, MPM-913991, September 30, 2013, Attachment 3 ML13197A2222013-07-12012 July 2013 Supplemental Response to 10 CFR 50.54(f) Request for Information, Recommendation 2.3, Seismic 2024-07-24
[Table view] Category:Technical
MONTHYEARNMP1L3545, Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems .2023-08-0404 August 2023 Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems . NMP1L3469, Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits2022-06-30030 June 2022 Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits RS-21-001, Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping2021-01-0404 January 2021 Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping ML20100F6822020-04-0909 April 2020 Submittal of Analytical Evaluation of Recirculation Discharge Nozzle-to-Safe End Weld Indication ML19228A0232019-08-15015 August 2019 Proposed Alternative to Utilize Code Case N-879 NMP2L2695, Supplement Information and Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of an Emergency License Amendment Request for One Time Extension to The.2018-12-0707 December 2018 Supplement Information and Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of an Emergency License Amendment Request for One Time Extension to The. NMP1L3229, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe ...2018-08-20020 August 2018 Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe ... ML18018B0122018-01-18018 January 2018 Semi-Annual Radioactive Effluent Release Report July-December 1999 ML18018A9652018-01-18018 January 2018 Nine Mile Point, Unit 1 - Equipment Qualification Program and Tables I - Equipment Qualification Reports and Table Ii - TMI Action Plan ML17109A3652017-04-13013 April 2017 Pressure and Temperature Limits Report ML17037A7032017-02-0606 February 2017 Table 7.2-1 (Cont'D) ML17037A6862017-02-0606 February 2017 Table 7.2-1 RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 12014-09-24024 September 2014 Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 ML15022A6612014-07-31031 July 2014 Stress Re-Evaluation of Nine Mile Point Unit 2 Steam Dryer at 115% CLTP, CDI Report No. 14-08NP, Revision 0, Non-proprietary Version ML14176A9612014-06-24024 June 2014 Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 ML15022A6622014-05-31031 May 2014 Acoustic and Low Frequency Hydrodynamic Loads at 115% CLTP Target Power Level on Nine Mile Point Unit 2 Steam Dryer to 250 Hz Using ACM Rev. 4.1R, C.D.I. Report No. 14-09NP, Revision 1, Non-proprietary Version ML15023A0312014-04-30030 April 2014 Computation of Cumulative Usage Factor for the 115% CLTP Power Level at Nine Mile Point Unit 2 with the Inboard RCIC Valve Closed, C.D.I. Technical Note No. 14-04NP, Revision 0, Non-proprietary Version ML14064A3242014-02-28028 February 2014 000N2495-R1-NP, Rev. 0, Nine Mile Point Nuclear Station Unit 2 Comparison of Mellla+ Reference Design to Cycle 15 Design Characteristics. ML14071A4782014-02-21021 February 2014 Response to Nrc'S Request for Cashflow Statements Regarding Application for Order Approving Transfer of Operating Authority and Conforming License Amendments ML14064A3222014-01-31031 January 2014 00N0123-SRLR, Rev. 2, Supplemental Reload Licensing Report for Nine Mile Point 2 (NMP2) Reload 14 Cycle 15 Extended Power Uprate (Epu)/Maximum Extended Load Line Limit Plus (Mellla+). ML14351A4272014-01-31031 January 2014 000N2528-SRLR, Revision 1, Supplemental Reload Licensing Report for Nine Mile Point 2 Reload 14 Cycle 15 Extended Power Uprate (3988 Mwt) / MELLLA (99-105% Flow). ML14064A3232013-12-31031 December 2013 000N0123-FBIR-NP, Rev. 0, Fuel Bundle Information Report for Nine Mile Point 2 Reload 14 Cycle 15. ML13225A5842013-12-19019 December 2013 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML13338A6632013-12-11011 December 2013 Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for Nine Mile Point, Unit 1, TAC No.: MF1129 ML13338A6642013-12-11011 December 2013 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Nine Mile Point, Unit 2, TAC No.: MF1130 ML13311A0542013-11-0404 November 2013 Pressure and Temperature Limits Report (PTLR) PTLR-2, Revision 0 (Draft B) ML13316B1102013-11-0101 November 2013 Attachment 9 - Global Nuclear Fuel Report GNF-0000-0156-7490-RO-NP, Gnf Additional Information Regarding the Requested Change to the Technical Specification SLMCPR, Dated August 26, 2013 (Non-proprietary) ML13311A0552013-09-30030 September 2013 Fluence Extrapolation in Support of NMP2 P-T Cure Update, MPM-913991, September 30, 2013, Attachment 3 ML13197A2222013-07-12012 July 2013 Supplemental Response to 10 CFR 50.54(f) Request for Information, Recommendation 2.3, Seismic ML13078A3232013-02-28028 February 2013 XGEN-2012-25-NP, Revision 1, Westinghouse Engineering Report, Technical Basis for the Inspection Frequency of the Modified Alloy 718 Jet Pump Beam, Attachment 2 ML13066A1692013-02-28028 February 2013 Units I and 2, Overall Integrated Plan for Reliable Hardened Vents ML12313A2032012-10-26026 October 2012 Attachment 1, NMP2 Extended Power Uprate, Power Ascension Test Report ML12313A2042012-10-26026 October 2012 Attachment 2, Final Steam Dryer Stress Report, Continuum Dynamics, Incorporated Report No. 12-18NP, Attachment 3, Affidavit from CDI ML12277A0902012-10-12012 October 2012 Technical Letter Report on Aging Management Program Audits at Ginna and Nine Mile Point 1 ML12284A1842012-09-30030 September 2012 Attachment 3, Final EPU Steam Dryer Load Definition CDI Report No. 12-20NP, Acoustic and Low Frequency Hydrodynamic Loads at 115% CLTP Target Power Level on Nine Mile Point, Unit 2 Steam Dryer to 250 Hz Using ACM Rev. 4.1 ML12284A1852012-06-30030 June 2012 Attachment 4, Steam Dryer Limit Curves CDI Technical Note No. 12-13NP, Limit Curves with ACM Rev. 4.1 for the 100% Power Level Basis at Nine Mile Point, Unit 2, Revision 1 ML12170A8692012-06-30030 June 2012 Transition to 10 CFR 50.48(c) - NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition ML11221A0132011-08-0505 August 2011 Attachment 3, Continuum Dynamics, Inc Technical Note No. 11-17NP, Limit Curve Analysis with ACM Rev. 4.1 for Power Ascension at Nine Mile Point Unit 2, Revision 1. (Non-Proprietary) ML11208B7732011-07-0808 July 2011 Report No. 1100539.401, Rev. 1, Nine Mile Point Unit 1, Steam Dryer Support Bracket Flaw Evaluation. ML11188A1952011-06-28028 June 2011 Calculation S0VESSELM035 (SIA File No. 1100566.301), Reactor Pressure Vessel Head Weld Flaw Evaluation, Rev. 00.00 ML11171A0602011-05-31031 May 2011 Attachment 3, CDI Report No. 11-04NP, Stress Evaluation of Nine Mile Point Unit 2 Steam Dryer Using ACM Rev. 4.1 Acoustic Loads, Revision 0. (Non-Proprietary), Attachment 4, Affidavit from Continuum Dynamics, Inc ML1108803022011-03-31031 March 2011 NEDO-33636, Fuel Storage Criticality Safety Analysis of New Fuel Storage Racks - GE14, Attachment 3, (Non-Proprietary) ML1104601602011-01-31031 January 2011 Attachment 1, CDI Report No. 10-09NP, ACM Rev. 4.1: Methodology to Predict Full Scale Steam Dryer Loads from In-Plant Measurements, Revision 3 ML12135A6232011-01-14014 January 2011 Off-Site Dose Calculation Manual (Odcm), Revision 32 ML1035003652010-12-13013 December 2010 Holtec Report No. HI-2012621 (Non-Proprietary), Criticality Safety Evaluation for the Nine Mile Point 2 Rack Installation Project ML1021702952010-07-30030 July 2010 Attachment 5, Continuum Dynamics, Inc., CDI Report No. 10-12NP, Design and Stress Evaluation of Nine Mile Point Unit 2 Steam Dryer Modifications for EPU Operation ML1021701862010-07-28028 July 2010 Attachment 4, Structural Integrity Associates, Inc., Flaw Evaluation of Indications in the Nine Mile Point Unit 2 Steam Dryer Vertical Support Plates Considering Extended Power Uprate Flow Induced Vibration Loading ML1019004492010-06-30030 June 2010 C.D.I. Report No. 10-10NP, Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Nine Mile Point Unit 2 Steam Dryer to 250 Hz Using ACM Rev. 4.1, Rev. 1 ML1021701852010-06-30030 June 2010 Attachment 3, Global Nuclear Fuel - Americas, LLC, MCNP01A, Low Enriched UO2 Pin Lattice in Water Critical Benchmark Evaluations Using ENDF/B-V Nuclear Cross-Section Data, Revision 1 ML1019004482010-06-30030 June 2010 C.D.I. Report No. 10-09NP, ACM Rev. 4.1: Methodology to Predict Full Scale Steam Dryer Loads from In-Plant Measurements, Rev. 1 (Non-Proprietary) 2023-08-04
[Table view] |
Text
ATTACHMENT (2)
FUEL BUNDLE INFORMATION REPORT FOR NINE MILE POINT 2, RELOAD 14 CYCLE 15 (000N0123-FBIR-NP)
(NON-PROPRIETARY)
Nine Mile Point Nuclear Station, LLC February 25, 2014
Name: 000N0123 Rev: 2 Security/IP: Class 2 Document Status: Verified Date Printed: Dec 13, 2013 3:49:38 PM EST GNP Global Nuclear Fuel Global Nuclear Fuel A Joint Venture of GE,Toshibo, & Hitachi 000N0123-FBIR-NP Revision 0 Class I December 2013 Non-ProprietaryInformation - Class I (Public)
Fuel Bundle Information Report for Nine Mile Point 2 Reload 14 Cycle 15 Copyright 2013 Global Nuclear Fuel - Americas, LLC All Rights Reserved
Name: 000N0123 Rev: 2 Security/IP: Class 2 Document Status: Verified Date Printed: Dec 13, 2013 3:49:38 PM EST NINE MILE POINT 2 Non-Proprietary Information O0ONO 123-FBIR-NP Reload 14 Class I (Public) Revision 0 Important Notice Regarding Contents of This Report Please Read Carefully This report was prepared by Global Nuclear Fuel - Americas, LLC (GNF-A) solely for use by Nine Mile Point Nuclear Station, LLC ("Recipient") in support of the operating license for NINE MILE POINT 2 (the "Nuclear Plant"). The information contained in this report (the "Information") is believed by GNF-A to be an accurate and true representation of the facts known by, obtained by or provided to GNF-A at the time this report was prepared.
The only undertakings of GNF-A respecting the Information are contained in the contract between Recipient and GNF-A for nuclear fuel and related services for the Nuclear Plant (the "Fuel Contract") and nothing contained in this document shall be construed as amending or modifying the Fuel Contract. The use of the Information for any purpose other than that for which it was intended under the Fuel Contract, is not authorized by GNF-A. In the event of any such unauthorized use, GNF-A neither (a) makes any representation or warranty (either expressed or implied) as to the completeness, accuracy or usefulness of the Information or that such unauthorized use may not infringe privately owned rights, nor (b) assumes any responsibility for liability or damage of any kind which may result from such use of such information.
Information Notice This is a non-proprietary version of the document 000N0123-FBIR-P, Revision 0, which has the proprietary information removed. Portions of the document that have been removed are indicated by an open and closed bracket as shown here (( B Page 2
Name: 000N0123 Rev: 2 Security/IP: Class 2 Document Status: Verified Date Printed: Dec 13. 2013 3:49:38 PM EST NINE MILE POINT 2 Non-Proprietary Information 000N0123-FBIR-NP Reload 14 Class I (Public) Revision 0
- 1. Introduction and Summary This report, which supplements the Supplemental Reload Licensing Report, contains thermal-mechanical linear heat generation rate (LHGR) limits for the GNF-A fuel designs to be loaded into Nine Mile Point 2 for Cycle 15. These LHGR limits are obtained from thermal-mechanical considerations only. Approved GNF-A calculation models documented in Reference I were used in performing this analysis.
LHGR limits as a function of exposure for each bundle of the core design are given in Appendix A and Reference 2. The LHGR values provide upper and lower exposure dependent LHGR boundaries which envelope the actual gadolinia dependent LHGR limits.
Appendix B contains a description of the fuel bundles. Table B-I contains a summary of bundle-specific information, and the figures provide the enrichment distribution and gadolinium distribution for the fuel bundles included in this appendix. These bundles have been approved for use under the fuel licensing acceptance criteria of Reference 1.
Page 3
Name: 000N0123 Rev: 2 Security/IP: Class 2 Document Status: Verified Date Printed: Dec 13, 2013 3:49:38 PM EST NINE MILE POINT 2 Non-Proprietary Information OOONO 123-FBIR-NP Reload 14 Class I (Public) Revision 0
- 2. References
- 1. General Electric StandardApplicationfor Reactor Fuel, NEDE-240 11-P-A- 19, May 2012; and the U.S. Supplement, NEDE-2401 I-P-A-19-US, May 2012.
- 2. Letter from B. R. Moore (GNF) to Document Control Desk (NRC),
Subject:
"GEl4 Compliance with Amendment 22 of NEDE-24011-P-A (GESTAR II), NEDC-32868P, Revision 5, May 2013," MFN13-028, May 24, 2013.
Page 4
Name: 000N0123 Rev: 2 Security/IP: Class 2 Document Status: Verified Date Printed: Dec "13. 2013 3:49:38 PM EST NINE MILE POINT 2 Non-Proprietary Information OOONO 123-FBIR-NP Reload 14 Class I (Public) Revision 0 Appendix A UO2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GE 14-P 10CNAB434-8G7.0/7G6.0-120T- 150-T6-3233 (GE 14C)
Bundle Number: 3233 Peak Pellet Exposure U02 LHGR Limit GWd/MT (GWd/ST) .1kW/ft See Table D-2 of Reference 2 Peak Pellet Exposure Most Limiting Gadolinia LHGR Limit GWd/MT (GWd/ST) kW/ft See Table D-4 of Reference 2 Page 5
Name: 000N0123 Rev: 2 Secunty/IP: Class 2 Document Status: Verified Date Printed: Dec 13. 2013 3:49:38 PM EST NINE MILE POINT 2 Non-Proprietary Information 00ON0123-FBIR-NP Reload 14 Class I (Public) Revision 0 UO2 Gd Thermal-Mechanical LHGR Limits Bundle Type: GE 14-P 1OCNAB416-17GZ- 120T- 150-T6-3235 (GE 14C)
Bundle Number: 3235 Peak Pellet Exposure U02 LHGR Limit GWd/MT (GWd/ST) kW/ft See Table D-2 of Reference 2 Peak Pellet Exposure Most Limiting Gadolinia LHGR Limit GWd/MT (GWd/ST) kW/ft See Table D-4 of Reference 2 Page 6
Name: 000N0123 Rev: 2 Security/IP: Class 2 Document Status: Verified Date Printed: Dec 13, 2013 3:49:38 PM EST NINE MILE POINT 2 Non-Proprietary Information OOONO 123-FBIR-NP Reload 14 Class I (Public) Revision 0 UO2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GE 14-P 1OCNAB417-17GZ- 120T- 150-T6-3236 (GE 14C)
Bundle Number: 3236 Peak Pellet Exposure U02 LHGR Limit GWd/MT (GWd/ST) kW/ft See Table D-2 of Reference 2 Peak Pellet Exposure Most Limiting Gadolinia LHtGR Limit GWd/MT (GWd/ST) kW/ft See Table D-4 of Reference 2 Page 7
Name: 000N0123 Rev: 2 SecurityilP: Class 2 Document Status: Verified Date Printed: Dec 13. 2013 3:49:38 PM EST NINE MILE POINT 2 Non-Proprietary Information 00ON0123-FBIR-NP Reload 14 Class I (Public) Revision 0 UO2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GE 14-P 1OCNAB434-15GZ- 120T- I50-T6-4039 (GE 14C)
Bundle Number: 4039 Peak Pellet Exposure U02 LHGR Limit GWd/MT (GWd/ST) IkW/ft See Table D-2 of Reference 2 Peak Pellet Exposure Most Limiting Gadolinia LHGR Limit GWd/MT (GWd/ST) kW/ft See Table D-4 of Reference 2 Page 8
Name: 000N0123 Rev: 2 Sectirity/IP: Class 2 Document Status: Verified Date Printed: Dec 13, 2013 3:49:38 PM EST NINE MILE POINT 2 Non-Proprietary Information 00ON0123-FBIR-NP Reload 14 Class I (Public) Revision 0 UO2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GE 14-P OCNAB422-17GZ- 120T- I50-T6-4041 (GE I4C)
Bundle Number: 4041 Peak Pellet Exposure U02 LHGR Limit GWd/MT (GWd/ST) .1 kW/ft See Table D-2 of Reference 2 Peak Pellet Exposure Most Limiting Gadolinia LHGR Limit GWd/MT (GWd/ST) kW/ft See Table D-4 of Reference 2 Page 9
Name: OOONO123 Rev: 2 Security/IP: Class 2 Document Status: Verified Date Printed: Dec 13. 2013 3:49:38 PM EST NINE MILE POINT 2 Non-Proprietary Information OOONO 123-FBIR-NP Reload 14 Cl~ast I (Pihlir) Revision 0 UO2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GE 14-P 1OCNAB412-15GZ- 120T- 150-T6-4040 (GE 14C)
Bundle Number: 4040 Peak Pellet Exposure U02 LHGR Limit GWd/MT (GWd/ST) IkW/ft See Table D-2 of Reference 2 Peak Pellet Exposure Most Limiting Gadolinia LHtGR Limit GWd/MT (GWd/ST) kW/ft See Table D-4 of Reference 2 Page 10
Name: 000N0123 Rev: 2 Secunty/IP: Class 2 Document Status: Verified Date Printed: Dec 13. 2013 3:49:38 PM EST NINE MILE POINT 2 Non-Proprietary Information 00ON0123-FBIR-NP Reload 14 Class I (Public) Revision 0 UO2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GE 14-P 1OCNAB422- 17GZ- 120T- I50-T6-4042 (GE I4C)
Bundle Number: 4042 Peak Pellet Exposure U02 LHGR Limit GWd/MT (GWd/ST) of kW/ft See Table D-2 of Reference 2 Peak Pellet Exposure Most Limiting Gadolinia LHGR Limit GWd/MT (GWd/ST) kW/ft See Table D-4 of Reference 2 Page 11
Name: 000N0123 Rev: 2 Security/IP: Class 2 Document Status: Verified Date Printed: Dec 13. 2013 3:49:38 PM EST NINE MILE POINT 2 Non-Proprietary Information 00ON0123-FBIR-NP Reload 14 Class I (Public) Revision 0 UO2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GE 14-P 1OCNAB412-14GZ- 120T- I50-T6-4043 (GE I4C)
Bundle Number: 4043 Peak Pellet Exposure U02 LHGR Limit GWd/MT (GWd/ST) I kW/ft See Table D-2 of Reference 2 Peak Pellet Exposure Most Limiting Gadolinia LHGR Limit GWd/MT (GWd/ST) kW/ft See Table D-4 of Reference 2 Page 12
Name: 000N0123 Rev: 2 Security/IP: Class 2 Document Status: Verified Date Printed: Dec 13, 2013 3:49:38 PM EST NINE MILE POINT 2 Non-Proprietary Information OOONO 123-FBIR-NP Reload 14 Class I (Public) Revision 0 U0 2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GE 14-P 1OCNAB430-15GZ- 120T- 150-T6-4239 (GE 14C)
Bundle Number: 4239 Peak Pellet Exposure U02 LHGR Limit GWd/MT (GWd/ST) o kW/ft See Table D-2 of Reference 2 Peak Pellet Exposure Most Limiting Gadolinia LHGR Limit GWd/MT (GWd/ST) kW/ft See Table D-4 of Reference 2 Page 13
Name: 000N0123 Rev: 2 Security/IP: Class 2 Document Status: Verified Date Printed: Dec 13. 2013 3:49:38 PM EST NINE MILE POINT 2 Non-Proprietary Information 00ON0123-FBIR-NP Reload 14 Class I (Public) Revision 0 U0 2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GE 14-P 1OCNAB430-14GZ- 120T- I50-T6-4240 (GE I4C)
Bundle Number: 4240 Peak Pellet Exposure U02 LHGR Limit GWd/MT (GWd/ST) kW/ft See Table D-2 of Reference 2 Peak Pellet Exposure Most Limiting Gadolinia LHGR Limit GWd/MT (GWd/ST) kW/ft See Table D-4 of Reference 2 Page 14
Name: 000N0123 Rev: 2 Security/IP: Class 2 Document Status: Verified Date Printed: Dec 13, 2013 3:49:38 PM EST NINE MILE POINT 2 Non-Proprietary Information 00ON0123-FBIR-NP Reload 14 Class I (Public) Revision 0 U0 2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GE 14-PI OCNAB418-15GZ- 120T- 150-T6-4241 (GE I4C)
Bundle Number: 4241 Peak Pellet Exposure UO2 LHGR Limit GWd/MT (GWd/ST) kW/ft See Table D-2 of Reference 2 Peak Pellet Exposure Most Limiting Gadolinia LHGR Limit GWd/MT (GWd/ST) kW/ft See Table D-4 of Reference 2 Page 15
Name: 000N0123 Rev: 2 Security/IP: Class 2 Document Status: Verified Date Printed: Dec 13, 2013 3:49:38 PM EST NINE MILE POINT 2 Non-Proprietary Information 00ON0123-FBIR-NP Reload 14 Class I (Public) Revision 0 UO2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GE 14-P 1OCNAB419-1 7GZ- 120T- 150-T6-4242 (GE I4C)
Bundle Number: 4242 Peak Pellet Exposure U02 LHGR Limit GWd/MT (GWd/ST) kW/fo See Table D-2 of Reference 2 Peak Pellet Exposure Most Limiting Gadolinia LHGR Limit GWd/MT (GWd/ST) kW/ft See Table D-4 of Reference 2 Page 16
Name: 000N0123 Rev: 2 Securily/IP: Class 2 Document Status: Verified Date Printed: Dec 13. 2013 3:49:38 PM EST NINE MILE POINT 2 Non-Proprietary Information 00ON0123-FBIR-NP Reload 14 Class I (Public) Revision 0 U02 /Gd Thermal-Mechanical LHGR Limits Bundle Type: GE 14-P 1OCNAB4 18-16GZ- 120T- I 50-T6-4243 (GE 14C)
Bundle Number: 4243 Peak Pellet Exposure U02 LHGR Limit GWd/MT (GWd/ST) of kW/ft See Table D-2 of Reference 2 Peak Pellet Exposure Most Limiting Gadolinia LHGR Limit GWd/MT (GWd/ST) kW/ft See Table D-4 of Reference 2 Page 17
Name: 000N0123 Rev: 2 Security/IP: Class 2 Document Status: Verified Date Printed: Dec 13, 2013 3:49:38 PM EST NINE MILE POINT 2 Non-Proprietary Information 00ON0123-FBIR-NP Reload 14 Class I (Public) Revision 0 U0 2 /Gd Thermal-Mechanical LHGR Limits Bundle Type: GE 14-P 1OCNAB422-16GZ- 120T- I50-T6-4244 (GE I4C)
Bundle Number: 4244 Peak Pellet Exposure U02 LHGR Limit GWd/MT (GWd/ST) I kW/ft See Table D-2 of Reference 2 Peak Pellet Exposure Most Limiting Gadolinia LHGR Limit GWd/MT (GWd/ST) kW/ft See Table D-4 of Reference 2 Page 18
Name: 000N0123 Rev: 2 Security/IP: Class 2 Document Status: Verified Date Printed: Dec 13, 2013 3:49:38 PM EST NINE MILE POINT 2 Non-Proprietary Information 00ON0123-FBIR-NP Reload 14 Class I (Public) Revision 0 Appendix B Fuel Bundle Information Table B-I Bundle Specific Information Bundle Enrichment Weight Weight Max Exposure Fuel of UOf U0 2 ofU k. at at Max k.
Bundle Number (wt% U-235) (kg) (kg) 200C GWd/MT (GWd/ST)
GE14-P1OCNAB434-8G7.0/7G6.0-120T- 150-T6-3233 3233 (GE14C)
GE 14-P 1OCNAB416-17GZ-120T-150-T6-3235 (GE14C)
GE 14-P l 0CNAB417-17GZ-120T-150-T6-3236 (GE14C)
GE 14-P 1OCNAB434-15GZ-120T- 150-T6-4039 (GE 14C)
GE 14-P IOCNAB422-17GZ-120T-150-T6-4041 (GE14C)
GE 14-P 1OCNAB412-15GZ-120T- 150-T6-4040 (GE 14C)
GE 14-P I0CNAB422-17GZ-120T-150-T6-4042 (GE14C)
GE 14-P 1OCNAB412-14GZ-120T- 150-T6-4043 (GE I4C)
GE 14-P 1OCNAB430-15GZ-120T- 150-T6-4239 (GE I4C)
GE I4-P 1OCNAB430-14GZ-120T- I 50-T6-4240 (GE I 4C)
GE 14-P IOCNAB418-15GZ-120T-150-T6-4241 (GE14C)
GE 14-P 1OCNAB419-17GZ-120T- 150-T6-4242 (GE 14C)
GE 14-P 1OCNAB418-16GZ-120T- 150-T6-4243 (GE 14C)
GE 14-P 1OCNAB422-16GZ-120T-150-T6-4244 (GE I4C) 4 1Maximum lattice k. for the most reactive uncontrolled state plus a (( )) adder for uncertainties.
Page 19
Name: 000N0123 Rev: 2 Security/IP: Class 2 Document Status: Verified Date Printed: Dec 13. 2013 3:49:38 PM EST NINE MILE POINT 2 Non-Proprietary Information 00ON0123-FBIR-NP Reload 14 Class I (Public) Revision 0
[r Figure B-I Enrichment and Gadolinium Distribution for EDB No. 3233 Fuel Bundle GE14-PIOCNAB434-8G7.0/7G6.0-120T-150-T6-3233 (GE14C)
Page 20
Name: 000N0123 Rev: 2 Security/IP: Class 2 Document Status: Verified Date Printed: Dec 13. 2013 3:49:38 PM EST NINE MILE POINT 2 Non-Proprietary Information 000N0123-FBIR-NP Reload 14 Class I (Public) Revision 0
((
Figure B-2 Enrichment and Gadolinium Distribution for EDB No. 3235 Fuel Bundle GE14-PIOCNAB416-17GZ-120T-150-T6-3235 (GE14C)
Page 21
Name: 000N0123 Rev: 2 Security/IP: Class 2 Document Status: Verified Date Pdnted: Dec 13. 2013 3:49:38 PM EST NINE MILE POINT 2 Non-Proprietary Information 00ON0123-FBIR-NP Reload 14 Class I (Public) Revision 0 Figure B-3 Enrichment and Gadolinium Distribution for EDB No. 3236 Fuel Bundle GE14-PIOCNAB417-17GZ-120T-150-T6-3236 (GEI4C)
Page 22
Name: 000N0123 Rev: 2 Security/IP: Class 2 Document Status: Verified Date Printed: Dec 13, 2013 3:49:38 PM EST NINE MILE POINT 2 Non-Proprietary Information 00ON0123-FBIR-NP Reload 14 Class I (Public) Revision 0 Figure B-4 Enrichment and Gadolinium Distribution for EDB No. 4039 Fuel Bundle GE14-PIOCNAB434-15GZ-120T-150-T6-4039 (GE14C)
Page 23
Name: 000N0123 Rev: 2 Security/IP: Class 2 Document Status: Verified Date Printed: Dec 13, 2013 3:49:38 PM EST NINE MILE POINT 2 Non-Proprietary Information 00ON0123-FBIR-NP Reload 14 Class I (Public) Revision 0 Figure B-5 Enrichment and Gadolinium Distribution for EDB No. 4041 Fuel Bundle GE14-PIOCNAB422-17GZ-120T-150-T6-4041 (GE14C)
Page 24
Name: 000N0123 Rev: 2 Security/IP: Class 2 Document Status: Verified Date Printed: Dec 13. 2013 3:49:38 PM EST NINE MILE POINT 2 Non-Proprietary Information 00ON0123-FBIR-NP Reload 14 Class I (Public) Revision 0
((
Figure B-6 Enrichment and Gadolinium Distribution for EDB No. 4040 Fuel Bundle GE14-PIOCNAB412-15GZ-120T-150-T6-4040 (GEI4C)
Page 25
Name: 000N0123 Rev: 2 Security/IP: Class 2 Document Status: Verified Date Printed: Dec 13. 2013 3:49:38 PM EST NINE MILE POINT 2 Non-Proprietary Information 000N0123-FBIR-NP Reload 14 Clacs I (Puhlie) Revision 0 Figure B-7 Enrichment and Gadolinium Distribution for EDB No. 4042 Fuel Bundle GE14-PIOCNAB422-17GZ-120T-150-T6-4042 (GEI4C)
Page 26
Name: 000N0123 Rev: 2 Security/IP: Class 2 Document Status: Verified Date Printed: Dec 13, 2013 3:49:38 PM EST NINE MILE POINT 2 Non-Proprietary Information 00ON0123-FBIR-NP Reload 14 Class I (Public) Revision 0 Figure B-8 Enrichment and Gadolinium Distribution for EDB No. 4043 Fuel Bundle GE14-PIOCNAB412-14GZ-120T-150-T6-4043 (GE14C)
Page 27
Name: 000N0123 Rev: 2 Security/IP: Class 2 Document Status: Verified Date Printed: Dec 13, 2013 3:49:38 PM EST NINE MILE POINT 2 Non-Proprietary Information 00ON0123-FBIR-NP Reload 14 Class I (Public) Revision 0 Figure B-9 Enrichment and Gadolinium Distribution for EDB No. 4239 Fuel Bundle GEI4-PIOCNAB430-15GZ-120T-150-T6-4239 (GE14C)
Page 28
Name: 000N0123 Rev: 2 Security/IP: Class 2 Document Status: Verified Date Printed: Dec 13. 2013 3:49:38 PM EST NINE MILE POINT 2 Non-Proprietary Information 00ON0123-FBIR-NP Reload 14 Class I (Public) Revision 0 1]
Figure B-10 Enrichment and Gadolinium Distribution for EDB No. 4240 Fuel Bundle GEI4-PIOCNAB430-14GZ-120T-150-T6-4240 (GEI4C)
Page 29
Name: 000N0123 Rev: 2 Security/IP: Class 2 Document Status: Verified Date Printed: Dec 13. 2013 3:49:38 PM EST NINE MILE POINT 2 Non-Proprietary Information 00ON0123-FBIR-NP Reload 14 Class I (Public) Revision 0 Class I (Public) Revision 0 Reload 14 Figure B-1I Enrichment and Gadolinium Distribution for EDB No. 4241 Fuel Bundle GE14-PIOCNAB418-15GZ-120T-150-T6-4241 (GE14C)
Page 30
Name: 000N0123 Rev: 2 Security/IP: Class 2 Document Status: Verified Date Printed: Dec 13, 2013 3:49:38 PM EST NINE MILE POINT 2 Non-Proprietary Information 00ON0123-FBIR-NP Reload 14 Class I (Public) Revision 0 1]
Figure B-12 Enrichment and Gadolinium Distribution for EDB No. 4242 Fuel Bundle GE14-PIOCNAB419-17GZ-120T-150-T6-4242 (GE14C)
Page 31
Name: 000N0123 Rev: 2 Security/IP: Class 2 Document Status: Verified Date Printed: Dec 13, 2013 3:49:38 PM EST NINE MILE POINT 2 Non-Proprietary Information 00ON0123-FBIR-NP Reload 14 Class I (Public) Revision 0 Figure B-13 Enrichment and Gadolinium Distribution for EDB No. 4243 Fuel Bundle GE14-P1OCNAB418-16GZ-120T-150-T6-4243 (GE14C)
Page 32
Name: 000N0123 Rev: 2 Secudty/IP: Class 2 Document Status: Verified Date Printed: Dec 13. 2013 3:49:38 PM EST NINE MILE POINT 2 Non-Proprietary Information 00ON0123-FBIR-NP Reload 14 Class I (Public) Revision 0 Figure B-14 Enrichment and Gadolinium Distribution for EDB No. 4244 Fuel Bundle GE14-PIOCNAB422-16GZ-120T-150-T6-4244 (GE14C)