ML18002A575

From kanterella
Jump to navigation Jump to search
Korea Hydro & Nuclear Power Co., Ltd - Transmittal of Revised Response to RAI Er 1-8429 for Question EIS ACC/SAMDA-4 (Rev.2)
ML18002A575
Person / Time
Site: 05200046
Issue date: 01/02/2018
From: Kim H
Korea Hydro & Nuclear Power Co, Ltd
To: William Ward
Document Control Desk, Office of New Reactors
Shared Package
ML18002A574 List:
References
MKD/NW-18-0005L
Download: ML18002A575 (2)


Text

70-1312-gil, Yuseong-daero, Yuseong-gu, Daejeon, 305-343, KOREA Tel: +82-42-870-5400 / Fax: +82-42-870-5449 http://www.khnp.co.kr January 2, 2018 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attention: Mr. William Ward Docket No.52-046 Division of New Reactor Licensing MKD/NW-18-0005L

Subject:

Revised Response to RAI ER 1-8429 for Question EIS ACC/SAMDA-4 (Rev.2)

References:

1) NRC Request for Additional Information ER 1-8429, dated March 22, 2016
2) KHNP Letter MKD/NW-16-1138L, Response to RAI ER 1-8429 for Question EIS ACC/SAMDA-4,datedDecember 13, 2016
3) KHNP Letter MKD/NW-17-0293L, Revised Response to RAI ER 1-8429 for the Question EIS ACC/SAMDA-4, dated September 15, 2017 KHNP is hereby submitting the response to RAI ER 1-8428, dated March 22, 2016. The revised response addresses Question EIS ACC/SAMDA-4. Regarding the response, Environmental Report (APR1400-K-X-ER-14001-NP, Rev.1_Draft) and SAMDA Report (APR1400-E-P-NR-14006-P, Rev.1_Draft) were uploaded in the APR1400 ERR (https://khnp.certrec.com, category:

31 ER/SAMDA Report). The enclosure provides the revised response to RAI ER 1-8429 for Question EIS ACC/SAMDA-4 (Rev.2) (Non-Proprietary).

If additional information or clarification is required, please contact Daegeun Ahn, Director of KHNP Washington DC Center at ahn.daegeun@khnp.co.kr or 703-388-0592.

Sincerely, Han-gon Kim Project Manager Advanced Reactors Development Laboratory Korea Hydro & Nuclear Power Co., Ltd.

Enclosure:

Revised Response to RAI ER 1-8429 for Question EIS ACC/SAMDA-4 (Rev.2)

(Non-Proprietary)

Enclosure Revised Response to RAI ER 1-8429 for Question EIS ACC/SAMDA-4 (Rev.2)

(Non-Proprietary)

January 2, 2018