Similar Documents at Ginna |
---|
Category:LICENSEE EVENT REPORT (SEE ALSO AO
MONTHYEARML17265A7541999-09-22022 September 1999 LER 99-011-00:on 990823,small Tears Were Discovered in Flexible Duct Work Connector at Inlet of CR HVAC Sys Return Air Fan (AKF08).Caused by in-leakage Greater than That Assumed.Implemented Temporary Mod 99-029.With 990922 Ltr ML17265A7431999-08-24024 August 1999 LER 99-004-01:on 990412,discovered That Containment Recirculation Fan Chevron Separator Vanes Were Installed Backwards.Caused by Improper Assembly by Mfg.Moisture Separator Vanes Were Dismantled & Correctly re-installed ML17265A7181999-07-23023 July 1999 LER 99-007-01:on 990423,reactor Trip Occurred Due to Instrument & Control Technicians Inadvertently Pulling Fuses from Wrong Nuclear Instrument Channel.Setpoint Adjustments Were Completed by Different Crew of Technicians ML17265A7081999-07-22022 July 1999 LER 98-003-02:on 980904,actuations of CR Emergency Air Treatment Sys Was Noted Due to Invalid Causes.Caused by Various Degraded Components in CR RM Sys.Creats Actuation Signal Was Reset & Normal Ventilation Was Restored ML17265A7031999-07-19019 July 1999 LER 99-S01-00:on 990617,determined That Temporary Unescorted Access Had Been Granted to Contractor Employee.Caused by Incomplete Info Re Circumstances of Individual Military Separation.Individual Access Was Revoked.With 990719 Ltr ML17265A7021999-07-15015 July 1999 LER 99-010-00:on 990615,ventilation Isolation of Auxiliary Bldg Occurred When Auxiliary Bldg Gas Radiation Monitor R-14 Reached High Alarm Setpoint.Cr Operators Rest Auxiliary Bldg Ventilation Isolation Signal.With 990715 Ltr ML17265A6851999-06-21021 June 1999 LER 99-001-01:on 990222,deficiencies in NSSS Vendor steam- Line Brake Mass & Energy Release Analysis Results in Plant Being Outside Design Bases Occurred.Caused by Deficiencies in W.Temporary Administrative Replaced.With 990621 Ltr ML17265A6661999-06-0202 June 1999 LER 99-009-00:on 990503,instrumentation Declared Inoperable in Multiple Channels Resulted in Condition Prohibited by Ts. Caused by Unanticipated High Frequency AC Voltage Ripple. Entered TS LCO 3.0.3.With 990602 Ltr ML17309A6541999-05-27027 May 1999 LER 99-008-00:on 990427,overtemperature Delta T Reactor Trip Occurred Due to Faulted Bistable During Calibr of Redundant Channel.Plant Was Stabilized in Mode 3 & Faulted Bistable Was Subsequently Replaced.With 990527 Ltr ML17265A6631999-05-24024 May 1999 LER 99-007-00:on 990423,technicians Inadvertently Pulled Fuses from Wrong Nuclear Instrument Cahnnel,Causing Reactor Trip,Due to High Range Flux Trip.Caused by Personnel Error. Labeling Scheme Improved ML17265A6601999-05-21021 May 1999 LER 99-006-00:on 990421,start of turbine-driven Auxiliary Feedwater Pump Was Noted.Caused by MOV Being Left in Open Position.Closed Manual Isolation Valve to Secure Steam to Pump.With 990521 Ltr ML17265A6441999-05-13013 May 1999 LER 99-005-00:on 990413,undervoltage Signal of Safeguards Bus During Testing Resulted in Automatic Start of B Edg. Caused by Personnel Error.Blown Fuse Was Replaced & Offsite Power Was Restored to Safeguards Bus 17.With 990513 Ltr ML17265A6431999-05-12012 May 1999 LER 99-004-00:on 990412,discovered That Containment Recirculation Fan Moisture Separator Vanes Were Incorrectly Installed,Per 10CFR21.Caused by Improper Assembly by Mfg. Subject Vanes Were Dismantled & Correctly re-installed ML17265A6141999-03-31031 March 1999 LER 99-003-00:on 990301,two Main Steam non-return Check Valves Were Declared Inoperable Due to Exceedance of Acceptance Criteria.Caused by Changes in Methodology & Matls.Packing Gland Torque Will Be Adjusted.With 990331 Ltr ML17265A6131999-03-29029 March 1999 LER 99-002-00:on 990227,discovered That Surveillance Had Not Been Performed at Frequency,Per Ts.Caused by Personnel Error.Procedure O-6.13 Will Be Evaluated for Enhancement Documentation of Completion of ITS Srs.With 990329 Ltr ML17265A6061999-03-24024 March 1999 LER 99-001-00:on 990222,plant Was Noted Outside Design Basis.Caused by Deficiencies in NSSS Vendor Slb Mass & Energy Release.Placed Temporary Administrative Restriction 40 Degrees F Max on Screenhouse Bay Temp ML17265A4951998-12-21021 December 1998 LER 98-005-00:on 981120,loss of 34.5 Kv Offsite Power Circuit 751,resulted in Automatic Start of B Edg.Caused by Faulted Cable Splice.Performed Appropriate Actions of Abnormal Procedure AP-ELEC.1.With 981221 Ltr ML17265A4931998-12-17017 December 1998 LER 98-004-00:on 971030,determined That Improperly Performed Surveillance Resulted in Condition Prohibited by Ts.Caused by Procedure non-adherence.Appropriate Calibr Procedures Were Properly Performed with 24 H of Condition Discovery ML17265A4691998-11-25025 November 1998 LER 98-003-01:on 980904,actuations of CR Emergency Air Treatment Systems (Creats) Occurred.Caused by Radon build-up During Temp Inversion.Creats Actuation Signal Was Reset & Normal Ventilation Was Restored to CR ML17265A4271998-10-0505 October 1998 LER 98-003-00:on 980904,actuations of CR Emergency Air Treatment Sys Occurred.Caused by Radon build-up During Temp Inversion.Air Samples Were Taken & Determined That Source of Radiation Was Naturally Occurring Radon.With 981005 Ltr ML17265A3671998-07-14014 July 1998 LER 98-002-00:on 971019,CR Emergency Air Treatment Sys Actuating Function Was Not Operable.Caused by Mispositioned Switch.Revised Procedure CPI-MON-R37.W/980714 Ltr ML17265A1921998-03-11011 March 1998 LER 98-001-00:on 980209,discovered That Boraflex Degradation in SPF Was Greater than Was Assumed.Caused by Dissolution of Boron on Boraflex Matrix,Per 10CFR50.21.Removed Spent Fuel Assemblies from Selected Degraded Storage Rack Cells ML17265A1641998-02-0606 February 1998 LER 97-007-01:on 971117,reactor Engineer Recognized That Neutron Flux Low Range Trip Circuitry for Channel Was Not in Tripped Condition as Required.Caused by Technical Inadequacies.Channel Defeat Will Be Identified ML17265A1601998-02-0606 February 1998 LER 97-006-01:on 971103,verification of B Concentration Was Not Performed Due to Misinterpretation of Event Sequence. Audible Count Rate Function Was Restored to Operable Status ML17264B1441997-12-17017 December 1997 LER 97-007-00:on 971117,NF Low Range Trip Circuitry for Channel N-44 Was Not Placed in Tripped Condition.Caused by Technical Inadequacies in Procedures.Implemented EWR 4862 to Resolve Design deficiency.W/971217 Ltr ML17264B1291997-12-0303 December 1997 LER 97-006-00:on 971103,NIS Audible Count Rate Function Was Inoperable.Caused by Misinterpretation of Event Sequence Due to Not Verifying Boron Concentration.B Verification Occurred Every 12 H Per ITS LCO Action 3.9.2.C.3.W/971203 Ltr ML17264B1271997-12-0101 December 1997 LER 97-005-00:on 971031,undetected Unblocking of SI Actuation Signal Occurred at Low Pressure Condition,Due to Faulty Bistable Which Resulted in Inadvertent SI Actuation Signal.Sias,Ci & CVI Signals Were Reset ML17264B1211997-11-24024 November 1997 LER 97-004-00:on 971024,radiation Monitor Alarm Were Noted Due to Higher than Normal Radioactive Gas Concentration Resulted in Cvi.New R-12 Alarm Setpoint Was Maintained for Duration of Refueling Outage ML17264B0461997-09-29029 September 1997 LER 97-003-01:on 970730,bistable Instrument Trip Setpoint Could Have Exceeded Allowable Value.Caused by Insufficient Existing Margin Between Trip Setpoint & Allowable Value. Held Switches in Tripped configuration.W/970929 Ltr ML17264B0111997-08-27027 August 1997 LER 97-003-00:on 970730,high Steam Flow Bistable Instrument Setpoint Plus Instrument Uncertainty Could Exceed Allowable Value in ITS Was Identified.Caused by Entry Into ITS LCO 3.0.3.Switches Placed in Tripped configuration.W/970827 Ltr ML17264A9941997-08-19019 August 1997 LER 97-002-00:on 970720,34.5 Kv Offsite Power Circuit 751 Was Lost.Caused by Automatic Actuation of B Emergency DG Due to Undervoltage on Safeguards Buses 16 & 17.Offsite Power Restored to Safeguards Buses 16 & 17.W/970819 Ltr ML17264A9911997-08-11011 August 1997 LER 96-009-02:on 960723,determined That Leak Rate Outside Containment Was Greater than Program Limit.Caused by Weld Defect.Isolated Leak & Cut Out & Replaced Leaking Pipe ML17264A8271997-03-0303 March 1997 LER 97-001-00:on 970131,discovered Service Water Temp Was Less than Specified Value.Caused by non-representative Method of Monitoring.Increased Water Temp in Screenhouse Bay to Greater than 35 Degrees F.W/970303 Ltr ML17264A8071997-01-22022 January 1997 LER 96-015-00:on 961223,discovered Thermally Induced Overpressure Transient Could Occur.Caused by Thermal Expansion of Fluid During Design Basis Accident Condition. Installed Relief Valve on Affected line.W/970122 Ltr ML17264A7471996-11-27027 November 1996 LER 96-013-00:on 961029,circuit Breakers Closed While in Mode 3 & Resulted in Condition Prohibited by TS Due to Personnel Error.Circuit Breakers for MOV-878B & MOV-878D Were re-opened.W/961127 Ltr ML17264A6051996-09-19019 September 1996 LER 96-012-00:on 960820,feedwater Transient Occurred,Due to Closure of Feedwater Regulating Valve,Causing Lo Lo Steam Generator Level Reactor Trip.Sgs Were Restored & Missing Screw in 1/P-476 Was replaced.W/960919 Ltr ML17264A6061996-09-19019 September 1996 LER 96-009-01:on 960723,leakage Outside Containment Occurred,Due to Weld Defect,Resulting in Leak Rate Greater than Program Limits.Source of Leakage Isolated from RWST by Freeze Seal,Allowing Exit from ITS LCO 3.0.3.W/960919 Ltr ML17264A5911996-09-0505 September 1996 LER 96-011-00:on 960807,improper Configuration of Circuit Breaker Occurred,Due to Undetected Internal Interference, Resulting in Automatic Start of Both Auxiliary Feedwater Pumps.Running AFW Pumps Were secured.W/960905 Ltr ML17264A5921996-09-0505 September 1996 LER 96-010-00:on 960806,latching of Main Turbine While in Mode 4 Occurred,Due to Defective Procedure,Resulting in Automatic Start of Auxiliary Feedwater Pump.Caused by Defective Maint Procedure.Procedure revised.W/960905 Ltr ML17264A5891996-08-22022 August 1996 LER 96-009-00:on 960723,determined Leak on Piping Sys Outside Containment Greater than Program Limit.Caused by Weld Defect.Pipe & Socket Welds Were Cut Out & Replaced. W/960822 Ltr ML17264A5781996-08-0606 August 1996 LER 96-008-00:on 960707,main Feedwater Pump Breakers Opened. Caused by Change in Seal Water Differential Pressure Occurred During Sys Realignment.Afw Flow Controlled as Desired to Maintain S/G level.W/960806 Ltr ML17264A5561996-07-12012 July 1996 LER 96-007-00:on 960612,CR Operators Identified Control Rods Misaligned & Not Moving in Proper Sequence.Caused by Faulty Firing Circuit Card in Rod Control Sys.Faulty Firing Circuit Card in 1BD Power Cabinet replaced.W/960712 Ltr ML17264A5421996-06-20020 June 1996 LER 96-006-00:on 960521,discovered Containment Penetration Not in Required Status.Caused by Personnel Error.Installed Flange Inside Containment Penetration 2.W/960620 Ltr ML17264A5411996-06-17017 June 1996 LER 96-005-00:on 960516,PORC Determined Deficient Procedures Do Not Meet SRs for Testing safety-related Logic Circuits. Caused by Inadequancies in Individual Testing Procedures. Procedures Re Improved TSs revised.W/960617 Ltr ML17264A5051996-05-17017 May 1996 LER 96-003-01:on 960308,identified That Both Pressurizer PORVs Inoperable Concurrently Due to Disconnection of Flex Hose to Both PORV Actuators to Install air-sets for Benchset & Limit Switch Activities.Hpes Completed ML17264A4481996-04-0808 April 1996 LER 96-003-00:on 960308,both Pressurizer Relief Valves Inoperable.Hpes Evaluation Is Being Conducted to Determined Cause of Event.C/As:Both PORVs restored.W/960408 Ltr ML17264A4471996-04-0808 April 1996 LER 96-002-00:on 960307,secondary Transient Occurred.Caused by Loss of B Condenser Circulating Water Pump.C/As: Thermography performed.W/960408 Ltr ML17264A4101996-03-18018 March 1996 LER 96-001-00:on 950504,inservice Test Not Performed During Refueling Outage.Caused by Inadequate Tracking of Surveillance Frequency.Valve Test Performed & Disassembled. W/960318 Ltr ML17264A2971995-12-14014 December 1995 LER 95-009-00:on 950817,surveillance Was Not Performed Due to Improper Application of TS Requirements Resulting in TS Violation.Testing of MOV-515 Was Performed on 951115.W/ 951214 Ltr ML17264A1711995-09-25025 September 1995 LER 95-008-00:on 950825,secondary Transient Occurred.Caused by Loss of B Condenser Circulating Water Pump That Resulted in Manual Rt.Returned S/G Levels to Normal Operating levels.W/950925 Ltr 1999-09-22
[Table view] Category:RO)
MONTHYEARML17265A7541999-09-22022 September 1999 LER 99-011-00:on 990823,small Tears Were Discovered in Flexible Duct Work Connector at Inlet of CR HVAC Sys Return Air Fan (AKF08).Caused by in-leakage Greater than That Assumed.Implemented Temporary Mod 99-029.With 990922 Ltr ML17265A7431999-08-24024 August 1999 LER 99-004-01:on 990412,discovered That Containment Recirculation Fan Chevron Separator Vanes Were Installed Backwards.Caused by Improper Assembly by Mfg.Moisture Separator Vanes Were Dismantled & Correctly re-installed ML17265A7181999-07-23023 July 1999 LER 99-007-01:on 990423,reactor Trip Occurred Due to Instrument & Control Technicians Inadvertently Pulling Fuses from Wrong Nuclear Instrument Channel.Setpoint Adjustments Were Completed by Different Crew of Technicians ML17265A7081999-07-22022 July 1999 LER 98-003-02:on 980904,actuations of CR Emergency Air Treatment Sys Was Noted Due to Invalid Causes.Caused by Various Degraded Components in CR RM Sys.Creats Actuation Signal Was Reset & Normal Ventilation Was Restored ML17265A7031999-07-19019 July 1999 LER 99-S01-00:on 990617,determined That Temporary Unescorted Access Had Been Granted to Contractor Employee.Caused by Incomplete Info Re Circumstances of Individual Military Separation.Individual Access Was Revoked.With 990719 Ltr ML17265A7021999-07-15015 July 1999 LER 99-010-00:on 990615,ventilation Isolation of Auxiliary Bldg Occurred When Auxiliary Bldg Gas Radiation Monitor R-14 Reached High Alarm Setpoint.Cr Operators Rest Auxiliary Bldg Ventilation Isolation Signal.With 990715 Ltr ML17265A6851999-06-21021 June 1999 LER 99-001-01:on 990222,deficiencies in NSSS Vendor steam- Line Brake Mass & Energy Release Analysis Results in Plant Being Outside Design Bases Occurred.Caused by Deficiencies in W.Temporary Administrative Replaced.With 990621 Ltr ML17265A6661999-06-0202 June 1999 LER 99-009-00:on 990503,instrumentation Declared Inoperable in Multiple Channels Resulted in Condition Prohibited by Ts. Caused by Unanticipated High Frequency AC Voltage Ripple. Entered TS LCO 3.0.3.With 990602 Ltr ML17309A6541999-05-27027 May 1999 LER 99-008-00:on 990427,overtemperature Delta T Reactor Trip Occurred Due to Faulted Bistable During Calibr of Redundant Channel.Plant Was Stabilized in Mode 3 & Faulted Bistable Was Subsequently Replaced.With 990527 Ltr ML17265A6631999-05-24024 May 1999 LER 99-007-00:on 990423,technicians Inadvertently Pulled Fuses from Wrong Nuclear Instrument Cahnnel,Causing Reactor Trip,Due to High Range Flux Trip.Caused by Personnel Error. Labeling Scheme Improved ML17265A6601999-05-21021 May 1999 LER 99-006-00:on 990421,start of turbine-driven Auxiliary Feedwater Pump Was Noted.Caused by MOV Being Left in Open Position.Closed Manual Isolation Valve to Secure Steam to Pump.With 990521 Ltr ML17265A6441999-05-13013 May 1999 LER 99-005-00:on 990413,undervoltage Signal of Safeguards Bus During Testing Resulted in Automatic Start of B Edg. Caused by Personnel Error.Blown Fuse Was Replaced & Offsite Power Was Restored to Safeguards Bus 17.With 990513 Ltr ML17265A6431999-05-12012 May 1999 LER 99-004-00:on 990412,discovered That Containment Recirculation Fan Moisture Separator Vanes Were Incorrectly Installed,Per 10CFR21.Caused by Improper Assembly by Mfg. Subject Vanes Were Dismantled & Correctly re-installed ML17265A6141999-03-31031 March 1999 LER 99-003-00:on 990301,two Main Steam non-return Check Valves Were Declared Inoperable Due to Exceedance of Acceptance Criteria.Caused by Changes in Methodology & Matls.Packing Gland Torque Will Be Adjusted.With 990331 Ltr ML17265A6131999-03-29029 March 1999 LER 99-002-00:on 990227,discovered That Surveillance Had Not Been Performed at Frequency,Per Ts.Caused by Personnel Error.Procedure O-6.13 Will Be Evaluated for Enhancement Documentation of Completion of ITS Srs.With 990329 Ltr ML17265A6061999-03-24024 March 1999 LER 99-001-00:on 990222,plant Was Noted Outside Design Basis.Caused by Deficiencies in NSSS Vendor Slb Mass & Energy Release.Placed Temporary Administrative Restriction 40 Degrees F Max on Screenhouse Bay Temp ML17265A4951998-12-21021 December 1998 LER 98-005-00:on 981120,loss of 34.5 Kv Offsite Power Circuit 751,resulted in Automatic Start of B Edg.Caused by Faulted Cable Splice.Performed Appropriate Actions of Abnormal Procedure AP-ELEC.1.With 981221 Ltr ML17265A4931998-12-17017 December 1998 LER 98-004-00:on 971030,determined That Improperly Performed Surveillance Resulted in Condition Prohibited by Ts.Caused by Procedure non-adherence.Appropriate Calibr Procedures Were Properly Performed with 24 H of Condition Discovery ML17265A4691998-11-25025 November 1998 LER 98-003-01:on 980904,actuations of CR Emergency Air Treatment Systems (Creats) Occurred.Caused by Radon build-up During Temp Inversion.Creats Actuation Signal Was Reset & Normal Ventilation Was Restored to CR ML17265A4271998-10-0505 October 1998 LER 98-003-00:on 980904,actuations of CR Emergency Air Treatment Sys Occurred.Caused by Radon build-up During Temp Inversion.Air Samples Were Taken & Determined That Source of Radiation Was Naturally Occurring Radon.With 981005 Ltr ML17265A3671998-07-14014 July 1998 LER 98-002-00:on 971019,CR Emergency Air Treatment Sys Actuating Function Was Not Operable.Caused by Mispositioned Switch.Revised Procedure CPI-MON-R37.W/980714 Ltr ML17265A1921998-03-11011 March 1998 LER 98-001-00:on 980209,discovered That Boraflex Degradation in SPF Was Greater than Was Assumed.Caused by Dissolution of Boron on Boraflex Matrix,Per 10CFR50.21.Removed Spent Fuel Assemblies from Selected Degraded Storage Rack Cells ML17265A1641998-02-0606 February 1998 LER 97-007-01:on 971117,reactor Engineer Recognized That Neutron Flux Low Range Trip Circuitry for Channel Was Not in Tripped Condition as Required.Caused by Technical Inadequacies.Channel Defeat Will Be Identified ML17265A1601998-02-0606 February 1998 LER 97-006-01:on 971103,verification of B Concentration Was Not Performed Due to Misinterpretation of Event Sequence. Audible Count Rate Function Was Restored to Operable Status ML17264B1441997-12-17017 December 1997 LER 97-007-00:on 971117,NF Low Range Trip Circuitry for Channel N-44 Was Not Placed in Tripped Condition.Caused by Technical Inadequacies in Procedures.Implemented EWR 4862 to Resolve Design deficiency.W/971217 Ltr ML17264B1291997-12-0303 December 1997 LER 97-006-00:on 971103,NIS Audible Count Rate Function Was Inoperable.Caused by Misinterpretation of Event Sequence Due to Not Verifying Boron Concentration.B Verification Occurred Every 12 H Per ITS LCO Action 3.9.2.C.3.W/971203 Ltr ML17264B1271997-12-0101 December 1997 LER 97-005-00:on 971031,undetected Unblocking of SI Actuation Signal Occurred at Low Pressure Condition,Due to Faulty Bistable Which Resulted in Inadvertent SI Actuation Signal.Sias,Ci & CVI Signals Were Reset ML17264B1211997-11-24024 November 1997 LER 97-004-00:on 971024,radiation Monitor Alarm Were Noted Due to Higher than Normal Radioactive Gas Concentration Resulted in Cvi.New R-12 Alarm Setpoint Was Maintained for Duration of Refueling Outage ML17264B0461997-09-29029 September 1997 LER 97-003-01:on 970730,bistable Instrument Trip Setpoint Could Have Exceeded Allowable Value.Caused by Insufficient Existing Margin Between Trip Setpoint & Allowable Value. Held Switches in Tripped configuration.W/970929 Ltr ML17264B0111997-08-27027 August 1997 LER 97-003-00:on 970730,high Steam Flow Bistable Instrument Setpoint Plus Instrument Uncertainty Could Exceed Allowable Value in ITS Was Identified.Caused by Entry Into ITS LCO 3.0.3.Switches Placed in Tripped configuration.W/970827 Ltr ML17264A9941997-08-19019 August 1997 LER 97-002-00:on 970720,34.5 Kv Offsite Power Circuit 751 Was Lost.Caused by Automatic Actuation of B Emergency DG Due to Undervoltage on Safeguards Buses 16 & 17.Offsite Power Restored to Safeguards Buses 16 & 17.W/970819 Ltr ML17264A9911997-08-11011 August 1997 LER 96-009-02:on 960723,determined That Leak Rate Outside Containment Was Greater than Program Limit.Caused by Weld Defect.Isolated Leak & Cut Out & Replaced Leaking Pipe ML17264A8271997-03-0303 March 1997 LER 97-001-00:on 970131,discovered Service Water Temp Was Less than Specified Value.Caused by non-representative Method of Monitoring.Increased Water Temp in Screenhouse Bay to Greater than 35 Degrees F.W/970303 Ltr ML17264A8071997-01-22022 January 1997 LER 96-015-00:on 961223,discovered Thermally Induced Overpressure Transient Could Occur.Caused by Thermal Expansion of Fluid During Design Basis Accident Condition. Installed Relief Valve on Affected line.W/970122 Ltr ML17264A7471996-11-27027 November 1996 LER 96-013-00:on 961029,circuit Breakers Closed While in Mode 3 & Resulted in Condition Prohibited by TS Due to Personnel Error.Circuit Breakers for MOV-878B & MOV-878D Were re-opened.W/961127 Ltr ML17264A6051996-09-19019 September 1996 LER 96-012-00:on 960820,feedwater Transient Occurred,Due to Closure of Feedwater Regulating Valve,Causing Lo Lo Steam Generator Level Reactor Trip.Sgs Were Restored & Missing Screw in 1/P-476 Was replaced.W/960919 Ltr ML17264A6061996-09-19019 September 1996 LER 96-009-01:on 960723,leakage Outside Containment Occurred,Due to Weld Defect,Resulting in Leak Rate Greater than Program Limits.Source of Leakage Isolated from RWST by Freeze Seal,Allowing Exit from ITS LCO 3.0.3.W/960919 Ltr ML17264A5911996-09-0505 September 1996 LER 96-011-00:on 960807,improper Configuration of Circuit Breaker Occurred,Due to Undetected Internal Interference, Resulting in Automatic Start of Both Auxiliary Feedwater Pumps.Running AFW Pumps Were secured.W/960905 Ltr ML17264A5921996-09-0505 September 1996 LER 96-010-00:on 960806,latching of Main Turbine While in Mode 4 Occurred,Due to Defective Procedure,Resulting in Automatic Start of Auxiliary Feedwater Pump.Caused by Defective Maint Procedure.Procedure revised.W/960905 Ltr ML17264A5891996-08-22022 August 1996 LER 96-009-00:on 960723,determined Leak on Piping Sys Outside Containment Greater than Program Limit.Caused by Weld Defect.Pipe & Socket Welds Were Cut Out & Replaced. W/960822 Ltr ML17264A5781996-08-0606 August 1996 LER 96-008-00:on 960707,main Feedwater Pump Breakers Opened. Caused by Change in Seal Water Differential Pressure Occurred During Sys Realignment.Afw Flow Controlled as Desired to Maintain S/G level.W/960806 Ltr ML17264A5561996-07-12012 July 1996 LER 96-007-00:on 960612,CR Operators Identified Control Rods Misaligned & Not Moving in Proper Sequence.Caused by Faulty Firing Circuit Card in Rod Control Sys.Faulty Firing Circuit Card in 1BD Power Cabinet replaced.W/960712 Ltr ML17264A5421996-06-20020 June 1996 LER 96-006-00:on 960521,discovered Containment Penetration Not in Required Status.Caused by Personnel Error.Installed Flange Inside Containment Penetration 2.W/960620 Ltr ML17264A5411996-06-17017 June 1996 LER 96-005-00:on 960516,PORC Determined Deficient Procedures Do Not Meet SRs for Testing safety-related Logic Circuits. Caused by Inadequancies in Individual Testing Procedures. Procedures Re Improved TSs revised.W/960617 Ltr ML17264A5051996-05-17017 May 1996 LER 96-003-01:on 960308,identified That Both Pressurizer PORVs Inoperable Concurrently Due to Disconnection of Flex Hose to Both PORV Actuators to Install air-sets for Benchset & Limit Switch Activities.Hpes Completed ML17264A4481996-04-0808 April 1996 LER 96-003-00:on 960308,both Pressurizer Relief Valves Inoperable.Hpes Evaluation Is Being Conducted to Determined Cause of Event.C/As:Both PORVs restored.W/960408 Ltr ML17264A4471996-04-0808 April 1996 LER 96-002-00:on 960307,secondary Transient Occurred.Caused by Loss of B Condenser Circulating Water Pump.C/As: Thermography performed.W/960408 Ltr ML17264A4101996-03-18018 March 1996 LER 96-001-00:on 950504,inservice Test Not Performed During Refueling Outage.Caused by Inadequate Tracking of Surveillance Frequency.Valve Test Performed & Disassembled. W/960318 Ltr ML17264A2971995-12-14014 December 1995 LER 95-009-00:on 950817,surveillance Was Not Performed Due to Improper Application of TS Requirements Resulting in TS Violation.Testing of MOV-515 Was Performed on 951115.W/ 951214 Ltr ML17264A1711995-09-25025 September 1995 LER 95-008-00:on 950825,secondary Transient Occurred.Caused by Loss of B Condenser Circulating Water Pump That Resulted in Manual Rt.Returned S/G Levels to Normal Operating levels.W/950925 Ltr 1999-09-22
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML17265A7601999-10-0505 October 1999 Part 21 Rept Re W2 Switch Supplied by W Drawn from Stock, Did Not Operate Properly After Being Installed on 990409. Switch Returned to W on 990514 for Evaluation & Root Cause Analysis ML17265A7621999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Re Ginna Npp.With 991008 Ltr ML17265A7531999-09-23023 September 1999 Part 21 Rept Re Corrective Action & Closeout of 10CFR21 Rept of Noncompliance Re Unacceptable Part for 30-4 Connector. Unacceptable Parts Removed from Stock & Scrapped ML17265A7541999-09-22022 September 1999 LER 99-011-00:on 990823,small Tears Were Discovered in Flexible Duct Work Connector at Inlet of CR HVAC Sys Return Air Fan (AKF08).Caused by in-leakage Greater than That Assumed.Implemented Temporary Mod 99-029.With 990922 Ltr ML17265A7471999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Re Ginna Npp.With 990909 Ltr ML17265A7431999-08-24024 August 1999 LER 99-004-01:on 990412,discovered That Containment Recirculation Fan Chevron Separator Vanes Were Installed Backwards.Caused by Improper Assembly by Mfg.Moisture Separator Vanes Were Dismantled & Correctly re-installed ML17265A7341999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Re Ginna Npp.With 990806 Ltr ML17265A7291999-07-29029 July 1999 Interim Part 21 Rept Re safety-related DB-25 Breaker Mechanism Procured from W Did Not Pas Degradatin Checks When Drawn from Stock to Be Installed Into BUS15/03A.Holes Did Not line-up & Tripper Pan Bent ML17265A7181999-07-23023 July 1999 LER 99-007-01:on 990423,reactor Trip Occurred Due to Instrument & Control Technicians Inadvertently Pulling Fuses from Wrong Nuclear Instrument Channel.Setpoint Adjustments Were Completed by Different Crew of Technicians ML17265A7081999-07-22022 July 1999 LER 98-003-02:on 980904,actuations of CR Emergency Air Treatment Sys Was Noted Due to Invalid Causes.Caused by Various Degraded Components in CR RM Sys.Creats Actuation Signal Was Reset & Normal Ventilation Was Restored ML17265A7131999-07-22022 July 1999 Special Rept:On 990407,radiation Monitor RM-14A Was Declared Inoperable.Caused by Failed Communication Link from TSC to Plant Process Computer Sys.Communication Link Was re-established & RM-14A Was Declaed Operable on 990521 ML17265A7031999-07-19019 July 1999 LER 99-S01-00:on 990617,determined That Temporary Unescorted Access Had Been Granted to Contractor Employee.Caused by Incomplete Info Re Circumstances of Individual Military Separation.Individual Access Was Revoked.With 990719 Ltr ML17265A7211999-07-19019 July 1999 ISI Rept for Third Interval (1990-1999) Third Period, Second Outage (1999) at Re Ginna Npp. ML17265A7021999-07-15015 July 1999 LER 99-010-00:on 990615,ventilation Isolation of Auxiliary Bldg Occurred When Auxiliary Bldg Gas Radiation Monitor R-14 Reached High Alarm Setpoint.Cr Operators Rest Auxiliary Bldg Ventilation Isolation Signal.With 990715 Ltr ML17265A7661999-06-30030 June 1999 1999 Rept of Facility Changes,Tests & Experiments Conducted Without Prior NRC Approval for Jan 1998 Through June 1999, Per 10CFR50.59.With 991020 Ltr ML17265A7011999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Re Ginna Npp.With 990712 Ltr ML17265A6851999-06-21021 June 1999 LER 99-001-01:on 990222,deficiencies in NSSS Vendor steam- Line Brake Mass & Energy Release Analysis Results in Plant Being Outside Design Bases Occurred.Caused by Deficiencies in W.Temporary Administrative Replaced.With 990621 Ltr ML17265A6761999-06-16016 June 1999 Part 21 Rept Re Defects & noncompliances,10CFR21(d)(3)(ii), Which Requires Written Notification to NRC on Identification of Defect or Failure to Comply. Relays Were Returned to Eaton for Evaluation & Root Cause Analysis ML17265A6661999-06-0202 June 1999 LER 99-009-00:on 990503,instrumentation Declared Inoperable in Multiple Channels Resulted in Condition Prohibited by Ts. Caused by Unanticipated High Frequency AC Voltage Ripple. Entered TS LCO 3.0.3.With 990602 Ltr ML17265A6681999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Re Ginna Nuclear Power Plant.With 990608 Ltr ML17265A6651999-05-27027 May 1999 Interim Rept Re W2 Control Switch,Procured from W,Did Not Operate Satisfactorily When Drawn from Stock to Be Installed in Main Control Board for 1C2 Safety Injection Pump. Estimated That Evaluation Will Be Completed by 991001 ML17309A6541999-05-27027 May 1999 LER 99-008-00:on 990427,overtemperature Delta T Reactor Trip Occurred Due to Faulted Bistable During Calibr of Redundant Channel.Plant Was Stabilized in Mode 3 & Faulted Bistable Was Subsequently Replaced.With 990527 Ltr ML17265A6631999-05-24024 May 1999 LER 99-007-00:on 990423,technicians Inadvertently Pulled Fuses from Wrong Nuclear Instrument Cahnnel,Causing Reactor Trip,Due to High Range Flux Trip.Caused by Personnel Error. Labeling Scheme Improved ML17265A6601999-05-21021 May 1999 LER 99-006-00:on 990421,start of turbine-driven Auxiliary Feedwater Pump Was Noted.Caused by MOV Being Left in Open Position.Closed Manual Isolation Valve to Secure Steam to Pump.With 990521 Ltr ML17265A6591999-05-17017 May 1999 Part 21 Rept Re Relay Deficiency Detected During pre-installation Testing.Caused by Incorrectly Wired Relay Coil.Relays Were Returned to Eaton Corp for Investigation. Relays Were Repaired & Retested ML17265A6441999-05-13013 May 1999 LER 99-005-00:on 990413,undervoltage Signal of Safeguards Bus During Testing Resulted in Automatic Start of B Edg. Caused by Personnel Error.Blown Fuse Was Replaced & Offsite Power Was Restored to Safeguards Bus 17.With 990513 Ltr ML17265A6431999-05-12012 May 1999 LER 99-004-00:on 990412,discovered That Containment Recirculation Fan Moisture Separator Vanes Were Incorrectly Installed,Per 10CFR21.Caused by Improper Assembly by Mfg. Subject Vanes Were Dismantled & Correctly re-installed ML17265A6381999-05-0707 May 1999 Part 21 Rept Re Replacement Turbocharger Exhaust Turbine Side Drain Port Not Functioning as Design Intended.Caused by Manufacturing Deficiency.Turbocharger Was Reaasembled & Reinstalled on B EDG ML17265A6391999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Re Ginna Nuclear Power Plant.With 990510 Ltr ML17265A6361999-04-23023 April 1999 Part 21 Rept Re Power Supply That Did Not Work Properly When Drawn from Stock & Installed in -25 Vdc Slot.Power Supply Will Be Sent to Vendor to Perform Failure Mode Assessment.Evaluation Will Be Completed by 991001 ML17265A6301999-04-18018 April 1999 Rev 1 to Cycle 28 COLR for Re Ginna Npp. ML17265A6251999-04-15015 April 1999 Special Rept:On 990309,halon Systems Were Removed from Svc & Fire Door F502 Was Blocked Open.Caused by Mods Being Made to CR Emergency Air Treatment Sys.Continuous Fire Watch Was Established with Backup Fire Suppression Equipment ML17265A6551999-04-0909 April 1999 Initial Part 21 Rept Re Mfg Deficiency in Replacement Turbocharger for B EDG Supplied by Coltec Industries. Deficiency Consisted of Missing Drain Port in Intermediate Casing.Required Oil Drain Port Machined Open ML17265A6291999-03-31031 March 1999 Rev 0 to Cycle 28 COLR for Re Ginna Npp. ML17265A6241999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Ginna Station.With 990409 Ltr ML17265A6141999-03-31031 March 1999 LER 99-003-00:on 990301,two Main Steam non-return Check Valves Were Declared Inoperable Due to Exceedance of Acceptance Criteria.Caused by Changes in Methodology & Matls.Packing Gland Torque Will Be Adjusted.With 990331 Ltr ML17265A6131999-03-29029 March 1999 LER 99-002-00:on 990227,discovered That Surveillance Had Not Been Performed at Frequency,Per Ts.Caused by Personnel Error.Procedure O-6.13 Will Be Evaluated for Enhancement Documentation of Completion of ITS Srs.With 990329 Ltr ML17265A6061999-03-24024 March 1999 LER 99-001-00:on 990222,plant Was Noted Outside Design Basis.Caused by Deficiencies in NSSS Vendor Slb Mass & Energy Release.Placed Temporary Administrative Restriction 40 Degrees F Max on Screenhouse Bay Temp ML17265A5661999-03-0101 March 1999 Rev 26 to QA Program for Station Operation. ML17265A5961999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Ginna Nuclear Power Plant.With 990310 Ltr ML17265A5371999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Re Ginna Nuclear Power Plant.With 990205 Ltr ML17265A5951998-12-31031 December 1998 Rg&E 1998 Annual Rept. ML17265A5001998-12-21021 December 1998 Rev 26 to QA Program for Station Operation. ML17265A4951998-12-21021 December 1998 LER 98-005-00:on 981120,loss of 34.5 Kv Offsite Power Circuit 751,resulted in Automatic Start of B Edg.Caused by Faulted Cable Splice.Performed Appropriate Actions of Abnormal Procedure AP-ELEC.1.With 981221 Ltr ML17265A4931998-12-17017 December 1998 LER 98-004-00:on 971030,determined That Improperly Performed Surveillance Resulted in Condition Prohibited by Ts.Caused by Procedure non-adherence.Appropriate Calibr Procedures Were Properly Performed with 24 H of Condition Discovery ML17265A4761998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Re Ginna Nuclear Power Plant.With 981210 Ltr ML17265A4691998-11-25025 November 1998 LER 98-003-01:on 980904,actuations of CR Emergency Air Treatment Systems (Creats) Occurred.Caused by Radon build-up During Temp Inversion.Creats Actuation Signal Was Reset & Normal Ventilation Was Restored to CR ML17265A4531998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Re Ginna Nuclear Power Plant.With 981110 Ltr ML17265A4271998-10-0505 October 1998 LER 98-003-00:on 980904,actuations of CR Emergency Air Treatment Sys Occurred.Caused by Radon build-up During Temp Inversion.Air Samples Were Taken & Determined That Source of Radiation Was Naturally Occurring Radon.With 981005 Ltr ML17265A4291998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Re Ginna Nuclear Power Plant.With 981009 Ltr 1999-09-30
[Table view] |
Text
ACCELERATED D TIUBUTION DEMONS TION SYSTEM
~"
k REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)'CCESSION NBR:9202060130 DOC.DATE: 92/01/29 NOTARIZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION BACKUS,W.H. Rochester Gas 6 Electric Corp.
MECREDY,R.C. Rochester Gas 6 Electric Corp.
RECIP.NAME RECIPIENT AFFILIATION R
SUBJECT:
LER 91-010-00:on 911230,during operator review of plant, process computer logs, util discovered that invalid data D had been used for calculation. Caused by invalid input from LEFM.LEFM HP-85B Computer was reinitialized.W/920129 ltr. S DISTRIBUTION CODE: IE22T COPIES RECEIVED:LTR ENCL SIZE:
.TITLE: 50.73/50.9 Licensee"Event Report (LER), Incident Rpt, etc.
NOTES:License Exp date in accordance with loCFR2,2.109(9/19/72). 05000244 A D
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D PD1-3 LA 1 1. PD1-3 PD 1 1 JOHNSON,A 1 1 INTERNAL: ACNW 2 2 AEOD/DOA 1 1 AEOD/DSP/TPAB NRR/DET/ECMB 9H 1=;1 1 1 AEOD/ROAB/DS P NRR/DET/EMEB 7E 2
1 2
1 NRR/DLPQ/LHFB10 1 1 NRR/DLPQ/LPEB10 1 1 NRR/DOEA/OEAB 1 1 NRR/DREP/PRPB11 2 2 NRR/DST/SELB SD 1 1 NRR/DST/SICBSH3 1 1 NRR/D~SJS LB.S Dl 1 1 NRR/DST/SRXB SE 1 1 RE -'CE 2 1 1 RES/DS IR/EI B 1 1 RGN IL 01 1 1 EXTERNAL EGGG BRYCE g J ~ H 3 3 L ST LOBBY WARD 1 1 NRC PDR 1" 1 NSIC MURPHY,G.A 1 1 NSIC POORE,W. 1 1, NUDOCS FULL TXT 1 1 Q~~o D pgys7>//~ 7 D
D NOTE TO ALL "RIDS" RECIPIENTS:
S PLEASE HELP US TO REDUCE iVASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
FULL TEXT CONVERSION'REQUIRED TOTAL NUMBER OF COPIES REQUIRED: LTTR 31 ENCL 31
0 I ~ II~ I ~ 44 Jnc r TOOK 11KTC C'OCHESTER GAS AND ELECTRIC CORPORATION ~ 89 EAST AVENUE, ROCHESTER N.K 14649-0001 ROBERT C. MECREDY TELEPttONE Vice President AAEA CODE 7 1 6 546 2700 Cinna Nuclear Production January 29, 1992 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
'n
Subject:
LER 91-010, During Operator Review of Plant Process Computer Logs, It Was Discovered That Invalid Data Had Been Used For Calorimetric Calculation R.E. Ginna Nuclear Power Plant Docket No. 50-244 This event is being voluntarily reported using the guidance of NUREG-1022 (Licensee Event Report System), and Supplement No.
1 to NUREG-1022. This report is intended to alert other utilities which may have similar systems. This event is related to, but does not meet, the reporting requirements of 10CFR50.73, item (a)(2) (i) (B) . Item (a) (2)(i) (B) requires reporting of "any operation or condition prohibited by the plant's Technical Specifications". The attached Licensee Event Report LER 91-010 is hereby voluntarily submitted.
This event has in no way affected the public's health and safety.
Very truly yours, Robert C. Mecredy xc4 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna USNRC Senior Resident Inspector
~ P i gp g
~ ~
Lr i3 0 V 3 c.)
9202060130 920129 PDR ADOCK 05000244 8 PDR
0
>>AC y>><<SOO UW NUCLSA1 1IOULATOA1COO<<)~ON IO4$ )
AtyNOTIO ONS NO. $ 1IO 0IOV LICENSEE EVENT REPORT (LERl IXSYASI I/Svss yACILITYNAA)a Ill OOCXST NV<<tall Ql A R.E. Ginna Nuclear Power Plant o 6 o o 0 244 >0)0 8
<<I I)4 During Opera or Review of Plant Process Computer Logs, Invalid Data Had Be n U '
It Was Discovered That imetr TINT OATS ISI LSN NU<<SIN III AIAOAT oATI 1)I OTHI1 IACILITIISINYOLVIONl NO>>TH OAY TIAII YIA1 ) I0 V I >> 1 I A L "'VNJOV
-.I'WaasIA OAY TtA1 yAO4TT HAH)A OOCXIT NVNSIAISI HV>>IIA 0 6 0 0 0 12 30 OAIAATINO
<<OOI NI 9 1 1 010 0001 AlyOAT N SUSINTTIO yVASVANT T 0 THt AIOVIAININTSOy ISCSA 992 f: ICA>>e>>V W>>A>>ey <<A
~ O.T $ 4) Q I IN)
~ lll 0 6 0 0 0
'HIS )O AO) ~ I
~
I $ 0.AOOIN
~ ONI 1 SO.NN41 IIII I Stoa4II)l ~ O.T $ 41ll I lyl TL1)4)
LavtL 0 9 SOANNIllllll ~ OMNIQI SO.T $ 4) Ql NII X 'oTHa1 ISA>>>>y 4 A>>A>> AAO IA rAAL>>1C sa SO.AOS 4 I III I <<) ~ O.T$ 4lallt IO.T $ 4) 0 II>>XIIAI ESSA)
$ 0AOS41)) lr>>l ~ O.T$ 4)Q)lal ~ O.T$ 4)QII<<IINI
" a+ g)~ig@i. $ OAN 4) ll)ly) SO I $ 4)QI I<<I ~ O.T $ 4) Q I la I LICINIIICONTACT SON THN Lail 0$ )
NAUI TSLtyHONI NVHSIII ANIA COOS Wesley H. Backus Technical Assistant to the rations Mana er 315 CO<<yLITI ONI LINI IOA IACH CO<<AONSNT SAI LV1l OIICAI~ IO IN THN 1tyOAT 11$ )
wjv{IN+Jv wg CAVSI STSTIN COUAONINT UANUI'AC IAON TAS Ll Rh'I'.Pri ggi9%j) '..
Ig<qg&I> CAUII STITSLI CO<<yONINT NANUSAC lyONTAS L TVNI1 TO Ny10$ gpss TUNI1 TO NyAOS @4i-..)(;Q>~b)<
X I0 W12'0 N yg~t)4 p ge
~%A"'o'~<V~~
~ UyyLII4INTALAITOAT IXylCTIO 114 VONTH CAY TIA1 tXAICTIO LVSLVSSION OATS II II T tl or y>>, y>>AA>>>> sxyscrso svsa>>ss)o>> oArsl NO ASSTAACT ILAA>>>> WO>>>>>>, I 1, AA>>su>>vary Nf>>AA <<V>>~r ITA>>>>N>>A AA>>l lit)
On December 30, 1991 at approximately 1830 EST, with the reactor at approximately 984 full power, the Control Room Foreman, while performing a review of the hourly Plant Process Computer System (PPCS) logs, determined that the Leading Edge Flow Meter (LEFM}
data used by the PPCS to calculate calorimetrics, was invalid from 1800 EST, December 20, 1991 to approximately 1830 EST, December .30, 1991. This event is being voluntarily reported to alert other utilities which may have similar systems.
The Control Room operators notified the reactor engineer and reinitialized the LEFM computer. After reinitialization, the LEFM printout values and PPCS values returned to expected/normal indications.
Corrective actions include revi'sions to the affected procedures to require checking the operation of the LEFM prior to performing calorimetrics and the addition of a high'alarm on PPCS indicating a failure may have occurred.
The immediate cause was identified as a failure of the LEFM HP-85B computer.
>>1C I>>>> SOS ISO$ 1
IIAC lees WA U $ , ISUOLSAA ASOULAToAv coeeMISCIbll I$4$ I LICENSEE EVENT REPORT ILER) TEXT CONTINUATION S ASSAOV $ 0 OM$ IlO $ 1$ 0%104
$ SSIA$ 5 ~ I)I 1$
SACILITY IIAMC III OOCKlT IIUI&SA l1I LlA IIUSSOSII I~ I ~ AO$ 1$ I S I OI V SMIIT I1A L V IS IO M e
~ M TSIT Ils R.E. Nuclear
~ ~ s Ieeweel vee ~Power, Plant lVAC Sese ~ $ I I Ill o s o o o 24 49.1 01 0 00 020FO 8 PRE-EVENT PLANT CONDITIONS The plant was at approximately 98% steady state reactor power with no major activities in progress. The Control Room Foreman (CRF) was reviewing the hourly Plant Process Computer System .(PPCS) logs.
DESCRIPTION OF EVENT -
A. DATES AND APPROXIMATE TIMES OF MAZOR OCCURRENCES:
o December 20, 1991, 1800 EST: Event date and approximate time.
o December 30, 1991, 1830 EST: Discovery date and approximate time.
o December 30, 1991, 2055 EST: Performed calori-metric using Barton D/P cells option and plant thermal power was determined to be approximately the same as that calculated using the Leading Edge Flow'eter (LEFM) option.
B. EVENT:
On December 30, 1991 at approximately 1830 EST, with the reactor at approximately 98% full power, the CRF, while performing a review of the hourly PPCS logs, determined that the LEFM data used by the PPCS to calculate calorimetrics, was invalid from 1800 EST, December 20, 1991 to approximately 1830'EST, December 30, 1991. This determination was based on the following information:
o The LEFM Feedwater (FW) Flow confidence level was 100.0% for most of the time period in question (Zt should be less than 100% and some variation is expected).
~ IAC sOAes $ $ SA I$ 4$ l
IIAC $ ere I$4$ I M U.$ . IIUCLEAA AEOULATOAT COAIAIIION
/
LICENSEE EVENT REPORT ILER) TEXT CONTINUATION AftAOVEO 0+5 hO $ I$0&IOA EXP>AE5 ~ I$ I $ $
AACILITYIIAAIE Ill COCKET IIUAWEA IEI LEA IIIAACI1 I~ I AAOE 1$ I SAOVANTIAL VOW)<
~I U U R.E. Ginna Nuclear Power Plant 24 4 9.1 010 00 030FO TEXT ill' ~ ~. ~
A OtWarW NIIC /ebs ~ $ I I I Tl o s o o o o The LEFM Feed Water Flow (FFWH) was a constant 6399 KLB/Hr for most of the time period in question (some variation is expected).
o Local observation of the remotely located LEFM HP-85B computer indicated the last printout was on December 20, 1991.
o During the time period in question, the PPCS still indicated valid values for all data points used for the calorimetric.
The Control Room operators notified the reactor engineer and reinitialized the LEFM HP-85Bcomputer.
After reinitialization, the LEFM HP-85B computer printout values and PPCS values returned to ex-pected/normal indications. Subsequently, calorimetrics were performed using both the Barton D/P Cells and the LEFM for Feedwater Flow Data input. The observed difference in calculated thermal power, between these two calorimetrics was approximately 0.154.
n 1
C. ICONTRIBUTED NOPERABLE STRUCTURES g COMPONENTS 5 OR SYSTEMS THAT TO THE EVENT:
A constant feedwater flow output from the LEFM was the prime contributor to the event.
D. OTIC SYSTEMS OR SECONDARY FUNCTIONS AFFECTED None.
E. METHOD OF DISCOVERY:
The event was discovered during the review of hourly PPCS logs by the CRF.
<AC AOAAI $ $ $ A
<$ 4$ l
IIAC /earn
($451
~ LICENSEE EVENT REPORT (LER) TEXT CONTINUATION V.t. WJCltAA AEOVEATOAT COAItllttIOII
/
AtPAOV EO OVt NO 51$ 0&IOA
, t)tP<A 5 5 tltl 5$
EACIEITT IIAME Ill OOCKtT IIV~tIIItl I.IA IllANEAIII ~ Aot 151 TTAA $ 5QMteaTiAI, pEvISIO<
M A M TEXT llT asar ~ e eWnC ~ ~
R.E. Nuclear Power Plant JVJIC AamS ~ $ 11111 o s o o o 244 91 010 00 040'8 OPERATOR ACTION:
Immediate operator action was to notify the reactor engineer, reinitialize the LEFM HP-85B .computer and perform additional calorimetrics using the Barton D/P Cells to confirm that reactor thermal power was within limits.
G. SAFETY SYSTEM RESPONSES:
None.
III.s CAUSE OP ~9FP A. IMlKDIATE CAUSE:
The source of invalid data to the PPCS calorimetric calculation was invalid input from the LEFM.
INTERMEDIATE CAUSES:
When the LEFM HP-85B computer failed updating the Digital Analog (D/A) output card.
it stopped Therefore, the analog output to PPCS remained un-changed.
C ROOT CAUSE:
The invalid LEFM output was due to the unanticipated failure mode of the HP-85B computer.
ANALYSIS OR EVENT This event is being voluntarily reported using the guidance of NUREG-1022 (Licensee Event Report System), and Supplement
'No. 1 to NUREG-1022. This report is intended to alert other utilities which may have similar systems. This event is related to, but does not meet, the reporting requirements of 10CFR50.73, item (a)(2)(i)(B) which requires reporting of "any operation or condition prohibited by the plant's Technical Specifications".
VAC AOAII tttA
>$ 451
MAC ivv Wk U 5, MUCLTAA A54ULATOAYCOWMI55IOOI l045 I LICENSEE EVENT REPORT ILER) TEXT CONTINUATION AAAAOYCO OM5 W
/ 5I54&I04 5)tt<II55 ~ I)I '55 I'ACILITYMAMC III OOCIICT MUM45A ITI LLII MUMOl1 III ~ A45 15I S0 4 U iM T < A I. Y Ig lO M
~ I U M R.E. Ginna Nuclear Power Plant 2 449. 1 0 005 Qf0 8 TaXT W VVY ~ ~.e YV AAAMVMIeIIC ~~ LU I I TI
.o s o o o The plant Technical Specification related to this event is specification 4.1.1 which states, "calibration, testing, and checking of analog channel and testing of logic channel shall be performed as specified in Table 4.1-1".
Table 4.1-1 describes that the nuclear power ranges shall be calibrated daily (i.e. at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />) using a Heat Balance Calculation (i.e. calorimetric).
'he Plant Operating Review Committee determined that the intent to perform the required Technical Specification daily calibration of the Nuclear Power Ranges, using the Daily Heat Balance calculation, was met, but the Heat Balance Calculations were invalid due to the invalid LEFM input data.
In summary, it'as determined that while the daily heat balance calculations were not valid, 'due to the steady state power maintained during the period, the Nuclear Power Ranges continued to be within design tolerances and were capable of performing their intended functions. An assessment was performed considering both the safety consequences and implications of this event and it was concluded that there were no operational or safety consequences or implications attributed to the invalid LEFM input to the Heat Balance Calculation because:
During the period in question, the highest recorded total feedwater flow (from the Main Control Board Feedflow Transmitters as recorded on the Heat Balance Calculation Form) was 6497.29 KLB/Hr. Using this feedflow resulted in a calculated reactor thermal power of approximately 98.74. Previous to the LEFM HP-85B 'computer failure, reactor power as indicated from plant calorimetrics had been limited to a maximum of approximately 984 power due to degradation in secondary side performance. Therefore, reactor thermal power was below 100% for all calculated heat balances.
~ eAC AOAM 544A i54$ I
IIAC Setto ITS I
~ LICENSEE EVENT REPORT ILERI TEXT CONTINUATION V S. MVCLSAII AIOVL*SOAYCOSSMINIOM ASSAOYKO OMS NO IISOW104 SISS(AE5 SINAI'SS fACII.ICY ISASSI III OOCIIlY IIVl&lAQl LIA MLAQIA I ~ I ~ AOI ISI vSAA SSOVSMTtAL ASYOIOH M A U A R.E. Nuclear Power Plant
'fQP llY ~ ~ ~. ~ 4 r400onV IIIIC Aeltl ~'Sl I III o s o o o 2 4 4 91 010 00 060'8 o The lowest calculated reactor thermal power using the invalid LEFM input was 97.274. The highest that reactor thermal power was estimated to be was 98%.
Based on these indications, the Nuclear Power Ranges could have been calibrated as much as .74 low. The accuracy of the reactor thermal power 'calculation is determined to be + 2.0%. Therefore, the Nuclear Power Ranges were calibrated to within the accuracy of the reactor thermal power calculation and the Nuclear Power Range" trips would have actuated within their design tolerance.
Based on the above, the conclusion was that the public's health and safety was assured at all times.
An evaluation was performed to determine appropriate means to detect an invalid LEFM input to the Reactor Thermal Power Calculation. The following conclusions were reached:
0 Reactor power was steady state during the time in question (i.e. approximately 10 days) and all control board indications remained approximately the same.
0 When the LEFM HP-85B computer failed, the output to PPCS failed "as is", 'as opposed to a failure that would register in an expected obvious extreme mode.
0 This .failure mode. was not anticipated by the LEFM
vendor. As a result, verification functions and associated alarms for this failure mode. were not included in the system design.
0 In addition to the LEFM vendor, plant staff did not anticipate this failure mode. As a 'result, the awareness level for a problem of this type was low and the formal processes to detect and respond to this condition were not in place. Although specific procedure guidance was provided to verify LEFM accuracy, verifying operability of the LEFM HP-85B computer prior to performing the Reactor Thermal Power Calculation was not required.
MAC SOAM lt4ll
~
IIAC SVfff (545 I
~ uCENSEE BIENT REPORT ILERI TEXT CONTINUATION U.l, IIUCL5*A Al4ULATOAYCOMMISSIOII ASSAOY5O Ovl IVO 5150&104 5 >et1 A 5 5 ~ I5 I 5 5 SACILITY NAMS Ill OOCKST IIUS%511 ITI Llll IIUM454 Ill JA45 I51 S~ CIUSffTf AL V
IflV 4 lO AV V A V V R.E. Ginna Nuclear Power Plant 0 5 0 0 0 2 4 4 91 010 00 0 7o~ 08 TTI(T IIT fffVS MASS ~ fSSffSSA ffv SSSffVfV JVAC Afffff~$ 11171 CORRECTIVE ACTION A ACTION TAKEN TO RETURN AFFECTED SYSTEMS TO PRE-EVENT NORMAL STATUS:
o The LEFM HP-85B Computer was reinitialized and the LEFM printout and PPCS values returned to expected normal indications.
o All subsequent calorimetrics were performed using the Barton D/P Cells and the Nuclear Power Ranges were adjusted as required.
o A note was added to the Plan Of The Day (POD) to instruct the Control Room Operators,to use the Barton D/P cells data for calorimetrics 'until further notice.
B ACTION TAKEN OR PLANNED TO PREVENT RECUEGUBTCE:
The following corrective actions have been taken to assure valid data from the LEFM prior to its use in a PPCS reactor thermal power calculation (i.e. calori-metric) .
o An indication of failure of, the LEFM input to the PPCS is- that the LEFM Confidence Level (FFWCL) will approach 1004 indicating the LEFM output is not changing. A high alarm on PPCS for FFWCL has been added to indicate that this failure has occurred. If this alarm activates, the LEFM will not be used.
Operating Procedures 0-6.3 (Maximum Unit Power) and 0-6.3.2 (Maximum Unit Power Calculation Using The LEFM For Flow Measurement) have been revised to include the following requirements prior to using the LEFM for a calorimetric:
- 1. Verifying that the LEFM HP-85B computer is updating and has been operating for at least 10 minutes. This ensures the current value for the LEFM in the PPCS is not failed.
VAC SCAM SSSA 1545l
NAC
($ CS I Tee M U,S. NUCLSAN NSOULATOAV COMMISSION uCENSEE EVENT REPORT (LER) TEXT CONTINUATION AJfAOVKO OUI VO )ISOAIOI SXrlASS IISI %$
FACILITY NANS Ill OOCKST NULICCN ITI L$ 1 NlA&$1 I~ I AAOC ill StauevTsAL V 1 lO N v 1 R.E. Ginna Nuclear Power Plant:
TtxT IN ~ Nrrr ~ NrvrNI. wr rrrrew Nrc INrr ~'el I In o s o o o 2 4 4 91 01 0 00 08<<0 8
- 2. Verifying that the LEFM confidence level is not in alarm (FFWCL > 99;504 and FFWCL 99.904). This ensures that the LEFM is operating properly.
0 An identification and evaluation process focusing on other plant systems that may be susceptible to this type of failure mode is in progress.
ADDITIONAL INFORMATION A FAILED COMPONENTS:
The LEFM system was supplied by Westinghouse Electric Corporation, Model gLEFM-824, Serial gU001. The specific component that failed was the HP-85B computer with I/O ROM, Serial g2619A53804.
B PREVIOUS LERs ON SIMILAR EVENTS:
A similar LER event historical search was conducted with the following results: No documentation of similar LER events with an undetermined root cause could be identified.
C. SPECIAL COMMBFIS:
Due to the unanticipated nature of the computer failure, the industry will be notified via Nuclear Network.
vrC 101il SCCA
<$ 44 l