ML16341F108

From kanterella
Jump to navigation Jump to search

Responds to Util 890324 Request for Info Re Fee for Review of Seismic Reevaluation Program for Plant
ML16341F108
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 04/11/1989
From: Holloway C
NRC OFFICE OF THE CONTROLLER
To: Shiffer J
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16341F109 List:
References
TAC-68049, NUDOCS 8904240006
Download: ML16341F108 (18)


Text

OR 1i 13N Docket Nos. 50-275/323 Pacific Gas and Electric Company ATTN:

Mr. J.

D. Shiffer Vice President - Nuclear Power Generation 77 Beale Street San Francisco, CA 94106 Gentlemen:

Your letter dated March 24, 1989 (DCL-89-077), requested certain specific information regarding the charge of $ 164,600 for the review of your seismic reevaluation program for Diablo Canyon Units 1 and 2.

Your specific concerns were on a hand entry of 6,227 staff hours against TAC Number 55305 for the period of.January 30, 1985 (date of PG&E's application) through December 19, 1987, and 23 hours2.662037e-4 days <br />0.00639 hours <br />3.80291e-5 weeks <br />8.7515e-6 months <br /> against TAC Number 68049 for the period from December 20, 1987 through June 18, 1988.

Your requests and our responses are as follows:

1.

Provide justification for and specific regulatory basis for these charges.

Under the requirements of 10 CFR 170, fees are chargeable for license amendments and other approvals (10 CFR 170.21).

The maximum fee chargeable through January 29, 1989, for a pending application is

$ 164,600.

License Condition 2.C(7) required Pacific Gas and Electric Company (PGLE) to submit the seismic reports for NRC review and approval to assure that the concern which created the license condition was satisfactorily resolved.

The fact that NRC requested these reports does not have an impact on fees.

Therefore, while it was not an application for license amendment, it did require NRC review and approval and is chargeable under 10 CFR 170.21.A.

2.

Provide. an explanation as to why the 6,227 man hours charged for the seismic reevaluation program are recorded by hologra'phic notation and not by computerized data entry, as well as a detailed breakdown of these charges, if applicable.

The hand-written entry for the 6,227 hours0.00263 days <br />0.0631 hours <br />3.753307e-4 weeks <br />8.63735e-5 months <br /> was made to avoid sending several sheets from various six-month fee data reports because the review period for this January 30, 1985 application covered several six-month billing cycles beginning 8904240006 8904ii PDR ADOCK 05000275 P

PDC (pt

I II l

APP.1 1'989 3.

with the one that ended June 22, 1985.

No charges had previously been billed for this review because it had been erroneously entered into the manpower tracking system with an incorrect fee flag.

Consequently, the hours had not been provided to us for billing.

The hours (6,227) expended for the review under TAC 55305 from January 30, 1985 through December 19, 1987, were totalled, hand-entered and notated on the six-month computer printout that we sent to you for the six-month period from December 20, 1987 through June 18, 1988.

There were also 23 hours2.662037e-4 days <br />0.00639 hours <br />3.80291e-5 weeks <br />8.7515e-6 months <br /> for the seismic review under TAC 68049 which were shown on the computer run you received with Invoice H0476.

The total hours on H0476 for your seismic program review dated January 30, 1985, were 6,250.

The six computer printout pages for the 6,227 hours0.00263 days <br />0.0631 hours <br />3.753307e-4 weeks <br />8.63735e-5 months <br /> are enclosed for your information.

Provide an explanation of whether the

$222,900 credit received for an over-ceiling charge regarding the July 3, 1984 application includes accrued interest to date for overpayment and, if not, whether the NRC intends to grant an additional credit.

We apologize for the incorrect application reference and the confusion caused by the manner in which we entered data for the

$222,900 on Invoice H0746.

The credit was shown because the maximum we can bill for a license amendment or other approval for review through January 29, 1989, is $164,600 (see 170.21.A).

The application reference should have been January 30, 1985.

The 6,250 hours0.00289 days <br />0.0694 hours <br />4.133598e-4 weeks <br />9.5125e-5 months <br /> (6,227 plus 23) multiplied by $62 per staff hour equals

$387,500.

Since we can only charge

$164,600, we subtracted that amount from $387,500 and showed the difference as a credit of $222,900.

Your Company has never been billed for $222,900.

We simply subtracted the unbillable portion of the 6,250 hours0.00289 days <br />0.0694 hours <br />4.133598e-4 weeks <br />9.5125e-5 months <br />.

For your information, in addition to the

$164,600 which your Company has paid for the January 30, 1985 seismic reevaluation

program, PGSE will be billed full costs for staff hours and contractual costs from January 30, 1989, until the review is completed for the seismic reevaluation programs submitted January 30, 1985 and July 31, 1988.

This is consistent with the provisions of the revisions to 10 CFR Part 170 that became effective on January 30, 1989 (copy enclosed).

~

~

~

I" ppR 1 i ISSUE We hope that the above information addresses and clarifies your concerns.

Sincerely, Signed by:

Q. jages Holl&<Qv Jf-C.

James Holloway, Jr., Chief License Fee Management Branch Division of Accounting and Finance Office of the Controller

Enclosures:

1.

Computer Printout Sheets f/55035(6) 2.

10 CFR 170 Revisions eff. 1/30/89 DISTRIBUTION' PEEE 9

LPDR w/3/24/89 PG&E Ltr.

ERegulato'ry Docket Files w/origi'o'al of-3/24/89 Ltr.-fd-g~csf/

HRood, PD-V w/cy of Ltr.

LFMB Reactor File w/cy of Ltr. cL ~M

//

LFMB Diablo A/M File-Amds. w/cy of Ltr.

cX CJHolloway, LFMB w/cy of Ltr.

RDiggs, LFMB w/cy of Ltr. < Q~. f
LTremper, LFMB w/cy of Ltr. g-P~. /

LFMB R/F (2) w/o encls.

OC/DAF R/F w/o encls.

D'W/RMD/Doc. No. 50-275/323 OFFICE: R /L MB SURNWE: RMDiggs:ab DATE: 4/il/89 FMB H

1 oway:ab

4 i /89

=8't t

~

>--~~

'!) (g~W)'

R-1208849-001 04/18/88 REGULATORY INFORMATION TRACKING SYSTEM FACILITY FEE REPORT 06/21/87 12/19/87 PAGE:

56 DOCKET NUMBER FEE TAC I BEAR FACILITY NAME PA NUMBER DATE OF COMPLETE REIEUEST DATE MANPOWER EXPENDED REG N-REG TOTAL DESCRIPTION LICENSED.

050=00275 H55305 N

DIABLO-CANYON.1

/l~~ p5

1531, 818:5 22.0 840.5 DIABLO CANYON 1 - SEISMIC REEVALUATION PROGRAM 050-00275 M55693 N

DIABLO CANYON 1 050-00275 H59816 N

DIABLO CANYON 1 050-00275 H60065 Y

DIABLO CANYON 1 050-00275 H61668 Y

DIABLO CANYON 1 1531 1531 1531 1531 08/01/84 1.0 10/03/85 2.0 10/24/85 401/05/884 13.0 04/18/86 401/04/884 18.0 0.0 1.0 0.0 2.0 0.0 13.0 DIABLO CANYON - 2.206 PETITION ON ANTITRUST (08/08/84)

DIABLO CANYON 1 - IST OF VALVES DIABLO CANYON 1 -

LAR 85-11 4

TECH.

SPEC.

CHANGES 1.5 19.5 DIABLO CANYON 1 - 10CFR20 EXEMPTION FOR USE OF PROTECTION FACTOR 050-00275 H61670 Y

DIABLO CANYON 1 050-00275 M61672 Y

DIABLO CANYON 1 1531 1531 06/10/86 12/16/87 4. 0 06/10/86 412/28/874 1.0 0

0 4.0 0.0 1.0 DIABLO CANYON 1 -

LAR 86"04:

LAUNDRY RELEASE TECH.

SPEC.

DIABLO CANYON 1 -

LAR 86-05:

UNIT

, CLARIFICATION OF TECH.

SPEC.

TABLE 4.11"2 RE SURVEILLANCE 050-00275 H62155 N

DIABLO CANYON 1 050-00275 H62161 N

DIABLO CANYON 1-050-00275 M64470 N

DIABLO CANYON 1 050-00275 H64487 Y

DIABLO CANYON 1 050-00275 H65292 N

DIABLO CANYON 1 050-00275 M65464 Y

DIABLO CANYON 1 050-00275 H66030 Y

DIABLO CANYON 1 050-00275 H66300 Y

DIABLO CANYON 1 1531 1531 1531 1531 1531 1531 1531 1531 08/12/86 08/08/86 40.0 5.0 1.5 41.5 DIABLO CANYON 1 " ISI AND IST PROGRAM PLAN 0.0 5.0 DIABLO 1 - LIC. COND.

ON CONTENT ISOLATION DEPENDABILITY II.E.4.2 1'2/18/86 10/15/87 9.0 0.0 9.0 12/24/86 3.0 0.0 3.0 DIABLO CANYON 1 - WET RERACTING ASPECTS SFR DIABLO CANYON 1 -

LAR 86-13, REACTOR TRIP TTE ESFAS SURVEILLANCE 03/03/87 147.0 05/14/87 12/16/87 5.0 08/04/87 402/17/884 109.0 0.'0 147.0 DIABLO CANYON 1 - TIA-ALLEGATIONS RE HILTI BOLTS 0.0 5.0 DIABLO CANYON 1 -

LAR 87-07 CHG BIOLOGICAL SAMPLING POINT 0.0 109.0 DIABLO CANYON 1 - REMOVAL OF RHR SYSTEM AUTOCLOSURE INTERLOCK 09/24/87 41.0 0.0 41.0 DIABLO CANYON 1 - EXTEND LONG-TERN SEISMIC PROGRAM.

LICENSE CONDITION 2.C.7.

R-1208848-001 11/17/87 REGULATORY INFORMATION TRACKING SYSTEM FACILITY FEE REPORT PAGE:

88

~

h

~

~

DOCKET FEE NUMBER TAC 8 BEAR LICENSED FACILITY NAME 12/20/86 - 06/20/87 PA DATE OF COMPLETE.

MANPOWER EXPENDED NUMBER

~EIEUEST DATE REO N-REB TOTAL DESCRIPTIOTa 050-00275 M55634 N

DIABLO CANYON 1 1531 08/01/84 03/13/87 84.0 0.0

= 84.0 DIABLO CANYON UNIT

3. - Nf)T.

CIRCL./BORON MIX.

EXT DIABLO CANYON - 2. 206 PE 5 ITION ~j ANTITRUST (08/08/84) 0.0 1.0 1.0 1531 08/01/84 050-00275 M55693 N

DIABLO CANYON 1 050-00275 H59756 Y

DIABLO CANYON 1 050-00275 M60067 Y

DIABLO CANYON 1 050-00275 M60525 Y

DIABLO CANYON 1 050-00275 H60829 Y

DIABLO CANYON 1 050 "00275 M60833 Y

DIABLO CANYON 1 1531

. 09/19/85 405/30/864 20.0 0.0 20.0 1531 10/25/85 )I(07/24!874 24.0 0.0 24.0 1531 11/25/85 409/00/874 1.0 0.0 1.0 1531 02/13/86 407/27/874 25.0 0.0 25.0 1531 02/14/86 01/07/87 2.0 0.5 2.5 DIABLO CANYON 1 - SPENT FUEL POOL RERACK DIABLO CANYON 1 -

t.AR 8:

12 DIESEL GENERATOR TECH.

SPEC.

DIABLO CANYON 1 - CRANE TECH.

SPECS.

LAR-85-14 DIABLO CANYON 1 - TECH.

SPEC.

AMEND LAR-86-01 CHECK Vf",VES DIABLO CANYON 1 - TECH.

SPEC.

AMEND LAR-86-0:l CONTAINl'E=NT PRESSURE AND FAN COOLER DIABLO CANYON 1 -

LAR 86- '04; LAUNDRY RELEASE.

TECtl SP."C.

050-00275 H61670 Y

DIABLO CANYON 1 050-00275 M61672 Y

DIABLO CANYON 1 1531 06/10/86 1531 06/10/86 1.0 0.0 1.0 0.0 1.0 DIABLO CANYON 1.-

LAR 86 ~ 1,'5:

UNIT CLARIFICATION l)F TECH..ii"EC. TA~

4. 11-2 RE SURVl:ILLANGi DIABLO CANYON

-. - ISI Al.: IST PROGRAM PLAN 1.0 47.0 1.0 48.0 050-00275 M62155 N.

DIABLO CANYON 1 050-00275 M62159 Y

DIABLO CANYON 1 050-00275 H62161 N

DIABLO CANYON 1 1531 08/12/86 1531 07/18/86 409/03/874 3.0 0.0 3.0 DIABLO 1." LAR '.6-0'"4:.0 PROTECT DIVICE! TElh.

CURRENT

.C.

1531 08/08/86 0.0 4.0 DIABLO 1 " LIC. <<OND.

GB. CONTENT ISOLATION DEPE'iDABILITE II.E.4.2 4.0 050='00275.,'N55305 N:DZABLO:CANYON 1 1531 04/15/34-1001,5 I 13.5 1105.0 DZABLO CANYON 1 - 5',ZSMZC REEVALUATION PROGRAM 050-00275 H62238 N

DIABLO CANYON 1 050-00275 M63469 N

DIABLO CANYON 1 1531 1531 08/06/86 409/30/874 4.0 10/15/86 412/19/864 2.0 0.0 4.0 DIABLO CANYON 1 RER Ez.

0.0 2.0 DIABLO 1 - ALLE..AT:.Of'".5 UATION

'AR86-06

4-1208868-001 02/12/8T DOCKET FEE HZ ~

%BE

~IC ~S)

REGULATORY INFORMATION TRACKING SYSTEM FACILITY FEE REPORT 06/22/86 1 2/20/86 PA DATE OF COMPLETE MANPOHER EXPENDED

~V~BE)g /~EURUS')~I~

G 0

~i

. 'PAGE:

"RQLQH

)50.-00275 M%9656 N

. DIABLO CANYON 1

)50-00275 M53908 N

DIABLO CANYON 1

1111 02/17/83 3E04/20/86%

1. 0 1111 11/01/84 1.0

)50=00275 IM55305 H

DIASL'0 CANYON-1 1111=

04/15/84 1022.0

/

0.0 0.0 1.0 52.5 1074.5 DIABLO CANYON 1

ITEMS 4.2~

4.2.4 PREVENT MiAIHT FROG-F0%%

TRIP BREAKERS I

DIABLO CANYON 1

SEISMIC REEVALUATION PROGRAM 1.0 DIABLO CANYON 1

AkD 2 - REACTOR COOLANT PUMP TRIP 10.0 0.0

>50"00275 M55337 DIABLO CANYON 1

PROl'EDURES GENERATION PACKAGE'SUPPLEMEN HUREG 0737 i DIABLO CANYON Ut)IT 1

'- NAT.

CIRCL./BORD'I MIX. TEXT 198.0

50"00275 M55634 N

DIABLO CANYON 1

50-00275 M55693 N

DIABLO CANYON 1

50-00275 M57575 N

DIABLO CANYON 1 1111

~

08/01/8%

1111 08/01/86 5.0 203.0 DIABLO CANYOII 2.

96 PETITION ANTITRUST (l)8/08/84)

DIABLO CANYOII 1 - NUREG 0737>

II.K.31> COMPLIANCF. 'IITH 10 CF 50.46 DIABLO CAHYOh' SPFr)T FUEL 0

RERACK DIABLO CAt)YOh

.'.PP NDIX>>"

INSPECTION p RV 1.0 1.0 0.0 9.0 0.0 12/09/86 9.0 1111 50-00275 M59756 Y

DIABLO CANYON 1

50-00275 M59802 N

DIABLO CANYON 1

50-00275 M59951 N

DIABLO CANYON 1

1111 09/19/85 ))05/30/86% 230.0

26. 0 256. 0 1111 08/29r85 10r26r86 15.0 1.0 16.D 26.0 DIABLD CANYO) 1 " 'R50.61 PRESSURIZED T.IERMAl

'SHOCK RULE REgUIREMENTSp PHASE 11 11 1 0/23/85

24. 0 0.0 DIABLO CANYON 1

1111

'7/30/85 10.0 50-00275 M60065 Y

DIABLO CANYON 50-00275 M60067 Y

DIABLD CANYON 1

50-00275 M60090 H

DIABLD CANYON 1

50-00275 M6065T Y

DIABLO CANYON 1

1111 10/24/85 1111 10/25/85 4.0 64.0 1111 11/07/85 11/0%/86 35.0 1111 12/26/85 %06/20/86K 1. 0 0.0 1.0 0.0 0.0

%.0 DIABLO CANYON' LAR )5-11 TECH.

SPEC.

CHANGES 45.0 DIABLO CAHYOI

)

LAR ".5-12 DIE:

GENERATOR TE CH.

SPEC 35.0 DIABLO CANYOtl i MA I)tIRY HALL LICEtlSE CDHDIis!)h 1.0 DIABLO CAHYOII ":" ).AR"'i5"15 DIE.'ENERATOR OUTA;-.TEC?!.

SPEC.

0

-1208868-001 08/27/86 REGULATORY INFORMATION TRACKING SYSTEM FACILITY FEE REPORT 12/22/85 06/21/86 PAGE:

CLI A

50-00275 M52155 N

DIABLO CANYON 1

50-00275 M52832 H

DIABLO CANYON 1

DOCKET FEE gUUBgg

~C

~E

~~S 50-00275 M%9654 N

DIABLO CANYON 1

1111 02/17/83 7.6 0.0 7.6 1111 08/02/83 02/28/86 2.0 0.0 2.0 1111 11/01/83 1.0 0.0 1.0 PA DATE OF COMPLETE MANPOHER EXPENDED

~U~BE

~EVADES ~D~

EG EG 0

JESC I 0

DIABLO CANYON 1

AND 2 REACTOR COOLANT PUMP TRIP DIABLO CANYON UNIT 1 - SAFETY PARAMETER DISPI.AY SYSTEM (I.D.

DIABLO CANYON c - ITEM 2.1 EQPMHT CLASSIF 8 VEND ItlTEP~

COMP I

50-00275 M52913 N

DIABLO CANYON 1

50-00275 M52990 N

DIABLO CANYON 1

1111

.f1/01/83 1111 11/01/83 18.0 6.0 0.0 0.0 18.0 DIABLO CANYON 1

T 'MS 3:1.1 8

3.1.2 - POST MAINT TEST PROC/V REC RTS COMP 6.0 DIABLO CANYON 1

ITEM 3.1.3 POST MAINT TESTING-CHANGES TO SPECS - RTS COMP 50-00275 M53666 N

DIABLO CANYON 1

1111 11/01/80 2.0 50-00275 M53832 Y

DIABLO CANYON 1

1111 11/01/84 2.0 50-00275 M53976 H

DIABLO CANYON 1

1111 11/01r84 6.0 50-00275 M55337 DIABLO CANYON 1

1111 07r30r85 35.0 50-00275 M55353 Y

DIABLO CANYON 1

1111 07/03/84 5.0 50-00275 M55630 N

DIABLO CANYON 1

50"00275 M55693 N

DIABLO CANYON 1

1111 08/01/84 1111 08/01/80 39.0 7.0 50-00275~M55305-,;.

N

-DIABLO CANYON..1 1111-

.00r15/80-

--- -1083.0 0.0 2.0 0.0 2.0 0.0 0.0 31.0 1110.0 0.0 35.0 0.0 5.0 0.0 39.0 0.0 DIABLO CANYON 1

- ITEM 2.2 EQUIPM CLASSIF 8 VEND INTERF VEtlDOR INTEl'.FACE DIABLO CANYOII 1

ITEM 3.2.3 POST-MAINT EST--

CH.'.!AGES TO T SPEC.

DIABLO CANYON f ITEHC 0.5.2 8

6.5.3 TRT<'YSTEN FVNCT T T

ALT 8 TEST i'lNTERVALS DIABLO CAHYGtl 1

SEISMIC REEVALUATIO!l PROGRAM DIABLO CANYOlI 1

P ROt'ED URES GENERATION -.'ACKAGE~ (SUPPLEMEN NUREG-0737)

DIABLO CANYOtl 'l - ITEM 0.3(TS)

AUTO ACTUAT OF SHUNT -TRIP (H A BSH)

TECH SPECS DIABLO CANYON UNIT

'i - NAT.

CIRCL./BORON MIX. T~s.'XT 7.0 DIABLO CANYON 2.2< 'ETITION ANTITRUST (08/08rSO;

R-1208848-001 04/22/86 REGULATORY INFORMATION TRACKING SYSTEM FACI L ITY FEE REPORT 06/23/85 12/21/85 PAGf DOCKET FEE

~UHKB I~C BX6E

~~D 050-00275 M49654 N

DIABLO CANYON 1

050-00275 N51590 N

DIABLO CANYON 1

050-00275 M51635 N

DIABLO CANYON 1

050-00275 N52155 N

DIABLO CANYON 1

050-00275 N52622 N

DIABLO CANYON 1

050-00275 N52913 N

DIABLO CANYON 1

050-00275 M53121 N

DIABLO CANYON 1

1111 02/17/83 1111 10/31/81 9.0 0.0 0.0 45.0 1111 09/28/81

%11/11/84K 30.0 0.0 1111, 08/02/83 5.0 0.0 9.0 45.0 30.0 5.0 DIABLO CANYON 1 - REACTOR COOl PUMP TRIP DIABLO CANYON 1 '- R0 AND SV TESTING (.'I.D.1)

DIABLO CANYON UNIT 1, INSER.

INSPECTION 8 TESTING PROC ~>

DIABLO CANYON UNiT 1 - SAFETY PARAMETER DISPLAY SYSTEM (I.I 1111 10/31/83

%04/00/85%

14.0 0.0 14.0 DIABLO CANYON.1

=TRUCTURAL ALLEGATIONS 1111.

11/01/83 3.0 0.0 11'1 1 11/01/83 06/24/85

4. 0
0. 0 3.0 4.0 DIABLO CANYON 1

TENS 3.1.1 3.1.2 POST NAINT TEST PROC/

REC RTS COMP DIABLO CANYON 1

I"tENS 4.2.1 4.2.2 PPEV MAINT PROGRAM TF BREAKERS PA DATE OF COMPLETE MANPOHER EXPENDED

~0~BE g EILUUS~ ~~

EG G

0 050-00275 N53246 N

DIABLO CANYON 1

050-00275 N53583 N

DIABLO CANYON 1

050-00275 N53908 N

DIABLO CANYON 1

1111 11/01/84 3.0 0.0 1111 10/13/83 08/26/85 7.0 0.0 1111 11/01/84 06/25/85 9.0 0.0 9.0 3.0 DIABLO CANYON 1 - ITEN 1.2 f

TRIP REVIKH"DATt'NDINFO 1

CAPABILIT'I DIABLO CANYON 1

I';.NS 4..3 4.2.4 PREVENT NAINT PROG FOR TRIP BREAKERS 7.0 DIABLO CANYON UNI' SYSTEM!

INTERACTICN REPORT 050-00275 N54059 N

DIABLO CANYON 1

050-00275 N54435 N

DIABLO CANYON 1

050-00275 N54492 N

DIABLO CANYON 1

1111 11/01/84 07/08/85

8. 0
0. 0 8.0 DIABLO CANYON 1 " ITiN 4.5.1-f TEST-DIV TRIP FEATUf'.ES 1111 08/19/83 09/30/85 36.0 0.0 36.0 DIABLO CANYON 1

f..T FUEL LOADING INITIAL T l.

PROGRAM 1111 03/12/84 08/26/85 183.0 0.0 183.0 DIABLO CANYON - TECI.

SPEC UPDl

--050"00275:-N55305--

N DIABLO CANYON 1

1111 04/15/84 1154. 0 63.0 1217.0 DIABLO CAN"ON 1

-cl.'SMIC REEVALUATION PRGht'.>'

R-1208808-001 09/20/85 REGULATORY INFORMATION TRACKING SYSTEtt FACILITY FEE REPORT 12/23/80 06/22/85 PAGE<.. 77 DOCKET FEE

~Ulgg JJQJQQ)

(CONTINUED) 050-00275 H54135 N

DIABLO CANYON 050-00275 H54492 N

DIABLO CANYON 050-00275 H51885 N

DIABLO CANYON 1

1111 03/12/84 1111 08/19/83 492.5 13.5 506.0 3%.0 0.0 30.0 00/00/85 2.0 0.0 2.0 PA DATE OF COHPLETE HANPOHER EXPENDED QUUBQf ~U~S

~)l~

R G

N-G DIABLO CANYON TECH SPEC UPDATE DIABLO CANYON 1 " POS': FUEL LOADING INITIA'EST:RQGRAH.

1 DIABLO CANYON 1 - PIPING AND SUPPORTS EVALUATION

~050=00275

.N55305 NDIABLO:CANYON-1 050-00275 H55353 Y

DIABLO CANYON 050"00275 H55634 N

DIABLO CANYON 1

050-00275 N55693 N

DIABLO CANYON 050-00275 N55853 Y

DIABLO CANYON 1

1111 00/ 15/81 1111 07/03/80 1111 08/0 t/80 1111 08/Ot/84 1 1 1.1 09/20/81 0.0 1058.0 0.0 0.0 0.0 392.0 10.0 006.0 DIABLO CANYON 1 " SEISNIC REEVALUATION PRQGRAH DIABLO CANYON 1 - ITEN ~.3(TS)

AUTO ACTUAT OF SHUNT TRIP (H AND BSN) - TECH SPECS DIABLO CANYON UltIT 1 - hicT.

CIRCL./BORON N [X. TE)LT 59.0 74.0 0.0 3.0

59. 0 DIABLO CANYON 2. 206 PF VZTION ON ANTITRUST (08/08/81) 77.0 DIABLO CANYON : - 'iiibt:i i.ENERATOR RELIABILITYTF:H..:~ ~.S.

(GL 80-15) 050-00275 H561 17 N

DIABLO CANYON 1

050"00275 856737 N

DIABLO CANYON 1

050-00275 H56740 Y

DIABLO CANYON 11 11 10/22/84 t 11.0 0.0 11%.0 111'I 01/25/85 17.0 0.0

17. 0

. 1111 0 tr23r85 03r19r85 156.0 10.0 166.0 DIABLO CANYON 1 I.Q. J.c DETAIL CONTROL ROON D':SIC.'PIEH SUN REPORT - F-71 DIABLO'CANYON 1 - RF4, CODE 1.97 DIAbLO CANYON 1 - CERTIF".ICATION OF AIR 8 HATER POLLUT",ON CONTROL LETTER 050-00275 H57 138 N

DIABLO CANYON 1

050-00275 N572%9 Y

DIABLO CANYON 1111 12/06/80 "cj ~ 0 33.0 0.0 0.0 0

0 DIABLO CANYON 1

SPDi 33.0 DIABLO CANYON L."IIT 1 - 'c:REG 737 ITEH II. F. 2 ICl:I CYST El": INCLUDING TECH SPECS LAR 050-00275 N57653 N

DIABLO CANYON 050" 00275 H57715 Y

DIABLO CANYON 1

1111 05/14/85

37. 0 0.0 37.0 DIABLO CANYON

< - DIFSE

'ENERATOR FUEL OIL TECH..".-'.*",.'.

c.F'-

~ GE 179.5 16.0 195.5 DIABLO CANYON 1

~ EiiiRGEir"Y RESPONSE FACIL'iIES APPRAISAL

CI