ML16341F986

From kanterella
Jump to navigation Jump to search

Notification of 910315 Meeting W/Util in Rockville,Md to Discuss Plant long-term Seismic Program
ML16341F986
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 02/28/1991
From: Rood H
Office of Nuclear Reactor Regulation
To: Dyer J
Office of Nuclear Reactor Regulation
References
TAC-55305, TAC-68049, NUDOCS 9103060368
Download: ML16341F986 (8)


Text

February 28, 1991 Docket Nos.

50-275 and 50-323 MEMORANDUM FOR:

James E. Dyer, Director Project Directorate V

Division of Reactor Projects III/IV/V FROM:

SUBJECT:

DATE 5 TIME:

LOCATION:

PURPOSE:

Harry Rood, Senior Project Manager Project Directorate V

Division of Reactor Projects III/IV/V FORTHCOMING MEETING WITH PACIFIC GAS AND ELECTRIC COMPANY Friday, March 15, 1991 - 8:00 a.m to 5:00 p.m.

Room 6-B-ll One White Flint North 11555 Roc kvi 1 le P i ke Rockvi lie, Maryland 20852 DISCUSS DIABLO CANYON LONG-TERM SEISMIC PROGRAM (TAC NUMBERS 55305 AND 68049)

  • PARTICIPANTS:

NRC G. Bagchi N. Chokshi R. McMullen R. Pichumani H.

Rood R.

Rothman B.

Slemmons P.

Sobel et al.

PGSE F. Brady L. Cluff W. Savage et al.

cc:

See next page

Contact:

H. Rood (301) 492-1352 QrigiRIg Sign< >iR Harry Rood, Senior Project Manager Project Directorate V

Division of Reactor Projects III/IV/V

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy," 43 Federal Receister 28058, 6/28/78.

W/PD5/PM D RP W/P$ 5JD HRood JDyerQQ 02

/91 02/ZS /91 9103060368 9i02281 PDR ADGCK 05000275 P

PDR

r r

8 H

P

~ I

AGENDA Meeting to Discuss Long-Term Seismic Program Friday, March 25, 1991 (1) Recent seismicity (including cross-sections)

(2) Status of, and long-term future plans for 'PGSE's seismic and accelerograph networks (3) The characteristics and maximum magnitude of the Southwest Boundary Zone (4) Sensitivity studies conducted for the seismic hazards analysis (5) Lessons learned from the 1990 ground motion meetings (6) Definition of seismic design basis for plant, and how LTSP results will be used in future seismic studies

0

Mr. J.

D. Shiffer Pacific Gas and Electric Company Diablo Canyon CC:

NRC Resident Inspector Diablo Canyon Nuclear Power Plant c/o U.S. Nuclear Regulatory Comoission P. 0.

Box 369 Avila Beach, California 93424 Dr. Richard Ferguson, Energy Chair Sierra Club California 6715 Rocky Canyon Creston, California 93432 Ms. Sandra A. Silver Mothers for Peace 660 Granite Creek Road Santa Cruz, California 95065 Ms. Jacquelyn C. Wheeler 3303 Barranca Court San Luis Obispo, California 93401 Managing Editor The Count Tele ram Tribune 1

o nson venue P. 0.

Box 112 San Luis Obispo, California 93406 Chairman San Luis Obispo County Board of Supervisors Room 370 County Government Center San Luis Obispo, California 93408 Richard F. Locke, Esq.

Pacific Gas 5 Electric Company Post Office Box 7442 San Francisco, California 94120 Mr. John Hickman Senior Health Physicist Environmental Radioactive Mgmt. Unit Environmental Management Branch State Department of Health Services 714 P Street, Room 616 Sacramento, California 95814 Regional Adminstrator, Region V

U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Mr. Peter H. Kaufman Deputy Attorney General State of California 110 West A Street, Suite 700 San Diego, California 92101 Ms. Nancy Culver 192 Luneta Street San Luis Obispo, California 93401 Michael M. Strumwasser, Esq.

Special Assistant Attorney General State of California Department of Justice 3580 Wi lshire Boulevard, Room 800 Los Angeles, California 90010

0

~

~

DISTRIBUTION C~J NRC 5 LPDR PDV Reading File T. Hurley/F. Niragl J. Partlow B. Boger

. C. Grimes J. Dyer H. Rood D. Foster Acting Chief, EAB OGC E. Jordan B. Grimes Receptionist, White J. Richardson G. Bagchi N. Chokshi R. McMullen R. Pichumani R.

Rothman P. Sobel ACRS (IO)

GPA/PA V. Wilson L. Thomas J. Caldwell G. Cook,,RV P. Horri 1 1, RV P. Narbut, RV ia Flint

~

t P

l'

~

4