MONTHYEARML17083B9111987-08-27027 August 1987 Trip Rept of 870609-11 Visit to Plant Re Audit of Calculational Programs to Evaluate Potential soil-structure Interaction Effects as Part of long-term Seismic Program. Summary of Items Audited Contained in Encl BNL Project stage: Other ML17083B9201987-09-0202 September 1987 Forwards List of Deterministic Comparisons Expected to Be Made in Order to Determine Whether & to What Extent Differences Between Earthquake Loads Exists.Comments on Proposed Comparisons Requested Project stage: Other ML17083C0381987-09-30030 September 1987 Requests Addl Info to Complete Analysis of Util Database Re Empirical Ground Motion & Plant Seismic Evaluation.Util Must Address Inconsistencies Found by K Campbell,Nrc Advisor for Diablo Canyon Seismic Reevaluation Program,Per Project stage: Other ML17083C0531987-10-15015 October 1987 Forwards BNL & Sandia Comments Re Plant Pra,Based on Util Matl Presented at 870217-18 Workshop in Bethesda,Md.Comments Re Overall Methodology & Special Investigations on Application.Nrc in Agreement W/Comments Project stage: Other ML17083C0631987-10-15015 October 1987 Forwards Revised Summary of NRC & Consultant Comments Made at 870715-16 Ground Motion Workshop.Nrc Still Not Clear About How Util Plans to Use Results of Ground Motion Studies in Soil Structure Interaction Analysis & PRA Project stage: Other ML17083C1171988-02-19019 February 1988 Forwards Summary of 880114-15 Meetings Re Plant PRA Study on Util long-term Seismic Program Project stage: Meeting ML16341E5931988-03-0909 March 1988 Forwards Jebco Seismic,Inc Ltr Discussing Offshore Seismic Data Collected in 1984 Near Facility & Requests Response Re Issues Raised by Ltr.Confidential Maps Attached May Be Released Per Telcon Between G Lichtman & R Rothman Project stage: Other ML17083C1091988-03-23023 March 1988 Forwards Summary of ACRS Subcommittee Meeting Held on 880223-24 in San Francisco Re long-term Seismic Program Project stage: Meeting ML17083C1371988-10-24024 October 1988 Summary of 881004 & 05 Meetings W/Util in Rockville,Md to Discuss Final Rept on long-term Seismic Program.Addl Info on Listed Items Must Be Submitted in Order to Continue Review of Rept.List of Attendees,Agenda & Viewgraphs Encl Project stage: Meeting ML16342B4961988-10-25025 October 1988 Summarizes 880225 NRC Audit of Selected Seismic Fragility Calculations Performed as Part of long-term Seismic Program. Fragility Curves for Specific Component,At Given Location, Should Not Be Used Generically Project stage: Other ML16341E8451988-10-25025 October 1988 Summary of 880328-30 Plant Walkdown by NRC Staff as Part of Review of PRA for Plant Long Term Seismic Program.Agenda & List of Attendees Encl Project stage: Approval ML16341E9221988-11-21021 November 1988 Summary of 880912-15 Public Meetings W/Util Re PRA & long-term Seismic Program for Plant.Agenda & Lists of Attendees Encl Project stage: Meeting ML16342C3531988-12-13013 December 1988 Forwards Request for Addl Info Re Plant long-term Seismic Program Final Rept.Response to PRA Questions Should Be Submitted by 890115 & Response to Other Questions by 890130 Project stage: RAI ML16342B5131989-01-10010 January 1989 Forwards BNL Repts Describing Analyses of Low Pressure & High Pressure Functions of Eccs,As Part of Review of long-term Seismic Program Final Rept.Comments & Requests for Addl Info in Encl Rept Should Be Addressed by 890210 Project stage: Approval ML16342C2121989-01-11011 January 1989 Summary of 881102 Meeting W/Util to Discuss Numerical Modeling of Ground Motions Used in Plant long-term Seismic Program Submitted by Util on 880731.Agenda,list of Attendess & Related Info Encl Project stage: Meeting ML16342B5211989-01-26026 January 1989 Notification of 890216 Meeting W/Util in San Francisco,Ca to Discuss Analysis of Selected Sys Important to PRA Re long- Term Seismic Program Project stage: Meeting ML16341E9891989-02-0707 February 1989 Forwards Listed Documents Relating to NRC Review of Long Term Seismic Program,Including BNL Review of Diablo Canyon PRA:High-Pressure Injection & Preliminary Rept on Empirical Studies of Horizontal Strong Ground Motion.. Project stage: Approval ML17095A5401989-02-21021 February 1989 Notification of 890301-03 Meeting W/Util in Rockville,Md to Discuss NRC Questions & Util Responses Re Seismic Ground Motion & long-term Seismic Program Project stage: Meeting ML20246L9941989-03-15015 March 1989 Environ Assessment & Finding of No Significant Impact Re Amends to Licenses DPR-80 & DPR-82.Amends Would Revise Tech Specs by Revising Steam Generator Low & Low Low Level Setpoints for Initiating Reactor Trip Project stage: Request ML16341F0341989-03-17017 March 1989 Summary of 890301-03 Meetings W/Util in San Francisco,Ca to Discuss Response to Seismic Ground Motion Questions,Per Project stage: Meeting ML17083C1721989-03-29029 March 1989 Summary of 890216 Meeting W/Util & Consultants in San Francisco,Ca to Discuss PRA,890217 Audit of Relay Chatter Analysis & Facility long-term Seismic Program.List of Attendees Encl Project stage: Meeting ML16341F1081989-04-11011 April 1989 Responds to Util 890324 Request for Info Re Fee for Review of Seismic Reevaluation Program for Plant Project stage: Approval ML16341F1371989-04-11011 April 1989 Forwards Review of Diablo Canyon Seismic Reevaluation Program & Rept, Preliminary Rept on Empirical Analyses of Vertical Strong Ground Motion for Diablo Canyon Site, California, for Info Project stage: Approval ML16341F1731989-05-12012 May 1989 Forwards Ltr Repts -01,Rev 2,-04,Rev 1 & -05,Rev 5 Re long- Term Seismic Program Project stage: Other ML16342B5641989-05-26026 May 1989 Notification of 890616 & 17 Meeting W/Util in San Francisco, CA to Discuss Fragility Analysis Topics Re Recent NRC Questions Concerning Plant long-term Seismic Program Project stage: Meeting ML16341F1801989-05-26026 May 1989 Notification of 890612-16 Meeting W/Util in San Francisco,Ca to Discuss Geology,Seismology,Geophysics & Tectonics Topics Re NRC Questions on long-term Seismic Program Project stage: Meeting ML20247M1881989-05-26026 May 1989 Notification of 890613,14 & 15 Meetings W/Util in San Francisco,Ca to Discuss PRA Topics Re NRC Questions on long-term Seismic Program Project stage: Meeting ML16341F1921989-05-31031 May 1989 Forwards BNL Rev 1 to Ltr Rept-06, Review of Sys Analysis in Diablo Canyon Pra:Component CWS Reactor Coolant Pump Seal Cooling Equipment Re NRC Review of long-term Seismic Program Project stage: Approval ML16342B5711989-06-0101 June 1989 Forwards Request for Addl Info & Transmittal of Documents Re NRC Review of Plant long-term Seismic Program.Comments by NRC Consultants Also Encl Project stage: RAI ML16341F2221989-06-29029 June 1989 EN-89-066:on 890705,notice of Violation & Proposed Imposition of Civil Penalty in Amount of $75,000 Will Be Issued for Licenses.Action Based on Violations Involving Engineering & Design Control Re Auxiliary Feedwater Pumps Project stage: Request ML16341F2531989-07-21021 July 1989 Notification of 890808,09 & 10 Meetings W/Util in Rockville, MD to Discuss Earthquake Source characterization,long-term Seismic Program Project stage: Meeting ML16341F2711989-08-0101 August 1989 Summary of 890612-16 Meetings W/Pg&E & Other Listed Companies in San Francisco,Ca Re Geology/Seismology/ Geophysics/Tectonics long-term Program.Agenda & Attendee List Encl Project stage: Meeting ML20245F9261989-08-0707 August 1989 Summary of 890613-15 Meetings W/Util in San Francisco,Ca Re PRA long-term Seismic Program.List of Attendees & Agenda Encl Project stage: Meeting ML16341F3531989-09-29029 September 1989 Forwards Ltr Repts Re Responses to long-term Seismic Program & Questions on Final Rept of long-term Seismic Program.Rept Contents Will Be Discussed at 891102-03 Meeting Re Soil Structure Interaction Project stage: Meeting ML16341F3611989-10-0404 October 1989 Forwards Documents & Requests Addl Info Re Review of Plant long-term Seismic Program.Addl Info Required by 891031 Project stage: Approval ML16341F3781989-10-0505 October 1989 Notification of Canceled 891024-26 Meetings W/Util & NRC Consultants in Bethesda,Md to Discuss Seismic Ground Motion & long-term Seismic Program Project stage: Meeting ML16341F3751989-10-13013 October 1989 Forwards Request for Addl Info long-term Seismic Program (LTSP) Seismic Source Characterization (SSC), Rept Re 890808-10 Meeting on SSC of LTSP, Rept Re 890808-10 Meeting & Rept Re 890808-10 Meeting Project stage: RAI ML16342C2351989-11-0909 November 1989 Notification of 891115 Meeting W/Util in Rockville,Md to Discuss Human Factors Analysis for PRA for long-term Seismic Program Project stage: Meeting ML16341F5121990-01-18018 January 1990 Notification of 900129 & 30 Meeting W/Util in San Francisco, CA to Review & Discuss Geophysical Data & Interpretations Along Hosgri Fault Zone Re Plant long-term Seismic Program Project stage: Meeting ML16341F5161990-01-19019 January 1990 Forwards Listed Documents,Including M Reich Re Task Assignment 17,FIN A-3841 & Ltr Rept-08, Review of Sys Analysis... & Requests Addl Info Re NRC Review of Plant long-term Seismic Program Project stage: Approval ML16341F5771990-02-23023 February 1990 Forwards Request for Addl Info Re NRC Review of Plant long- Term Seismic Program Covering Geology,Geophysics & Seismology Issues.Info Should Be Provided by 900331 to Prepare for mid-Apr 1990 Meeting Project stage: RAI ML16341F5981990-03-0606 March 1990 Notification of 900319 Meeting W/Util in Golden,Co to Review & Discuss Empirical Ground Motion Studies & Plant long-term Seismic Program Project stage: Meeting ML16341F6051990-03-14014 March 1990 Forwards Request for Addl Info Re NRC Review of Plant PRA Performed for long-term Seismic Program,Resulting from Review of Util Presentations at Recent Technical Meetings & Written Submittals Project stage: RAI ML16341F6041990-03-14014 March 1990 Notification of 900403,04 & 05 Meeting W/Util in Rockville, MD to Discuss NRC Evaluation of Electrical Power Sys & Fire Analysis of Plant PRA & Results of NRC Plant Quantification & Sensitivity Analyses Re long-term Seismic Program Project stage: Meeting ML16341F6451990-03-27027 March 1990 Notification of Change of Location for 900430 & 0501 Meetings W/Util in San Francisco,Ca to Discuss Ground Motion for Facility long-term Seismic Program Project stage: Meeting ML16341F6351990-03-27027 March 1990 Notification of 900430 & 0501 Meetings W/Util in San Francisco,Ca to Discuss Groundmotion for Plant long-term Seismic Program Project stage: Meeting ML16341F6401990-03-27027 March 1990 Notification of 900417-20 Meetings W/Util in San Francisco,Ca to Discuss Geology,Geophysics & Source Characterization for Plant Long Term Seismic Program Project stage: Meeting ML16342B6591990-03-30030 March 1990 Notification of 900416 Meeting W/Util in Golden,Co to Review & Discuss Empirical Ground Motion Studies as Part of long-term Seismic Program Project stage: Meeting ML16341F6601990-04-12012 April 1990 Forwards Documents & Request for Addl Info Re NRC Review of long-term Seismic Program During 900430 & 0501 Ground Motion Meeting Project stage: RAI ML16341F6701990-04-26026 April 1990 Requests Addl Info Re NRC Review of long-term Seismic Program Project stage: Approval 1989-03-15
[Table View] |
Text
March, 14, 1990 Docket Nos.
50-275 and 50-323 Mr. J.
D. Shiffer, Vice President Nuclear Power Generation c/o Nuclear Power Generation, Licensing Pacific Gas and Electric Company 77 Beale Street, Room 1451 San Francisco, California 94106
Dear Mr. Shiffer:
DISTRIBUTION NRC 5 LPDR PD5 Reading JZwolinski CTrammell HRood OGC E. Jordan N. Chokshi R.
Rothman ACRS(10)
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION RELATING TO NRC STAFF REVIEW OF DIABLO CANYON LONG TERM SEISMIC PROGRAM (LTSP)
(TAC NOS.
55305 AND 68049)
Enclosed is a request for additional information related to the NRC staff review of the Diablo Canyon Probabi listic Risk Assessment (PRA) performed for the LTSP.
This request has resulted from the review, by the NRC staff and its consultants, of PGImE presentations at recent technical meetings and written submittals.
In order to assure that our review schedule is not
- delayed, we request that you provide the additional information identified in the enclosure as soon as possible.
If you have any questions regarding this request, please contact me.
Sincerely,
Enclosures:
as cc w/encl:
See DRSP/PD5:PM HRood 03/1$/90 stated next page DRSP/PD5:(A)D CTra ell 03/
/90 original signed by Harry Rood, Senior Project Manager Project Directorate V
Division of Reactor Projects - III, IV, V and Special Projects Office of Nu c 1 ear Reactor Regu 1 at ion 9003200344 9003i4 PDR ADOCK 05000275 P
PDC p(
~
lt
~
1
c<gyp REJIG po
+~**4 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 March 14, 1990 Docket Nos.
50-275 and 50-323 Mr. J.
D. Shiffer, Vice President Nuclear Power Generation c/o Nuclear Power Generation, Licensing Pacific Gas and Electric Company 77 Beale Street, Room 1451 San Francisco, California 94106
Dear Mr. Shiffer:
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION RELATING TO NRC STAFF REVIEW OF DIABLO CANYON LONG TERM SEISMIC PROGRAM (LTSP)
(TAC NOS.
55305 AND 68049)
Enclosed is a request for additional information related to the NRC staff review of the Diablo Canyon Probabi listic Risk Assessment (PRA) performed for the LTSP.
This request has resulted from the review, by the NRC staff and its consultants, of PGRE presentations at recent technical meetings and written submittals.
In order to assure that our review schedule is not
- delayed, we request that you provide the additional information identified in the enclosure as soon as possible.
If you have any questions regarding this request, please contact me.
Sincerely,
Enclosures:
as stated cc w/encl:
See next page Harry Rood, Senior Project Manager Project Directorate V
Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation
'4 r
n l
Mr. J.
D. Shiffer Pacific Gas and Electric Company Diablo Canyon CC:
Richard F. Locke, Esq.
Pacific Gas Im Electric Company Post Office Box 7442 San Francisco, California 94120 Hs. Sandra A. Silver 660 Granite Creek Road Santa Cruz, California 95065 Hr. Peter H. Kaufman Deputy Attorney General State of California 110 West A Street, Suite 700 San Diego, California 92101 Managing Editor The Count Tele ram Tribune o nson venue P. 0.
Box 112 San Luis Obispo, California 93406 h/s.
Nancy Culver 192 Luneta Street San Luis Obispo, California 93401 Regional Administrator, Region V
U.S.
Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, Ca 1 iforni a 94596 fir. John Hickman Senior Health P hys ici st Environmental Radioactive Hgmt. Unit Environmental management Branch State Department of Health Services 714 P Street, Room 616 Sacramento, Ca 1 if orni a 95814 NRC Resident Inspector Diablo Canyon Nuclear Power Plant c/o U.S. Nuclear Regulatory Commission P. 0.
Box 369 Avila Beach, California 93424 Bruce Norton, Esq.
c/o Richard F. Locke, Esq.
Pacific Gas and Electric Company Post Office Box 7442 San Francisco, California 94120 Dr. R. B. Ferguson Sierra Club - Santa Lucia Chapter Roc'anyon Star Route Creston, California 93432 Chairman San Luis Obispo County Board of Supervisors Room 270 County Government Center San Luis Obispo, California 93408 Michael M. Strumwasser, Esq.
Special Assistant Attorney General State of California Department of Justice 3580 Wilshire Boulevard, Room 800 Los Angeles, California 90010
Hr. J.
D.
S hiffer Paci fi c Gas and E 1 ectri c Company
-2<<
Diablo Canyon Long Term Seismic Program CC:
Dr. Keiiti Aki Department of Geol ogi ca 1 Sciences University Park University of Southern California Los Angeles, California 90089-0741 Dr. Ralph J. Archuleta Department of Geological Sciences University of California Santa Barbara Santa Barbara, California 93106 Dr. Robert D. Brown, Jr.
U.S. Geological Survey Mail Stop 977 345 Hiddlefield Road Henlo Park, California 94025 Dr. David B. Slemmons 2905 Autumn Haze Lane Las Vegas, Nevada 89117 Dr. Robert Fitzpatrick Building 130 Brookhaven National Laboratory
- Upton, New York 11973 Dr. Steven H.
Day Department of Geological Science San Diego State University San Diego, California 92182 Dr. James Johnson EQE 595 Market St.,
18th Floor San Francisco, California 94105 Dr. Jean Savy Mail Code L-196 Lawrence Livermore National Laboratory P. 0.
Box 808 Livermore, California 94550 Dr. Anestis S. Veletsos 5211 Paisley Avenue
- Houston, Texas 77096 Dr. Kenneth Campbell Dames and Moore 27728 Whirlaway Trail Evergreen, Colorado 80439 Dr.
C. J. Costantino Building 129 Brookhaven National Laboratory
- Upton, New York 11973 Dr. H.
K. Ravindra EQE 3150 Bristol Street, Suite 350 Costa Mesa, California 92626 Dr. Michael Bohn Organization 6412 Sandia National Laboratory Post Office Box 5800 Albuquerque, New Mexico 87185 Dr. James Davis Division of Hines and Geology 660 Bercut Drive Sacramento CA 95814 Dr. Morris Reich Building 129 Broo khaven National Laboratory
- Upton, New Yor k 11973
,y
ENCLOSURE I REQUEST FOR ADDITIONAL PRA INFORMATION DIABLO CANYON LONG TERM SEISMIC PROGRAM l.
In your response dated January 23, 1990 to a question on the fire
- analysis, you stated that the operator action ZHEF11 was reevaluated with 10 minutes as a time period before the onset of seal damage because of the pump bearing failure.
The period of 10 minutes was chosen based on a Westinghouse analysis.
Please provide the details of this supporting analysis.
2.
In response to questions related to Anticipated Transients Without Trip (ATWT) sequences, please provide the status of the implementation of. the AMSAC system as.required by the ATWS rule.
3.
With respect to the control room fire scenarios, it is not clear how the human actions at the hot shutdown panel and the associated timings are
. modeled for the cases where the RCPs are not tripped before evacuating the control room.
Based on discussions with you, we conclude that reexamination of these scenarios is necessary.
Please provide this reexamination, and the following information.
a
~
b.
c ~
Discuss the independence between the control room and the hot shutdown panel circuitry (both actuation and instrumentation).
Discuss whether a
LOCA can be mitigated from the hot shutdown
- panel, and if so, discuss the applicable procedure.
Discuss the procedure for tripping the RCPs from outside the control room when component cooling water is lost.
0 t