Forwards Listed Documents Relating to NRC Review of Long Term Seismic Program,Including BNL Review of Diablo Canyon PRA:High-Pressure Injection & Preliminary Rept on Empirical Studies of Horizontal Strong Ground Motion..
ML16341E989
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 02/07/1989
From: Rood H
Office of Nuclear Reactor Regulation
To: Shiffer J
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16341E990 List:
References
CON-FIN-A-3958 TAC-55305, TAC-68049, NUDOCS 8902170111
Download: ML16341E989 (12)


Text

February 7, 1989 Docket Nos.

50-275 and 50-323 1.

Letter dated January 23, 1989 from R.

G. Fitzpatrick (Brookhaven National Laboratory) to Ni lesh Chokshi (NRC staff), "Review of the Diablo Canyon PRA:

High Pressure Injection (FIN A-3958)."

2.

Memorandum dated March 24, 1988 from Leon Reiter (NRC staff) to Goutam Bagchi (NRC staff), "Report on.USGS Workshop on Fault Segmentation and Controls of Rupture Initiation and Termination, Visit to USGS Offices and Visit to Region V."

3.

Letter dated December 2, 1988 from Kenneth W. Campbell (USGS) to Robert Rothman (NRC staff) transmitting report by Kenneth W.

Campbell dated October 1988, "Preliminary Report on Empirical Studies of Horizontal Strong Ground Motion for the Diablo Canyon Site, California."

4.

Letter dated, December 14, 1988 from Morris Reich (Brookhaven National Laboratory) to Dr.

R. Pichumani (NRC staff) transmitting report by A. S. Valetsos, Y. Tang, and A. M. Prasad dated December 10, 1988, "Studies of Earthquake Ground Motions and Soil-Structure Interaction for Diablo Caryon Nuclear Power Plant."

Sincerely,

/s/

D ISTR IBUT ION k

kk R I NRC 8

LPDRs GBagchi MVirgilio NChokshi JLee

RRothman

. BGrimes GKnighton EJordan RPichumani PDV Plant File OGC (for information only)

ACRS (10)

Dear Mr. Shiffer:

SUBJECT'RANSMITTAL OF DOCUMENTS RELATING TO NRC STAFF REVIEW OF DIABLO CANYON LONG TERM SEISMIC PROGRAM (LTSP)

(TAC NOS.

55305 AND 68049)

Enclosed for youi information and use are some letters, memoranda, and reports which relate to the NRC staff review of the Diablo Canyon Seismic Reevaluation Program.

The enclosed material is as follows:

8902i70lil 85'0207 PDR ADOCK 05000275 PDC Harry Rood, Senior Project Manager Project Directorate V

Division of Reactor Projects - III, IV, V and Special Projects

Enclosures:

as stated cc'w/encl:

See next page DRSP/PD5 DR,

)

.PD5 HRood GK on 02/

) /89 02/ (/89 OFFICIAL RECGRD COPY

~c>

gp,R REGy (4

0 aO OO IcA' g

~ ~+

o

/p +a*++

t UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 February 7,

1989

, Docket Nos.

50-275 and 50-323 Mr. J.

D. Shiffer, Vice Pres ident Nuclear Power Generation c/o Nuclear Power Generation, Licensing Pacific Gas and Electric Company 77 Beal.e Street, Room -1451 San Francisco, California 94106

Dear Mr. Shiffer:

SUBJECT:

TRANSMITTAL OF DOCUMENTS RELATING TO NRC STAFF REVIEW OF DIABLO CANYON LONG TERM SEISMIC PROGRAM (LTSP)

(TAC NOS.

55305 AND 68049)

Enclosed for your information and use are some letters, memoranda, and reports which relate to the NRC staff review of the Diablo Canyon Seismic Reevaluation Program.

The enclosed material is as follows:

1.

Letter dated January 23, 1989 from R.

G. Fitzpatrick (Brookhaven National Laboratory) to Ni lesh Chokshi (NRC stiff), "Review of the Diablo Canyon PRA:

High Pressure Injection (FIN A-3958)."

2.

Memorandum dated f~iarch 24, 1988 from Leon Reiter (NPC staff) to Goutam Baochi (NRC staff), "Report on USGS Workshop on Fault Segmentation and Controls of Rupture Initiation and Termination, Visit to USGS Offices and Visit to Region V."

3.

Letter dated December 2,

1988 from Kenneth W. Campbell (USGS) to Robert Rothman (NRC staff) transmitting report by Kenneth W.

Campbell dated October 1988, "Preliminary Report on Empirical Studies of Horizontal Strong Ground t1otion for the Diablo Canyon Site, California."

4, Letter dated December 14, 1988 from IIorris Reich (Brookhaven National Laboratory) to Dr.

R. Pichumani (NRC staff) transmitting report by A. S. Valetsos, Y. Tang, and A. M. Prasad dated December 10, 1988, "Studies of Earthquake Ground Motions and Soil-Structure Interaction for Diablo Canyon Nuclear Power Plant."

Sincerely, Harry Rood, Senior Project Manager Project Directorate V

Division of Reactor Projects

- III, IV, V and Special Projects

Enclosures:

as stated cc w/encl:

See next page

Mr. J.

D. Shiffer Pacific Gas and Electric Company Diablo Canyon CC:

Richard F. Locke, Esq.

Pacific Gas 5 Electric Company Post Office Box 7442 San Franci sco, Gal ifor nia 94120 Janice E. Kerr, Esq.

California Public Utilities Commission 350 McAllister Street San Francisco, California 94102 Ms. Sandra A. Silver 660 Granite Creek Road Santa Cruz, California 95065 Mr.

W. C. Gangloff Westinghouse Electric Corporation P. 0.

Box 355 Pittsburgh, Pennsylvania 15230 Managing Editor San Luis Obispo County Telegram Tribune 1321 Johnson Avenue P..O.

Box 112 Sa'n Luis Obispo, California 93406 Mr. Leland M. Gustafson, Mana'ger Federal Relations Pacific Gas and Electric Company 1726 M Street, N.

W.

Washington, DC 20036-4502 Dian M. Grueneich flarcia Preston Law Office of Dian M. Grueneich 380 Nayes Street, Suite 4

San Francisco, California 94102 NRC Resident Inspector Diablo Canyon Nuclear Power Plant c/o U.S. Nuclear Regulatory Commission P. 0.

Box 369 Avila Beach, California 93424 Mr. Dick Blakenburg Editor E Co-Publisher South County Publishing Company P. 0.

Box 460 Arroyo Grande, California 93420 Bruce Norton, Esq.

c/o Richard F.. Locke, Esq.

Pacific Gas and Electric Company Post Office Box 7442 San Francisco, California 94120 Dr. R.

B. Ferguson Sierra Club - Santa Lucia Chapter Rocky Canyon Star Route Creston, California 93432 Chairman San Luis Obispo County Board of Supervisors Room 270 County Government Center San Luis Obispo, California 93408 Director Energy Facilities Siting Division Energy Resources Conservation and Development Commission 1516 9th Street Sacramento, Ca 1 iforni a 95814 Ms. Jacquelyn Wheeler 3033 Barranca Court San Luis Obispo, California 93401

Pacific Gas IK Electric Company Diablo Canyon CC:

Ns. Laurie NcDermott, Coordinator Consumers Or9 arri zed for Defense of Environmental Safety 731 Pacific Street, Suity 42, San Luis Obispo, California 93401 Nr. Jack NcGurk, Acting Chief Radiological Health Branch State Department of Health Services 714 P Street, Office Building P8 Sacramento, California 95814 Regional Administrator, Region Y

U.S. Nuclear Regulatory Commission 1450 Naria Lane Suite 210 Walnut Creek, California 94596 Ns.

Nancy Culver 192 Luneta Street San Luis Obispo, California 93401 President California Public Utilities Commission California State Building 350 NcAllister Street San Francisco, California 94102 Nichael N. Strumwasser, Esq.

Special Assistant Attorney General State of California Department of Justice 3580 Wi lshire Boulevard, Room 800 Los Angeles, California 90010

Pacific Gas and Electric Company Long Term Seismic Program 4

Diablo Canyon CC:

Dr. S. T. Algermissen U.S. Geological Survey P. 0.

Box 25046 Denver Federal Center-H.S.

966 Denver, Colorado 80225 Dr. Keiiti Aki Department of Geological Sciences University of Southern California Los Angeles, California 90089 Dr. Ralph J. Archuleta Department of Geological Sciences University of California Santa Barbara Santa Barbara, California 93106 Hr.

Don Bernreuter Hail Stop L-196 Lawrence Livermore Laboratory P. 0.

Box 808 Livermore, California 94550 Hr. Donald A. Brand Vice President, Power Generation Pacific Gas and Electric Company 77 Beale Street, Room 2917 San Franc isco, Ca liforni a 94106 Dr. Robert D. Brown, Jr.

U.S. Geological Survey Mail Stop 977 345 Hiddlefield Road Menlo Park, California 94025 Mr. Lloyd S. Cluff Pacific Gas and Electric Company One California Street, Room 200 San Francisco, California 94106 Dr. David B. Slemmons HacKay School of Hines University of Nevada-Reno

Reno, Nevada 89557-0047 Dr. Robert Fitzpatrick Building 130 Brookhaven National Laboratory
Upton, New York 11973 Dr.

C; J. Costantino Building 129 Brookhaven National Laboratory

Upton, New York 11973 State Geologist California Divison of Hines and Geology Room 1351 1416 Ninth Street Sacramento, Califor nia 95814 Dr. Steven H.

Day Department of Geological Sciences San Diego State University San Diego, California 92182 Dr. George Gazetas Dept; of Civil Engineering 212 Ketter Hall Suny-Buffalo, N.Y.

14260 Dr. James Davis California Division of Mines and Geology 1516 Ninth St. - Fourth Floor Sacramento, CA 95814 Dr. Morris Reich Structural Analysis Division Building 129 Brookhaven National Laboratory

Upton, New York 11973 Dr. Jean Savy Hail Stop L-196 Lawrence Livermore Laboratory P. 0.

Box 808 Livermore, California 94550 Dr. Anestis S. Veletsos 5211 Paisley Avenue

Houston, Texas 77096 Dr.

Ken Campbell U. S. Geological Survey P. 0.

Box 25046, Hail Stop 966 Denver Federal Center

Denver, Colorado 80225

Pacific Gas and Electric Company Long Term Seismic Progr'an Diablo Canyon CC:

Dr. Nichael Bohn Sandia Lab. - Organization 6412 Post Office Box 5800 Albuquerque, Hew Nexico 87185 Edie Clark 613 Stanford Drive San Luis Ob ispo, California 93401 Dr. J.

Johnson EQE Incorporated Two Anabel Lane, Suite 101 San

Ramon, CA 94583 Nr. William H. Wallace Vice President, Engineering Pacific Gas 'and Electric Company 77 Beale Street, Room 2645 San F.rancisco, California 94106 Dr. N.

K. Ravindra EQE Incorporated 3150 Bristol Street, Suite 350 Costa

Nesa, CA 92626

0