Docket Nos. 50-275 and 50-323 UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 April 26, 1990 Mr. J.

D. Shiffer, Vice President Nuclear Power Generation c/o Nuclear Power Generation, Licensing Pacific Gas and Electric Company 77 Beale Street, Room 1451 San Francisco, California 94106

Dear Mr. Shiffer:

SUBJECT:

RE(VEST FOR ADDITIONAL INFORMATION RELATING TO NRC STAFF REVIEW OF DIABLO CANYON LONG TERM SEISMIC PROGRAM (LTSP)

(TAC NOS.

55305 AND 68049)

In Chapter 7 of the LTSP Final Report issued on July 31, 1988, you attempted to show that the plant structures and components have adequate seismic margins over the demands (plant responses) resulting from the 84th percentile ground motions due to the maximum magnitude earthquake.

In doing so you have back-calculated high confidence of low probability of failure (HCLPF) seismic capacities from the full fragility curves used in the seismic probabilistic risk assessment (PRA) studies.

These HCLPF capacities are defined in terms of average spectral accelerations for a specified range of frequencies, e.g.,

3 Hz to 8.5 Hz.

We generally agree with this methodology, but believe that the scope of the deterministic evaluations reported in the LTSP final report should be expanded.

In Chapter 7 of the LTSP final report, you compared, at selected locations in the major structures, the in-structure response spectra resulting from the LTSP site-specific ground motion with the in-structure response spectra for the plant seismic qualification basis (i.e., the Hosgri re-evaluation earthquake).

The location where such comparisons have been made appear to have been largely dictated by the location of the PRA-based structural elements and components.

We request that you augment the LTSP deterministic evaluations to include the following additional items:

1.

Compare the Hosgri-estimated structural response parameters such as base

shear, overturning
moment, and floor response spectra (including but not limited to the operating floor level) with similar, consistent, LTSP response parameters for all Category I structures.

2.

Compare the LTSP deterministic capacities with those predicted by the Hosgri analyses for selected structural elements and components.

For example, this comparison should be made for some of the structural elements and components identified as "weak links" during the Hosgri re-evaluation, such as the pipe-way structure, certain block walls and bolted connections in the Turbine Building, and the buried diesel fuel tanks.

900427028i 900426 PDR ADOCK 05000275 P

PDC

)

j II y

April 26, 1990 3.

For some selected items discussed in guestions I and 2, above, provide alternate (code-based) capacity calculations to compare with the capacity calculations made using the Conservative Deterministic Fai lure Margin (CDFM) method.

In responding, we request that you use the CDFM methodology described in Electric Power Research Institute Final Report No. NP-6064, "A Methodology for Assessment of Nuclear Power Plant Seismic Margin", dated October 1988.

Also, these capacities should be expressed in terms of specific capacities such as base shear capacity, etc., rather than in terms of the acceleration levels (g's).

After the site-specific ground motion meeting scheduled for April 30 - May I, 1990, I suggest that we discuss the scope and methodology of deterministic evaluations.

The objective of these discussions would be to reach agreement on the selection of structural elements and components for which deterministic calculations are to be performed in response to this request, and on a submittal date for your response.

If you have any questions regarding this request, please contact me.

Sincer ely,

Enclosures:

as stated cc w/encl:

See next page original signed by Harry Rood Harry Rood, Senior Project Manager Project Directorate V

Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation DISTRIBUTION RPi NRC

& LPDRs GBagchi JZwol inski NChokshi PShea RRothman HRood JLarkins EJordan ACRS (10)

OGC (for information only)

PDV Plant File DR

/PD5 D

PD5 HRood L

04/g5/90 04/m/90 OFFICIAL RECORD COPY OFo(

i(0

~

t

~

t

%t l

~

p w e

~ lf~

I

3.

For some selected items discussed in guestions I and 2, above, provide alternate (code-based) capacity calculations to compare with the capacity calculations made using the Conservative Deterministic Failure Margin (CDFM) method.

In responding, we request that you use the CDFH methodology described in Electric Power Research Institute Final Report No. NP-6064, "A Methodology for Assessment of Nuclear Power Plant Seismic Margin", dated October 1988.

Also, these capacities should be expressed in terms of specific capacities such as base shear capacity, etc., rather than in terms of the acceleration levels (g's).

After the site-specific ground motion meeting scheduled for April 30 - Hay I,

1990, I suggest that we discuss the scope and methodology of deterministic evaluations.

The objective of these discussions would be to reach agreement on the selection of structural elements and components for which deterministic calculations are to be performed in response to this request.

If you have any questions regarding this request, please contact me.

S in cere ly,

Enclosures:

as stated cc w/encl:

See next page Harry R

d, Senior Project Manager Project Directorate V

Division of Reactor Projects - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation

I

+ ~ Q AV

Mr. J.

D. Shiffer Pacific Gas and Electric Company Diablo Canyon CC:

Richard F. Locke, Esq.

Pacific Gas E Electric Company Post Office Box 7442 San Francisco, Ca 1 ifornia 94120 Ms. Sandra A. Silver 660 Granite Creek Road Santa Cruz, California 95065 Mr. Peter H.

Kaufman Deputy Attorney General State of California 110 West A Street, Suite 700 San Diego, California 92101 Managing Editor The Count Tele ram Tribune 1321 Johnson Avenue P. 0.

Box 112 San Luis Obispo, California 93406 Ms. Nancy Culver 192 Luneta Street San Luis Obispo, California 93401 Reg iona 1 Administrator, Regi on V

U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Mr. John Hickman Senior Health Physicist Environmental Radioactive Mgmt. Unit Environmental Management Branch State Department of Health Services 714 P Street, Room 616 Sacramento, Ca Iifornia 95814 NRC Resident Inspector Diablo Canyon Nuclear Power Plant c/o U.S. Nuclear Regulatory Commission P. 0.

Box 369 Avila Beach, California 93424 Bruce Norton, Esq.

c/o Richard F. Locke, Esq.

Pacific Gas and Electric Company Post Office Box 7442 San Francisco, California 94120 Dr. R.

B. Ferguson Sierra Club - Santa Lucia Chapter Rocky Canyon Star Route Creston, California 93432 Chairman San Luis Obispo County Board of Supervisors Room 270 County Government Center San Luis Obispo, California 93408 Michael M. Strumwasser, Esq.

Special Assistant Attorney General State of California Department of Justice 3580 Wilshire Boulevard, Room 800 Los Angeles, California 90010

~ ~a+

4 4

.Mr. J.

D. Shiffer Pacific Gas and Electric Company Diablo Canyon Long Term Seismic Program CC:

Dr. Keiiti Aki Department of Geological Sciences University Park University of Southern California Los Angeles, Califor nia 90089-0741 Dr. Ralph J. Archuleta Department of Geological Sciences University of California Santa Barbara Santa Barbara, California 93106 Dr. Steven M. Day Department of Geological Science San Diego State University San Diego, California 92182 Dr. George Gazetas Dept. of Civil Engineering 212 Ketter Hall SUNY-Buffalo Buffalo, New York 14260 Dr. Robert D. Brown, Jr.

U.S. Geological Survey Hail Stop 977 345 Hiddlefie ld Road Menlo Park, California 94025 Dr. David B. Sleranons Center for Neotectonic Studies MacKay School of Mines University of Nevada-Reno

Reno, Nevada 89557-0047 Dr. Robert Fitzpatrick Building 130 Brookhaven National Laboratory
Upton, New Yor k 11973 Dr. Jean Savy Mail Code L-196 Lawrence Livermore National Laboratory P. 0.

Box 808 Livermore, California 94550 Dr. Anestis S. Veletsos 5211 Paisley Avenue

Houston, Texas 77096 Dr.

Ken Campbell U.S. Geological Survey P.O.

Box 25046, Hail Stop 966 Denver Federal Center

Denver, Colorado 80225 Dr. C. J. Costantino Building 129 Brookhaven National Laboratory
Upton, New York 11973 Dr. M. K. Ravindra EQE 3150 Bristol Street, Suite 350 Costa Mesa, California 92626 Dr. Michael Bohn Sandia Lab. - Organization 6412 Post Office Box 5800 Albuquerque, New Mexico 87185 Dr. J.

Johnson EQE 595 Market Street - 18th Floor San Francisco, California 94105

lg