Discusses 900615 Request That Rev 1 to CE444 (Uplift) Seismic Soil-Structure Interaction Analysis W/Basement Uplift Be Withheld from Public Disclosure.Request Granted
ML16341F859
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 10/30/1990
From: Dyer J
Office of Nuclear Reactor Regulation
To: Rutgers J
BECHTEL POWER CORP.
References
TAC-55305, TAC-68049, NUDOCS 9011060189
Download: ML16341F859 (6)


Text

~ t,nmR~cu co a

0 I

C 0

+p

++*dc+

UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 October 30, 1990 Docket Nos.

50-275 and 50-323 Mr. John A. Rutgers Yice President Bechtel Power Corporation 45 Fremont Street San Francisco, California 94105

Dear Mr. Rutgers:

SUBJECT:

REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE-DIABLO CANYON UNITS 1

AND 2 (TAC NOS.

55305 and 68049)

By letter dated June 15, 1990, Pacific Gas and Electric Company submitted the following document and requested that it be withheld from public disclosure pursuant to 10 CFR 2.790:

"CE444 (UPLIFT) Seismic Soil-Structure Interaction Analysis with Basemat Uplift" Theoretical Manual, Revision 1, July 1984 The Bechtel Power Corporation's affidavit forwarded with the documents stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:

1.

The information contained in the documents in owned and has been held in confidence by Bechtel Power Corporation (BPC).

2.

The information consists of data relative to a process (or component, structure, tool, method, etc.) the application of which secures competitive economic advantage, e.g.,

by optimization or improved marketability to BPC.

3.

Public disclosure of the information would put BPC at a competitive disadvantage by reducing competitor's expenditure of resources at their expense.

We have reviewed your application and the material based on the requirements and criteria of 10 CFR 2.790.

On the basis of the affidavit, we have deter-mined that the submitted information to be withheld contains trade secrets or proprietary commercial information.

Therefore, "CE444 (UPLIFT) Seismic Soil-Structure Interaction Analysis with Basemat Uplift" Theoretical Manual, will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of

1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the'ocuments.

If the need PP'0iiObOi89'01030 PDR ADDCK 05000275 P

PNU '

'li d

0

).',ll

Mr. John A. Rutgers

arises, we may send copies of this information to our consultants working in this area.

Me will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC.

You should also understand that the NRC may have cause to review this determination in the

future, such as, if the scope of a Freedom of Information Act request includes your information.

In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

Sincerely, cc:

See next page DISTRIBUTION c~J NRC

& Local PDRs PD5 Reading File D. Crutchfield M. Virgilio D. Foster H.

Rood C. Holzle, OGC R.

Zimmerman, RV

  • See previous concurrence Onginai Signed By James E. Dyer, Acting Director Project Directorate V

Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation F

'DR P

LA PD5 NAME

DFoster DATE 0 /P/90
DRSP PM D

DR P

A D:PD5 GC

HRood:cc
JDyec @PE
CHolzle
@ /p/90:(>/3, '/90: 8/7/90 ocument arne:

D N

R

f t 'Tg f

I g '(ll*"

lt

>t 4

Mr. John A. Rutgers CC:

NRC Resident Inspector Diablo Canyon Nuclear Power Plant c/o U.S. Nuclear Regulatory Commission P. 0.

Box 369 Avila Beach, California 93424 Dr. R.

B. Ferguson Sierra CLub - Santa Lucia Chapter Rocky Canyon Star Route Company Creston, California 93432 Ms. Sandra A. Silver 660 Granite Creek Road Santa Cruz, California 95065 Bruce Norton, Exq.

c/o Richard F. Locke, Esq.

P. 0.

Box 7442 San Francisco, California 94120 Managing Editor The Count Tele ram Tribune 1321 Jo nson Avenue P. 0.

Box 112 San Luis Obispo, California 93406 Chairman San Luis Obispo County Board of Supervisors Room 270 County Government Center San Luis Obispo, California 93408 Richard F. Locke, Esq.

Pacific Gas 5 Electric Company Post Office Box 7442 San Francisco, California 94120 Mr. John Hickman Seni or Health Physi cist Environmental Radioactive Mgmt. Unit Environmental Management Branch State Department of Health Services 714 P Street, Room 616 Sacramento, California 95814 Regional Adminstrator, Region V

U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Mr. Peter H. Kaufman Deputy Attorney General State of California 110 West A Street, Suite 700 San Diego, California 92101 Ms. Nancy Culver 192 Luneta Street San Luis Obispo, California 93401 Michael M. Strumwasser, Esq.

Special Assistant Attorney General State of California Department of Justice 3580 Wilshire Boulevard, Room 800 Los Angeles, California 90010 Mr. J.

D. Shiffer, Vice President Nuclear Power Generation c/o Nuclear Power Generation, Licensing Pacific Gas and Electric Company 77 Beale Street, Room 1451 San Francisco, California 94106

r gg +~*

ll I

4 Ft