MONTHYEARML17083B9111987-08-27027 August 1987 Trip Rept of 870609-11 Visit to Plant Re Audit of Calculational Programs to Evaluate Potential soil-structure Interaction Effects as Part of long-term Seismic Program. Summary of Items Audited Contained in Encl BNL Project stage: Other ML17083B9201987-09-0202 September 1987 Forwards List of Deterministic Comparisons Expected to Be Made in Order to Determine Whether & to What Extent Differences Between Earthquake Loads Exists.Comments on Proposed Comparisons Requested Project stage: Other ML17083C0381987-09-30030 September 1987 Requests Addl Info to Complete Analysis of Util Database Re Empirical Ground Motion & Plant Seismic Evaluation.Util Must Address Inconsistencies Found by K Campbell,Nrc Advisor for Diablo Canyon Seismic Reevaluation Program,Per Project stage: Other ML17083C0531987-10-15015 October 1987 Forwards BNL & Sandia Comments Re Plant Pra,Based on Util Matl Presented at 870217-18 Workshop in Bethesda,Md.Comments Re Overall Methodology & Special Investigations on Application.Nrc in Agreement W/Comments Project stage: Other ML17083C0631987-10-15015 October 1987 Forwards Revised Summary of NRC & Consultant Comments Made at 870715-16 Ground Motion Workshop.Nrc Still Not Clear About How Util Plans to Use Results of Ground Motion Studies in Soil Structure Interaction Analysis & PRA Project stage: Other ML17083C1171988-02-19019 February 1988 Forwards Summary of 880114-15 Meetings Re Plant PRA Study on Util long-term Seismic Program Project stage: Meeting ML16341E5931988-03-0909 March 1988 Forwards Jebco Seismic,Inc Ltr Discussing Offshore Seismic Data Collected in 1984 Near Facility & Requests Response Re Issues Raised by Ltr.Confidential Maps Attached May Be Released Per Telcon Between G Lichtman & R Rothman Project stage: Other ML17083C1091988-03-23023 March 1988 Forwards Summary of ACRS Subcommittee Meeting Held on 880223-24 in San Francisco Re long-term Seismic Program Project stage: Meeting ML17083C1371988-10-24024 October 1988 Summary of 881004 & 05 Meetings W/Util in Rockville,Md to Discuss Final Rept on long-term Seismic Program.Addl Info on Listed Items Must Be Submitted in Order to Continue Review of Rept.List of Attendees,Agenda & Viewgraphs Encl Project stage: Meeting ML16342B4961988-10-25025 October 1988 Summarizes 880225 NRC Audit of Selected Seismic Fragility Calculations Performed as Part of long-term Seismic Program. Fragility Curves for Specific Component,At Given Location, Should Not Be Used Generically Project stage: Other ML16341E8451988-10-25025 October 1988 Summary of 880328-30 Plant Walkdown by NRC Staff as Part of Review of PRA for Plant Long Term Seismic Program.Agenda & List of Attendees Encl Project stage: Approval ML16341E9221988-11-21021 November 1988 Summary of 880912-15 Public Meetings W/Util Re PRA & long-term Seismic Program for Plant.Agenda & Lists of Attendees Encl Project stage: Meeting ML16342C3531988-12-13013 December 1988 Forwards Request for Addl Info Re Plant long-term Seismic Program Final Rept.Response to PRA Questions Should Be Submitted by 890115 & Response to Other Questions by 890130 Project stage: RAI ML16342B5131989-01-10010 January 1989 Forwards BNL Repts Describing Analyses of Low Pressure & High Pressure Functions of Eccs,As Part of Review of long-term Seismic Program Final Rept.Comments & Requests for Addl Info in Encl Rept Should Be Addressed by 890210 Project stage: Approval ML16342C2121989-01-11011 January 1989 Summary of 881102 Meeting W/Util to Discuss Numerical Modeling of Ground Motions Used in Plant long-term Seismic Program Submitted by Util on 880731.Agenda,list of Attendess & Related Info Encl Project stage: Meeting ML16342B5211989-01-26026 January 1989 Notification of 890216 Meeting W/Util in San Francisco,Ca to Discuss Analysis of Selected Sys Important to PRA Re long- Term Seismic Program Project stage: Meeting ML16341E9891989-02-0707 February 1989 Forwards Listed Documents Relating to NRC Review of Long Term Seismic Program,Including BNL Review of Diablo Canyon PRA:High-Pressure Injection & Preliminary Rept on Empirical Studies of Horizontal Strong Ground Motion.. Project stage: Approval ML17095A5401989-02-21021 February 1989 Notification of 890301-03 Meeting W/Util in Rockville,Md to Discuss NRC Questions & Util Responses Re Seismic Ground Motion & long-term Seismic Program Project stage: Meeting ML20246L9941989-03-15015 March 1989 Environ Assessment & Finding of No Significant Impact Re Amends to Licenses DPR-80 & DPR-82.Amends Would Revise Tech Specs by Revising Steam Generator Low & Low Low Level Setpoints for Initiating Reactor Trip Project stage: Request ML16341F0341989-03-17017 March 1989 Summary of 890301-03 Meetings W/Util in San Francisco,Ca to Discuss Response to Seismic Ground Motion Questions,Per Project stage: Meeting ML17083C1721989-03-29029 March 1989 Summary of 890216 Meeting W/Util & Consultants in San Francisco,Ca to Discuss PRA,890217 Audit of Relay Chatter Analysis & Facility long-term Seismic Program.List of Attendees Encl Project stage: Meeting ML16341F1081989-04-11011 April 1989 Responds to Util 890324 Request for Info Re Fee for Review of Seismic Reevaluation Program for Plant Project stage: Approval ML16341F1371989-04-11011 April 1989 Forwards Review of Diablo Canyon Seismic Reevaluation Program & Rept, Preliminary Rept on Empirical Analyses of Vertical Strong Ground Motion for Diablo Canyon Site, California, for Info Project stage: Approval ML16341F1731989-05-12012 May 1989 Forwards Ltr Repts -01,Rev 2,-04,Rev 1 & -05,Rev 5 Re long- Term Seismic Program Project stage: Other ML16342B5641989-05-26026 May 1989 Notification of 890616 & 17 Meeting W/Util in San Francisco, CA to Discuss Fragility Analysis Topics Re Recent NRC Questions Concerning Plant long-term Seismic Program Project stage: Meeting ML16341F1801989-05-26026 May 1989 Notification of 890612-16 Meeting W/Util in San Francisco,Ca to Discuss Geology,Seismology,Geophysics & Tectonics Topics Re NRC Questions on long-term Seismic Program Project stage: Meeting ML20247M1881989-05-26026 May 1989 Notification of 890613,14 & 15 Meetings W/Util in San Francisco,Ca to Discuss PRA Topics Re NRC Questions on long-term Seismic Program Project stage: Meeting ML16341F1921989-05-31031 May 1989 Forwards BNL Rev 1 to Ltr Rept-06, Review of Sys Analysis in Diablo Canyon Pra:Component CWS Reactor Coolant Pump Seal Cooling Equipment Re NRC Review of long-term Seismic Program Project stage: Approval ML16342B5711989-06-0101 June 1989 Forwards Request for Addl Info & Transmittal of Documents Re NRC Review of Plant long-term Seismic Program.Comments by NRC Consultants Also Encl Project stage: RAI ML16341F2221989-06-29029 June 1989 EN-89-066:on 890705,notice of Violation & Proposed Imposition of Civil Penalty in Amount of $75,000 Will Be Issued for Licenses.Action Based on Violations Involving Engineering & Design Control Re Auxiliary Feedwater Pumps Project stage: Request ML16341F2531989-07-21021 July 1989 Notification of 890808,09 & 10 Meetings W/Util in Rockville, MD to Discuss Earthquake Source characterization,long-term Seismic Program Project stage: Meeting ML16341F2711989-08-0101 August 1989 Summary of 890612-16 Meetings W/Pg&E & Other Listed Companies in San Francisco,Ca Re Geology/Seismology/ Geophysics/Tectonics long-term Program.Agenda & Attendee List Encl Project stage: Meeting ML20245F9261989-08-0707 August 1989 Summary of 890613-15 Meetings W/Util in San Francisco,Ca Re PRA long-term Seismic Program.List of Attendees & Agenda Encl Project stage: Meeting ML16341F3531989-09-29029 September 1989 Forwards Ltr Repts Re Responses to long-term Seismic Program & Questions on Final Rept of long-term Seismic Program.Rept Contents Will Be Discussed at 891102-03 Meeting Re Soil Structure Interaction Project stage: Meeting ML16341F3611989-10-0404 October 1989 Forwards Documents & Requests Addl Info Re Review of Plant long-term Seismic Program.Addl Info Required by 891031 Project stage: Approval ML16341F3781989-10-0505 October 1989 Notification of Canceled 891024-26 Meetings W/Util & NRC Consultants in Bethesda,Md to Discuss Seismic Ground Motion & long-term Seismic Program Project stage: Meeting ML16341F3751989-10-13013 October 1989 Forwards Request for Addl Info long-term Seismic Program (LTSP) Seismic Source Characterization (SSC), Rept Re 890808-10 Meeting on SSC of LTSP, Rept Re 890808-10 Meeting & Rept Re 890808-10 Meeting Project stage: RAI ML16342C2351989-11-0909 November 1989 Notification of 891115 Meeting W/Util in Rockville,Md to Discuss Human Factors Analysis for PRA for long-term Seismic Program Project stage: Meeting ML16341F5121990-01-18018 January 1990 Notification of 900129 & 30 Meeting W/Util in San Francisco, CA to Review & Discuss Geophysical Data & Interpretations Along Hosgri Fault Zone Re Plant long-term Seismic Program Project stage: Meeting ML16341F5161990-01-19019 January 1990 Forwards Listed Documents,Including M Reich Re Task Assignment 17,FIN A-3841 & Ltr Rept-08, Review of Sys Analysis... & Requests Addl Info Re NRC Review of Plant long-term Seismic Program Project stage: Approval ML16341F5771990-02-23023 February 1990 Forwards Request for Addl Info Re NRC Review of Plant long- Term Seismic Program Covering Geology,Geophysics & Seismology Issues.Info Should Be Provided by 900331 to Prepare for mid-Apr 1990 Meeting Project stage: RAI ML16341F5981990-03-0606 March 1990 Notification of 900319 Meeting W/Util in Golden,Co to Review & Discuss Empirical Ground Motion Studies & Plant long-term Seismic Program Project stage: Meeting ML16341F6051990-03-14014 March 1990 Forwards Request for Addl Info Re NRC Review of Plant PRA Performed for long-term Seismic Program,Resulting from Review of Util Presentations at Recent Technical Meetings & Written Submittals Project stage: RAI ML16341F6041990-03-14014 March 1990 Notification of 900403,04 & 05 Meeting W/Util in Rockville, MD to Discuss NRC Evaluation of Electrical Power Sys & Fire Analysis of Plant PRA & Results of NRC Plant Quantification & Sensitivity Analyses Re long-term Seismic Program Project stage: Meeting ML16341F6451990-03-27027 March 1990 Notification of Change of Location for 900430 & 0501 Meetings W/Util in San Francisco,Ca to Discuss Ground Motion for Facility long-term Seismic Program Project stage: Meeting ML16341F6351990-03-27027 March 1990 Notification of 900430 & 0501 Meetings W/Util in San Francisco,Ca to Discuss Groundmotion for Plant long-term Seismic Program Project stage: Meeting ML16341F6401990-03-27027 March 1990 Notification of 900417-20 Meetings W/Util in San Francisco,Ca to Discuss Geology,Geophysics & Source Characterization for Plant Long Term Seismic Program Project stage: Meeting ML16342B6591990-03-30030 March 1990 Notification of 900416 Meeting W/Util in Golden,Co to Review & Discuss Empirical Ground Motion Studies as Part of long-term Seismic Program Project stage: Meeting ML16341F6601990-04-12012 April 1990 Forwards Documents & Request for Addl Info Re NRC Review of long-term Seismic Program During 900430 & 0501 Ground Motion Meeting Project stage: RAI ML16341F6701990-04-26026 April 1990 Requests Addl Info Re NRC Review of long-term Seismic Program Project stage: Approval 1989-03-15
[Table View] |
Text
._
August 7, 1989
+ DDCKET NOS.: 50-275-and 50-323 APPLICANT:
PACIFIC GAS AND ELECTRIC COMPANY (PG&E)
FACILITY:
DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2
SUBJECT:
SUMMARY
OF JUNE 13-15, 1989 PUBLIC MEETING TO DISCUSS PROBABILISTIC RISK ASSESSMENT, DIABLO CANYON LONG TERM SEISMIC PROGRAM (LTSP) (TAC NOS. 55305 ARD 68049)
On June 13-15, 1989 the NRC staff and its consultants from Brookhaven National Laboratory (BNL) met with PG&E in San Francisco, California to discuss selected l
aspects of the probabilistic risk assessment (PRA) summarized in PG&E's Final l
Report on the Diablo Canyon Long Term Seismic Program. The purpose of the f
meeting was to discuss the review findings by the NRC staff and BNL on the i
solid state protection system, auxiliary feedwater system, and auxiliary saltwater (ASW) system. The staff and BNL also conducted an audit of PG&E's analysis of the selected components on June 15, 1989.
Attendees at the meeting e given in Enclosure 1.
The agenda for the meeting is given in Enclosure 2.
A copy of all the viewgraphs presented at the meeting has been transmitted to the meeting participants by PG&E letter dated July 25, I
1989. This material has been docketed (Accession number 8907310303)and.is
)
available for public inspection at the PDR and the LPDR.
Action items for PG&E that resulted from the meeting are given in Enclosure 3.
The NRC staff requested that PG&E respond to these action items as soon as possible, so that the staff and BNL may continue their review in this area. A BNL letter dated June 29, 1989, summarizing the BNL observations from the meeting and documenting some of the details of the assumptions used by BNL in evaluating the Diablo Canyon ASW system, is attached as Enclosure 4.
original signed by Harry Rood, Senior Project Manager Project Directorate V Division of Reactor Projects - III, IV, Y and Special Projects
Enclosures:
1.
Meeting Attendees 2.
Meeting Agenda 3.
Action Items for PG&E Response 4.
BNL Letter Dated June 29, 1989 f
cc: w/ enclosures - see next page DISTRIBUTION gl
/
UDocketFile OGC
/
' NBClayto6- ' GBagchi
\\
r/
HRood GKelly 1
W NChokshi RRothman DR /PD5 t SP/D:PD5 NRC & LPDRs EJordan HRood GKnighton JSniezek PD5 Plant File 08/ r)/89 08/7/89 GKnighton ACRS (10)
I 8908150134 890007 ADOCK 05000275 l
N i
L
.p * * %
f UNITED STATES ii $e i
NUCLEAR REGULATORY COMMISSION e
g4 j
WASWNGTON, D. C. 20555
,,,j-August 7, 1989 1
\\
ObCKETNOS.: SC-275 and 50-323 APPLICANT:
PACIFIC GAS AND ELECTRIC COMPANY (PG&E)
FACILITY:
DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2
SUBJECT:
SUMMARY
OF JUNE 13-15, 1989 PUBLIC MEETING TO DISCUSS PROBABILISTIC RISK ASSESSMENT, DIABLO CANYON LONG TERM SEISMIC PROGRAM (LTSP) (TAC N05. 55305 AND 68049)
On June 13-15, 1989 the NRC staff and its consultants from Brookhaven National Laboratory (BNL) met with PG&E in San Francisco, California to discuss selected aspects of the probabilistic ri:;k assessment (PRA) summarized in PG&E's Final Report on the Diablo Canyon Long Term seismic Program. The purpose of the meeting was to discuss the review findings by the NRC staff and BNL on the solid state protection system, auxiliary feedwater system, and auxiliary saltwater (ASW) system. The staff and BNL also conducted an audit of PG&E's analysis of the selected components on June 15, 1989.
Attendees at the meeting are given in Enclosure 1.
The agenda for the meeting is given in Enclosure 2.
A copy of all the viewgraphs presented at the meeting has been transmitted to the meeting participants by PG&E letter dated July 25, 1989. This material has been docketed (Accession number 8907310303)andis available for public inspection at the PDR and the LPDR.
Action items for PG&E that resulted from the meeting are given in Enclosure 3.
The NRC staff requested that PG&E respond to these action items as soon as possible, so that the staff and BNL may continue their review in this area. A BNL letter dated June 29, 1989, summarizing the BNL observations from the meeting and documenting some of the details of the assumptions used by BNL in evaluating the Diablo Canyon ASW system, is attached as Enclosure 4.
&n'
\\
Harry Rood, Senior Project Manager Project Directorate Y Division of Reactor Projects - III, IV, Y and Special Projects
Enclosures:
1.
Meeting Attendees 2.
Meeting Agenda 3.
Action Items for PG&E Response 4.
BNL Letter Dated June 29, 1989 cc: w/ enclosures - see next page
7
-i Mr. J. D. Shiffer Diablo Canyon Pacific Gas and Electric Company CC:
Richard F. Locke, Esq.
NRC Resident Inspector Pacific Gas ~T Electric Company Diablo Canyon Nuclear Power Plant Post Office Box 7442 c/o U.S. Nuclear Regulatory Comission San Francisco, California 94120 P. 0. Box 369 Avila Beach, California 93424 Ms. Sandra A. Silver 660 Granite Creek Road Bruce Norton, Esq.
Santa Cruz, California 95065 c/o Richard F. Locke,-Esq.
Pacific Gas and Electric Company.
Post Office Box 7442 Mr. Peter H. Kaufman San Francisco, California 94120 Deputy Attorney General State of California 110 West A Street, Suite 700 Dr. R. B. Ferguson San Diego, Californie 92101 Sierra Club - Santa Lucia Chapter Rocicy Canyon Star Route Creston, California 93432 Ma'naging Editor The County Telegram Tribure P. O. Box 112 Chairman San Luis Obispo, California 93406 San Luis Obispo County Board of Supervisors Room 270 Ms. Nancy Culver County Government Center 192 Luneta Street San Luis Obispo, California 93408 San Luis Obispo, California 93401 Michael M. Stru m asser, Esq.
Regional Administrator, Region Y Special Assistant Attorney General U.S. Nuclear Regulatory Commission State of California 1450 Maria Lane Department of Justice Suite 210 94596 Los Angeles, California 90010 3580 Wilshire Boulevard, Room 800 Walnut Creek, California Dr. Gerard C. Wong, Chief Radiological Materials Control Section State Department of Health Services-714 P Street, Office Building #8 Sacramento, California 95814
e=
Pacific' Gas and Electric Company.Diablo Canyon Long Term Seismic l-Program L
l CC*'
Dr. Keiiti Aki Dr. Steven M. Day Department of Geological Sciences Department of. Geological Science University Park San Diego State University University of~ Southern California San Diego, California 92182 Los. Angeles, California 90089-0741 Dr. George Gazetas Dr. Ralph J. Archuleta Dept. of Civil Engineering Department'of Geological Sciences 212 Ketter Hall University of California Santa Barbara SUNY-Buffalo Santa Barbara, California 93106 Buffalo, New York 14260 Dr. Robert D.' Brown, Jr.
Dr. Jean Savy U.S. Geological Survey Mail Code L-196 Mail Stop 977 Lawrence Livermore National-345 Middlefield Road Laboratory
.Menlo Park, California 94025 P. 0. Box 808 Livermore, California 94550 Dr. David B. Slemmons Center for Neotectonic Studies Dr.'Anestis S. Veletsos
.MacKay School of Mines 5211 Paisley Avenue University of Nevada-Reno Houston, Texas 77096 Reno, Nevada 89557-0047 Dr. Ken Campbell Dr. Robert Fitzpatrick U.S. Geological Survey Building 130 P.O. Box 25046, Mail Stop 966 Brookhaven National Laboratory Denver Federal Center Upton, New York 11973 Denver, Colorado 80225 Dr. C. J. Costantino Dr. M. K. Ravindra Building 129 EQE Brookhaven National Laboratory 3150 Bristol Street, Suite 350 Upton, New York 11973 Costa Mesa, California 92626 Dr. Michael Bohn Dr. J. Johnson Sandia Lab. - Organization 6412 EQE Post Office Box 5800 595 Market Street - 18th Floor Albuquerque, New Mexico 87185 San Francisco, California 94105
}
g
-; c l[
ENCLOSURE'1 l Attendees, Public' Meeting!on Probabilistic Risk Assessment Diablo Canyon Long. Term Seismic Program June 13
-15, 1989 fiAME -
ORGANIZATION
.G. R. Andre-Westinghouse Dennis'C. Bley-PL&G(PG&E)
George Bozoki BNL (NRC)
Nilesh Chokshi NRC/RES/PRAB Lloyd S..Cluff.
PG&E Pete Davis ACRSConsultant(NRC)
Bob Fitzpatrick
.BNL(NRC)
_. Tom Grant
-SAIC Glenn Kelly NRC/NRR/PRAB Barclay S. Lew PG&E
. James C. Lin.
PL&G(PG&E)
Thomas J.~Mikschl PL&G (PG&E)
David.W. Ogden PG&E
.it. K. Ravindra EQE(NRC)
Harry Rood.
NRC/NRR/PDV Mohamed Sahek BNL (NRC)
Bimal Sarkar Bechtel(PG&E)
Bruce D. Smith PG&E Raymond Thierry
-PG&E M. R. Tresler PG&E-Bill White Bechtel(PG&E)
George C. Wu PG&E
)
I
_ _ _ _ _ - __-___ _ _ = -_________ - ____--___-_ _-_ __ -___ _ __ _
. ENCLOSURE 2 i
NRC/PG&E MEETING ON PROBABILISTIC RISK ASSESSMEhR DIABLO CANYON LONG TERM SEISMIC PROGRAM ONE CALIFORNIA STREET, ROOM 271 SAN FRANCISCO, CALIFORNIA, 94106 JUNE 13 - 15. 1989 AGENDA TUESDAY. JUNE 13. 1989 8:30 a.m.
-Introduction NRC/PG&E 8:40 a.m.
Meeting Organization Bruce Smith 8:45'a.m.
Solid State Protection System Raymond Thierry 11:00 a.m.
NRC Caucus NRC/BNL 11:30 a.m.
NRC Comments' Harry Rood /Nilesh Chokshi 12:00 noon Lunch 1:00 p.m.
Auxiliary Feedwater System Raymond Thierry 3:00 p.m.
NRC Caucus NRC/BNL 3:30 p.m.
-NRC Comments Harry Rood /Nilesh Chokshi 4:00-p.m.
Adjourn WEDNESDAY. JUNE 14. 1989 8:00 a.m.
Auxiliary Saltwater System Raymond Thierry Data Issues 10:00 a.m.
Auxiliary Saltwater System Raymond Thierry Modeling Issues 12:00 noon' Lunch 1:00 p.m.
Auxiliary Saltwater System Raymond Thierry Initiating Event Frequency 4:00 p.m.
NRC Caucus NRC/P.NL
~4:30 p.m.
NRC Comments Harry Rood /Nilesh Chokshi 5:00 p.m.
Adjourn LSC/BDS:sjm 6/8/89
K.. '
l.
~
NRC/PG1E NEETING ON PROBABILISTIC RISK ASSESSMENT DIABLO CANYON LONG TERN SEISNIC PROGRAN L
ONE CALIFORNIA STREET, ROON 271 R
SAN FRANCISCO, CALIFORNIA, 94106 JUNE 13 - 15. 1989 TENTATIVE AGENDA THURSDAY. JUNE 15. 1989 8:00 a.m.
Component Cooling Water System Raymond Thierry 11:00 a.m.
NRC Caucus NRC/BNL
~
11:30 a.m.
NRC Comments Harry Rood /Nilesh Chokshi 12:00 noon Lunch 1:00 p.m.
Meeting Summary / Action Items Bruce Smith 2:00 p.m.
Adjourn LSC/BDS:sjm 6/8/89
_ _ _ - _ _ _ _ _ _ _ = _ _ _ _ _ _
EtlCLOSURE 3 ACTION ITEMS'FOR PG&E FROM PRA MEETING,' 06/13-15/89 l
1.
PG&E is requested to provide the block diagram containing the Boolean equations used in the seismic risk quantification. This diagram was shown by-P6&E during the meeting.
2.
While discussing the reduced model of the internal events sequences during the' meeting, a draft document was exhibited by PG&E.' This draft document contained notes'on at'least some of the sequences detailing some of the idiosyncracies built into them.~ Because this documentation would be extremely beneficial.to have while performing the leading sequence review, PG&E is requested to' provide this information.
3.
The Diablo Canyon PRA assumes that a s. ingle ASW pump can be used to supply the full cooling needs of both units.(under all modes) given the other-three.. pumps.are not-available. The pump capability was briefly discussed.
at the meeting but no analysis was presented.
PG&E is requested to
-provide additional information to justify this. assumption.