ML16341F516

From kanterella
Jump to navigation Jump to search

Forwards Listed Documents,Including M Reich Re Task Assignment 17,FIN A-3841 & Ltr Rept-08, Review of Sys Analysis... & Requests Addl Info Re NRC Review of Plant long-term Seismic Program
ML16341F516
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 01/19/1990
From: Rood H
Office of Nuclear Reactor Regulation
To: Shiffer J
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16341F517 List:
References
CON-FIN-A-3841 TAC-55305, TAC-68049, NUDOCS 9001290304
Download: ML16341F516 (8)


Text

fb yI 11

~Docket'Nos.

50-275

'and 50-323 January 19, 1990 Mr. J.

D. Shiffer, Vice President Nuclear Power Generation c/o Nuclear Power Generation, Licensing Pacific Gas and Electric Company 77 Beale Street, Room 1451 San Francisco, California 94106

Dear Mr. Shiffer:

D ISTRIBUTION

~WKCRl RP i NRC Im LPDRs GBagchi JZwolinski NChokshi JLee RRothman BGrimes LReiter EJordan HRood ACRS (10)

OGC (for information only)

PDV Plant File

SUBJECT:

TRANSMITTAL OF DOCUMENTS AND RE(VEST FOR ADDITIONAL INFORMATION RELATING TO NRC STAFF REVIEW OF DIABLO CANYON LONG TERM SEISMIC PROGRAM (LTSP)

(TAC NOS.

55305 AND 68049)

Enclosed are three items which relate to the NRC staff review of the Diablo Canyon Seismic Reevaluation Program.

The enclosed material is as follows:

1.

Letter dated November 29, 1989 from M. Reich, BNL, to R. Pichumani, NRC; subject:

Task Assignment 17, FIN A-3841.

Attached to this letter are trip reports from Professors A. Veletsos and C. Costantino, BNL consultants, regarding the November 2-3, 1989 meeting between NRC and PGIIE on the soil-structure analysis of the Diablo Canyon Nuclear Power Plant.

2.

guestions on the soil-structure analysis of Diablo Canyon, by the NRC Staff.

3.

Letter Report-08, "A REVIEW OF SYSTEM ANALYSIS IN THE DCPRA:

ELECTRIC POWER SYSTEMS (EXCEPT DIESEL GENERATOR AND FUEL TRANSFER SYSTEMS," December

1989, by G. Bozoki, R. Fitzpatrick, and M. Sabek, of Brookhaven National Laboratory.

In order to maintain our review schedule, we request that you provide the additional information identified in Enclosure 2 as soon as possible.

If you have any questions regarding this request, please contact me.

Sincere ly,

Enclosures:

as stated original signed by Harry Rood, Senior Project Manager Project Directorate V

0ivision of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation cc w/encl:

See next age D SP/PD5 RS (A)D:PD5 HRood Tr el 1

~)t~

~gQ I

PCA ADOCK 05000275 p

-PDC OFFICIAL RECORD COPY t9 gFDI I

[

'5 C

r t

I r

5

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 January 19, 1990 Docket Nos.

50-275 and 50-323 Hr. J.

D. Shiffer, Vice President Nuclear Power Generation c/o Nuclear Power Generation, Licensing Pacific Gas and Electric Company 77 Beale Street, Room 1451 San Francisco, California 94106

Dear Mr. Shiffer:

SUBJECT:

TRANSMITTAL OF DOCUMENTS AND REQUEST FOR ADDITIONAL INFORMATION RELATING TO NRC STAFF REVIEW OF DIABLO CANYON LONG TERM SEISMIC PROGRAM (LTSP)

(TAC NOS. 55305 AND 68049)

Enclosed are three items which relate to the NRC staff review of the Diablo Canyon Seismic Reevaluation Program.

The enclosed material is as follows:

I.

Letter dated November 29, 1989 from H. Reich, BNL, to R. Pichumani, NRC; subject:

Task Assignment 17, FIN A-3841.

Attached to this letter are trip reports from Professors A. Veletsos and C. Costantino, BNL consultants, regarding the November 2-3, 1989 meeting between NRC and PGSE on the soil-structure analysis of the Diablo Canyon Nuclear Power Plant.

2.

Questions on the soil-structure analysis of Diablo Canyon, by the NRC Staff.

3.

Letter Report-08, "A REVIEW OF SYSTEM ANALYSIS IN THE DCPRA:

ELECTRIC POWER SYSTEMS (EXCEPT DIESEL GENERATOR AND FUEL TRANSFER SYSTEMS," December

1989, by G. Bozoki, R. Fitzpatrick, and H. Sabek, of Brookhaven National Laboratory.

In order to maintain our review schedule, we request that you provide the additional information identified in Enclosure 2 as soon as possible.

If you have any questions regarding this request, please contact me.

Sincerely,

Enclosures:

as stated cc w/encl:

See next page Harry R, Senior Project Manager Project Director ate V

Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation

4

'I I

~ ', Mr.~ J.

D. Shiffer Paci fic Gas and Electric Company Diablo Canyon CC:

Ri chard F. Locke, Esq.

Pacific Gas 5 Electric Company Post Office Box 7442 San Francisco, California 94120 Ms. Sandra A. Silver 660 Granite Creek Road Santa Cruz, California 95065 Mr. Peter H. Kaufman Deputy Attorney General State of California 110 West A Street, Suite 700 San Diego, California 92101 Managing Editor The Count Tele ram Tribune 13 1 Jo nson Avenue P. 0.

Box 112 San Luis Obispo, California 93406 Ms. Nancy Culver 192 Luneta Street San Luis Obispo, Ca 1 ifor nia 93401 Regional Administrator, Region V

U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Mr. John Hickman Senior Health Physicist Environmental Radioactive Mgmt. Unit Environmental Management, Branch State Department of Health Services 714 P Street, Room 616 Sacramento, California 95814 NRC Resident Inspector Diablo Canyon Nuclear Power Plant c/o U.S. Nuclear Regulatory Commission P. 0.

Box 369 Avila Beach, California 93424 Bruce Norton, Esq.

c/o Richard F. Locke, Esq.

Pacific Gas and Electric Company Post Office Box 7442 San Francisco, California 94120 Dr. R.

B. Ferguson Sierra Club - Santa Lucia Chapter Rocky Canyon Star Route

Creston, California 93432 Chairman San Luis Obispo County Board of Supervisors Room 270 County Government Center San Luis Obispo, California 93408 Michael M. Strumwasser, Esq.

Special Assistant Attorney General State of California Department of Justice 3580 Wilshire Boulevard, Room 800 Los Angeles, California 90010

r

~

~ t l

Mr. J.

D. Shiffer Pac'ific Gas and Electric Company Diablo Canyon Long Term Seismic Program CC'r.

Keiiti Aki Department of Geological Sciences University Park University of Southern California Los Angeles, Ca 1 iforni a 90089-0741 Dr. Ralph J. Archuleta Department of Geological Sciences University of California Santa Barbara Santa Barbara, California 93106 Dr. Steven M. Day Department of Geological Science San Diego State University San Diego, California 92182 Dr. George Gazetas Dept. of Civil Engineering 212 Ketter Hall SUNY-Buffalo Buffalo, New York 14260 Dr. Robert D. Brown, Jr.

V.S. Geological Survey Mail Stop 977 345 Middlefield Road Menlo Park, California 94025 Dr. David B. Slemmons Center for Neotectonic Studies MacKay School of Mines

-University of Nevada-Reno

Reno, Nevada 89557-0047 Dr. Robert Fitzpatrick Building 130 Brookhaven National Laboratory
Upton, New York 11973 Dr. Jean Savy Mail Code L-196 Lawrence Livermore National Laboratory P. 0.

Box 808 Livermore, California 94550 Dr. Anestis S. Yeletsos 5211 Paisley Avenue

Houston, Texas 77096 Dr. Ken Campbell U.S. Geological Survey P.O.

Box 25046, Mail Stop 966 Denver Federal Center

Denver, Colorado 80225 Dr. C. J. Costantino Building 129 Brookhaven National Laboratory
Upton, New York 11973 Dr. M. K. Ravindra E(E 3150 Bristol Street, Suite 350 Costa Mesa, California 92626 Dr. Michael Bohn Sandia Lab. - Organization 6412 Post Office Box 5800 Albuquerque, New Mexico 87185 Dr. J.

Johnson E(E 595 Market Street - 18th Floor San Francisco, California 94105

I~

C J l