Letter Sequence Approval |
---|
CAC:MF6609, SFDP Clarifications (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
|
MONTHYEARCNL-15-052, Annual Insurance Status Report2015-04-0101 April 2015 Annual Insurance Status Report Project stage: Request CNL-15-051, Guarantee of Payment of Deferred Premiums - 2014 Annual Report2015-04-0707 April 2015 Guarantee of Payment of Deferred Premiums - 2014 Annual Report Project stage: Request CNL-15-121, Shutdown Technical Specifications for Component Cooling System and Essential Raw Cooling Water System to Support Dual Unit Operation2015-06-17017 June 2015 Shutdown Technical Specifications for Component Cooling System and Essential Raw Cooling Water System to Support Dual Unit Operation Project stage: Request CNL-15-130, Distributed Control System (DCS) Data Storm Test Plan2015-07-10010 July 2015 Distributed Control System (DCS) Data Storm Test Plan Project stage: Request CNL-15-168, Notification of Construction Substantially Complete and Request for Operating License2015-08-12012 August 2015 Notification of Construction Substantially Complete and Request for Operating License Project stage: Request CNL-15-149, Application to Update Watts Bar Nuclear Plant Unit 1 License Condition 2.F to Allow Two-Unit Operation and Add License Condition 2.I (WBN-TS-15-01)2015-08-13013 August 2015 Application to Update Watts Bar Nuclear Plant Unit 1 License Condition 2.F to Allow Two-Unit Operation and Add License Condition 2.I (WBN-TS-15-01) Project stage: Request CNL-15-165, Submittal of Electromagnetic Interference (EMI) Survey Results2015-08-20020 August 2015 Submittal of Electromagnetic Interference (EMI) Survey Results Project stage: Request CNL-15-176, Financial Protection Requirements and Indemnity Agreements, Insurance Status2015-08-26026 August 2015 Financial Protection Requirements and Indemnity Agreements, Insurance Status Project stage: Request CNL-15-185, Supplement to Application to Update to License Condition 2.F to Allow Two-Unit Operation and Add License Condition (WBN-TS-15-01)2015-08-27027 August 2015 Supplement to Application to Update to License Condition 2.F to Allow Two-Unit Operation and Add License Condition (WBN-TS-15-01) Project stage: Request CNL-15-170, Responses to NRC Audit Review Questions for Essential Raw Cooling Water and Component Cooling Water System License Amendment Request2015-08-28028 August 2015 Responses to NRC Audit Review Questions for Essential Raw Cooling Water and Component Cooling Water System License Amendment Request Project stage: Request CNL-15-202, Financial Protection Requirements and Indemnity Agreements - Insurance Status Supplement2015-09-24024 September 2015 Financial Protection Requirements and Indemnity Agreements - Insurance Status Supplement Project stage: Request CNL-15-211, Financial Protection Requirements and Indemnity Agreements - Insurance Status Second Supplement2015-09-29029 September 2015 Financial Protection Requirements and Indemnity Agreements - Insurance Status Second Supplement Project stage: Request CNL-15-208, Technical and Regulatory Basis for Technical Specification 3.2.1, Heat Flux Hot Channel Factor (Fq (Z)), Revision 02015-09-30030 September 2015 Technical and Regulatory Basis for Technical Specification 3.2.1, Heat Flux Hot Channel Factor (Fq (Z)), Revision 0 Project stage: Request CNL-15-206, Response to Follow-Up Question Regarding Submittal of Electromagnetic Interference (EMI) Survey Results2015-10-0808 October 2015 Response to Follow-Up Question Regarding Submittal of Electromagnetic Interference (EMI) Survey Results Project stage: Request CNL-15-193, Distributed Control System (DCS) Data Storm Test Results2015-10-0909 October 2015 Distributed Control System (DCS) Data Storm Test Results Project stage: Request ML15282A0512015-10-31031 October 2015 NUREG-0847, Supp. 29, Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant, Unit 2, Docket No. 50-391, Tennessee Valley Authority. Project stage: Request ML15344A3182015-12-23023 December 2015 Issuance of Amendment Regarding Fire Protection License Conditions Project stage: Approval 2015-08-12
[Table View] |
|
---|
Category:Letter
MONTHYEARML23319A2452024-01-29029 January 2024 Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML24008A2462024-01-18018 January 2024 Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-24-016, Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-01-10010 January 2024 Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-23-052, Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability2024-01-0909 January 2024 Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability CNL-23-062, Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018)2024-01-0808 January 2024 Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018) ML23346A1382024-01-0303 January 2024 Regulatory Audit Summary Related to Request to Increase the Number of Tritium Producing Burnable Absorber Rods CNL-23-069, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000390/20234412023-12-21021 December 2023 Plantfinal Significance Determination for a Security-Related Greater than Green Finding, Nov, and Assessment Follow-up, 05000390-2023441 and 05000391-2023441-Public CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) IR 05000390/20234042023-12-14014 December 2023 Security Baseline Inspection Report 05000390/2023404 and 05000391/2023404 CNL-23-001, Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01)2023-12-13013 December 2023 Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01) ML23293A0572023-12-0606 December 2023 Issuance of Amendment Nos. 163 and 70 Regarding Adoption of TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control IR 05000390/20230102023-11-30030 November 2023 RE-Issue Watts Bar Nuclear Plant - Biennial Problem Identification and Resolution Inspection Report 050000390/2023010 and 05000391/2023010 and Apparent Violation CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20230032023-11-13013 November 2023 Integrated Inspection Report 05000390/2023003 and 05000391/2023003 and Apparent Violation ML23312A1432023-11-0808 November 2023 Submittal of Dual Unit Updated Final Safety Analysis Report (UFSAR) Amendment 5 CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision ML23251A2002023-09-11011 September 2023 Request for Withholding Information from Public Disclosure for Watts Bar Nuclear Plant, Units 1 and 2 CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 IR 05000390/20230052023-08-30030 August 2023 Updated Inspection Plan for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390/2023005 and 05000391/2023005 ML23233A0042023-08-28028 August 2023 Proposed Alternative to the Requirements of the ASME Boiler and Pressure Vessel Code for Upper Head Injection Dissimilar Metal Butt Welds IR 05000390/20230022023-08-16016 August 2023 Reissue - Watts Bar Nuclear Plant - Integrated Inspection Report 05000390/2023002 and 05000391/2023002 ML23220A1582023-08-0909 August 2023 Integrated Inspection Report 05000390/2023002 and 05000391/2023002 CNL-23-045, License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010)2023-08-0707 August 2023 License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010) CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills IR 05000390/20230112023-07-24024 July 2023 Quadrennial Focused Engineering Inspection (FEI) Commercial Grade Dedication Report 05000390 2023011 and 05000391 2023011 CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions CNL-23-020, Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06)2023-06-28028 June 2023 Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06) CNL-23-049, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan .2023-06-26026 June 2023 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan . ML23122A2322023-06-0707 June 2023 Issuance of Amendment Nos. 162 and 69 Regarding Change to Date in Footnotes for Technical Specification 3.7.11, Control Room Emergency Air Temperature Control System (Creatcs) CNL-23-044, Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out2023-06-0101 June 2023 Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out IR 05000390/20234032023-05-30030 May 2023 Cyber Security Inspection Report 05000390/2023403 and 05000391/2023403 ML23131A1812023-05-23023 May 2023 Correction to Amendment No. 161 to Facility Operating License No. NPF-90 CNL-23-042, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-05-16016 May 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20220032023-05-0909 May 2023 Reissue Watts Bar Nuclear Plant - Integrated Inspection Report 05000390/2022003 and 05000391/2022003 ML23125A2202023-05-0505 May 2023 Issuance of Amendment No. 161 Regarding a Change to Footnotes for Technical Specification Table 1.1-1 Modes (Emergency Circumstances) IR 05000390/20230012023-05-0404 May 2023 Integrated Inspection Report 05000390/2023001 and 05000391/2023001 CNL-23-043, Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09)2023-05-0404 May 2023 Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09) CNL-23-032, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 412023-04-27027 April 2023 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 41 CNL-23-030, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2023-04-27027 April 2023 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-23-033, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-04-24024 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-029, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-04-11011 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23072A0652023-04-0505 April 2023 Units 1 and 2 Issuance of Amendment Nos. 364 and 358; 160 and 68 Regarding a Revision to Technical Specification 3.4.12 ML23073A2762023-04-0303 April 2023 Individual Notice of Consideration of Issuance of Amendments to Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing (EPID L-2023-LLA-0029) (Letter) CNL-23-023, Annual Insurance Status Report2023-03-30030 March 2023 Annual Insurance Status Report CNL-23-024, TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report2023-03-29029 March 2023 TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report 2024-01-09
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML23319A2452024-01-29029 January 2024 Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML23293A0572023-12-0606 December 2023 Issuance of Amendment Nos. 163 and 70 Regarding Adoption of TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML23122A2322023-06-0707 June 2023 Issuance of Amendment Nos. 162 and 69 Regarding Change to Date in Footnotes for Technical Specification 3.7.11, Control Room Emergency Air Temperature Control System (Creatcs) ML23131A1812023-05-23023 May 2023 Correction to Amendment No. 161 to Facility Operating License No. NPF-90 ML23125A2202023-05-0505 May 2023 Issuance of Amendment No. 161 Regarding a Change to Footnotes for Technical Specification Table 1.1-1 Modes (Emergency Circumstances) ML23072A0652023-04-0505 April 2023 Units 1 and 2 Issuance of Amendment Nos. 364 and 358; 160 and 68 Regarding a Revision to Technical Specification 3.4.12 ML22348A0052023-01-25025 January 2023 Issuance of Amendment Nos. 326, 349, and 309; 363 and 35; 159 and 67 Regarding Adoption of TSTF-554, Revise Reactor Coolant Leakage Requirements ML22349A6472023-01-20020 January 2023 Issuance of Amendment Nos. 325, 348, and 308; 362 and 356; and 158 and 66 Regarding Adoption of TSTF-529, Rev. 4, Clarify Use and Application Rules ML22271A9142022-12-0707 December 2022 Issuance of Amendment Nos. 324, 347, and 307; 360 and 354; 157 and 65 Regarding a Revision to the Emergency Action Level Scheme ML22257A0512022-11-0404 November 2022 Issuance of Amendment Nos. 156 and 64 Regarding Adoption of TSTF-205-A, Revision 3, and TSTF-563-A ML22276A1612022-10-24024 October 2022 Issuance of Amendment Nos. 359, 353, 155, & 63 Regarding Adoption of TSTF Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML22187A0192022-09-20020 September 2022 Issuance of Amendment No. 154 Regarding Revision to Technical Specification 3.3.2 to Revise Allowable Value for Trip of Turbine-Driven Main Feedwater Pumps ML22187A1812022-09-20020 September 2022 Issuance of Amendment Nos. 153 and 62 Regarding Extension of Completion Time for Technical Specification 3.7.8 for Inoperable Essential Raw Cooling Water Train ML22014A2062022-05-0404 May 2022 Issuance of Amendment Nos. 152 and 61 Regarding Revision to Technical Specifications to Delete a Redundant Unit of Measure for Certain Radiation Monitors ML21347A9672022-02-0101 February 2022 Correction of Errors Incurred During Issuance of the Initial Facility Operating License, and Issuance of License Amendment Nos. 6, 21, and 39 ML21306A2872022-01-25025 January 2022 Issuance of Amendment No. 60 Regarding Revision of Technical Specification Requirements Specific to the Model D3 Steam Generators That Will No Longer Apply Following Steam Generator Replacement ML21334A2952022-01-18018 January 2022 Issuance of Amendment No. 151 Regarding Revision to TS 3.7.12 for One-Time Exception to Permit Continuous Opening of Auxiliary Building Secondary Containment Enclosure During Unit 2 Steam Generator Replacement ML21334A3892022-01-12012 January 2022 Issuance of Amendment No. 59 Regarding Revision to Steam Generator Tube Rupture Dose Analysis ML21271A1372021-12-16016 December 2021 Issuance of Amendment Nos. 150 and 58 Regarding Modification of Technical Specification Surveillance Requirement 3.6.15.4, Shield Building ML21260A2102021-11-22022 November 2021 Issuance of Amendment No. 57 to Revise Technical Specifications to Change the Steam Generator Secondary Side Water Level ML21189A3072021-11-0303 November 2021 Issuance of Amendment Nos. 149 and 56 Regarding Modification of Technical Specification 5.7.2.19, Containment Leakage Rate Testing Program ML21158A2842021-09-17017 September 2021 Issuance of Amendment Nos. 148 and 55 to Revise Technical Specifications for Function 6.E of Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation ML21153A0492021-07-26026 July 2021 Issuance of Amendment No. 147 Regarding Change to Steam Generator Tube Inspection Frequency and Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-510 ML21161A2392021-06-24024 June 2021 Issuance of Amendment No. 54 Regarding Use of Temperature Adjustment to Voltage Growth Rate for the Generic Letter 95-05 Steam Generator Tube Repair Criteria ML21148A1002021-06-17017 June 2021 Issuance of Amendment No. 53 Regarding Neutron Fluence Calculation Methodology ML21099A2462021-05-14014 May 2021 Issuance of Amendment Nos. 146 and 52 to Adopt TSTF-490, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec ML21078A4842021-05-0505 May 2021 Issuance of Amendment Nos. 145 and 51 for One-Time Change to Technical Specification 3.7.11 to Extend the Completion Time for Main Control Room Chiller Modifications ML21015A0342021-03-0909 March 2021 Issuance of Amendment No. 144 Regarding Post Accident Monitoring Instrumentation ML21034A1692021-02-26026 February 2021 Issuance of Amendment Nos. 143 and 50 Regarding Implementation of Full Spectrumtm Loss-of-Coolant Accident Analysis (LOCA) and New LOCA-Specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology ML20232C6222021-02-11011 February 2021 Issuance of Amendment Nos. 142 and 49 Regarding Revision to Technical Specifications to Implement WCAP-17661-P-A, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specifications (EPID L-2020-LLA-0037 ML21027A1672021-02-0909 February 2021 Issuance of Amendment No. 48 Regarding Use of Alternate Probability of Detection Values for Beginning of Cycle in Support of Operational Assessment ML20350B4932021-01-25025 January 2021 Issuance of Amendment Nos. 352, 346, 141, and 47 Regarding the Adoption of Technical Specification Task Force Traveler, TSTF-569, Revision 2, Revise Response Time Testing Definition ML21005A1252021-01-12012 January 2021 Correction of Errors Incurred During Issuance of License Amendment Nos. 43 and 45 ML20268A0822021-01-12012 January 2021 Issuance of Amendment Nos. 314, 337, and 297; 351 and 345; 140 and 46 Regarding Changes to the Technical Specifications ML20245E4132020-12-0808 December 2020 Issuance of Amendment Nos. 139 and 45 Regarding Revisions to Technical Specification 3.6.15, Shield Building ML20282A3452020-11-19019 November 2020 Issuance of Amendment Nos. 313, 336, 296, 350, 344, 138, and 44 Revise Emergency Plan On-Shift Emergency Medical Technician & Onsite Ambulance Requirements ML20239A7912020-10-28028 October 2020 Issuance of Amendment Nos. 137 and 43 Regarding Revision to Technical Specifications to Adopt Technical Specification Task Force Traveler 541, Revision 2 ML20226A4442020-10-21021 October 2020 Issuance of Amendment No. 42 Regarding Measurement Uncertainty Recapture Power Uprate ML20238C0612020-09-21021 September 2020 Correction of Typographical Error Incurred During Issuance of License Amendment No. 104 ML20167A1482020-08-19019 August 2020 Issuance of Amendment Nos. 136 and 41 Regarding the Automatic Transfer from a Unit Service Station Transformer to a Common Station Service Transformer ML20156A0182020-08-10010 August 2020 Issuance of Amendment No. 40 Regarding Technical Specifications for Steam Generator Tube Repair Sleeve ML20076A1942020-04-30030 April 2020 Issuance of Amendment Nos. 134 and 38 Regarding Adopting the Title 10 CFR Section 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Plants ML20057E2422020-03-30030 March 2020 Issuance of Amendment Nos. 133 and 37 Regarding Changes to Technical Specifications Pertaining to Diesel Generator Start Instrumentation (EPID-L-2020-LLA-0003) ML20028F7332020-02-28028 February 2020 Issuance of Amendment Nos. 132 and 36 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-425, Revision 3 ML20024F8352020-02-24024 February 2020 Issuance of Amendment No. 35 Regarding One-Time Extension of Completion Time for Technical Specification 3.7.8 for Inoperable Essential Raw Cooling Water Train ML20015A4792020-01-30030 January 2020 Correction to Amendment No. 30 to Facility Operating License Npf-96 Regarding Use of Optimized Zirlo Fuel Rod Cladding ML19336C5192019-12-10010 December 2019 Issuance of Amendment Nos. 131 and 34 Regarding Correction to Unbalanced Voltage Relay Instrumentation Values ML19276E5572019-12-0909 December 2019 Issuance of Amendment Nos. 130 and 33 Regarding Adoption of Technical Specifications Task Force Traveler, TSTF-500, DC Electrical Rewrite - Update to TSTF-360 ML19238A0052019-11-26026 November 2019 Issuance of Amendment Nos. 129 and 32 Regarding Changes to Technical Specifications 3.8.1, 3.8.7, 3.8.8, and 3.8.9 ML18277A1102019-08-27027 August 2019 Units, 1 & 2 Issuance of Amendment Nos. 309, 332, 292, 345, 339, 128, and 31 Regarding Unbalanced Voltage Protection 2024-01-29
[Table view] Category:Safety Evaluation
MONTHYEARML23319A2452024-01-29029 January 2024 Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML23293A0572023-12-0606 December 2023 Issuance of Amendment Nos. 163 and 70 Regarding Adoption of TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML23233A0042023-08-28028 August 2023 Proposed Alternative to the Requirements of the ASME Boiler and Pressure Vessel Code for Upper Head Injection Dissimilar Metal Butt Welds ML23125A2202023-05-0505 May 2023 Issuance of Amendment No. 161 Regarding a Change to Footnotes for Technical Specification Table 1.1-1 Modes (Emergency Circumstances) ML23072A0652023-04-0505 April 2023 Units 1 and 2 Issuance of Amendment Nos. 364 and 358; 160 and 68 Regarding a Revision to Technical Specification 3.4.12 ML23048A3042023-03-0808 March 2023 Tennessee Valley Authority - Request for Relief from Requirements of ASME Boiler and Pressure Vessel Code Regarding Weld Examination Coverage (EPID L-2022-LLR-0045,-0046,-0047) ML22348A0052023-01-25025 January 2023 Issuance of Amendment Nos. 326, 349, and 309; 363 and 35; 159 and 67 Regarding Adoption of TSTF-554, Revise Reactor Coolant Leakage Requirements ML22349A6472023-01-20020 January 2023 Issuance of Amendment Nos. 325, 348, and 308; 362 and 356; and 158 and 66 Regarding Adoption of TSTF-529, Rev. 4, Clarify Use and Application Rules ML22271A9142022-12-0707 December 2022 Issuance of Amendment Nos. 324, 347, and 307; 360 and 354; 157 and 65 Regarding a Revision to the Emergency Action Level Scheme ML22293A4082022-11-14014 November 2022 Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule ML22257A0512022-11-0404 November 2022 Issuance of Amendment Nos. 156 and 64 Regarding Adoption of TSTF-205-A, Revision 3, and TSTF-563-A ML22276A1612022-10-24024 October 2022 Issuance of Amendment Nos. 359, 353, 155, & 63 Regarding Adoption of TSTF Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML22272A5682022-10-12012 October 2022 Authorization of Alternatives to Certain Inservice Testing Requirements in the American Society of Mechanical Engineers Operating and Maintenance Code ML22187A0192022-09-20020 September 2022 Issuance of Amendment No. 154 Regarding Revision to Technical Specification 3.3.2 to Revise Allowable Value for Trip of Turbine-Driven Main Feedwater Pumps ML22187A1812022-09-20020 September 2022 Issuance of Amendment Nos. 153 and 62 Regarding Extension of Completion Time for Technical Specification 3.7.8 for Inoperable Essential Raw Cooling Water Train ML22014A2062022-05-0404 May 2022 Issuance of Amendment Nos. 152 and 61 Regarding Revision to Technical Specifications to Delete a Redundant Unit of Measure for Certain Radiation Monitors ML22084A0012022-04-0505 April 2022 Clinch River Nuclear Site; Sequoyah Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Units 1 and 2, Review of Quality Assurance Plan Changes ML22070A0022022-03-28028 March 2022 Review of the Fall 2021 Mid Cycle Generic Letter 95-05 Voltage-Based Alternate Repair Criteria Report ML21306A2872022-01-25025 January 2022 Issuance of Amendment No. 60 Regarding Revision of Technical Specification Requirements Specific to the Model D3 Steam Generators That Will No Longer Apply Following Steam Generator Replacement ML21334A2952022-01-18018 January 2022 Issuance of Amendment No. 151 Regarding Revision to TS 3.7.12 for One-Time Exception to Permit Continuous Opening of Auxiliary Building Secondary Containment Enclosure During Unit 2 Steam Generator Replacement ML21334A3892022-01-12012 January 2022 Issuance of Amendment No. 59 Regarding Revision to Steam Generator Tube Rupture Dose Analysis ML21271A1372021-12-16016 December 2021 Issuance of Amendment Nos. 150 and 58 Regarding Modification of Technical Specification Surveillance Requirement 3.6.15.4, Shield Building ML21260A2102021-11-22022 November 2021 Issuance of Amendment No. 57 to Revise Technical Specifications to Change the Steam Generator Secondary Side Water Level ML21189A3072021-11-0303 November 2021 Issuance of Amendment Nos. 149 and 56 Regarding Modification of Technical Specification 5.7.2.19, Containment Leakage Rate Testing Program ML21158A2842021-09-17017 September 2021 Issuance of Amendment Nos. 148 and 55 to Revise Technical Specifications for Function 6.E of Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation ML21153A0492021-07-26026 July 2021 Issuance of Amendment No. 147 Regarding Change to Steam Generator Tube Inspection Frequency and Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-510 ML21161A2392021-06-24024 June 2021 Issuance of Amendment No. 54 Regarding Use of Temperature Adjustment to Voltage Growth Rate for the Generic Letter 95-05 Steam Generator Tube Repair Criteria ML21148A1002021-06-17017 June 2021 Issuance of Amendment No. 53 Regarding Neutron Fluence Calculation Methodology ML21099A2462021-05-14014 May 2021 Issuance of Amendment Nos. 146 and 52 to Adopt TSTF-490, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec ML21130A6012021-05-13013 May 2021 Correction of Proposed Alternative IST-RR-8 to the Requirements of the ASME OM Code for the Residual Heat Removal Pump 1B-B ML21078A4842021-05-0505 May 2021 Issuance of Amendment Nos. 145 and 51 for One-Time Change to Technical Specification 3.7.11 to Extend the Completion Time for Main Control Room Chiller Modifications ML21110A0372021-04-29029 April 2021 Proposed Alternative IST-RR-8 to the Requirements of the ASME OM Code for the Residual Heat Removal Pump 1B-B ML21064A4082021-03-10010 March 2021 Correction of Safety Evaluation for License Amendment Nos. 143 and 50 (EPID L-2020-LLA-0005) (Non-Proprietary) ML21015A0342021-03-0909 March 2021 Issuance of Amendment No. 144 Regarding Post Accident Monitoring Instrumentation ML21034A1692021-02-26026 February 2021 Issuance of Amendment Nos. 143 and 50 Regarding Implementation of Full Spectrumtm Loss-of-Coolant Accident Analysis (LOCA) and New LOCA-Specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology ML20232C6222021-02-11011 February 2021 Issuance of Amendment Nos. 142 and 49 Regarding Revision to Technical Specifications to Implement WCAP-17661-P-A, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specifications (EPID L-2020-LLA-0037 ML21027A1672021-02-0909 February 2021 Issuance of Amendment No. 48 Regarding Use of Alternate Probability of Detection Values for Beginning of Cycle in Support of Operational Assessment ML20350B4932021-01-25025 January 2021 Issuance of Amendment Nos. 352, 346, 141, and 47 Regarding the Adoption of Technical Specification Task Force Traveler, TSTF-569, Revision 2, Revise Response Time Testing Definition ML20268A0822021-01-12012 January 2021 Issuance of Amendment Nos. 314, 337, and 297; 351 and 345; 140 and 46 Regarding Changes to the Technical Specifications ML20245E4132020-12-0808 December 2020 Issuance of Amendment Nos. 139 and 45 Regarding Revisions to Technical Specification 3.6.15, Shield Building ML20282A3452020-11-19019 November 2020 Issuance of Amendment Nos. 313, 336, 296, 350, 344, 138, and 44 Revise Emergency Plan On-Shift Emergency Medical Technician & Onsite Ambulance Requirements ML20239A7912020-10-28028 October 2020 Issuance of Amendment Nos. 137 and 43 Regarding Revision to Technical Specifications to Adopt Technical Specification Task Force Traveler 541, Revision 2 ML20226A4442020-10-21021 October 2020 Issuance of Amendment No. 42 Regarding Measurement Uncertainty Recapture Power Uprate ML20167A1482020-08-19019 August 2020 Issuance of Amendment Nos. 136 and 41 Regarding the Automatic Transfer from a Unit Service Station Transformer to a Common Station Service Transformer ML20156A0182020-08-10010 August 2020 Issuance of Amendment No. 40 Regarding Technical Specifications for Steam Generator Tube Repair Sleeve ML20076A1942020-04-30030 April 2020 Issuance of Amendment Nos. 134 and 38 Regarding Adopting the Title 10 CFR Section 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Plants ML20057E2422020-03-30030 March 2020 Issuance of Amendment Nos. 133 and 37 Regarding Changes to Technical Specifications Pertaining to Diesel Generator Start Instrumentation (EPID-L-2020-LLA-0003) ML20028F7332020-02-28028 February 2020 Issuance of Amendment Nos. 132 and 36 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-425, Revision 3 ML20024F8352020-02-24024 February 2020 Issuance of Amendment No. 35 Regarding One-Time Extension of Completion Time for Technical Specification 3.7.8 for Inoperable Essential Raw Cooling Water Train ML19336C5192019-12-10010 December 2019 Issuance of Amendment Nos. 131 and 34 Regarding Correction to Unbalanced Voltage Relay Instrumentation Values 2024-01-29
[Table view] Category:Technical Specifications
MONTHYEARML23319A2452024-01-29029 January 2024 Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues CNL-24-016, Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-01-10010 January 2024 Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-23-052, Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability2024-01-0909 January 2024 Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability CNL-23-062, Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018)2024-01-0808 January 2024 Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018) CNL-23-001, Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01)2023-12-13013 December 2023 Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01) ML22348A0052023-01-25025 January 2023 Issuance of Amendment Nos. 326, 349, and 309; 363 and 35; 159 and 67 Regarding Adoption of TSTF-554, Revise Reactor Coolant Leakage Requirements ML22349A6472023-01-20020 January 2023 Issuance of Amendment Nos. 325, 348, and 308; 362 and 356; and 158 and 66 Regarding Adoption of TSTF-529, Rev. 4, Clarify Use and Application Rules ML22276A1612022-10-24024 October 2022 Issuance of Amendment Nos. 359, 353, 155, & 63 Regarding Adoption of TSTF Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML22187A0192022-09-20020 September 2022 Issuance of Amendment No. 154 Regarding Revision to Technical Specification 3.3.2 to Revise Allowable Value for Trip of Turbine-Driven Main Feedwater Pumps ML22187A1812022-09-20020 September 2022 Issuance of Amendment Nos. 153 and 62 Regarding Extension of Completion Time for Technical Specification 3.7.8 for Inoperable Essential Raw Cooling Water Train CNL-22-030, Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03)2022-07-27027 July 2022 Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03) CNL-22-039, Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04)2022-07-13013 July 2022 Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04) WBL-22-017, Technical Specification (TS) 5.9.8 - Post Accident Monitoring System (Pams) Report2022-03-22022 March 2022 Technical Specification (TS) 5.9.8 - Post Accident Monitoring System (Pams) Report ML21260A2102021-11-22022 November 2021 Issuance of Amendment No. 57 to Revise Technical Specifications to Change the Steam Generator Secondary Side Water Level ML21158A2842021-09-17017 September 2021 Issuance of Amendment Nos. 148 and 55 to Revise Technical Specifications for Function 6.E of Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation ML21099A2462021-05-14014 May 2021 Issuance of Amendment Nos. 146 and 52 to Adopt TSTF-490, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec ML21078A4842021-05-0505 May 2021 Issuance of Amendment Nos. 145 and 51 for One-Time Change to Technical Specification 3.7.11 to Extend the Completion Time for Main Control Room Chiller Modifications ML21015A0342021-03-0909 March 2021 Issuance of Amendment No. 144 Regarding Post Accident Monitoring Instrumentation ML21034A1692021-02-26026 February 2021 Issuance of Amendment Nos. 143 and 50 Regarding Implementation of Full Spectrumtm Loss-of-Coolant Accident Analysis (LOCA) and New LOCA-Specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology ML20232C6222021-02-11011 February 2021 Issuance of Amendment Nos. 142 and 49 Regarding Revision to Technical Specifications to Implement WCAP-17661-P-A, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specifications (EPID L-2020-LLA-0037 ML20282A3452020-11-19019 November 2020 Issuance of Amendment Nos. 313, 336, 296, 350, 344, 138, and 44 Revise Emergency Plan On-Shift Emergency Medical Technician & Onsite Ambulance Requirements ML20226A4442020-10-21021 October 2020 Issuance of Amendment No. 42 Regarding Measurement Uncertainty Recapture Power Uprate ML20273A0432020-09-29029 September 2020 Plants Unit 1 and 2 - Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual ML20156A0182020-08-10010 August 2020 Issuance of Amendment No. 40 Regarding Technical Specifications for Steam Generator Tube Repair Sleeve CNL-19-115, Non-Voluntary License Amendment Request to Modify Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications 3.2.1, Fq(Z), to Implement Methodology from WCAP-17661, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specific2020-03-0202 March 2020 Non-Voluntary License Amendment Request to Modify Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications 3.2.1, Fq(Z), to Implement Methodology from WCAP-17661, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specificat ML20028F7332020-02-28028 February 2020 Issuance of Amendment Nos. 132 and 36 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-425, Revision 3 ML19276E5572019-12-0909 December 2019 Issuance of Amendment Nos. 130 and 33 Regarding Adoption of Technical Specifications Task Force Traveler, TSTF-500, DC Electrical Rewrite - Update to TSTF-360 ML19238A0052019-11-26026 November 2019 Issuance of Amendment Nos. 129 and 32 Regarding Changes to Technical Specifications 3.8.1, 3.8.7, 3.8.8, and 3.8.9 CNL-19-067, Application to Revise Watts Bar Nuclear Plant (WBN) Unit 2 - Technical Specifications for Steam Generator Tube Repair Sleeve (WBN-TS-391-19-13)2019-09-30030 September 2019 Application to Revise Watts Bar Nuclear Plant (WBN) Unit 2 - Technical Specifications for Steam Generator Tube Repair Sleeve (WBN-TS-391-19-13) CNL-19-060, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (WBN-TS-18-14)2019-08-29029 August 2019 Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (WBN-TS-18-14) ML18277A1102019-08-27027 August 2019 Units, 1 & 2 Issuance of Amendment Nos. 309, 332, 292, 345, 339, 128, and 31 Regarding Unbalanced Voltage Protection ML19112A0042019-07-25025 July 2019 Issuance of Amendment Nos. 127 and 30 Regarding the Use of Optimized Zirlo Fuel Rod Cladding ML19098A7742019-06-0707 June 2019 Issuance of Amendments Regarding Technical Specifications Changes Pertaining to 120-Volt Alternating Current Vital Buses ML18255A1562018-10-30030 October 2018 Issuance of Amendment to Modify Technical Specification 3.3.1 Reactor Protection System Instrumentation, Turbine Trip Function on Low Fluid Oil Pressure ML18079A0292018-06-26026 June 2018 Issuance of Amendments Regarding Adoption of TSTF-547, Clarification of Rod Position Requirements (CAC Nos. MF8912and MF8913; EPID L-2016-LLA-0034) ML17311A7862017-12-0707 December 2017 Issuance of Amendment Regarding Ventilation Filter Testing Program (CAC No. MF9584; EPID L-2017-LLA-0207) ML17215A2432017-10-0202 October 2017 Browns Ferry Nuclear Plant, Units 1, 2, and 3; Watts Bar Nuclear Plant, Units 1 and 2 - Issuance of Amendments to Change Technical Specifications to Adopt Technical Specifications Task Force Traveler-522 (CAC No. MF9562-MF9566) CNL-17-029, Response to Request for Additional Information Regarding License Amendment Request for a One-Time Extension of Technical Specification Surveillance Requirements for AC Sources2017-03-0606 March 2017 Response to Request for Additional Information Regarding License Amendment Request for a One-Time Extension of Technical Specification Surveillance Requirements for AC Sources ML16343A8142017-01-0505 January 2017 Issuance of Amendment Regarding One-Time Extension of Intervals for Surveillance Requirements 3.6.11.2 and 3.6.11.3 CNL-16-164, Application to Modify Technical Specifications to Extend Surveillance Requirement Intervals for AC Sources (WBN-TS-16-024)2016-10-17017 October 2016 Application to Modify Technical Specifications to Extend Surveillance Requirement Intervals for AC Sources (WBN-TS-16-024) NL-16-164, Watts Bar, Units 1 and 2 - Application to Modify Technical Specifications to Extend Surveillance Requirement Intervals for AC Sources (WBN-TS-16-024)2016-10-17017 October 2016 Watts Bar, Units 1 and 2 - Application to Modify Technical Specifications to Extend Surveillance Requirement Intervals for AC Sources (WBN-TS-16-024) ML16159A0572016-07-29029 July 2016 Issuance of Amendment Regarding Revised Technical Specification 4.2.1 Fuel Assemblies to Increase the Maximum Number of Tritium Producing Burnable Absorber Rods CNL-16-047, Response to Request for Additional Information Regarding Request to Use F* Steam Generator Alternate Repair Criteria2016-05-0404 May 2016 Response to Request for Additional Information Regarding Request to Use F* Steam Generator Alternate Repair Criteria ML15344A3182015-12-23023 December 2015 Issuance of Amendment Regarding Fire Protection License Conditions ML15348A1122015-12-14014 December 2015 Technical Specification (TS) 5.7.2.15 - Explosive Gas and Storage Tank Radioactivity Monitoring Program ML15251A5872015-10-22022 October 2015 Issuance of Facility Operating License No. NPF-96 Watts Bar Nuclear Plant, Unit 2 ML15301A1402015-10-22022 October 2015 Current Facility Operating License NPF-96, Tech Specs, Revised 11/08/2017 ML15275A0422015-10-20020 October 2015 Issuance of Amendment Regarding Application to Revise Technical Specifications for Component Cooling Water and Essential Raw Cooling Water to Support Dual Unit Operation ML15230A1552015-09-17017 September 2015 Issuance of Amendment Regarding Modification to Technical Specification 3.8.1 Regarding Diesel Generator Steady-State Frequency NL-15-177, Watts Bar, Unit 2, Submittal of Replacement Pages for Developmental and Final Revision J of the Technical Specification & Technical Specification Bases, and Developmental and Final Revision E of Technical Requirements Manual & Technical Ma2015-09-0404 September 2015 Watts Bar, Unit 2, Submittal of Replacement Pages for Developmental and Final Revision J of the Technical Specification & Technical Specification Bases, and Developmental and Final Revision E of Technical Requirements Manual & Technical Man 2024-01-09
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 23, 2015 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3R-C Chattanooga, TN 37402-2801
SUBJECT:
WATTS BAR NUCLEAR PLANT, UNIT 1 - ISSUANCE OF AMENDMENT REGARDING FIRE PROTECTION LICENSE CONDITIONS (CAC NO. MF6609)
Dear Mr. Shea:
The U.S. Nuclear Regulatory Commission has issued the enclosed Amendment No. 105 to Facility Operating License No. NPF-90 for the Watts Bar Nuclear Plant, Unit 1. This amendment consists of changes to the license in response to your application dated August 13, 2015, as supplemented by letter dated August 27, 2015.
The amendment modifies a license condition and adds a new license condition related to fire protection to reflect the revised dual-unit Fire Protection Program in effect following the issuance of the Watts Bar Nuclear Plant, Unit 2, Operating License.
A copy of the related Safety Evaluation is also enclosed. Notice of Issuance will be included in the Commission's Biweekly Federal Register Notice.
If you have any questions, please contact me at 301-415-6020 or Robert.Schaaf@nrc.gov.
Sincerely, Robert G. Schaaf, Senior ProJ Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-390
Enclosures:
- 1. Amendment No. 105 to NPF-90
- 2. Safety Evaluation cc w/enclosures: Distribution via Listserv
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 TENNESSEE VALLEY AUTHORITY DOCKET NO. 50-390 WATTS BAR NUCLEAR PLANT. UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 105 License No. NPF-90
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by the Tennessee Valley Authority (TVA or the licensee) dated August 13, 2015, as supplemented by letter dated August 27, 2015, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
Enclosure 1
- 2. Accordingly, Facility Operating License No. NPF-90 is amended as indicated in the attachment to this license amendment.
- 3. This license amendment is effective as of the date of its issuance, and shall be implemented prior to Watts Bar Nuclear Plant, Unit 2, entry into Mode 4, "Hot Shutdown."
FOR THE NUCLEAR REGULATORY COMMISSION Benjamin G. Beasley, Chief Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Operating License Date of Issuance: December 23, 2015
ATIACHMENT TO LICENSE AMENDMENT NO. 10S FACILITY OPERATING LICENSE NO. NPF-90 DOCKET NO. 50-390 Replace the following pages of Facility Operating License No. NPF-90 with the attached pages.
The revised pages are identified by amendment number and contain vertical lines indicating the area of change.
Remove Pages Insert Pages 3 3 4b 4b Sa Sa
3 (4) TVA, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required, any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis, instrument calibration, or other activity associated with radioactive apparatus or components; and (5) TVA, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect, and is subject to the additional conditions specified or incorporated below.
(1) Maximum Power Level TVA is authorized to operate the facility at reactor core power levels not in excess of 3459 megawatts thermal.
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A as revised through Amendment No. 105 and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated into this license. TVA shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
(3) Safety Parameter Display System (SPDS) (Section 18.2 of SER Supplements 5 and 15)
Prior to startup following the first refueling outage, TVA shall accomplish the necessary activities, provide acceptable responses, and implement all proposed corrective actions related to having the Watts Bar Unit 1 SPDS operational.
(4) Vehicle Bomb Control Program (Section 13.6.9 of SSER 20)
During the period of the exemption granted in paragraph 2.D.(3) of this license, in implementing the power ascension phase of the approved initial test program, TVA shall not exceed 50% power until the requirements of 10 CFR 73.55(c)(7) and (8) are fully implemented. TVA shall submit a letter under oath or affirmation when the requirements of 73.55(c)(7) and (8) have been fully implemented.
Facility License No. NPF-90 Amendment No. 105
4b (10) By May 31, 2018, TVA shall ensure that a listing organization acceptable to the NRC (as the Authority Having Jurisdiction) determines that the fire detection monitoring panel in the main control room either meets the appropriate designated standards or has been tested and found suitable for the specified purpose.
D. The following exemptions are authorized by law, will not present an undue risk to the public health and safety, and are consistent with the common defense and security. Therefore, these exemptions are granted pursuant to 10 CFR 50.12.
(1) Deleted Amendment No. 98 105
5a F. TVA shall implement and maintain in effect all provisions of the approved fire protection program as described in the Fire Protection Report for the facility, as approved in Appendix FF Section 3.5 of Supplement 18 and Supplement 29 of the SER (NUREG-0847) subject to the following provision:
TVA may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
G. Deleted H. The licensee shall have and maintain financial protection of such types and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.
Amendment &7 gg 00 105
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 105 TO FACILITY OPERATING LICENSE NO. NPF-90 TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT. UNIT 1 DOCKET NO. 50-390
1.0 INTRODUCTION
By letter dated August 13, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15225A344), as supplemented by letter dated August 27, 2015 (ADAMS Accession No. ML15239B225), the Tennessee Valley Authority (TVA, or the licensee) submitted a license amendment request (LAR) for the Watts Bar Nuclear Plant (WBN), Unit 1.
The proposed LAR would modify existing license condition 2.F regarding the Fire Protection Program and propose a new license condition 2.C(10) regarding a fire protection requirement for WBN, Unit 1.
Specifically, license condition 2.F would be modified to reflect the revised WBN dual-unit operation Fire Protection Report (FPR) that was made effective upon issuance of the WBN, Unit 2, Operating License. The proposed addition of license condition 2.C(10) will add a requirement to confirm that the fire detection monitoring panel in the main control room either meets the appropriate designated standards or has been tested and found suitable for the specified purpose, consistent with a similar license condition imposed on the WBN, Unit 2, Operating License, issued on October 22, 2015 (ADAMS Accession No. ML15301A140).
The supplemental letter dated August 27, 2015, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the U.S. Nuclear Regulatory Commission (NRC) staff's original proposed no significant hazards consideration determination as published in the Federal Register on September 4, 2015 (80 FR 53581).
2.0 REGULATORY EVALUATION
The as-constructed WBN dual-unit FPR was submitted for NRC review by TVA letters dated June 24, August 27, and October 7, 2015 (ADAMS Accession Nos. ML15175A508, ML15239A794, and ML15280A508, respectively) to support completion of the NRC staff's review of the Operating License application for WBN, Unit 2. The FPR describes the measures that are established at WBN to implement a defense-in-depth fire protection program in plant areas important to safety. The objective of these measures is to: (1) prevent fires from starting; (2) detect rapidly, control, and extinguish promptly those fires that do occur; and (3) provide protection for structures, systems, and components important to safety so that a fire that is not Enclosure 2
promptly extinguished by the fire suppression activities will not prevent the safe shutdown of the plant.
In the FPR, TVA stated that, "The purpose of the Fire Protection Report (FPR) is to consolidate a sufficiently detailed summary of the WBN regulatory required Fire Protection Program into a single document and to reflect the design as-constructed at the time of fuel load." The FPR describes the operational phase of the fire protection program for both WBN units. The NRC staff's technical review and approval of the dual-unit FPR was documented in NUREG-0847, "Safety Evaluation Report [SER] Related to the Operation of Watts Bar Nuclear Plant, Unit 2,"
Supplement 29 (SSER 29), issued October 2015 (ADAMS Accession No. ML15282A051 ).
The WBN, Unit 2, Operating License included license conditions regarding (1) implementation of the fire protection program for WBN, Unit 2; and (2) confirmation that the fire detection monitoring panel in the main control room has been determined to meet designated standards or has been found suitable for the specified purpose.
By letter dated August 13, 2015, as supplemented by letter dated August 27, 2015, TVA submitted the proposed LAR for WBN, Unit 1, to (1) update the license condition regarding implementation of the fire protection program for WBN, Unit 1, to reflect the approval of the dual-unit FPR; and (2) to add a condition regarding the fire detection monitoring panel. The proposed changes would modify the WBN, Unit 1, Operating License to make the license conditions related to the dual-unit FPR consistent with the similar conditions contained in the WBN, Unit 2, Operating License.
Currently, WBN, Unit 1, license condition 2.F states:
TVA shall implement and maintain in effect all provisions of the approved fire protection program as described in the Fire Protection Report for the facility, as approved in Supplement 18 (except page 80 of Appendix FF), revised page 80 of Appendix FF of Supplement 18 (as revised by Amendment No. 88, and Supplement 19 of the SER (NUREG-0847) subject to the following provision:
TVA may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
As proposed by TVA in its August 13, 2015, letter, the amendment proposed to revise license condition 2.F to state:
TVA shall implement and maintain in effect all provisions of the approved fire protection program as described in the Fire Protection Report for the facility, as approved in Section 3.5 of Supplement 18 and Supplement XX of the SER (NUREG-0847) subject to the following provision:
TVA may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
The NRC staff notes that the relevant SSER 18 [NUREG-0847, "Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant, Unit 2," Supplement 18, October 1995 (ADAMS Accession No. ML070530364)] approval that remains in effect for WBN, Unit 1, under the dual-unit FPR is documented in Section 3.5 of Appendix FF of SSER 18. Also, at the time the proposed change was submitted, the dual-unit FPR was still under NRC staff review. The staff's review and approval of the Watts Bar dual-unit FPR was subsequently documented in SSER 29. Therefore, the license condition has been modified by the NRC staff and is issued in this amendment as follows:
TVA shall implement and maintain in effect all provisions of the approved fire protection program as described in the Fire Protection Report for the facility, as approved in Appendix FF Section 3.5 of Supplement 18 and Supplement 29 of the SER (NUREG-0847) subject to the following provision:
TVA may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
The licensee also proposed to add license condition 2.C(10), regarding the fire detection monitoring panel, consistent with the license condition imposed on WBN, Unit 2. The proposed license condition states:
By May 31, 2018, TVA shall report that a listing organization acceptable to the NRC (as the Authority Having Jurisdiction) determines that the fire detection monitoring panel in the main control room either meets the appropriate designated standards or has been tested and found suitable for the specified purpose.
Title 1O of the Code of Federal Regulations (10 CFR), Section 50.48, "Fire protection," requires that each operating nuclear power plant have a fire protection plan that satisfies General Design Criterion (GDC 3).
As stated, 10 CFR, Part 50, Appendix A, GDC 3, "Fire protection," requires that structures, systems, and components important to safety be designed and located to minimize, consistent with other safety requirements, the probability and effect of fires and explosions.
Generic Letter (GL) 86-10, "Implementation of Fire Protection Requirements," defines a standard license condition acceptable to the NRC staff regarding implementation and maintenance of approved fire protection programs.
Regulatory Guide 1.189, Revision 2, "Fire Protection for Nuclear Power Plants," Position 3.1 (b) states, in part, that, "Fire detection and alarm systems should comply with the requirements of Class A systems, as defined in [National Fire Protection Association (NFPA) Code] NFPA 72."
NFPA 72, "National Fire Alarm and Signaling Code" (2010 Edition), covers the application, installation, location, performance, inspection, testing and maintenance of fire alarm systems,
supervising station alarm systems, public emergency alarm reporting systems, fire warning equipment and emergency communications systems, and their components.
3.0 TECHNICAL EVALUATION
The staff's review and approval of the Watts Bar dual-unit FPR was documented in SSER 29.
The staff review of operator manual actions (OMAs) described in the dual-unit FPR, as documented in Section 3.5 of Appendix FF of SSER 29, was limited to the review of OMAs for WBN, Unit 2. The staff noted in SSER 29 that the WBN, Unit 1, OMAs were previously approved in SSER 18. Specifically, the WBN, Unit 1, OMAs were addressed in Section 3.5 of Appendix FF of SSER 18.
Based on the staff's approval of the dual-unit FPR, as documented in SSER 29, including the staff's determination that the approval of OMAs contained in SSER 18 remains applicable, the staff finds that the proposed change to license condition 2. F accurately describes the approved fire protection program for WBN, Unit 1. The proposed license condition is also consistent with the standard license condition defined in GL 86-10. Therefore, the NRC staff concludes that the proposed amendment to license condition 2. F is acceptable.
The "fire detection monitoring panel, as described in the August 13, 2015, LAR, provides indication of the status of the fire alarm system in the main control room. The original panel was accepted by a listing organization (Underwriters Laboratory), acceptable to the authority having jurisdiction (the NRC) for use in fire protection systems.
In 2014, TVA completed a design change to replace the original, now obsolete, fire detection monitoring panel in the main control room with a new panel procured by TVA's Computer Engineering Group. TVA performed post-modification testing to verify the operability of the system, but the new panel was not accepted by a listing organization. During the review of the WBN dual-unit FPR, documented in SSER 29, the NRC staff raised a question regarding the functionality, safety, and reliability of the non-listed fire detection monitoring panel. The NRC staff considers these elements appropriately assured when the equipment is accepted by a listing organization.
- To resolve this issue for WBN, Unit 2, the following license condition was included in the WBN, Unit 2, Operating License:
By May 31, 2018, TVA shall report that a listing organization acceptable to the NRC (as the Authority Having Jurisdiction) determines that the fire detection monitoring panel in the main control room either meets the appropriate designated standards or has been tested and found suitable for the specified purpose.
The licensee proposed in its LAR that a similar license condition be imposed as condition 2.C(10) of the WBN, Unit 1, Operating License.
The current version of NRC staff guidance related to fire alarm systems is contained in Regulatory Guide 1.189, Revision 2, which states that such systems should comply with
NFPA 72. The version of NFPA 72 in effect at the time of the design change was the 2010 Edition. A fundamental aspect of NFPA 72 is that equipment be designed and installed in conformity with its listed purpose. NFPA 72 describes that equipment is listed when an organization acceptable to the authority having jurisdiction has determined that it meets appropriate standards and is suitable for its purpose. The NRC is the authority having jurisdiction in this case.
The NRC staff concludes that the proposed license condition is acceptable because the completion of the action will confirm that WBN's fire detection monitoring panel is in conformance with the current NRC guidance regarding fire alarm systems as described in Regulatory Guide 1.189, Revision 2, Position 3.1 (b), and NFPA 72. The staff concludes that the proposed schedule for completing the actions is reasonable, because it provides sufficient time to permit confirmation that the installed equipment is appropriate, and provides sufficient time to address any non-panel-related detection equipment (for example detectors or other system components in the plant) that would need to be replaced to attain conformance.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Tennessee State official was notified of the proposed issuance of the amendment. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendment changes a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR, Part 20. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration, and there has been no public comment on such finding (80 FR 53581, September 4, 2015). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributors: Charles E. Moulton Robert G. Schaaf Date: December 23, 2015