Letter Sequence Request |
---|
CAC:MF6609, SFDP Clarifications (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
|
MONTHYEARCNL-15-052, Annual Insurance Status Report2015-04-0101 April 2015 Annual Insurance Status Report Project stage: Request CNL-15-051, Guarantee of Payment of Deferred Premiums - 2014 Annual Report2015-04-0707 April 2015 Guarantee of Payment of Deferred Premiums - 2014 Annual Report Project stage: Request CNL-15-121, Shutdown Technical Specifications for Component Cooling System and Essential Raw Cooling Water System to Support Dual Unit Operation2015-06-17017 June 2015 Shutdown Technical Specifications for Component Cooling System and Essential Raw Cooling Water System to Support Dual Unit Operation Project stage: Request CNL-15-130, Distributed Control System (DCS) Data Storm Test Plan2015-07-10010 July 2015 Distributed Control System (DCS) Data Storm Test Plan Project stage: Request CNL-15-168, Notification of Construction Substantially Complete and Request for Operating License2015-08-12012 August 2015 Notification of Construction Substantially Complete and Request for Operating License Project stage: Request CNL-15-149, Application to Update Watts Bar Nuclear Plant Unit 1 License Condition 2.F to Allow Two-Unit Operation and Add License Condition 2.I (WBN-TS-15-01)2015-08-13013 August 2015 Application to Update Watts Bar Nuclear Plant Unit 1 License Condition 2.F to Allow Two-Unit Operation and Add License Condition 2.I (WBN-TS-15-01) Project stage: Request CNL-15-165, Submittal of Electromagnetic Interference (EMI) Survey Results2015-08-20020 August 2015 Submittal of Electromagnetic Interference (EMI) Survey Results Project stage: Request CNL-15-176, Financial Protection Requirements and Indemnity Agreements, Insurance Status2015-08-26026 August 2015 Financial Protection Requirements and Indemnity Agreements, Insurance Status Project stage: Request CNL-15-185, Supplement to Application to Update to License Condition 2.F to Allow Two-Unit Operation and Add License Condition (WBN-TS-15-01)2015-08-27027 August 2015 Supplement to Application to Update to License Condition 2.F to Allow Two-Unit Operation and Add License Condition (WBN-TS-15-01) Project stage: Request CNL-15-170, Responses to NRC Audit Review Questions for Essential Raw Cooling Water and Component Cooling Water System License Amendment Request2015-08-28028 August 2015 Responses to NRC Audit Review Questions for Essential Raw Cooling Water and Component Cooling Water System License Amendment Request Project stage: Request CNL-15-202, Financial Protection Requirements and Indemnity Agreements - Insurance Status Supplement2015-09-24024 September 2015 Financial Protection Requirements and Indemnity Agreements - Insurance Status Supplement Project stage: Request CNL-15-211, Financial Protection Requirements and Indemnity Agreements - Insurance Status Second Supplement2015-09-29029 September 2015 Financial Protection Requirements and Indemnity Agreements - Insurance Status Second Supplement Project stage: Request CNL-15-208, Technical and Regulatory Basis for Technical Specification 3.2.1, Heat Flux Hot Channel Factor (Fq (Z)), Revision 02015-09-30030 September 2015 Technical and Regulatory Basis for Technical Specification 3.2.1, Heat Flux Hot Channel Factor (Fq (Z)), Revision 0 Project stage: Request CNL-15-206, Response to Follow-Up Question Regarding Submittal of Electromagnetic Interference (EMI) Survey Results2015-10-0808 October 2015 Response to Follow-Up Question Regarding Submittal of Electromagnetic Interference (EMI) Survey Results Project stage: Request CNL-15-193, Distributed Control System (DCS) Data Storm Test Results2015-10-0909 October 2015 Distributed Control System (DCS) Data Storm Test Results Project stage: Request ML15282A0512015-10-31031 October 2015 NUREG-0847, Supp. 29, Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant, Unit 2, Docket No. 50-391, Tennessee Valley Authority. Project stage: Request ML15344A3182015-12-23023 December 2015 Issuance of Amendment Regarding Fire Protection License Conditions Project stage: Approval 2015-08-12
[Table View] |
|
---|
Category:Financial Assurance Document
MONTHYEARCNL-17-030, Guarantee of Payment of Deferred Premiums - 2016 Annual Report2017-03-31031 March 2017 Guarantee of Payment of Deferred Premiums - 2016 Annual Report CNL-16-005, Guarantee of Payment of Deferred Premiums - 2015 Annual Report2016-04-0606 April 2016 Guarantee of Payment of Deferred Premiums - 2015 Annual Report CNL-16-006, Annual Insurance Status Report2016-03-29029 March 2016 Annual Insurance Status Report ML16042A1772016-01-11011 January 2016 Certificate of Liability Insurance CNL-15-223, Proof of Financial Protection, Nuclear Liability and Property Insurance and Indemnity Agreement2015-10-22022 October 2015 Proof of Financial Protection, Nuclear Liability and Property Insurance and Indemnity Agreement CNL-15-211, Financial Protection Requirements and Indemnity Agreements - Insurance Status Second Supplement2015-09-29029 September 2015 Financial Protection Requirements and Indemnity Agreements - Insurance Status Second Supplement CNL-15-176, Financial Protection Requirements and Indemnity Agreements, Insurance Status2015-08-26026 August 2015 Financial Protection Requirements and Indemnity Agreements, Insurance Status CNL-15-051, Guarantee of Payment of Deferred Premiums - 2014 Annual Report2015-04-0707 April 2015 Guarantee of Payment of Deferred Premiums - 2014 Annual Report CNL-15-052, Annual Insurance Status Report2015-04-0101 April 2015 Annual Insurance Status Report CNL-14-049, CNL-14-049, TVA Guarantee of Payment of Deferred Premiums - 2013 Annual Report2014-04-0303 April 2014 CNL-14-049, TVA Guarantee of Payment of Deferred Premiums - 2013 Annual Report ML13093A3702013-04-0101 April 2013 Annual Insurance Status Report ML13093A3712013-04-0101 April 2013 Guarantee of Payment of Deferred Premiums - 2012 Annual Report ML13030A0322013-01-24024 January 2013 Documentation of Liability Insurance Coverage Requested Per Supplemental Safety Evaluation Report (Sser) Open Item 25 ML12094A3052012-04-0202 April 2012 Guarantee of Payment of Deferred Premiums - 2011 Annual Report ML12094A3042012-04-0202 April 2012 Annual Insurance Status Report. ML1123800232011-11-14014 November 2011 2010 DFS Report Analysis for Watts Bar Nuclear Plant, Unit 1 ML1109506832011-04-0101 April 2011 Submittal of Annual Insurance Status Report ML1109600732011-03-31031 March 2011 Submittal of Decommissioning Funding Status Report ML1109600722011-03-31031 March 2011 Guarantee of Payment of Deferred Premiums - 2010 Annual Report ML1012503002010-04-29029 April 2010 Financial Protection Requirements & Indemnity Agreements - Insurance Status ML0933800462009-12-10010 December 2009 Status of Decommissioning Funding Assurance ML0925200202009-09-0404 September 2009 Decommissioning Funding Assurance ML0909302852009-04-0101 April 2009 Watts Barr (WBN) Nuclear Plants - Insurance Status ML0711705732007-03-28028 March 2007 TVA - Decommissioning Funding Status Report ML0706800402007-03-0707 March 2007 Tennessee Valley Authority - 2006 Annual Report ML0609502462006-04-0303 April 2006 (Bfn), Sequoyah (Sqn), and Watts Bar (WBN) Nuclear Plants - Insurance Status ML0509402222005-03-30030 March 2005 TVA- Decommissioning Funding Status Report - Browns Ferry (Bfn), Sequoyah (SQN) and Watts Bar (WBN) Nuclear Plants 2017-03-31
[Table view] Category:Letter type:CNL
MONTHYEARCNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-24-016, Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-01-10010 January 2024 Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-23-052, Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability2024-01-0909 January 2024 Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability CNL-23-062, Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018)2024-01-0808 January 2024 Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018) CNL-23-069, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) CNL-23-001, Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01)2023-12-13013 December 2023 Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01) CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 CNL-23-045, License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010)2023-08-0707 August 2023 License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010) CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions CNL-23-020, Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06)2023-06-28028 June 2023 Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06) CNL-23-049, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan .2023-06-26026 June 2023 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan . CNL-23-044, Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out2023-06-0101 June 2023 Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out CNL-23-042, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-05-16016 May 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-043, Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09)2023-05-0404 May 2023 Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09) CNL-23-030, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2023-04-27027 April 2023 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-23-032, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 412023-04-27027 April 2023 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 41 CNL-23-033, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-04-24024 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-029, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-04-11011 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-023, Annual Insurance Status Report2023-03-30030 March 2023 Annual Insurance Status Report CNL-23-022, Decommissioning Funding Status Report2023-03-29029 March 2023 Decommissioning Funding Status Report CNL-23-024, TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report2023-03-29029 March 2023 TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report CNL-23-002, Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Sche2023-03-20020 March 2023 Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Schedu CNL-23-021, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-03-0808 March 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-015, Expedited Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-22-08)2023-02-27027 February 2023 Expedited Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-22-08) CNL-23-003, Browns Nuclear Plant, Units 1, 2 & 3; Sequoyah Nuclear Plant, Units 1 & 2; and Watts Bar Nuclear Plant, Units 1 & 2 - Organizational Topic Report TVA-NPOD89-A2023-01-30030 January 2023 Browns Nuclear Plant, Units 1, 2 & 3; Sequoyah Nuclear Plant, Units 1 & 2; and Watts Bar Nuclear Plant, Units 1 & 2 - Organizational Topic Report TVA-NPOD89-A CNL-23-009, Response to Request for Additional Information Request to Revise Technical Specification 3.4.122023-01-0404 January 2023 Response to Request for Additional Information Request to Revise Technical Specification 3.4.12 CNL-23-008, Tennessee Valley Authority Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-12-22022 December 2022 Tennessee Valley Authority Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-109, Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements2022-12-22022 December 2022 Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements CNL-22-101, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative WBN-2-ISI-012022-11-28028 November 2022 American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative WBN-2-ISI-01 CNL-22-106, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-14, Revision 38, Nuclear Emergency Public Information Organization and Operat2022-11-28028 November 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-14, Revision 38, Nuclear Emergency Public Information Organization and Operatio CNL-22-099, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2022-10-31031 October 2022 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-22-098, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC EPIP-7, Rev. 45 & CECC EPIP-8, Rev. 552022-10-17017 October 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC EPIP-7, Rev. 45 & CECC EPIP-8, Rev. 55 CNL-22-085, Response to Request for Additional Information Regarding Sequoyah Nuclear Plant (Sqn), Units 1 and 2 and Watts Bar Nuclear Plant (Wbn), Units 1 and 2, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Al2022-09-0202 September 2022 Response to Request for Additional Information Regarding Sequoyah Nuclear Plant (Sqn), Units 1 and 2 and Watts Bar Nuclear Plant (Wbn), Units 1 and 2, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alte CNL-22-077, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-08-11011 August 2022 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-030, Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03)2022-07-27027 July 2022 Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03) CNL-22-039, Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04)2022-07-13013 July 2022 Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04) CNL-22-071, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08)2022-07-13013 July 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08) CNL-22-070, Status Regarding the Improved Flood Mitigation System Project2022-06-30030 June 2022 Status Regarding the Improved Flood Mitigation System Project CNL-22-008, and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002)2022-06-13013 June 2022 and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002) CNL-22-064, Response to Request for Additional Information Regarding Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change2022-06-0909 June 2022 Response to Request for Additional Information Regarding Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change CNL-22-068, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-06-0808 June 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-047, Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2022-05-23023 May 2022 Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-22-043, Response to Request for Additional Information and Confirmation of Information Regarding Application to Modify Watts Bar Nuclear Plant Units 1 and 2 Technical Specification 3.7.8 to Support Shutdown Board.2022-05-0202 May 2022 Response to Request for Additional Information and Confirmation of Information Regarding Application to Modify Watts Bar Nuclear Plant Units 1 and 2 Technical Specification 3.7.8 to Support Shutdown Board. CNL-22-046, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan.2022-04-28028 April 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan. 2024-01-09
[Table view] |
Text
Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 CNL-15-176 August 26, 2015 10 CFR § 50.54(w) 10 CFR Part 140 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 2 Construction Permit No. CPPR-92 NRC Docket No. 50-391
Subject:
WATTS BAR NUCLEAR PLANT UNIT 2 - FINANCIAL PROTECTION REQUIREMENTS AND INDEMNITY AGREEMENTS - INSURANCE STATUS
Reference:
NUREG-0847, Supplement 22, Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant, Unit 2, dated February 2011 The purpose of this letter is to provide a summary and status of the financial qualifications and indemnity agreements for Watts Bar Nuclear Plant (WBN) Unit 2 to facilitate closure of Supplemental Safety Evaluation Report (SSER) 22 Open Item 25 (Reference). The enclosure to this letter summarizes the Tennessee Valley Authoritys (TVAs) compliance with 10 CFR §§ 50.54(w), 140.11, 140.15, and 140.21 for WBN Unit 2.
There are no new regulatory commitments contained in this submittal. Please contact Gordon Arent at 423-365-2004 if there are questions regarding this submittal.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 26th day of August 2015.
Respectfully, Digitally signed by J. W. Shea J. W. Shea DN: cn=J. W. Shea, o=Tennessee Valley Authority, ou=Nuclear Licensing, email=jwshea@tva.gov, c=US Date: 2015.08.26 14:12:40 -04'00' J. W. Shea Vice President, Nuclear Licensing Enclosure cc: See Page 2
U.S. Nuclear Regulatory Commission CNL-15-176 Page 2 August 26, 2015
Enclosure:
Summary of Financial Protection and Indemnity Agreements cc (Enclosure):
NRC Regional Administrator - Region II NRC Senior Resident Inspector - Watts Bar Nuclear Plant, Unit 2 NRC Project Manager - Watts Bar Nuclear Plant, Unit 2
ENCLOSURE Watts Bar Nuclear Plant Unit 2 Summary of Financial Protection and Indemnity Agreements
The Nuclear Regulatory Commission (NRC) reviewed financial protection and indemnity requirements for Watts Bar Nuclear Plant (WBN) Unit 2 in NUREG-0847, Supplement 22, Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant, Unit 2 (SSER 22) (Reference 1). Open Item 25 was documented in SSER 22 as described below.
Before the issuance of an operating license under Title 10 of the Code of Federal Regulations (10 CFR) Part 50, "Domestic Licensing of Production and Utilization Facilities," the Tennessee Valley Authority (TVA) is required to provide satisfactory documentation that it has obtained the financial protection required by 10 CFR 140.11(a)(4), and not less than the amount required by 10 CFR 50.54(w) with respect to insurance from private sources or an equivalent amount of protection covering the licensee's obligation. This is Open Item 25 (Appendix HH) until TVA provides the necessary documentation and the U.S. Nuclear Regulatory Commission staff has reviewed and approved it.
On August 17, 2015, NRC staff from the Financial Analysis and International Projects Branch held a telephone call with Tennessee Valley Authority (TVA) WBN Licensing personnel during which the staff stated that TVA needed to demonstrate compliance with regulations associated with financial protection and indemnity agreements: 10 CFR §§ 50.54(w), 140.11(a)(4), 140.15, and 140.21.
In response to SSER Appendix HH Open Item 25 and the request from the NRC in the August 17, 2015 telephone conversation, TVA is providing the following information.
The Tennessee Valley Authority is a wholly owned corporate agency and instrumentality of the United States of America established pursuant to the Tennessee Valley Authority Act of 1933, as amended. As an agency of the United States Government, TVA is administered by a board of nine members appointed by the President of the United States with the advice and consent of the United States Senate. TVA is self-regulated and the TVA Act gives the TVA Board of Directors the sole responsibility for establishing the rates that TVA charges for electric power.
These rates are not subject to review or approval by any State or Federal regulatory body.
As required by 10 CFR § 140.21(e), TVA provides an annual report establishing the guarantee of payment of deferred premiums (Reference 2 provides an example). As denoted in these letters, TVAs Form 10-K Annual Reports are filed pursuant to the Securities Exchange Act of 1934 and the current Form 10-K report is publicly available on the internet at either of the websites provided below.
www.tva.gov or www.sec.gov The general financial qualifications of TVA were reviewed by the NRC and the results of the review were documented in SSER 22 Section 21.1, Tennessee Valley Authority Financial Qualifications for Watts Bar Nuclear Plant Unit 2. The annual financial reports required by 10 CFR § 140.21(e) for the three TVA nuclear sites are made in a single report. Reporting for WBN Unit 2 is not required prior to the issuance of the Operating License.
1
ENCLOSURE Watts Bar Nuclear Plant Unit 2 Summary of Financial Protection and Indemnity Agreements
On April 29, 2010, TVA submitted a letter to the NRC, Watts Bar Nuclear Plant (WBN) Unit 2 -
Financial Protection Requirements and Indemnity Agreements - Insurance Status (Reference 3). This letter provided a copy of the certificate of insurance coverage issued by the American Nuclear Insurers showing the amount of financial coverage carried by TVA pursuant to 10 CFR § 140.13.
On January 24, 2013, TVA submitted a letter to the NRC, Watts Bar Nuclear Plant Unit 2 -
Documentation of Liability Insurance Coverage Requested Per Supplemental Safety Evaluation Report (SSER) Open Item 25 (Reference 4). The letter was submitted to show the completion of TVA actions required to close SSER Open Item 25. The letter provided the Certificate of Insurance for Watts Bar Nuclear Plant Unit 2 documenting that TVA had obtained the maximum secondary liability insurance coverage required pursuant to 10 CFR § 140.11(a)(4) which is also equal to or greater than the amount required by 10 CFR § 50.54(w). The certificate had been provided to the NRC by letter from Marsh & McLennan Companies on October 3, 2011. Marsh & McLennans letter stated that the certified copy of the Bond for Payment of Retrospective Premiums for Watts Bar Unit 2 in accordance with 10 CFR §140.15 was enclosed. Their letter further stated that the certificate would become effective on the effective date of the NRC Facility Operating License for WBN Unit 2.
Reference 5 provides an example of the annual insurance status report that TVA submits to the NRC as required by 10 CFR §50.54(w)(3). Similar to the annual financial report submitted by TVA, this report is submitted for all three of TVAs nuclear sites. Watts Bar Nuclear Plant Unit 2 is not listed in the reports that have been submitted to date since it has not received an Operating License.
The information that TVA has provided and summarized above establishes that TVA has obtained the requisite financial protection and indemnity agreements required by 10 CFR §§ 50.54(w), 140.11(a)(4), and 140.13. TVA has provided a copy of the Bond for Payment of Retrospective Premiums for Watts Bar Unit 2 in accordance with 10 CFR § 140.15.
Finally, TVA provides an annual financial qualification report pursuant to the requirements of 10 CFR § 140.21(e).
References:
- 1. NUREG-0847, Supplement 22, Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant, Unit 2, dated February 2011
- 2. TVA Letter to NRC, Guarantee of Payment of Deferred Premiums - 2014 Annual Report, dated April 3, 2015 [ML15097A469]
- 3. TVA Letter to NRC, Watts Bar Nuclear Plant (WBN) Unit 2 - Financial Protection Requirements and Indemnity Agreements - Insurance Status, dated April 29, 2010
[ML101250300]
- 4. TVA Letter to NRC, Watts Bar Nuclear Plant Unit 2 - Documentation of Liability Insurance Coverage Requested Per Supplemental Safety Evaluation Report (SSER)
Open Item 25, dated January 24, 2013 [ML13030A032]
- 5. TVA Letter to NRC, Browns Ferry, Units 1, 2, & 3, Sequoyah, Units 1 & 2, and Watts Bar, Unit 1, Annual Insurance Status Report, dated April 1, 2015 [ML15238A829]
2