ML23319A24529 January 2024Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 IssuesCyber Security
Surveillance Frequency Control Program
Safeguards Contingency Plan
Fire Protection Program
ML23293A0576 December 2023Issuance of Amendment Nos. 163 and 70 Regarding Adoption of TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee ControlCyber Security
Surveillance Frequency Control Program
Safeguards Contingency Plan
Fire Protection Program
ML23122A2327 June 2023Issuance of Amendment Nos. 162 and 69 Regarding Change to Date in Footnotes for Technical Specification 3.7.11, Control Room Emergency Air Temperature Control System (Creatcs)Cyber Security
Surveillance Frequency Control Program
Fire Protection Program
ML23131A18123 May 2023Correction to Amendment No. 161 to Facility Operating License No. NPF-90
ML23125A2205 May 2023Issuance of Amendment No. 161 Regarding a Change to Footnotes for Technical Specification Table 1.1-1 Modes (Emergency Circumstances)Safe Shutdown Earthquake
Operating Basis Earthquake
VT-2
Pressure Boundary Leakage
ML23072A0655 April 2023Units 1 and 2 Issuance of Amendment Nos. 364 and 358; 160 and 68 Regarding a Revision to Technical Specification 3.4.12Anticipated operational occurrence
Cyber Security
Pressure and Temperature Limits Report
Fire Protection Program
ML22348A00525 January 2023Issuance of Amendment Nos. 326, 349, and 309; 363 and 35; 159 and 67 Regarding Adoption of TSTF-554, Revise Reactor Coolant Leakage RequirementsCyber Security
Pressure Boundary Leakage
Fire Protection Program
ML22349A64720 January 2023Issuance of Amendment Nos. 325, 348, and 308; 362 and 356; and 158 and 66 Regarding Adoption of TSTF-529, Rev. 4, Clarify Use and Application RulesTime of Discovery
Cyber Security
Fire Protection Program
ML22271A9147 December 2022Issuance of Amendment Nos. 324, 347, and 307; 360 and 354; 157 and 65 Regarding a Revision to the Emergency Action Level SchemeOperating Basis Earthquake
Earthquake
ML22257A0514 November 2022Issuance of Amendment Nos. 156 and 64 Regarding Adoption of TSTF-205-A, Revision 3, and TSTF-563-AShutdown Margin
Probabilistic Risk Assessment
Cyber Security
Surveillance Frequency Control Program
Large early release frequency
Pressure Boundary Leakage
Fire Protection Program
ML22276A16124 October 2022Issuance of Amendment Nos. 359, 353, 155, & 63 Regarding Adoption of TSTF Traveler TSTF-577, Revised Frequencies for Steam Generator Tube InspectionsPost Accident Monitoring
Nondestructive Examination
Cyber Security
Fire Protection Program
ML22187A01920 September 2022Issuance of Amendment No. 154 Regarding Revision to Technical Specification 3.3.2 to Revise Allowable Value for Trip of Turbine-Driven Main Feedwater Pumps
ML22187A18120 September 2022Issuance of Amendment Nos. 153 and 62 Regarding Extension of Completion Time for Technical Specification 3.7.8 for Inoperable Essential Raw Cooling Water TrainUltimate heat sink
Cyber Security
Surveillance Frequency Control Program
Fire Protection Program
ML22014A2064 May 2022Issuance of Amendment Nos. 152 and 61 Regarding Revision to Technical Specifications to Delete a Redundant Unit of Measure for Certain Radiation MonitorsCyber Security
Fire Protection Program
ML21347A9671 February 2022Correction of Errors Incurred During Issuance of the Initial Facility Operating License, and Issuance of License Amendment Nos. 6, 21, and 39Time of Discovery
ML21306A28725 January 2022Issuance of Amendment No. 60 Regarding Revision of Technical Specification Requirements Specific to the Model D3 Steam Generators That Will No Longer Apply Following Steam Generator ReplacementPost Accident Monitoring
Nondestructive Examination
Cyber Security
Fire Protection Program
ML21334A29518 January 2022Issuance of Amendment No. 151 Regarding Revision to TS 3.7.12 for One-Time Exception to Permit Continuous Opening of Auxiliary Building Secondary Containment Enclosure During Unit 2 Steam Generator Replacement
ML21334A38912 January 2022Issuance of Amendment No. 59 Regarding Revision to Steam Generator Tube Rupture Dose Analysis
ML21271A13716 December 2021Issuance of Amendment Nos. 150 and 58 Regarding Modification of Technical Specification Surveillance Requirement 3.6.15.4, Shield BuildingSafe Shutdown Earthquake
Cyber Security
Fire Protection Program
ML21260A21022 November 2021Issuance of Amendment No. 57 to Revise Technical Specifications to Change the Steam Generator Secondary Side Water LevelAnticipated operational occurrence
Cyber Security
Surveillance Frequency Control Program
Fire Protection Program
ML21189A3073 November 2021Issuance of Amendment Nos. 149 and 56 Regarding Modification of Technical Specification 5.7.2.19, Containment Leakage Rate Testing ProgramHigh winds
Non-Destructive Examination
Internal Flooding
Probabilistic Risk Assessment
Coatings
Nondestructive Examination
Cyber Security
Incorporated by reference
Large early release frequency
Moisture barrier
Maintenance Rule Program
Fire Protection Program
ML21158A28417 September 2021Issuance of Amendment Nos. 148 and 55 to Revise Technical Specifications for Function 6.E of Table 3.3.2-1, Engineered Safety Feature Actuation System InstrumentationCyber Security
Surveillance Frequency Control Program
Fire Protection Program
ML21153A04926 July 2021Issuance of Amendment No. 147 Regarding Change to Steam Generator Tube Inspection Frequency and Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-510Anticipated operational occurrence
Post Accident Monitoring
Nondestructive Examination
Foreign Material Exclusion
ML21161A23924 June 2021Issuance of Amendment No. 54 Regarding Use of Temperature Adjustment to Voltage Growth Rate for the Generic Letter 95-05 Steam Generator Tube Repair Criteria
ML21148A10017 June 2021Issuance of Amendment No. 53 Regarding Neutron Fluence Calculation MethodologyHydrostatic
Cyber Security
Pressure and Temperature Limits Report
Fire Protection Program
ML21099A24614 May 2021Issuance of Amendment Nos. 146 and 52 to Adopt TSTF-490, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech SpecCyber Security
Surveillance Frequency Control Program
Pressure Boundary Leakage
Fire Protection Program
Power change
ML21078A4845 May 2021Issuance of Amendment Nos. 145 and 51 for One-Time Change to Technical Specification 3.7.11 to Extend the Completion Time for Main Control Room Chiller ModificationsSafe Shutdown
Safe Shutdown Earthquake
Internal Flooding
Temporary Modification
Cyber Security
Tornado Generated Missile
Surveillance Frequency Control Program
Earthquake
Fire Protection Program
ML21015A0349 March 2021Issuance of Amendment No. 144 Regarding Post Accident Monitoring InstrumentationAnticipated operational occurrence
Post Accident Monitoring
ML21034A16926 February 2021Issuance of Amendment Nos. 143 and 50 Regarding Implementation of Full Spectrumtm Loss-of-Coolant Accident Analysis (LOCA) and New LOCA-Specific Tritium Producing Burnable Absorber Rod Stress Analysis MethodologyCoatings
Cyber Security
Fuel cladding
Fire Protection Program
ML20232C62211 February 2021Issuance of Amendment Nos. 142 and 49 Regarding Revision to Technical Specifications to Implement WCAP-17661-P-A, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specifications (EPID L-2020-LLA-0037Safe Shutdown
Anticipated operational occurrence
Internal Flooding
Probabilistic Risk Assessment
Cyber Security
Surveillance Frequency Control Program
Fire Protection Program
Power change
ML21027A1679 February 2021Issuance of Amendment No. 48 Regarding Use of Alternate Probability of Detection Values for Beginning of Cycle in Support of Operational Assessment
ML20350B49325 January 2021Issuance of Amendment Nos. 352, 346, 141, and 47 Regarding the Adoption of Technical Specification Task Force Traveler, TSTF-569, Revision 2, Revise Response Time Testing DefinitionShutdown Margin
Anticipated operational occurrence
Hydrostatic
Cyber Security
Fire Protection Program
ML21005A12512 January 2021Correction of Errors Incurred During Issuance of License Amendment Nos. 43 and 45Cyber Security
Fire Protection Program
ML20268A08212 January 2021Issuance of Amendment Nos. 314, 337, and 297; 351 and 345; 140 and 46 Regarding Changes to the Technical SpecificationsCyber Security
Fire Protection Program
ML20245E4138 December 2020Issuance of Amendment Nos. 139 and 45 Regarding Revisions to Technical Specification 3.6.15, Shield BuildingSafe Shutdown Earthquake
Cyber Security
Fire Protection Program
ML20282A34519 November 2020Issuance of Amendment Nos. 313, 336, 296, 350, 344, 138, and 44 Revise Emergency Plan On-Shift Emergency Medical Technician & Onsite Ambulance Requirements
ML20239A79128 October 2020Issuance of Amendment Nos. 137 and 43 Regarding Revision to Technical Specifications to Adopt Technical Specification Task Force Traveler 541, Revision 2Cyber Security
Surveillance Frequency Control Program
Fire Protection Program
ML20226A44421 October 2020Issuance of Amendment No. 42 Regarding Measurement Uncertainty Recapture Power UprateSafe Shutdown
Boric Acid
Shutdown Margin
Ultimate heat sink
Offsite Dose Calculation Manual
Fire Barrier
Anticipated operational occurrence
Internal Flooding
Coatings
Operator Manual Action
Cyber Security
Emergency Lighting
Incorporated by reference
Annual Radioactive Effluent Release Report
Surveillance Frequency Control Program
Annual Radiological Environmental Operating Report
Process Control Program
Time Critical Operator Action
Safeguards Contingency Plan
Subsequent License Renewal
Earthquake
Fire Protection Program
Flow Induced Vibration
Power Uprate
Measurement Uncertainty Recapture
ML20238C06121 September 2020Correction of Typographical Error Incurred During Issuance of License Amendment No. 104
ML20167A14819 August 2020Issuance of Amendment Nos. 136 and 41 Regarding the Automatic Transfer from a Unit Service Station Transformer to a Common Station Service TransformerCyber Security
Offsite Circuit
Fire Protection Program
ML20156A01810 August 2020Issuance of Amendment No. 40 Regarding Technical Specifications for Steam Generator Tube Repair SleeveNon-Destructive Examination
Anticipated operational occurrence
Safe Shutdown Earthquake
Post Accident Monitoring
Probabilistic Risk Assessment
Nondestructive Examination
Cyber Security
Fire Protection Program
ML20076A19430 April 2020Issuance of Amendment Nos. 134 and 38 Regarding Adopting the Title 10 CFR Section 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power PlantsHot Short
Safe Shutdown
High winds
Internal Flooding
Probabilistic Risk Assessment
Multiple Spurious Operation
Incorporated by reference
FLEX
Fukushima Dai-Ichi
Large early release frequency
Fire Protection Program
ML20057E24230 March 2020Issuance of Amendment Nos. 133 and 37 Regarding Changes to Technical Specifications Pertaining to Diesel Generator Start Instrumentation (EPID-L-2020-LLA-0003)
ML20028F73328 February 2020Issuance of Amendment Nos. 132 and 36 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-425, Revision 3High winds
Shutdown Margin
High Radiation Area
Ultimate heat sink
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Cyber Security
Incorporated by reference
FLEX
Fukushima Dai-Ichi
Surveillance Frequency Control Program
Large early release frequency
Tritium Producing Burnable Absorber Rods
Offsite Circuit
Fire Protection Program
Backfit
Power change
ML20024F83524 February 2020Issuance of Amendment No. 35 Regarding One-Time Extension of Completion Time for Technical Specification 3.7.8 for Inoperable Essential Raw Cooling Water TrainSafe Shutdown
Ultimate heat sink
Cyber Security
Fire Protection Program
ML20015A47930 January 2020Correction to Amendment No. 30 to Facility Operating License Npf-96 Regarding Use of Optimized Zirlo Fuel Rod CladdingTritium Producing Burnable Absorber Rods
ML19336C51910 December 2019Issuance of Amendment Nos. 131 and 34 Regarding Correction to Unbalanced Voltage Relay Instrumentation Values
ML19276E5579 December 2019Issuance of Amendment Nos. 130 and 33 Regarding Adoption of Technical Specifications Task Force Traveler, TSTF-500, DC Electrical Rewrite - Update to TSTF-360Safe Shutdown
Anticipated operational occurrence
Cyber Security
Emergency Lighting
Battery sizing
Fire Protection Program
ML19238A00526 November 2019Issuance of Amendment Nos. 129 and 32 Regarding Changes to Technical Specifications 3.8.1, 3.8.7, 3.8.8, and 3.8.9Safe Shutdown
Anticipated operational occurrence
Cyber Security
FLEX
Offsite Circuit
Fire Protection Program
ML18277A11027 August 2019Units, 1 & 2 Issuance of Amendment Nos. 309, 332, 292, 345, 339, 128, and 31 Regarding Unbalanced Voltage ProtectionSafe Shutdown
Anticipated operational occurrence
Cyber Security
Surveillance Frequency Control Program
Open Phase Condition
Fire Protection Program