Issue date | Title | Topic | |
---|---|---|---|
ML23319A245 | 29 January 2024 | Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues | Cyber Security Surveillance Frequency Control Program Safeguards Contingency Plan Fire Protection Program |
ML23293A057 | 6 December 2023 | Issuance of Amendment Nos. 163 and 70 Regarding Adoption of TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control | Cyber Security Surveillance Frequency Control Program Safeguards Contingency Plan Fire Protection Program |
ML23122A232 | 7 June 2023 | Issuance of Amendment Nos. 162 and 69 Regarding Change to Date in Footnotes for Technical Specification 3.7.11, Control Room Emergency Air Temperature Control System (Creatcs) | Cyber Security Surveillance Frequency Control Program Fire Protection Program |
ML23131A181 | 23 May 2023 | Correction to Amendment No. 161 to Facility Operating License No. NPF-90 | |
ML23125A220 | 5 May 2023 | Issuance of Amendment No. 161 Regarding a Change to Footnotes for Technical Specification Table 1.1-1 Modes (Emergency Circumstances) | Safe Shutdown Earthquake Operating Basis Earthquake VT-2 Pressure Boundary Leakage |
ML23072A065 | 5 April 2023 | Units 1 and 2 Issuance of Amendment Nos. 364 and 358; 160 and 68 Regarding a Revision to Technical Specification 3.4.12 | Anticipated operational occurrence Cyber Security Pressure and Temperature Limits Report Fire Protection Program |
ML22348A005 | 25 January 2023 | Issuance of Amendment Nos. 326, 349, and 309; 363 and 35; 159 and 67 Regarding Adoption of TSTF-554, Revise Reactor Coolant Leakage Requirements | Cyber Security Pressure Boundary Leakage Fire Protection Program |
ML22349A647 | 20 January 2023 | Issuance of Amendment Nos. 325, 348, and 308; 362 and 356; and 158 and 66 Regarding Adoption of TSTF-529, Rev. 4, Clarify Use and Application Rules | Time of Discovery Cyber Security Fire Protection Program |
ML22271A914 | 7 December 2022 | Issuance of Amendment Nos. 324, 347, and 307; 360 and 354; 157 and 65 Regarding a Revision to the Emergency Action Level Scheme | Operating Basis Earthquake Earthquake |
ML22257A051 | 4 November 2022 | Issuance of Amendment Nos. 156 and 64 Regarding Adoption of TSTF-205-A, Revision 3, and TSTF-563-A | Shutdown Margin Probabilistic Risk Assessment Cyber Security Surveillance Frequency Control Program Large early release frequency Pressure Boundary Leakage Fire Protection Program |
ML22276A161 | 24 October 2022 | Issuance of Amendment Nos. 359, 353, 155, & 63 Regarding Adoption of TSTF Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections | Post Accident Monitoring Nondestructive Examination Cyber Security Fire Protection Program |
ML22187A019 | 20 September 2022 | Issuance of Amendment No. 154 Regarding Revision to Technical Specification 3.3.2 to Revise Allowable Value for Trip of Turbine-Driven Main Feedwater Pumps | |
ML22187A181 | 20 September 2022 | Issuance of Amendment Nos. 153 and 62 Regarding Extension of Completion Time for Technical Specification 3.7.8 for Inoperable Essential Raw Cooling Water Train | Ultimate heat sink Cyber Security Surveillance Frequency Control Program Fire Protection Program |
ML22014A206 | 4 May 2022 | Issuance of Amendment Nos. 152 and 61 Regarding Revision to Technical Specifications to Delete a Redundant Unit of Measure for Certain Radiation Monitors | Cyber Security Fire Protection Program |
ML21347A967 | 1 February 2022 | Correction of Errors Incurred During Issuance of the Initial Facility Operating License, and Issuance of License Amendment Nos. 6, 21, and 39 | Time of Discovery |
ML21306A287 | 25 January 2022 | Issuance of Amendment No. 60 Regarding Revision of Technical Specification Requirements Specific to the Model D3 Steam Generators That Will No Longer Apply Following Steam Generator Replacement | Post Accident Monitoring Nondestructive Examination Cyber Security Fire Protection Program |
ML21334A295 | 18 January 2022 | Issuance of Amendment No. 151 Regarding Revision to TS 3.7.12 for One-Time Exception to Permit Continuous Opening of Auxiliary Building Secondary Containment Enclosure During Unit 2 Steam Generator Replacement | |
ML21334A389 | 12 January 2022 | Issuance of Amendment No. 59 Regarding Revision to Steam Generator Tube Rupture Dose Analysis | |
ML21271A137 | 16 December 2021 | Issuance of Amendment Nos. 150 and 58 Regarding Modification of Technical Specification Surveillance Requirement 3.6.15.4, Shield Building | Safe Shutdown Earthquake Cyber Security Fire Protection Program |
ML21260A210 | 22 November 2021 | Issuance of Amendment No. 57 to Revise Technical Specifications to Change the Steam Generator Secondary Side Water Level | Anticipated operational occurrence Cyber Security Surveillance Frequency Control Program Fire Protection Program |
ML21189A307 | 3 November 2021 | Issuance of Amendment Nos. 149 and 56 Regarding Modification of Technical Specification 5.7.2.19, Containment Leakage Rate Testing Program | High winds Non-Destructive Examination Internal Flooding Probabilistic Risk Assessment Coatings Nondestructive Examination Cyber Security Incorporated by reference Large early release frequency Moisture barrier Maintenance Rule Program Fire Protection Program |
ML21158A284 | 17 September 2021 | Issuance of Amendment Nos. 148 and 55 to Revise Technical Specifications for Function 6.E of Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation | Cyber Security Surveillance Frequency Control Program Fire Protection Program |
ML21153A049 | 26 July 2021 | Issuance of Amendment No. 147 Regarding Change to Steam Generator Tube Inspection Frequency and Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-510 | Anticipated operational occurrence Post Accident Monitoring Nondestructive Examination Foreign Material Exclusion |
ML21161A239 | 24 June 2021 | Issuance of Amendment No. 54 Regarding Use of Temperature Adjustment to Voltage Growth Rate for the Generic Letter 95-05 Steam Generator Tube Repair Criteria | |
ML21148A100 | 17 June 2021 | Issuance of Amendment No. 53 Regarding Neutron Fluence Calculation Methodology | Hydrostatic Cyber Security Pressure and Temperature Limits Report Fire Protection Program |
ML21099A246 | 14 May 2021 | Issuance of Amendment Nos. 146 and 52 to Adopt TSTF-490, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec | Cyber Security Surveillance Frequency Control Program Pressure Boundary Leakage Fire Protection Program Power change |
ML21078A484 | 5 May 2021 | Issuance of Amendment Nos. 145 and 51 for One-Time Change to Technical Specification 3.7.11 to Extend the Completion Time for Main Control Room Chiller Modifications | Safe Shutdown Safe Shutdown Earthquake Internal Flooding Temporary Modification Cyber Security Tornado Generated Missile Surveillance Frequency Control Program Earthquake Fire Protection Program |
ML21015A034 | 9 March 2021 | Issuance of Amendment No. 144 Regarding Post Accident Monitoring Instrumentation | Anticipated operational occurrence Post Accident Monitoring |
ML21034A169 | 26 February 2021 | Issuance of Amendment Nos. 143 and 50 Regarding Implementation of Full Spectrumtm Loss-of-Coolant Accident Analysis (LOCA) and New LOCA-Specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology | Coatings Cyber Security Fuel cladding Fire Protection Program |
ML20232C622 | 11 February 2021 | Issuance of Amendment Nos. 142 and 49 Regarding Revision to Technical Specifications to Implement WCAP-17661-P-A, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specifications (EPID L-2020-LLA-0037 | Safe Shutdown Anticipated operational occurrence Internal Flooding Probabilistic Risk Assessment Cyber Security Surveillance Frequency Control Program Fire Protection Program Power change |
ML21027A167 | 9 February 2021 | Issuance of Amendment No. 48 Regarding Use of Alternate Probability of Detection Values for Beginning of Cycle in Support of Operational Assessment | |
ML20350B493 | 25 January 2021 | Issuance of Amendment Nos. 352, 346, 141, and 47 Regarding the Adoption of Technical Specification Task Force Traveler, TSTF-569, Revision 2, Revise Response Time Testing Definition | Shutdown Margin Anticipated operational occurrence Hydrostatic Cyber Security Fire Protection Program |
ML21005A125 | 12 January 2021 | Correction of Errors Incurred During Issuance of License Amendment Nos. 43 and 45 | Cyber Security Fire Protection Program |
ML20268A082 | 12 January 2021 | Issuance of Amendment Nos. 314, 337, and 297; 351 and 345; 140 and 46 Regarding Changes to the Technical Specifications | Cyber Security Fire Protection Program |
ML20245E413 | 8 December 2020 | Issuance of Amendment Nos. 139 and 45 Regarding Revisions to Technical Specification 3.6.15, Shield Building | Safe Shutdown Earthquake Cyber Security Fire Protection Program |
ML20282A345 | 19 November 2020 | Issuance of Amendment Nos. 313, 336, 296, 350, 344, 138, and 44 Revise Emergency Plan On-Shift Emergency Medical Technician & Onsite Ambulance Requirements | |
ML20239A791 | 28 October 2020 | Issuance of Amendment Nos. 137 and 43 Regarding Revision to Technical Specifications to Adopt Technical Specification Task Force Traveler 541, Revision 2 | Cyber Security Surveillance Frequency Control Program Fire Protection Program |
ML20226A444 | 21 October 2020 | Issuance of Amendment No. 42 Regarding Measurement Uncertainty Recapture Power Uprate | Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Anticipated operational occurrence Internal Flooding Coatings Operator Manual Action Cyber Security Emergency Lighting Incorporated by reference Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Annual Radiological Environmental Operating Report Process Control Program Time Critical Operator Action Safeguards Contingency Plan Subsequent License Renewal Earthquake Fire Protection Program Flow Induced Vibration Power Uprate Measurement Uncertainty Recapture |
ML20238C061 | 21 September 2020 | Correction of Typographical Error Incurred During Issuance of License Amendment No. 104 | |
ML20167A148 | 19 August 2020 | Issuance of Amendment Nos. 136 and 41 Regarding the Automatic Transfer from a Unit Service Station Transformer to a Common Station Service Transformer | Cyber Security Offsite Circuit Fire Protection Program |
ML20156A018 | 10 August 2020 | Issuance of Amendment No. 40 Regarding Technical Specifications for Steam Generator Tube Repair Sleeve | Non-Destructive Examination Anticipated operational occurrence Safe Shutdown Earthquake Post Accident Monitoring Probabilistic Risk Assessment Nondestructive Examination Cyber Security Fire Protection Program |
ML20076A194 | 30 April 2020 | Issuance of Amendment Nos. 134 and 38 Regarding Adopting the Title 10 CFR Section 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Plants | Hot Short Safe Shutdown High winds Internal Flooding Probabilistic Risk Assessment Multiple Spurious Operation Incorporated by reference FLEX Fukushima Dai-Ichi Large early release frequency Fire Protection Program |
ML20057E242 | 30 March 2020 | Issuance of Amendment Nos. 133 and 37 Regarding Changes to Technical Specifications Pertaining to Diesel Generator Start Instrumentation (EPID-L-2020-LLA-0003) | |
ML20028F733 | 28 February 2020 | Issuance of Amendment Nos. 132 and 36 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-425, Revision 3 | High winds Shutdown Margin High Radiation Area Ultimate heat sink Internal Flooding Hydrostatic Probabilistic Risk Assessment Cyber Security Incorporated by reference FLEX Fukushima Dai-Ichi Surveillance Frequency Control Program Large early release frequency Tritium Producing Burnable Absorber Rods Offsite Circuit Fire Protection Program Backfit Power change |
ML20024F835 | 24 February 2020 | Issuance of Amendment No. 35 Regarding One-Time Extension of Completion Time for Technical Specification 3.7.8 for Inoperable Essential Raw Cooling Water Train | Safe Shutdown Ultimate heat sink Cyber Security Fire Protection Program |
ML20015A479 | 30 January 2020 | Correction to Amendment No. 30 to Facility Operating License Npf-96 Regarding Use of Optimized Zirlo Fuel Rod Cladding | Tritium Producing Burnable Absorber Rods |
ML19336C519 | 10 December 2019 | Issuance of Amendment Nos. 131 and 34 Regarding Correction to Unbalanced Voltage Relay Instrumentation Values | |
ML19276E557 | 9 December 2019 | Issuance of Amendment Nos. 130 and 33 Regarding Adoption of Technical Specifications Task Force Traveler, TSTF-500, DC Electrical Rewrite - Update to TSTF-360 | Safe Shutdown Anticipated operational occurrence Cyber Security Emergency Lighting Battery sizing Fire Protection Program |
ML19238A005 | 26 November 2019 | Issuance of Amendment Nos. 129 and 32 Regarding Changes to Technical Specifications 3.8.1, 3.8.7, 3.8.8, and 3.8.9 | Safe Shutdown Anticipated operational occurrence Cyber Security FLEX Offsite Circuit Fire Protection Program |
ML18277A110 | 27 August 2019 | Units, 1 & 2 Issuance of Amendment Nos. 309, 332, 292, 345, 339, 128, and 31 Regarding Unbalanced Voltage Protection | Safe Shutdown Anticipated operational occurrence Cyber Security Surveillance Frequency Control Program Open Phase Condition Fire Protection Program |