Submittal of the 2015 Annual Update to the License Renewal Application
ML15313A175
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 10/22/2015
From: Gerry Powell
South Texas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NOC-AE-15003300, STI: 34226056, TAC ME4936, TAC ME4937
Download: ML15313A175 (2)


Text

A*:*

1/2:*:

,* i**

Nuclear Operating Company South Texas Project Electric Generating Station.P.. Box 289 Wadsworth, Texas 77483?%VV October 22, 2015 NOC-AE-1 5003300 10 CFR 54 File: G25 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 2015 Annual Update to the South Texas Project License Renewal Application (TAC NOS. ME4936 and ME4937)

Reference:

STPNOC Letter from G. T. Powell to NRC Document Control Desk, "License Renewal Application", dated October 25, 2010 (NOC-AE-1 0002607)

(ML103010257)

By the referenced letter, STP Nuclear Operating Company (STPNOC) submitted an application to the Nuclear Regulatory Commission (NRC) for the renewal of Facility Operating Licenses NPF-76 and NPF-80, for South Texas Project (STP) Units 1 and 2, respectively. The application included the License Renewal Application (LRA), and the Applicant's Environmental Report - Operating License Renewal Stage. As required by 10 CFR 54.21(b), each year following submittal of the LRA, an amendment to the LRA must be submitted that identifies any change to the current licensing basis (CLB) that materially affects the contents of the LR.A, including the Updated Final Safety Analysis Report (UFSAR) supplement.

This LRA update covers the period from September 1, 2014 through August 31, 2015. A review was performed on the changes to the CLB, completed plant enhancements, and LRA commitments to evaluate if there have been any changes that materially affects the contents of the LRA. It has been determined that for the period from September 1, 2014 through August 31, 2015, there have been no changes that affect the contents of the LRA.

There are no regulatory commitments in this letter.

Should you have any questions regarding this letter, please contact Rafael Gonzales, STP License Renewal Project regulatory point-of-contact, at 361-972-4779, or me at 361-972-7566.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on z*

e '/5 Date f

/

G. T. Powell Site Vice President A (1 rig STI: 34226056

NOC-AE-1 5003300 Page 2 of 2 CC:

(paper copy)

(electronic copy)

Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 1600 East Lamar Boulevard Arlington, Texas 76011-4511 Lisa M. Regner Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North (O8H04) 11555 Rockville Pike Rockville, MD 20852 NRC Resident Inspector U. S. Nuclear Regulatory Commission P. O. Box 289, Mail Code: MN116 Wadsworth, TX 77483 John W. Daily License Renewal Project Manager (Safety)

U.S. Nuclear Regulatory Commission One White Flint North (MS 011-F1l)

Washington, DC 20555-0001 Tam Tran License Renewal Project Manager (Environmental)

U. S. Nuclear Regulatory Commission One White Flint North (MS 011 F01)

Washington, DC 20555-0001 Steve Frantz Morgan, Lewis & Bockius, LLP John Ragan Chris O'Hara Jim von Suskil NRG South Texas LP Kevin Polio Cris Eugster L.D. Blaylock City Public Service Peter Nemeth Cramn Caton & James, P.C.

Cheryl Mele John Wester City of Austin Richard A. Ratliff Robert Free Texas Department of State Health Services

,Lisa M. Regner John W. Daily Tam Tran U. S. Nuclear Regulatory Commission