|
---|
Category:Inspection Plan
MONTHYEARIR 05000298/20240052024-08-22022 August 2024 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2024005) IR 05000298/20230062024-02-28028 February 2024 Annual Assessment Letter for Cooper Nuclear Station - Report 05000298/2023006 IR 05000298/20230052023-08-21021 August 2023 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2023005)- Mid Cycle Letter ML23214A2742023-08-0303 August 2023 Nuclear Station - Notification of Inspection (NRC Inspection Report 05000298/2023004) and Request for Information ML23173A0862023-06-26026 June 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000298/2023401 IR 05000298/20220062023-03-0101 March 2023 Annual Assessment Letter for Cooper Nuclear Station Report 05000298/2022006 IR 05000298/20220052022-08-18018 August 2022 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298 2022005) ML22179A3152022-06-28028 June 2022 Notification of Post-Approval Site Inspection for License Renewal (Phase 4) (NRC Inspection Report 05000298/2022011) and Request for Information IR 05000298/20210062022-03-0202 March 2022 Annual Assessment Letter for Cooper Nuclear Station (Report 05000298/2021006) ML21305B8012021-11-0202 November 2021 Notification of NRC Triennial Heat Exchanger/Sink Performance Inspection 05000298/2022001 and Request for Information IR 05000298/20210052021-09-0101 September 2021 CNS Mid-Cycle Inspection Plan Transmittal Letter for Cooper Nuclear Station (Report 05000298/2021005) ML21217A1182021-08-0505 August 2021 Notification of Inspection (NRC Inspection Report 05000298/2021004) and Request for Information ML21083A2832021-03-24024 March 2021 Ti 2515/194 Inspection Documentation Request ML20315A3922020-11-10010 November 2020 Email 11-10-2020 - Cooper EP Prog Insp RFI IR 05000298/20200052020-09-0101 September 2020 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2020005) IR 05000298/20190062020-03-0303 March 2020 Annual Assessment Letter for Cooper Nuclear Station (Report 05000298/2019006) IR 05000298/20190052019-08-30030 August 2019 Updated Inspection Plan for Cooper Nuclear Station - Report 05000298/2019005 IR 05000298/20180062019-03-0404 March 2019 Annual Assessment Letter for Cooper Nuclear Station (Report 05000298/2018006) IR 05000298/20180052018-08-31031 August 2018 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2018005) IR 05000298/20170062018-03-0101 March 2018 Annual Assessment Letter for Cooper Nuclear Station (Report 05000298/2017006) ML18023A1102018-01-23023 January 2018 CNS - Notification of NRC Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans (05000298/2018010) and Request IR 05000298/20170052017-08-28028 August 2017 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2017005) IR 05000298/20160062017-03-0101 March 2017 Annual Assessment Letter for Cooper Nuclear Station (Report 05000298/2016006) IR 05000298/20160052016-09-12012 September 2016 Errata for Mid-Cycle Assessment Letter for Cooper Nuclear Station (Report 05000298/2016005) IR 05000298/20164012016-08-31031 August 2016 Non-Public Security Inspection Plan for Cooper Nuclear Station (NRC Physical Security Inspection Report Number 05000298/2016401) ML16242A3292016-08-31031 August 2016 Mid-Cycle Assessment Letter for Cooper Nuclear Station (Report 05000298/2016005) IR 05000298/20150062016-03-0202 March 2016 Annual Assessment Letter for Cooper Nuclear Station (Report 05000298/2015006) IR 05000298/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Cooper Nuclear Station (Report 05000298/2015005) IR 05000298/20154012015-09-0101 September 2015 Non-Public Security Inspection Plan for Cooper Nuclear Station (NRC Physical Security Inspection Report Number 05000298/2015401) ML15183A3602015-07-0202 July 2015 Notification of Inspection (NRC Inspection Report 05000298/2015003 and Request for Information ML14364A1532014-12-30030 December 2014 Notification of NRC Triennial Heat Sink Performance IR 05000298/2015001 and Request for Information IR 05000298/20140062014-09-0202 September 2014 Mid-Cycle Assessment Letter for Cooper Nuclear Station (Report 05000298/2014006) IR 05000298/20144022014-09-0202 September 2014 Non-Public Security Inspection Plan for Cooper Nuclear Station (NRC Physical Security Inspection Report Number 05000298/2014402) IR 05000298/20130012014-03-0404 March 2014 Annual Assessment Letter for the Cooper Nuclear Station (Report 05000298/2013001) IR 05000298/20130062013-09-0303 September 2013 Mid-cycle Assessment Letter for Cooper Nuclear Station (Report 05000298-13-006) IR 05000298/20128012013-03-0404 March 2013 Annual Assessment Letter for Cooper Nuclear Station (Report 05000298/2012801) IR 05000298/20120062012-09-0404 September 2012 Mid-Cycle Assessment Letter for Cooper Nuclear Station (Report 05000298/2012006) ML12243A4372012-09-0404 September 2012 Mid-Cycle Assessment Letter for Cooper Nuclear Station (Report 05000298-12-006) IR 05000298/20120012012-03-0505 March 2012 Annual Assessment Letter for Cooper Nuclear Station (Report Number 05000298/2012001) ML1124306512011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan - Cooper Nuclear Station IR 05000298/20110012011-03-0404 March 2011 Annual Assessment Letter for Cooper Nuclear Station (Report 05000298-11-001) ML1024305762010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan - Cooper Nuclear Station ML0906301572009-03-0404 March 2009 Annual Assessment Letter and Inspection Plan - 2009 - Cooper Nuclear Station ML0824606182008-09-0202 September 2008 2008 Midcycle Assessment Letter Cooper Nuclear Station IR 05000298/20080012008-03-0303 March 2008 Annual Assessment Letter - Cooper Nuclear Station End of Cycle 03-03-2008, (Inspection Report 05000298-08-001) ML0724309262007-08-31031 August 2007 Mid-Cycle Performance Review and Inspection Plan - Cooper IR 05000298/20070012007-03-0202 March 2007 Annual Assessment Letter - Cooper Nuclear Station (NRC Inspection Report 05000298-07-001) ML0624306492006-08-31031 August 2006 Midcycle Performance Review and Inspection Plan - Cooper Nuclear Station IR 05000298/20060012006-03-0202 March 2006 Annual Assessment Letter - Cooper Nuclear Station (NRC Inspection Report 05000298-06-001) ML0524300922005-08-30030 August 2005 Midcycle 2005 Performance Review and Inspection Plan - Cooper Nuclear Station 2024-08-22
[Table view] Category:Letter
MONTHYEARIR 05000298/20240032024-11-0505 November 2024 Integrated Inspection Report 05000298/2024003 ML24250A2052024-10-0808 October 2024 Issuance of Amendment No. 278 Regarding Revision to Technical Specification Table 3.3.2.1-1 and Transfer of Minimum Critical Power Ratio Values to Core Operating Limit Report ML24227A0822024-09-0303 September 2024 Summary of Regulatory Audit in Support of License Amendment Request to Modify the High Pressure Coolant Injection Low Flow Value IR 05000298/20240052024-08-22022 August 2024 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2024005) IR 05000298/20240022024-07-25025 July 2024 Integrated Inspection Report 05000298/2024002 ML24183A1722024-07-17017 July 2024 Issuance of Amendment No. 277 to Adopt TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil ML24197A1462024-07-15015 July 2024 NRC Region IV Ltr to Cooper Nuclear Station Re FEMA Level 1 Finding ML24134A1782024-07-0303 July 2024 Issuance of Amendment No. 276 Revision to Technical Specification 3.8.3, Diesel Fuel Oil, Lube Oil and Starting Air, to Allow for Cleaning, Inspection and Any Needed Repairs During Refuel Outage 33 ML24197A0682024-06-24024 June 2024 FEMA Ltr to Missouri State Emergency Management Agency - Level 1 Finding, 24 June 2024 ML24192A0112024-06-13013 June 2024 2024-06-Post Exam Comments 05000298/LER-2023-002-01, Secondary Containment Differential Pressure Perturbation Exceeds Technical Specifications2024-06-0606 June 2024 Secondary Containment Differential Pressure Perturbation Exceeds Technical Specifications IR 05000298/20244012024-06-0404 June 2024 Security Baseline Inspection Report 05000298/2024401 ML24151A1082024-05-30030 May 2024 NRC Initial Operator Licensing Examination Approval 05000298/2024301 ML24137A0942024-05-17017 May 2024 Regulatory Audit Plan in Support of License Amendment Request to Modify Allowable Value Regarding Technical Specification for High Pressure Coolant Injection Pump Discharge Low Flow 05000298/LER-2024-005, High Pressure Coolant Injection Pressure Switch Installation Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited B Technical2024-05-13013 May 2024 High Pressure Coolant Injection Pressure Switch Installation Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited B Technical. 05000298/LER-2024-004, Main Turbine Stop Valve Position Switches Do Not Meet Channel Independence Criteria Results in Two Channels Being Declared Inoperable and a Condition Prohibited by Technical Specifications2024-05-0909 May 2024 Main Turbine Stop Valve Position Switches Do Not Meet Channel Independence Criteria Results in Two Channels Being Declared Inoperable and a Condition Prohibited by Technical Specifications IR 05000298/20240012024-05-0303 May 2024 Integrated Inspection Report 05000298/2024001 ML24129A0952024-04-25025 April 2024 Preparation and Scheduling of Operator Licensing Examinations IR 05000298/20240102024-04-24024 April 2024 Comprehensive Engineering Team Inspection Report 05000298/2024010 05000298/LER-2024-003, High Pressure Coolant Injection Steam Leak Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited by Technical Specifications2024-04-22022 April 2024 High Pressure Coolant Injection Steam Leak Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited by Technical Specifications ML24096A1202024-04-0505 April 2024 Issuance of Amendment No. 275 Revision to Technical Specification 3.3.1.1 (Emergency Circumstances) ML24093A2282024-04-0202 April 2024 Notice of Enforcement Discretion for Cooper Nuclear Station IR 05000298/20240902024-04-0101 April 2024 – Notice of Violation, NRC Inspection Report 05000298/2024090 05000298/LER-2024-002, Technical Specifications Prohibited Condition for Inoperable Service Water Booster Pump2024-03-0404 March 2024 Technical Specifications Prohibited Condition for Inoperable Service Water Booster Pump 05000298/LER-2024-001, Inoperable Turbine Stop Valve Limit Switch Causes Condition Prohibited by Technical Specifications2024-03-0404 March 2024 Inoperable Turbine Stop Valve Limit Switch Causes Condition Prohibited by Technical Specifications IR 05000298/20230062024-02-28028 February 2024 Annual Assessment Letter for Cooper Nuclear Station - Report 05000298/2023006 IR 05000298/20230042024-02-12012 February 2024 Integrated Inspection Report 05000298/2023004 IR 05000298/20230122024-02-12012 February 2024 NRC Inspection Report 05000298/2023012 ML24033A3092024-02-12012 February 2024 Summary of Regulatory Audit Regarding the Relief Request RC3-02 Regarding Drywell Head Bolting ML23334A2012024-01-0303 January 2024 Issuance of Amendment No. 274 Revision to Technical Specifications to Adopt TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements 05000298/LER-2023-002, Secondary Containment Differential Pressure Perturbation Exceeds Technical Specifications2023-12-20020 December 2023 Secondary Containment Differential Pressure Perturbation Exceeds Technical Specifications ML23311A1122023-11-0909 November 2023 Project Manager Assignment ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000298/20230032023-11-0202 November 2023 Integrated Inspection Report 05000298/2023003 IR 05000298/20234012023-11-0101 November 2023 Cyber Security Report 05000298/2023401 Public ML23264A8052023-10-11011 October 2023 Issuance of Amendment No. 273 Revision to Technical Specifications to Adopt TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23233A1882023-09-0505 September 2023 Regulatory Audit Plan in Support of Relief Request RC3-02 Regarding Drywell Head Bolting IR 05000298/20243012023-09-0101 September 2023 Notification of NRC Initial Operator Licensing Examination 05000298/2024301 IR 05000298/20230052023-08-21021 August 2023 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2023005)- Mid Cycle Letter IR 05000298/20230022023-08-0808 August 2023 Integrated Inspection Report 05000298/2023002 IR 05000298/20234022023-08-0303 August 2023 NRC Security Inspection Report 05000298/2023402 ML23214A2742023-08-0303 August 2023 Nuclear Station - Notification of Inspection (NRC Inspection Report 05000298/2023004) and Request for Information IR 05000298/20234202023-08-0101 August 2023 Security Baseline Inspection Report 05000298/2023420 05000298/LER-2022-002-01, Manual Core Spray Injection to Restore Skimmer Surge Tank Level2023-06-29029 June 2023 Manual Core Spray Injection to Restore Skimmer Surge Tank Level ML23173A0862023-06-26026 June 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000298/2023401 IR 05000298/20230102023-05-17017 May 2023 Biennial Problem Identification and Resolution Inspection Report 05000298/2023010 05000298/LER-2022-004-01, 1 for Cooper Nuclear Station, Manual Reactor Scram and Group I Isolation Due to Main Turbine Bypass Valve Failing Open2023-05-11011 May 2023 1 for Cooper Nuclear Station, Manual Reactor Scram and Group I Isolation Due to Main Turbine Bypass Valve Failing Open 05000298/LER-2023-001, Valve Test Failures Result in Condition Prohibited by Technical Specifications2023-05-0808 May 2023 Valve Test Failures Result in Condition Prohibited by Technical Specifications IR 05000298/20234032023-05-0404 May 2023 Security Baseline Inspection Report 05000298/2023403 ML23129A2822023-04-20020 April 2023 Submittal of Revision 31 to Updated Safety Analysis Report 2024-09-03
[Table view] |
Text
ber 1, 2015
SUBJECT:
NON-PUBLIC SECURITY INSPECTION PLAN FOR COOPER NUCLEAR STATION (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBER 05000298/2015401)
Dear Mr. Limpias:
On August 12, 2015, the NRC completed its mid-cycle performance review of Cooper Nuclear Station. The results of that review have been transmitted to you separately in a publicly available assessment letter. This letter informs you of the NRCs plans for future security-related inspections at your facility.
The enclosed inspection plan lists the security-related inspections scheduled through June 30, 2017. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the next semiannual performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. Routine force-on-force inspections are conducted approximately every 3 years. You will be notified by separate correspondence 8 to 10 weeks in advance of any force-on-force inspections scheduled for your facility.
While we are fully committed to our goal of ensuring openness in our regulatory process, we must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country. Thus due to the security-related information contained in this correspondence, and in accordance with NRC Policy For Handling, Marking and Protecting Sensitive Unclassified Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's document system (ADAMS).
Please contact me at (817) 200-1527 with any questions you have regarding this letter.
Sincerely,
/RA/
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-298 License No. DPR-46 Enclosure:
Inspection Plan cc w/encl:
Mr. Jerry Bebb Security Manager Nebraska Public Power District Cooper Nuclear Station 72676 648A Avenue P.O. Box 98 Brownville, NE 68321 cc w/o encl:
Electronic Distributionj for Cooper Nuclear Station