Category:Inspection Report Correspondence
MONTHYEARML19158A2952019-06-0707 June 2019 Notification of Evaluation of Changes, Tests, and Experiments Inspection (05000298/2019003) and Request for Information ML18190A2032018-07-0606 July 2018 Notification of NRC Triennial Heat Sink Performance Inspection (05000298/2018003) and Request for Information IR 05000298/20164052016-07-19019 July 2016 Cover Letter for NRC Security Inspection Report 05000298/2016405 IR 05000298/20154022016-03-0202 March 2016 Non-Public Security Inspection Plan for Cooper Nuclear Station (NRC Physical Security Inspection Report Number 05000298/2015402) IR 05000298/20154032015-04-0303 April 2015 IR 05000298/2015403, on 03/27/2015, Cooper Nuclear Station - NRC Temporary Instruction 2201/004, Inspection of Implementation of Interim Cyber Security Milestones 1-7. IR 05000298/20134042013-05-28028 May 2013 NRC Security Inspection Report 05000298-13-404. Cover Letter IR 05000298/20105012011-01-10010 January 2011 IR 05000298-10-501, on 12/31/2010, Cooper Nuclear Station - NRC Annual Emergency Preparedness IR 05000498/20105012011-01-10010 January 2011 IR 05000498-10-501 and 05000499-10-501, on 12/31/2010, South Texas Project Electric Generating Station, Unit 1 and 2 - NRC Emergency Preparedness Annual IR 05000298/20094012010-03-26026 March 2010 NRC Physical Security Annual Inspection Report 05000298-09-401 ML0907211072009-03-12012 March 2009 Notification of NRC Initial Operator Licensing Examination 05000298-09-301 ML0805605062008-02-25025 February 2008 IR 05000298-08-003, 04/15/2008 - 04/18/2008, Cooper Nuclear Station - Notification of Inspection and Request for Information IR 05000298/20075012008-02-21021 February 2008 IR 05000298-07-501, on 12/31/2007, 01/01/2007, for Cooper Nuclear Station - Emergency Preparedness Annual Inspection Report IR 05000298/20074022007-12-12012 December 2007 IR 05000298-07-402, on 11/29/2007, Cooper Nuclear Station - NRC Physical Security Inspection Report ML0719200742007-07-0909 July 2007 IR 05000298-07-401, on 06/04/2007 - 06/07/2007, for Cooper Nuclear Station, Security Baseline Inspection, Security Training - Letter Only IR 05000298/20060082006-08-14014 August 2006 IR 05000298-06-008 07/14/2006 Cooper Nuclear Station - non-SGI Letter Only ML0518002512005-06-29029 June 2005 IR 05000298-05-002 - Cooper Nuclear Station - Reply to Denial of Noncited Violation IR 05000298/20050012005-03-0202 March 2005 Annual Assessment Letter - Cooper Nuclear Station (IR 05000298-05-001) ML0226604592002-09-20020 September 2002 IR 05000298-02-07 Appendix to Cooper Nuclear Station Supplemental Inspection IR 05000298/20023012002-09-0505 September 2002 IR 05000298-02-301, on August 5-9, 2002; Nebraska Public Power District; Cooper Nuclear Station IR 05000298/20010082002-05-0303 May 2002 IR 05000298/2001-008, Cooper Nuclear Station, Inspection on 12/30/2001 - 04/06/2002, Related to Mitigating System, Occupational Radiation Safety & Security Posture. Non-Cited Violations Noted IR 05000298/20010072002-02-0404 February 2002 IR 05000298/2001-007; 10/07/2001-12/29/2001; Nebraska Public Power District; Cooper Nuclear Station. Integrated Resident/Regional Report; Fire Protection, Operability Evaluations, Surveillance Testing, Occupational Radiation Safety. Non-cit IR 05000298/20010112002-01-0909 January 2002 IR 05000298/2001-011, on 11/12 Through 12/11/2001, Nebraska Public Powers District, Cooper Nuclear Station, Supplemental Inspection for a Degraded Emergency Preparedness Cornerstone in the Reactor Safety Strategic Performance Area 2019-06-07
[Table view] Category:Letter
MONTHYEARIR 05000298/20240022024-07-25025 July 2024 Integrated Inspection Report 05000298/2024002 ML24183A1722024-07-17017 July 2024 Issuance of Amendment No. 277 to Adopt TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil ML24197A1462024-07-15015 July 2024 NRC Region IV Ltr to Cooper Nuclear Station Re FEMA Level 1 Finding ML24134A1782024-07-0303 July 2024 Issuance of Amendment No. 276 Revision to Technical Specification 3.8.3, Diesel Fuel Oil, Lube Oil and Starting Air, to Allow for Cleaning, Inspection and Any Needed Repairs During Refuel Outage 33 ML24197A0682024-06-24024 June 2024 FEMA Ltr to Missouri State Emergency Management Agency - Level 1 Finding, 24 June 2024 ML24192A0112024-06-13013 June 2024 2024-06-Post Exam Comments IR 05000298/20244012024-06-0404 June 2024 Security Baseline Inspection Report 05000298/2024401 IR 05000298/20243012024-05-30030 May 2024 NRC Initial Operator Licensing Examination Approval 05000298/2024301 ML24137A0942024-05-17017 May 2024 Regulatory Audit Plan in Support of License Amendment Request to Modify Allowable Value Regarding Technical Specification for High Pressure Coolant Injection Pump Discharge Low Flow IR 05000298/20240012024-05-0303 May 2024 Integrated Inspection Report 05000298/2024001 ML24129A0952024-04-25025 April 2024 Preparation and Scheduling of Operator Licensing Examinations IR 05000298/20240102024-04-24024 April 2024 Comprehensive Engineering Team Inspection Report 05000298/2024010 ML24096A1202024-04-0505 April 2024 Issuance of Amendment No. 275 Revision to Technical Specification 3.3.1.1 (Emergency Circumstances) ML24093A2282024-04-0202 April 2024 Notice of Enforcement Discretion for Cooper Nuclear Station ML23334A2012024-01-0303 January 2024 Issuance of Amendment No. 274 Revision to Technical Specifications to Adopt TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23311A1122023-11-0909 November 2023 Project Manager Assignment IR 05000298/20230032023-11-0202 November 2023 Integrated Inspection Report 05000298/2023003 IR 05000298/20234012023-11-0101 November 2023 Cyber Security Report 05000298/2023401 Public ML23264A8052023-10-11011 October 2023 Issuance of Amendment No. 273 Revision to Technical Specifications to Adopt TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23233A1882023-09-0505 September 2023 Regulatory Audit Plan in Support of Relief Request RC3-02 Regarding Drywell Head Bolting IR 05000298/20230052023-08-21021 August 2023 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2023005)- Mid Cycle Letter IR 05000298/20230022023-08-0808 August 2023 Integrated Inspection Report 05000298/2023002 IR 05000298/20234022023-08-0303 August 2023 NRC Security Inspection Report 05000298/2023402 ML23214A2742023-08-0303 August 2023 Nuclear Station - Notification of Inspection (NRC Inspection Report 05000298/2023004) and Request for Information IR 05000298/20234202023-08-0101 August 2023 Security Baseline Inspection Report 05000298/2023420 ML23173A0862023-06-26026 June 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000298/2023401 IR 05000298/20230102023-05-17017 May 2023 Biennial Problem Identification and Resolution Inspection Report 05000298/2023010 IR 05000298/20234032023-05-0404 May 2023 Security Baseline Inspection Report 05000298/2023403 ML23129A2822023-04-20020 April 2023 Submittal of Revision 31 to Updated Safety Analysis Report ML23102A0282023-04-19019 April 2023 U.S. Nuclear Regulatory Commission Presentation at the May 8, 2023, Brownville Village Meeting IR 05000298/20230012023-04-17017 April 2023 Integrated Inspection Report 05000298/2023001 ML23060A1582023-03-0808 March 2023 Design Basis Assurance Inspection (Programs) Inspection Report 05000298/2023001 IR 05000298/20220062023-03-0101 March 2023 Annual Assessment Letter for Cooper Nuclear Station Report 05000298/2022006 ML23041A1622023-02-10010 February 2023 Licensed Operator Positive Fitness-for-Duty Test Request for Additional Information IR 05000298/20220042023-01-30030 January 2023 Integrated Inspection Report 05000298/2022004 IR 05000298/20220112022-12-23023 December 2022 License Renewal Phase 4 Inspection Report 05000298/2022011 ML22286A2072022-11-30030 November 2022 Issuance of Amendment No. 272 Revision to Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements IR 05000298/20220032022-10-27027 October 2022 Integrated Inspection Report 05000298/2022003 ML22304A0052022-10-26026 October 2022 Surveillance Capsule Location (Re-insertion Into the Reactor Vessel) IR 05000298/20223022022-10-20020 October 2022 NRC Initial Operator Licensing Examination Approval 05000298/2022302 ML22276A1562022-10-0505 October 2022 Notification of Commercial Grade Dedication Inspection 05000298/2023011 and Request for Information IR 05000298/20224022022-09-29029 September 2022 NRC Security Inspection Report 05000298/2022402 (Full Report) IR 05000298/20220052022-08-18018 August 2022 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298 2022005) IR 05000298/20223012022-08-10010 August 2022 NRC Examination Report 05000298/2022301 IR 05000298/20220022022-07-28028 July 2022 Integrated Inspection Report 05000298/2022002 ML22200A2772022-07-21021 July 2022 Correction to Proposed Inservice Testing Alternative RS-01, Revision of Error in Safety Evaluation ML22152A1232022-07-18018 July 2022 Issuance of Amendment No. 271 Request for Exception from Certain Primary Containment Leak Rate Testing Requirements IR 05000298/20224012022-06-29029 June 2022 Security Baseline Inspection Report 05000298/2022401 IR 05000298/20224032022-06-28028 June 2022 Security Baseline Inspection Report 05000298/2022403 2024-07-03
[Table view] |
Text
ril 3, 2015
SUBJECT:
COOPER NUCLEAR STATION - NRC TEMPORARY INSTRUCTION 2201/004, INSPECTION OF IMPLEMENTATION OF INTERIM CYBER SECURITY MILESTONES 1-7, INSPECTION REPORT 05000298/2015403
Dear Mr. Limpias:
On March 27, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security temporary instruction inspection at your Cooper Nuclear Station. The inspection covered the implementation of interim milestones associated with your cyber security program, as outlined in your approved cyber security plan and described in Temporary Instruction 2201/004, Inspection of Implementation of Interim Cyber Security Milestones 1-7, Revision 1. The enclosed inspection report documents the inspection results, which were discussed on March 27, 2015, with Mr. D. Buman, Director, Engineering, and other members of your staff.
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
NRC inspectors documented four findings of very low security significance in this report.
These findings involved violations of NRC requirements. Inspectors also documented one licensee-identified violation, which was determined to be of very low security significance. The NRC is treating these violations as non-cited violations consistent with Section 2.3.2.a of the Enforcement Policy. These issues were discussed and reviewed during a Security Issues Forum meeting conducted on February 25, 2015. The Security Issues Forum Panel review concluded that, although these issues constituted violations of Title 10, Code of Federal Regulations (10 CFR), Part 73, Section 54, Protection of Digital Computer and Communication Systems and Networks, the NRC is exercising enforcement discretion. The NRC is exercising enforcement discretion for these violations because they meet the criteria established in an NRC Memorandum from Barry C. Westreich, Director, Cyber Security Directorate, Office of Nuclear Security and Incident Response, to each regional office and Director, Division of Reactor Safety, Subject: Enhanced Guidance for Licensee Near-Term Corrective Actions to Address Cyber Security Inspection Findings and Licensee Eligibility for Good-Faith Attempt Discretion, dated July 1, 2013 (ADAMS Accession Number ML13178A203). Consistent with the NRC Memorandum, when you complete and close corrective actions associated with these violations, you are requested to provide written notification to the NRCs regional office as to the method and date of closure of the corrective actions for the identified violations.
If you contest the violations or significance of these non-cited violations, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC resident inspector at the Cooper Nuclear Station.
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)
component of the NRC's Agencywide Documents Access and Management System (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
The material enclosed herewith, however, contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely,
/RA/ Gregory A. Pick for Gregory E. Werner, Branch Chief Engineering Branch 2 Division of Reactor Safety Docket No. 50-298 License No. DPR-46 Nonpublic Enclosure:
Inspection Report No. 05000298/2015403 w/Attachment: Supplemental Information cc w/o encl:
Electronic Distribution