MONTHYEARML13079A2272013-03-12012 March 2013 Flood Hazard Reevaluation Report in Response to NRC Ltr. Request for Information Pursuant to 10 CFR 50.54(f) Re Recommendations 2.1, 2.3, and 9.3, of Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident Project stage: Request ML13077A1782013-03-18018 March 2013 3/25/13 Forthcoming Meeting with Duke Energy Carolinas to Discuss Response to NRC Request for Information for a Flooding Hazard Reevaluation for Oconee Nuclear Station, Units 1, 2, and 3 Project stage: RAI ML13092A3632013-04-0404 April 2013 3/25/2013 - Oconee Nuclear Station, Units 1, 2, and 3 - Summary of Meeting with Duke Energy Carolinas, LLC, to Discuss the Flood Hazard Reevaluation Report Project stage: Meeting ML13254A2262013-09-11011 September 2013 Meeting Notice with Duke Energy Carolinas, LLC, to Discuss the Seismic Review of the Jocassee Dam for the Oconee Nuclear Station, Units 1, 2, and 3 (Tac Nos. MF0518, MF0519, MF0520, MF1012, MF1013, and MF1014) Project stage: Meeting ML13275A2252013-09-24024 September 2013 9/24/13 Meeting Slides from Meeting with Duke Energy Carolinas, LLC, Oconee Nuclear Station Units 1, 2, and 3, Jocassee Dam Seismic Analysis Project stage: Request ML13281A5412013-10-21021 October 2013 9/24/2013 - Oconee Nuclear Station, Units 1, 2, and 3, Summary of Meeting with Duke Energy Carolinas, LLC, to Discuss the Jocassee Dam Seismic Analysis Project stage: Meeting ML14064A5912014-03-20020 March 2014 Request for Additional Information Regarding Fukushima Lessons Learned Flood Hazard Reevaluation Report (TAC Nos. MF1012, MF1013, and MF1014) Project stage: RAI ML14258B2222014-09-15015 September 2014 NRR E-mail Capture - Request for Additional Informaiton - Oconee Flooding Hazard Reevaluation Report (TAC Nos. MF1012, MF1013, and MF1014) Project stage: Other ML14356A0062014-12-0303 December 2014 Presentation at December 3, 2014, Category 1 Public Meeting with Duke Energy Carolinas, LLC to Discuss NTTF Recommendation 2.1, Flooding Response Project stage: Request ML14356A0052014-12-31031 December 2014 Summary of December 3, 2014, Category 1 Public Meeting with Duke Energy Carolinas, LLC to Discuss NTTF Recommendation 2.1, Flooding Response for Oconee Nuclear Station, Units 1, 2, and 3 Project stage: Meeting ONS-2015-011, Submittal of Revised Flood Hazard Reevaluation Report Per Nrc'S Request for Additional Information2015-03-0606 March 2015 Submittal of Revised Flood Hazard Reevaluation Report Per Nrc'S Request for Additional Information Project stage: Request ML15118A4602015-05-0808 May 2015 Audit Plan for the Flood Hazard Reevaluation Report Submittal Relating to the Near-Term Task Force Recommendation 2.1 - Flooding Project stage: Other ML15239B2612015-09-24024 September 2015 Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation Project stage: Other ONS-2016-001, Transmittal of Supplemental Information Regarding NRC 2008 and 2012 Requests for Information, Pursuant to 10 Cer 50.54(f) Pertaining to External Flooding - Revision 12016-01-0808 January 2016 Transmittal of Supplemental Information Regarding NRC 2008 and 2012 Requests for Information, Pursuant to 10 Cer 50.54(f) Pertaining to External Flooding - Revision 1 Project stage: Supplement ML15355A1642016-01-12012 January 2016 Nuclear Regulatory Commission Report for the Audit of Duke Energy Carolinas, Llc'S Flood Hazard Reevaluation Report Submittal Related to the Near-Term Task Force Recommendation 2.1-Flooding for Oconee Nuclear Station, Units 1, 2 and 3 Project stage: Other ONS-2016-042, Notification of External Flood Modifications Completion2016-04-29029 April 2016 Notification of External Flood Modifications Completion Project stage: Other 2014-12-31
[Table View] |
|
---|
Category:Letter type:ONS
MONTHYEARONS-2018-025, 2017 Annual Radiological Environmental Operating Report (AREOR)2018-05-15015 May 2018 2017 Annual Radiological Environmental Operating Report (AREOR) ONS-2018-024, 2017 Annual Radioactive Effluent Release Report (ARERR)2018-04-30030 April 2018 2017 Annual Radioactive Effluent Release Report (ARERR) ONS-2018-032, Ufsar/Selected Licensee Commitment Changes2018-04-17017 April 2018 Ufsar/Selected Licensee Commitment Changes ONS-2018-029, Technical Specifications Task Force (TSTF) - 448, Revision 3, Control Room Habitability, License Amendment Request No. 2015-03, Supplement 32018-04-0404 April 2018 Technical Specifications Task Force (TSTF) - 448, Revision 3, Control Room Habitability, License Amendment Request No. 2015-03, Supplement 3 ONS-2018-027, Oconee, Units 1, 2, and 3, Submittal of Emergency Plan Revision 2018-0022018-03-28028 March 2018 Oconee, Units 1, 2, and 3, Submittal of Emergency Plan Revision 2018-002 ONS-2018-023, Response to Nrc'S Request for Additional Information Regarding Relief Request 17-ON-001; Alternative to Extend the Code Case N-770, Inspection Item B, Examination Frequency2018-03-20020 March 2018 Response to Nrc'S Request for Additional Information Regarding Relief Request 17-ON-001; Alternative to Extend the Code Case N-770, Inspection Item B, Examination Frequency ONS-2018-017, Oconee, Units 1, 2, and 3, Submittal of Revised Evaluation to Emergency Plan2018-03-15015 March 2018 Oconee, Units 1, 2, and 3, Submittal of Revised Evaluation to Emergency Plan ONS-2018-021, ISFSI - Submittal of 2017 Annual Effluent Release Report2018-03-0101 March 2018 ISFSI - Submittal of 2017 Annual Effluent Release Report ONS-2018-020, Refuel 28 (O2R28) In-service Inspection (ISI) and Steam Generator In-service Inspection (SG-ISI) Report, Fifth 10-Year ISI Interval2018-02-26026 February 2018 Refuel 28 (O2R28) In-service Inspection (ISI) and Steam Generator In-service Inspection (SG-ISI) Report, Fifth 10-Year ISI Interval ONS-2018-013, Technical Specification Bases Changes2018-02-22022 February 2018 Technical Specification Bases Changes ONS-2018-015, Duke Energy Response to Request for Additional Information; Request for Alternative to Codes and Standards Requirements Pursuant to 10 CFR 50.55a(z) to Satisfy 10 CFR 50.55a(h)(2) Associated with Bronze Tape Wrapped Emergency Power Cabl2018-02-19019 February 2018 Duke Energy Response to Request for Additional Information; Request for Alternative to Codes and Standards Requirements Pursuant to 10 CFR 50.55a(z) to Satisfy 10 CFR 50.55a(h)(2) Associated with Bronze Tape Wrapped Emergency Power Cables i ONS-2018-014, License Amendment Request (LAR) for Changes to the Duke Energy Physical Security Plan - License Amendment Request No. 2018-012018-02-12012 February 2018 License Amendment Request (LAR) for Changes to the Duke Energy Physical Security Plan - License Amendment Request No. 2018-01 ONS-2018-019, Submittal of Emergency Plan, Section B2018-02-0505 February 2018 Submittal of Emergency Plan, Section B ONS-2018-011, Ufsar/Selected Licensee Commitment Changes2018-01-25025 January 2018 Ufsar/Selected Licensee Commitment Changes ONS-2017-087, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from ...2017-12-0404 December 2017 Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from ... ONS-2017-083, Core Operating Limits Report (COLR) for Cycle 29 ONEl-0400-491, Revision 02017-11-21021 November 2017 Core Operating Limits Report (COLR) for Cycle 29 ONEl-0400-491, Revision 0 ONS-2017-041, Revision to Tornado/Helb Mitigation Strategies and Regulatory Commitments2017-11-15015 November 2017 Revision to Tornado/Helb Mitigation Strategies and Regulatory Commitments ONS-2017-085, Duke Energy Comments on the October 24, 2017, Public Meeting with NRC Committee to Review Generic Requirements (CRGR)2017-11-15015 November 2017 Duke Energy Comments on the October 24, 2017, Public Meeting with NRC Committee to Review Generic Requirements (CRGR) ONS-2017-079, Supplemental Information to Support NRC Review of Relief Request No. 17-0N-001; Alternative to Extend the Code Case N-770, Inspection Item B Examination Frequency2017-11-13013 November 2017 Supplemental Information to Support NRC Review of Relief Request No. 17-0N-001; Alternative to Extend the Code Case N-770, Inspection Item B Examination Frequency ONS-2017-078, Emergency Plan Revision 2017-0042017-11-0909 November 2017 Emergency Plan Revision 2017-004 ONS-2017-074, Proposed Amendment to the Renewed Facility Operating Licenses Regarding Revisions to the Updated Final Safety Analysis Report Section Associated with Tile Standby Shutdown Facility License Amendment Request No. 2017-032017-10-20020 October 2017 Proposed Amendment to the Renewed Facility Operating Licenses Regarding Revisions to the Updated Final Safety Analysis Report Section Associated with Tile Standby Shutdown Facility License Amendment Request No. 2017-03 ONS-2017-067, Response to Request for Additional Information Regarding License Amendment Request for TSTF-448, Revision 3, Control Room Habitability, License Amendment Request No. 2015-03, Supplement 22017-10-16016 October 2017 Response to Request for Additional Information Regarding License Amendment Request for TSTF-448, Revision 3, Control Room Habitability, License Amendment Request No. 2015-03, Supplement 2 ONS-2017-069, (ONS) - Additional Information Regarding License Amendment Request for Temporary Completion Time for One Keowee Hydro Unit Inoperable for Generator Stator Replacement2017-10-13013 October 2017 (ONS) - Additional Information Regarding License Amendment Request for Temporary Completion Time for One Keowee Hydro Unit Inoperable for Generator Stator Replacement ONS-2017-070, Transmittal of Oconee, Units 1, 2, and 3, Emergency Plan Implementing Procedures Manual Volume 2, Revision 2017-0022017-10-0505 October 2017 Transmittal of Oconee, Units 1, 2, and 3, Emergency Plan Implementing Procedures Manual Volume 2, Revision 2017-002 ONS-2017-072, Fifth Ten Year Lnservice Inspection Interval, Relief Request No. 17-0N-001; Alternative to Extend the Code Case N-770, Inspection Item B Examination Frequency2017-10-0303 October 2017 Fifth Ten Year Lnservice Inspection Interval, Relief Request No. 17-0N-001; Alternative to Extend the Code Case N-770, Inspection Item B Examination Frequency ONS-2017-066, Registration for Use of General License Spent Fuel Cask Numbers 147 and 1482017-09-20020 September 2017 Registration for Use of General License Spent Fuel Cask Numbers 147 and 148 ONS-2017-061, Revised Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator License Examinations2017-08-10010 August 2017 Revised Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator License Examinations ONS-2017-060, Registration for Use of General License Spent Fuel Cask Numbers 145 and 1462017-08-0303 August 2017 Registration for Use of General License Spent Fuel Cask Numbers 145 and 146 ONS-2017-059, Transmittal of Response to March 12, 2012 Request for Information, Recommendation 2.1 Flooding, Required Response 3, Flooding Focused Evaluation Summary2017-07-31031 July 2017 Transmittal of Response to March 12, 2012 Request for Information, Recommendation 2.1 Flooding, Required Response 3, Flooding Focused Evaluation Summary ONS-2017-050, Technical Specification Bases Change 2017-042017-07-21021 July 2017 Technical Specification Bases Change 2017-04 ONS-2017-052, Technical Specification Bases Change 2017-032017-07-20020 July 2017 Technical Specification Bases Change 2017-03 ONS-2017-043, Technical Specification Bases Change 2017-012017-07-20020 July 2017 Technical Specification Bases Change 2017-01 ONS-2017-047, Registration for Use of General License Spent Fuel Cask Numbers 142, 143, and 1442017-06-27027 June 2017 Registration for Use of General License Spent Fuel Cask Numbers 142, 143, and 144 ONS-2017-042, Additional Information Regarding License Amendment Request for Temporary Completion Time for One Keowee Hydro Unit Inoperable for Generator Stator Replacement, License Amendment Request No. 2015-08, Supplement 22017-06-0101 June 2017 Additional Information Regarding License Amendment Request for Temporary Completion Time for One Keowee Hydro Unit Inoperable for Generator Stator Replacement, License Amendment Request No. 2015-08, Supplement 2 ONS-2017-040, Transmittal of Emergency Plan Implementing Procedures Manual Volume 1, Revision 2017-0032017-05-22022 May 2017 Transmittal of Emergency Plan Implementing Procedures Manual Volume 1, Revision 2017-003 ONS-2017-037, 2016 Annual Radiological Environmental Operating Report2017-05-15015 May 2017 2016 Annual Radiological Environmental Operating Report ONS-2017-026, Submittal of Ufsar/Selected Licensee Commitment Change2017-04-11011 April 2017 Submittal of Ufsar/Selected Licensee Commitment Change ONS-2017-024, Revision 028 to ERTG-001, Emergency Response Organization and Emergency Services Training Program2017-03-16016 March 2017 Revision 028 to ERTG-001, Emergency Response Organization and Emergency Services Training Program ONS-2017-001, Submittal of Emergency Plan Program Procedure HP/O/B/1009/001 Rev 0452017-03-0202 March 2017 Submittal of Emergency Plan Program Procedure HP/O/B/1009/001 Rev 045 ONS-2017-017, Emergency Plan Implementing Procedures Manual Volume 1, Revision 2017-0012017-03-0202 March 2017 Emergency Plan Implementing Procedures Manual Volume 1, Revision 2017-001 ONS-2017-018, Emergency Plan Implementing Procedures Manual Volume 2, Revision 2017-0012017-03-0202 March 2017 Emergency Plan Implementing Procedures Manual Volume 2, Revision 2017-001 ONS-2017-015, End of Cycle 29 (1 EOC29) Refueling Outage Lnservice Inspection (ISI) and Steam Generator Lnservice Inspection (SG-ISI) Report, Fifth 10-Year ISI Interval2017-02-24024 February 2017 End of Cycle 29 (1 EOC29) Refueling Outage Lnservice Inspection (ISI) and Steam Generator Lnservice Inspection (SG-ISI) Report, Fifth 10-Year ISI Interval ONS-2017-019, Technical Specification Bases Change 2015-092017-02-23023 February 2017 Technical Specification Bases Change 2015-09 ONS-2017-011, Emergency Plan Revised Evaluation2017-02-0202 February 2017 Emergency Plan Revised Evaluation ONS-2017-009, Units 1, 2 & 3 - Notification of Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events.2017-02-0101 February 2017 Units 1, 2 & 3 - Notification of Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events. ONS-2017-004, Submittal of Core Operating Limits Report2017-01-12012 January 2017 Submittal of Core Operating Limits Report ONS-2017-006, Emergency Plan Revision 2016-0032017-01-12012 January 2017 Emergency Plan Revision 2016-003 ONS-2016-097, Emergency Plan/Emergency Plan Implementing Procedures Manual, Revised 10CFR 50.54(q) Evaluation(S)2016-11-17017 November 2016 Emergency Plan/Emergency Plan Implementing Procedures Manual, Revised 10CFR 50.54(q) Evaluation(S) ONS-2016-098, Special Report Per Technical Specification 5.6.6, Inoperability of Post Accident Monitoring Containment High Range Radiation Monitors2016-11-14014 November 2016 Special Report Per Technical Specification 5.6.6, Inoperability of Post Accident Monitoring Containment High Range Radiation Monitors ONS-2016-096, Revised Response to NRC Regulatory Issue Summary 2015-05, Preparation and Scheduling of Operator Licensing Examinations2016-11-10010 November 2016 Revised Response to NRC Regulatory Issue Summary 2015-05, Preparation and Scheduling of Operator Licensing Examinations 2018-05-15
[Table view] |
Text
DUKE Scott L. Batson Vice President Oconee Nuclear Station ENERGY. Duke Energy ONOI VP 17800 RochesterHwy Seneca, SC 29672 o: 864.873.3274 f 864.873. 4208 ONS-2015-011 Scoff.Batson@duke-energy.com March 6, 2015 ATTN: Document Control Desk 10 CFR 50.54(f)
U.S. Nuclear Regulatory Commission (NRC)
Washington, DC 20555 Duke Energy Carolinas, LLC (Duke Energy)
Oconee Nuclear Station, Units 1, 2 and 3 Docket Numbers 50-269, 50-270, 50-287 Renewed License Numbers DPR-38, DPR-47, and DPR-55
Subject:
Revised Flood Hazard Reevaluation Report per NRC's Request for Additional Information.
References:
- 1. NRC Letter, Request for Information Pursuantto Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichiAccident, dated March 12, 2012, (ADAMS Accession No. ML12053A340)
- 2. Duke Energy Letter, Flood Hazard Reevaluation Report in response to NRC letter, "Request for Information Pursuantto Title 10 of the Code of FederalRegulations 50.54(f)
Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichiAccident,"dated March 12, 2013
- 3. NRC Letter, Oconee Nuclear Station, Units 1, 2, and 3, Request for Additional Information Regarding Fukushima Lessons Learned Flood Hazard Reevaluation Report (TAC Nos. MF1012, MF1013, AND MF1014), dated March 20, 2014, (ADAMS Accession No. ML14064A591)
- 4. NRC E-Mail, Request for Additional Information - Oconee Flooding Hazard Reevaluation Report (TAC NOS. MF1012, MF1013, AND MF1014), dated September 15, 2014, (ADAMS Accession No. ML14258B222)
- 5. Duke Energy Letter, Schedule to Respond to a Request for Additional Information Regarding the Reanalysis of an Upstream Dam Flood, dated October 15, 2014, (ADAMS Accession No. ML14293A043)
- 6. NRC Letter; CAL 2-10-003: ConfirmatoryAction Letter - Oconee Nuclear Station, Units 1, 2, and 3 Commitments to addressexternal Flooding Concerns,dated June 22, 2010, (ADAMS Accession No. ML101730329) contains Security Sensitive Information; withhold from public per 10 CFR 2.390(d)(1)
Upon removal of Enclosure 1, this letter is uncontrolled.
ONS-2015-011 March 6, 2015 Page 2 Ladies and Gentlemen, Duke Energy submitted the Flood Hazard Reevaluation Report (FHRR) for Oconee Nuclear Station (ONS) on March 12, 2013 (Reference 2) pursuant to the NRC's 10 CFR 50.54(f) request dated March 12, 2012 (Reference 1).
By E-mail dated September 15, 2014 (Reference 4), the NRC transmitted a Request for Additional Information (RAI) regarding Oconee's flood analysis of a postulated upstream dam failure. That RAI requested the dam failure be re-analyzed by applying alternate breach methodologies.
Because the new analysis would impact the information in the original FHRR, and affect several responses to a previous RAI (Reference 3), ONS submitted an RAI response on October 15, 2014 (Reference 5) that provided an action plan to revise the FHRR and to address any previous RAI responses affected by that revision. This letter submits the deliverables of that action plan.
Enclosure 1 to this letter is the revised "FloodHazardReevaluation Report"for Oconee Nuclear Station. It incorporates the results of a revised flood analysis which utilizes alternate breach methodologies, as requested by the September 15, 2014 RAI. It also incorporates a recently completed seismic analysis specific to the Jocassee Dam, which satisfies the request framed by RAIl of the March 20, 2014 RAI.
When preparing Duke Energy's October 15, 2014 response, it was recognized that the FHRR revision would impact the previous response to RAIsl 1 through 15 of the March 20, 2014 RAI.
The updated answers to RAIs-1 1 and 12, are now contained in the appropriate sections of the enclosed report. RAI-13 requested electronic input and output files for the dam breach computer model applicable to the FHRR. This letter transmits the new model files implemented in the revised FHRR as attachments (the files will be on electronic media). The new responses to RAIs14 and 15 are provided in Section 5 of the revised FHRR.
Enclosure 1 contains Security Sensitive information and is requested to be withheld from public disclosure in accordance with 10 CFR 2.390(d).
This letter does not create nor revise any Regulatory Commitments.
Should you have any questions concerning this letter, or require additional information, please contact Bryan McCabe at (919) 812-8324.
I declare under penalty of perjury that the foregoing is true and correct. Executed on March 6, 2015.
Sincerely, Scott L. Batson Vice President Oconee Nuclear Station Enclosure I contains Security Sensitive Information; withhold from public per 10 CFR 2.390(d)(1)
Upon removal of Enclosure 1, this letteris uncontrolled.
ONS-2015-011 March 6, 2015 Page 3
Enclosures:
- 1. Revision 1 to Flood Hazard Reevaluation Report - Oconee Nuclear Station Attachments:
- 1. Computer support Files on CD:
Oconee Nuclear Station, Upstream Dam Failure 1-D Hydraulic Modeling -
HECRAS Ver. 4.1 Input/Output Files, January 28, 2015
- 2. Computer support Files on CD:
Oconee Nuclear Station, Upstream Dam Failure 2-D Hydraulic Modeling -
TUFLOW FV Ver. 2014.01.007, January 28, 2015 Note: The Attached electronic media are computer files being transmitted to the Japan Lessons Learned Division for input to their software.
The files are not documents and are incompatible with printing. contains Security Sensitive Information; withhold from public per 10 CFR 2.390(d)(1)
Upon removal of Enclosure 1, this letteris uncontrolled.
ONS-2015-011 March 6, 2015 Page 4 cc: (with Enclosure only)
Mr. Victor McCree, Regional Administrator U.S. Nuclear Regulatory Commission - Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 Mr. William Dean, Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Mr. Jeffery Whited (by electronic mail only)
U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop 0-811A Rockville, MD 20852 Mr. Nicholas DiFrancesco, Project Manager (Seismic Walkdowns and Reevaluations)
(by electronic mail only)
U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop 0-1 3C5 Rockville, MD 20852 Mr. Eddy Crowe NRC Senior Resident Inspector Oconee Nuclear Station cc (with Enclosure and 2 copies of Attachment):
Mr. James R. Hall, Project Manager (ONS)
(by electronic mail only)
US. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop O-8G9A Rockville, MD 20852 cc (with Enclosure and 3 copies of Attachment):
Mr. Robert F. Kuntz, Senior Project Manager (NRR/JLD/JHMB)
U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop O-13F15 Rockville, MD 20852 contains Security Sensitive Information; withhold from public per 10 CFR 2.390(d)(1)
Upon removal of Enclosure 1, this letter is uncontrolled.