MONTHYEARML24025A0922024-01-25025 January 2024 Requalification Program Inspection L-23-267, Submittal of Discharge Monitoring Report (Npdes), Permit No. PA00256152023-12-18018 December 2023 Submittal of Discharge Monitoring Report (Npdes), Permit No. PA0025615 IR 05000334/20230112023-12-0404 December 2023 Age-Related Degradation Inspection Report 05000334/2023011 and 05000412/2023011 L-23-229, Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports2023-11-29029 November 2023 Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports IR 05000334/20233012023-11-27027 November 2023 Initial Operator Licensing Examination Report 05000334/2023301 L-23-247, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-11-17017 November 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 IR 05000334/20230032023-11-0606 November 2023 Integrated Inspection Report 05000334/2023003 and 05000412/2023003 L-23-227, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 20232023-10-20020 October 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 2023 ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23198A3592023-10-0202 October 2023 Issuance of Amendment Nos. 322 and 212 Analytical Methodology to the Core Operating Limits Report for a Full Spectrum Loss of Coolant Accident (EPID L-2022-LLA-0129) - Nonproprietary IR 05000334/20234022023-09-29029 September 2023 Security Baseline Inspection Report 05000334/2023402 and 05000412/2023402 (Cover Letter Only) ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure IR 05000334/20234012023-09-21021 September 2023 Cybersecurity Inspection Report 05000334/2023401 and 05000412/2023401 (Cover Letter Only) ML23263A0192023-09-20020 September 2023 Operator Licensing Examination Approval ML23243A9272023-09-19019 September 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23249A1842023-09-18018 September 2023 Authorization and Safety Evaluation for Alternative Request No. 2-TYP-4-RV-06 L-23-208, Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA00256152023-09-14014 September 2023 Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA0025615 L-23-167, Twenty-Third Refueling Outage Inservice Inspection Summary Report2023-09-13013 September 2023 Twenty-Third Refueling Outage Inservice Inspection Summary Report L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments IR 05000334/20230052023-08-31031 August 2023 Updated Inspection Plan for Beaver Valley Power Station Units 1 and 2 (Report 05000334/2023005 and 05000412/2023005) L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual ML23129A1722023-08-25025 August 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 IR 05000334/20230022023-08-0909 August 2023 Integrated Inspection Report 05000334/2023002 and 05000412/2023002 ML23219A0592023-08-0707 August 2023 Steam Generator Inspection Reports - Spring 2023 Spring Refueling Outrage L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-179, Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA00256152023-07-18018 July 2023 Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA0025615 ML23188A0982023-07-17017 July 2023 Correction to the Safety Evaluation Issued Related to Amendment Nos. 321 and 211 Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time ML23188A0672023-07-10010 July 2023 Project Manager Assignment L-23-165, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-06-26026 June 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-139, Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report2023-06-13013 June 2023 Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report ML23157A1072023-06-0707 June 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000334/2023011 and 05000412/2023011 ML23143A0272023-05-23023 May 2023 Licensed Operator Positive Fitness-For-Duty Test L-23-055, Submittal of the Updated Final Safety Analysis Report, Revision 342023-05-23023 May 2023 Submittal of the Updated Final Safety Analysis Report, Revision 34 ML23102A1472023-05-22022 May 2023 Issuance of Amendment Nos. 321 and 211 Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report ML23135A7872023-05-19019 May 2023 Summary of Conference Calls Regarding the Spring 2023 Steam Generator Tube Inspections L-23-137, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-05-18018 May 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 ML23124A1742023-05-17017 May 2023 Energy Harbor Fleet Vistra License Transfer - Request for Withholding Information from Public Disclosure for Commance Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 L-23-125, Cycle 24 Core Operating Limits Report2023-05-17017 May 2023 Cycle 24 Core Operating Limits Report ML23124A3882023-05-16016 May 2023 Summary of Regulatory Audit in Support of License Amendment Request to Revise Technical Specification 5.6.3, Core Operating Limits Reports (COLR) and TS 4.2.1 Fuel Assemblies ML23129A0112023-05-16016 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (Letter) L-23-132, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-10010 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations IR 05000334/20230012023-05-0808 May 2023 Integrated Inspection Report 05000334/2023001 and 05000412/2023001 L-23-129, Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations2023-05-0505 May 2023 Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations ML23118A3812023-04-28028 April 2023 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations L-23-115, Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological2023-04-27027 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological L-23-126, Discharge Monitoring Report (Npdes), Permit No. PA00256152023-04-22022 April 2023 Discharge Monitoring Report (Npdes), Permit No. PA0025615 CP-202300181, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-20020 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments ML23107A2502023-04-18018 April 2023 Requalification Program Inspection 2024-01-25
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23143A0272023-05-23023 May 2023 Licensed Operator Positive Fitness-For-Duty Test ML23125A1462023-05-0505 May 2023 NRR E-mail Capture - Beaver Valley - RAI Regarding Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations ML23125A1602023-05-0505 May 2023 NRR E-mail Capture - Correction to Beaver Valley - RAI Regarding Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations ML23122A0342023-05-0202 May 2023 NRR E-mail Capture - Beaver Valley - Request for Additional Information Regarding Unit 1 - 180 Day Steam Generator Tube Inspection Report ML22312A5912022-11-0808 November 2022 NRR E-mail Capture - Beaver Valley Power Station, Units 1&2 - Request for Additional Information LAR to Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time ML22278A0972022-10-0606 October 2022 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Fire Protection Program Changes ML22178A1322022-06-24024 June 2022 Request for Additional Information for Beaver Valley Unit 2 Steam Generator Inspection Report - Fall 2021 Refueling Outage ML22068A1822022-03-0909 March 2022 NRR E-mail Capture - Beaver Valley Power Station, Units 1 & 2 - Request for Additional Information for License Amendment Request to Revise Technical Specification 3.3.5 ML22013A7512022-01-13013 January 2022 Information Request to Support Triennial Baseline Design-Basis Capability of Power-Operated Valves Inspection; Inspection Report 05000334/2022010 and 05000412/2022010 ML21292A0482021-10-19019 October 2021 Ti 2515/194 Inspection Documentation Request ML21259A1642021-09-16016 September 2021 NRR E-mail Capture - Request for Additional Information Regarding the LAR for Core Operating Limits ML21124A1322021-05-0404 May 2021 Notification of Conduct of a Fire Protection Team Inspection ML21102A1542021-04-0909 April 2021 Request for Additional Information (2nd Round) - Steam Generator Tube Sleeve LAR ML21082A4942021-03-23023 March 2021 Final RAIs for GL 04-02 Closure (Email) ML21068A3502021-03-0909 March 2021 Final Request for Additional Information for Reactor Coolant System (RCS) and Pressure and Tempature Limits Report(Ptlr) TS LAR ML21053A0252021-02-20020 February 2021 NRR E-mail Capture - Request for Additional Information (Rais) - LaSalle Request for Exemption from Pre-Access Drug and Alcohol Testing ML21015A5762021-01-14014 January 2021 Final RAIs for Steam Generator 180 Day Tube Inspection Report ML21007A3732021-01-0707 January 2021 NRR E-mail Capture - (External_Sender) (External) Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff, ML21004A1442020-12-30030 December 2020 NRR E-mail Capture - Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff ML20290B0082020-10-0808 October 2020 Draft Request for Additional Information - Steam Generator Letter ML20127H8672020-05-0606 May 2020 NRR E-mail Capture - Beaver Valley, Davis-Besse, and Perry - Request for Additional Information Regarding Request for Exemptions from Part 73 Security Requalification Requirements ML20072N0402020-03-12012 March 2020 Request for Additional Information - Control Envelope Habitability LAR ML19192A2222019-07-18018 July 2019 Request for Additional Information Regarding Application for Order Consenting to Transfer of Licenses and Conforming License Amendments ML19143A0732019-05-29029 May 2019 FENOC Fleet - Beaver Valley, Units 1 and 2; Davis-Besse, Unit 1, Perry, Unit 1 - Supplemental Information Needed for Acceptance of Requested Licensing Action; Application for Order Consenting to License Transfer and Conforming Amendments ML18242A3642018-08-29029 August 2018 Request for Additional Information (Final) -Steam Generator Technical Specification LAR ML18102B0852018-04-12012 April 2018 NRR E-mail Capture - Follow-up Request for Additional Information (RAI) FENOC FLEET-- Exemption Request for a Physical Barrier Requirement for Beaver ML18043A0102018-02-0909 February 2018 NRR E-mail Capture - FENOC--MG0010-MG0011, MG-0012, MG0013-- Request for Additional Information (RAI) - Exemption Request Security Barrier in Physical Plans ML18024B3642018-01-24024 January 2018 NRR E-mail Capture - Beaver Valley 10 CFR 50.54(f) - NTTF 2.1 SPRA Review ML18019A0722018-01-18018 January 2018 NRR E-mail Capture - Beaver Valley Unit No. 1: Request for Additional Information - Modified Rtpts Values and Reactor Vessel Surveillance Capsule Withdrawal Schedule ML17353A1582017-12-19019 December 2017 NRR E-mail Capture - Request for Additional Information: Beaver Valley Unit No. 1 - Proposed Alternative Request, 1-TYP-4-BA-01 ML17352B2612017-12-18018 December 2017 NRR E-mail Capture - Request for Additional Information: Beaver Valley Unit No. 1 - Proposed Alternative Request, 1-TYP-4-BA-01 ML17303B1582017-11-0707 November 2017 FENOC-Beaver Valley Power Station, Units 1 and 2, Davis-Besse Nuclear Power Station, Unit 1, Perry Nuclear Power Plant Unit 1 - Generic Letter 2016-01, Request for Supplemental Information ML17256A2502017-09-13013 September 2017 NRR E-mail Capture - Beaver Valley Power Station Units 1&2: Request for Additional Information for Emergency Plan EAL Change to Adopt NEI 99-01, Rev. 6, ML17220A2342017-08-0808 August 2017 E-mail Regarding Request for Additional Information for NFPA 805 License Amendment Request ML17093A7622017-04-10010 April 2017 Request for Additional Information Regarding Emergency Action Level Scheme Change License Amendment Request ML17031A0362017-02-0303 February 2017 Request for Additional Information Regarding Relief Request Numbers PR6 and PR7 ML16333A0162016-12-0202 December 2016 Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 ML16147A2842016-06-14014 June 2016 Request for Additional Infomation Regarding Fall 2015 Refueling Steam Generator Tube Inspections ML16071A1222016-04-0707 April 2016 Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 ML16084A8442016-03-30030 March 2016 Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 ML16060A0122016-02-29029 February 2016 FENOC - Email RAI to Licensee Regarding LAR for Changes to TS 5.3.1 CAC Nos. MF7118, MF7119, and MF7120 ML15320A4132015-11-24024 November 2015 Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 ML15280A0742015-10-0909 October 2015 Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 ML15279A1252015-10-0505 October 2015 Licensed Operator Positive for Fitness-for-Duty-Test ML15181A2142015-07-14014 July 2015 Request for Additional Information Regarding License Amendment Request to Revise Steam Generator Technical Specifications to Reflect TSTF-510 and to Revise Alloy 800 Sleeve Technical Specifications (TAC Nos. MF6054 & MF6055) ML15125A4162015-05-11011 May 2015 Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 (TAC Nos. MF3301 & MF3302) ML15016A4392015-01-20020 January 2015 Draft Request for Additional Information ML15007A5582015-01-15015 January 2015 Request for Additional Information Steam Generator Inspection Reports ML14218A7622014-12-11011 December 2014 RAI Request to Implement 10 CFR 50.61a Alternate Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events ML14316A3902014-11-14014 November 2014 Request for Additional Information Review of Licensee Security Plans 2023-05-05
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 24, 2014 Mr. Eric A Larson, Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-SEB1 P.O. Box 4, Route 168 Shippingport, PA 15077
SUBJECT:
BEAVER VALLEY POWER STATION, UNIT NO.2- SUPPLEMENTAL INFORMATION NEEDED FOR ACCEPTANCE OF REQUESTED LICENSING ACTION RE: LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATION 4.3.2, SPENT FUEL STORAGE POOL MINIMUM INADVERTENT DRAINAGE ELEVATION (TAC NO. MF4213)
Dear Mr. Larson:
By letter dated June 2, 2014, FirstEnergy Nuclear Operating Company (FENOC) requested an amendment to the operating license for Beaver Valley Power Station, Unit No. 2 (BVPS-2). The proposed amendment would correct the minimum drain elevation for the spent fuel storage pool specified in BVPS-2 Technical Specification 4.3.2, "Drainage."
The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this license amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (1 0 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required.
This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that the information delineated in the enclosure to this letter is necessary to enable the NRC staff to make an independent assessment regarding the acceptability of the proposed amendment request in terms of regulatory requirements and the protection of public health and safety and the environment.
In order to make the application complete, the NRC staff requests that FENOC supplement the application to address the information requested in the enclosure by August 15, 2014. This will enable the NRC staff to complete its detailed technical review. If the information responsive to the NRC staff's request is not received by the above date, the application will not be accepted for review pursuant to 10 CFR 2.101, and the NRC staff will cease its review activities associated with the application. If the application is subsequently accepted for review, you will
E. Larson be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence.
The information requested and the associated time frame in this letter were discussed with Mr.
Phil Lashley of your staff on July 23, 2014.
If you have any questions, please contact me at (301) 415-4090 or via e-mail at Jeffrey.Whited@nrc.gov.
Sincerely,
~_dUd_
Jeffrey Whited, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-412
Enclosure:
As stated cc w/encl: Distribution via Listserv
SUPPLEMENTAL INFORMATION NEEDED REVISED TECHNICAL SPECIFICATION 4.3.2. SPENT FUEL STORAGE POOL MINIMUM INADVERTENT DRAINAGE ELEVATION FIRSTENERGY NUCLEAR OPERATING COMPANY BEAVER VALLEY POWER STATION. UNIT 2 DOCKET NO. 50-412 The Nuclear Regulatory Commission (NRC) staff has reviewed the application submitted by FirstEnergy Nuclear Operating Company (FENOC, the licensee) to amend the operating license for Beaver Valley Power Station, Unit No.2 (BVPS-2) by letter dated June 2, 2014, 1 and concluded that the information delineated below is necessary to enable the staff to make an independent assessment regarding the acceptability of the proposed license amendment request in terms of regulatory requirements and the protection of public health and safety and the environment.
Pursuant to the Code of Federal Regulations (10 CFR) Part 50.90, whenever a holder of an operating license desires to amend the license, application for the amendment must be filed with the Commission, as specified in 10 CFR 50.4(b)(1), as applicable, fully describing the changes desired, and following as far as applicable, the form prescribed for original applications.
In the enclosure to the letter dated June 2, 2014, FENOC, submitted an evaluation which supports the request to change Technical Specification (TS) 4.3.2, "Drainage." Specifically, TS 4.3.2 requires that the spent fuel storage pool be designed to prevent inadvertent draining of the pool below a certain specified elevation. The proposed change would revise this specified elevation in TS 4.3.2 to reflect the actual installed piping by lowering the elevation by 5 inches.
The licensee discusses how the amendment request meets the five design provisions listed in General Design Criterion (GDC) 61, "Fuel storage and handling and radioactivity control," set forth in Appendix A, "General Design Criteria for Nuclear Power Plants," of 10 CFR 50. These provisions require that fuel storage and handling, radioactive waste, and other systems that may contain radioactivity be designed to assure adequate safety under normal and postulated accident conditions. However, it is unclear how provision two of General Design Criterion 61 is met to ensure that suitable shielding for radiation protection is available with the given information.
GDC 61 states, in part, that:
The fuel storage and handling, radioactive waste, and other systems which may contain radioactivity shall be designed to assure adequate safety under normal and postulated accident conditions. These systems shall be designed ...
(2) with suitable shielding for radiation protection 1
Agencywide Documents Access and Management System Accession No. ML14153A388.
Page 4 of the enclosure, in reference to GDC 61 (2), states, in part, that:
This design provision directly relates to the proposed [TS] change. A discussion of the effects of the proposed [TS] change on radiation shielding is provided later in this Technical Evaluation.
Page 5 of the enclosure states, in part, that:
The conservatively high calculated gamma radiation dose rate for personnel located at the fuel building operating floor elevation, directly above freshly discharged fuel assemblies stored in the spent fuel storage pool with the pool water level reduced to the 750 feet, 10 inch elevation (providing at least 9.84 feet of water above the active fuel) is estimated to be approximately 280 millirem per hour. This calculated result can be used to estimate operator exposure for post drain-down event mitigation activities ...
Page 6 of the enclosure states, in part, that:
Reducing the spent fuel storage pool minimum shielding depth from the UFSAR specified 10 feet above the top of the fuel stored in the racks to 9.84 feet above the top of the active fuel stored in the racks corresponds to an approximate 51 millirem per hour increase in the radiation dose rate for personnel located at the fuel building operating floor elevation ...
The basis of the above statements is unclear to the NRC staff, since no calculation sheet was provided with the license amendment request. In order to make the application complete, the NRC staff requests that FENOC supplement the application with:
- 1) A calculation sheet which cites the appropriate Regulatory Guide methodology and provides the calculation that demonstrates an estimated dose rate of approximately 280 millirem per hour for a person located at the fuel building operating floor elevation, directly above freshly discharged fuel assemblies stored in the spent fuel storage pool with the pool water level reduced to the 750 feet, 10 inch elevation.
ML14190A684 *via e-mail **via memo OFFICE LPL 1-2/PM LPL 1-2/PM LPL 1-2/LA AHPB/BC LPL 1-2/BC(A) LPL 1-2/PM NAME RGiadney JWhited ABaxter
- UShoop** RSchaaf JWhited DATE 06/26/14 07/17/14 07/14/14 07/09/14 07/23/14 07/24/14