ML14126A008
ML14126A008 | |
Person / Time | |
---|---|
Site: | Susquehanna |
Issue date: | 04/30/2014 |
From: | Susquehanna |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
Download: ML14126A008 (100) | |
Text
Apr. 30, 2014 Page I of 3 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2014-19726 USER INFORMATION:
GERLACH*ROSEY M EMPL#:028401 CA#: 0363 Address: NUCSA2 Phone#: 254-3194 TRANSMITTAL INFORMATION:
TO: GERLACH*ROSEY M 04/30/2014 LOCATION: USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE
- UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.
ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.
TRMI - TECHNICAL REQUIREMENTS MANUAL UNIT 1 REMOVE MANUAL TABLE OF CONTENTS DATE: 02/12/2014 ADD MANUAL TABLE OF CONTENTS DATE: 04/29/2014 CATEGORY: DOCUMENTS TYPE: TRMI 4ooivc"
Apr. 30, 2014 Page 2 of 3 ID: TEXT 3.2.1 ADD: REV: 14 REMOVE: REV:13 CATEGORY: DOCUMENTS TYPE: TRM1 ID: TEXT 3.3.6 REMOVE: REV:3 ADD: REV: 4 CATEGORY: DOCUMENTS TYPE: TRM1 ID: TEXT 3.6.2 REMOVE: REV:1 ADD: REV: 2 CATEGORY: DOCUMENTS TYPE: TRMI ID: TEXT B3.1.1 SREMOVE: REV:1 ADD: REV: 2 CATEGORY: DOCUMENTS TYPE: TRMI ID: TEXT B3.7.3.4 ADD: REV: 3 REMOVE: REV:2 CATEGORY: DOCUMENTS TYPE: TRMI ID: TEXT LOES ADD: REV: 80 REMOVE: REV:79
Apr. 30, 2014 Page 3 of 3 CATEGORY: DOCUMENTS TYPE: TRM1 ID: TEXT TOC ADD: REV: 23 REMOVE: REV:22 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
SSES MANUAL Manual Name: TRM1 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 Table Of Contents Issue Date:
Procedure Name 0)4/29/2014 Rev Issue Date Oi TilO LL"D Change ID Change Number TEXT LOES 80 04/29/2014
Title:
LIST OF EF FECTIVE SECTIONS TEXT TOC 23 04/29/2014
Title:
TABLE OF CONTENTS TEXT 1.1 1 01/31/2014
Title:
USE AND APPLICATION DEFINITIONS TEXT 2.1 1 02/04/2005
Title:
PLANT PROGRAMS AND SETPOINTS PLANT PROGRAMS TEXT 2.2 10 01/31/2014
Title:
PLANT PROGRAMS AND SETPOINTS INSTRUMENT TRIP SETPOINT TABLE TEXT 3.0 4 05/23/2008
Title:
TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY & SURVEILLANCE (TRS)
APPLICABILITY TEXT 3.1.1 1 11/09/2007
Title:
REACTIVITY CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT 3.1.2 0 11/18/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT 3.1.3 5 04/16/2009
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0 11/18/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION &
CHECK VALVE TEXT 3.2.1 14 04/29/2014
Title:
CORE OPERATING LIMITS REPORT (COLR)
Report Date: 04/30/14 Page I1 of of 16 16 Report Date: 04/30/14
SSES MANUAL Manual Name: TRM1 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.3.1 0 11/18/2002
Title:
INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION TEXT 3.3.2 3 03/31/2011
Title:
INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 2 11/09/2007
Title:
INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 6 07/09/2010
Title:
INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3.5 0 11/18/2002
Title:
INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK TEXT 3.3.6 4 04/29/2014
Title:
INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 1 11/09/2007
Title:
INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1 10/22/2003
Title:
INSTRUMENTATION TRM RPS INSTRUMENTATION TEXT 3.3.9 3 04/17/2008
Title:
OPRM INSTRUMENTATION CONFIGURATION TEXT 3.3.10 1 12/14/2004
Title:
INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11 1 10/22/2003
Title:
INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.3.12 0 04/16/2009
Title:
WATER MONITORING INSTRUMENTATION Report Date: 04/30/14 Page 2.
2 of of 16 16 Report Date: 04/30/14
SSES MANUAL O Manual Namee:
Manual
Title:
TRM1 TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3 .4.1 1 04/26/2006
Title:
REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY TEXT 3.4.2 1 04/16/2009
Title:
REACTOR COOLANT SYSTEM STRUCTURAL INTEGRITY TEXT 3.4.3 1 11/09/2007
Title:
REACTOR COOLANT SYSTEM HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITORS TEXT 3.4.4 2 04/17/2008
Title:
REACTOR COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT 3.4.5 1 04/26/2006
Title:
REACTOR COOLANT SYSTEM REACTOR VESSEL MATERIALS TEXT 3.4.6 2 04/25/2013
Title:
REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION TEXT 3.5.1 1 02/04/2005
Title:
EMERGENCY CORE COOLING AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 1 11/09/2007
Title:
EMERGENCY CORE COOLING AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0 11/18/2002
Title:
EMERGENCY CORE COOLING AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0 11/18/2002
Title:
CONTAINMENT VENTING OR PURGING TEXT 3.6.2 2 04/29/2014
Title:
SUPPRESSION CHAMBER TO DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0 11/18/2002
Title:
CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION Report Date: 04/30/14 Page 33 Page of of 16 16 Report Date: 04/30/14
SSES MANUAL Manual Name: TJY1 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.6.4 0 11/18/2002
Title:
CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7.1 0 11/18/2002
Title:
PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW) SHUTDOWN TEXT 3.7.2 0 11/18/2002
Title:
PLANT SYSTEMS ULTIMATE HEAT SINK (UHS) AND GROUND WATER LEVEL TEXT 3.7.3.1 2 04/16/2009
Title:
PLANT SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT 3.7.3.2 3 04/16/2009
Title:
PLANT SYSTEMS SPRAY AND SPRINKLER SYSTEMS TEXT 3.7.3.3 3 04/16/2009
Title:
PLANT SYSTEMS C02 SYSTEMS TEXT 3.7.3.4 2 04/16/2009
Title:
PLANT SYSTEMS HALON SYSTEMS TEXT 3.7.3.5 2 04/16/2009
Title:
PLANT SYSTEMS FIRE HOSE STATIONS TEXT 3.7.3.6 2 04/16/2009
Title:
PLANT SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT 3.7.3.7 1 04/26/2006
Title:
PLANT SYSTEMS FIRE RATED ASSEMBLIES TEXT 3.7.3.8 10 09/27/2012
Title:
PLANT SYSTEMS FIRE DETECTION INSTRUMENTATION TEXT 3.7.4 1 04/26/2006
Title:
PLANT SYSTEMS SOLID RADWASTE SYSTEM Report Date: 04/30/14 Page 4 Page4 of of 16
.16 Report Date: 04/30/14
SSES MANUAL
. Manual Namee:
Manual
Title:
TRMI TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.7.5.1 0 11/18/2002
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT 3.7.5.2 0 11/18/2002
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT 3.7.5.3 1 04/26/2006
Title:
PLANT SYSTEMS LIQUID HOLDUP TANKS TEXT 3.7.6 3 06/04/2012
Title:
PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 2 09/05/2008
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING TEXT 3.7.8 4 06/21/2007
Title:
PLANT SYSTEMS SNUBBERS TEXT 3.7.9 2 01/31/2014
Title:
PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 1 12/14/2004
Title:
PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)
TEXT 3.7.11 0 04/16/2009
Title:
STRUCTURAL INTEGRITY TEXT 3.8.1 2 04/05/2010
Title:
ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.1 2 11/09/2007
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
CONTINUOUS TEXT 3.8.2.2 2 12/14/2004
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
AUTOMATIC Page5 of .16 Report Date: 04/30/14
SSES MANUJAL Manual Name: TRMI Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.8.3 1 04/05/2010
Title:
ELECTRICAL POWER DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT 3.8.4 0 11/18/2002
Title:
ELECTRICAL POWER 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT 3.8.5 1 11/14/2013
Title:
ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION TEXT 3.8.6 1 12/08/2011
Title:
ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.8.7 1 06/15/2009
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT 3.9.1 0 11/18/2002 0
Title:
REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0 11/18/2002
Title:
REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 0 11/18/2002
Title:
REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 1 04/26/2006
Title:
MISCELLANEOUS SEAL SOURCE CONTAMINATION TEXT 3.10.2 2 08/08/2006
Title:
MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 2 06/15/2010
Title:
MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT 3.10.4 2 04/17/2008
Title:
MISCELLANEOUS LEADING EDGE FLOW METER (LEFM)
Report Date: 04/30/14 Page~6 Page of of i~
16 Report Date: 04/30/14
SSES MANUAL Manual Namee: TRMl Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.11.1.1 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION TEXT 3.11.1.2 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE TEXT 3.11.1.3 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM TEXT 3.11.1.4 2 10/09/2012
Title:
RADIOACTIVE EFFLUENTS LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.1.5 2 05/02/2007
Title:
RADIOACTIVE EFFLUENTS RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT 3.11.2.1 3 04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE RATE TEXT 3.11.2.2 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE - NOBLE GASES TEXT 3.11.2.3 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE FORM TEXT 3.11.2.4 0 11/18/2002
Title:
RADIOACTIVE EFFLUENTS GASEOUS RADWASTE TREATMENT SYSTEM TEXT 3.11.2.5 4 07/03/2013
Title:
RADIOACTIVE EFFLUENTS VENTILATION EXHAUST TREATMENT SYSTEM TEXT 3.11.2.6 4 09/16/2009
Title:
RADIOACTIVE EFFLUENTS RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.3 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS TOTAL DOSE Report Date: 04/30/14 Page 7 7 of of 16
.16 Report Date: 04/30/14
SSES MANUAL Manual Name: TRM1 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.11.4.1 4 08/08/2006
Title:
RADIOACTIVE EFFLUENTS MONITORING PROGRAM TEXT 3.11.4.2 2 04/26/2006
Title:
RADIOACTIVE EFFLUENTS LAND USE CENSUS TEXT 3.11.4.3 1 04/26/2006
Title:
RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1 0 11/19/2002
Title:
LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL POOL STORAGE POOL TEXT 3.12.2 4 04/17/2008
Title:
LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3.12.3 0 11/19/2002
Title:
LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENT TEXT 4. 1 0 08/31/1998
Title:
ADMINISTRATIVE CONTROLS ORGANIZATION TEXT 4.2 08/31/1998
Title:
ADMINISTRATIVE CONTROLS REPORTABLE EVENT ACTION TEXT 4.3 0 08/31/1998
Title:
ADMINISTRATIVE CONTROLS SAFETY LIMIT VIOLATION TEXT 4.4 1 12/18/2008
Title:
ADMINISTRATIVE CONTROLS PROCEDURES & PROGRAMS TEXT 4.5 0 08/31/1998
Title:
ADMINISTRATIVE CONTROLS REPORTING REQUIREMENTS TEXT 4.6 0 08/31/1998
Title:
ADMINISTRATIVE CONTROLS RADIATION PROTECTION PROGRAM 0
Report Date: 04/30/14 Page8 Page .a of of 16 i_66 Report Date: 04/30/14
SSES MANUAL
. Manual Name:
Manual
Title:
TRMI TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 4.7 0 08/31/1998
Title:
ADMINISTRATIVE CONTROLS TRAINING TEXT B3.0 4 05/23/2008
Title:
APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT B3.1.1 2 04/29/2014
Title:
REACTIVITY CONTROL SYSTEMS BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT B3.1.2 0 11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT B3.1.3 3 03/31/2006
Title:
REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4 0 11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT B3.2.1 0 11/19/2002
Title:
CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR)
TEXT B3.3.1 1 01/31/2014
Title:
INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2 2 03/31/2011
Title:
INSTRUMENTATION BASES SEISMIC MONITORING INSTRUMENTATION TEXT B3.3.3 3 12/18/2008
Title:
INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION TEXT B3.3.4 4 07/09/2010
Title:
INSTRUMENTATION BASES TRM POST ACCIDENT MONITORING (PAM) INSTRUMENTATION TEXT B3.3.5 2 11/09/2007
Title:
INSTRUMENTATION BASES THIS PAGE INTENTIONALLY LEFT BLANK Page 9 of 16 Report Date: 04/30/14
SSES MANUAL Manual Name: TRM1 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.3.6 5 01/31/2014
Title:
INSTRUMENTATION BASES TRM ISOLATION ACTUATION INSTRUMENTATION TEXT B3.3.7 1 11/09/2007
Title:
INSTRUMENTATION BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT B3.3.8 1 10/22/2003
Title:
INSTRUMENTATION BASES TRM REACTOR PROTECTION SYSTEM (RPS) INSTRUMENTATION TEXT B3.3.9 3 04/17/2008
Title:
OPRM INSTRUMENTATION TEXT B3.3.10 3 08/09/2010
Title:
INSTRUMENTATION BASES REACTOR RECIRCULATION PUMP MG SET STOPS TEXT B3.3.11 1 10/22/2003
Title:
INSTRUMENTATION BASES MVP ISOLATION INSTRUMENTATION TEXT B3.3.12 0 04/16/2009
Title:
WATER MONITORING INSTRUMENTATION TEXT B3.4.1 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY TEXT B3.4.2 1 04/16/2009
Title:
REACTOR COOLANT SYSTEM BASES STRUCTURAL INTEGRITY TEXT B3.4.3 1 11/09/2007
Title:
REACTOR COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR TEXT B3.4.4 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT B3.4.5 0 11/19/2002
Title:
REACTOR COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS Page 10 of .16 Report Date: 04/30/14
SSES MANUAL
. Manual Name:
Manual
Title:
TRM1 TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.4.6 2 04/25/2013
Title:
REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION TEXT B3.5.1 0 11/19/2002
Title:
ECCS AND RCIC BASES ADS MANUAL INHIBIT TEXT B3.5.2 1 11/09/2007
Title:
ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT B3.5.3 1 11/09/2007
Title:
ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1 0 11/19/2002
Title:
CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0 11/19/2002
Title:
CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT B3.6.3 2 04/17/2008
Title:
CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3.6.4 1 12/14/2004
Title:
CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1 0 11/19/2002
Title:
PLANT SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN)
TEXT B3.7.2 0 11/19/2002
Title:
PLANT SYSTEMS BASES ULTIMATE HEAT SINK (UHS) GROUND WATER LEVEL TEXT B3.7.3.1 3 06/15/2010
Title:
PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM O TEXT B3.7.3.2 2 04/26/2006
Title:
PLANT SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS Page 11 of .16 Report Date: 04/30/14
SSES MANUJAL Manual Name: TRMI Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.7.3.3 0 11/19/2002
Title:
PLANT SYSTEMS BASES C02 SYSTEMS TEXT B3.7.3.4 3 04/29/2014
Title:
PLANT SYSTEMS BASES HALON SYSTEMS TEXT B3.7.3.5 1 04/26/2006
Title:
PLANT SYSTEMS BASES FIRE HOSE STATIONS TEXT B3.7.3.6 1 04/26/2006
Title:
PLANT SYSTEMS BASES YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT B3.7.3.7 0 11/19/2002
Title:
PLANT SYSTEMS BASES FIRE RATED ASSEMBLIES TEXT B3.7.3.8 3 09/27/2012
Title:
PLANT SYSTEMS BASES FIRE DETECTION INSTRUMENTATION TEXT B3.7.4 0 11/19/2002
Title:
PLANT SYSTEMS BASES SOLID RADWASTE SYSTEM TEXT B3.7.5.1 0 11/19/2002
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT B3.7.5.2 0 11/19/2002
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT B3.7.5.3 0 11/19/2002
Title:
PLANT SYSTEMS BASES LIQUID HOLDUP TANKS TEXT B3.7.6 4 06/04/2013
Title:
PLANT SYSTEMS BASES ESSW PUMPHOUSE VENTILATION TEXT B3.7.7 2 01/31/2008
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION Page 12 of .16 Report Date: 04/30/14
SSES MANUAL Manual Name: TRMI Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.7.8 4 01/31/2014
Title:
PLANT SYSTEMS BASES SNUBBERS TEXT B3.7.9 2 12/08/2011
Title:
PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10 1 12/14/2004
Title:
PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.7.11 1 04/14/2010
Title:
STRUCTURAL INTEGRITY TEXT B3.8.1 2 03/10/2010
Title:
ELECTRICAL POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT B3.8.2.1 0 11/19/2002
Title:
ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
CONTINUOUS TEXT B3.8.2.2 1 09/17/2004
Title:
ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
AUTOMATIC TEXT B3.8.3 0 11/19/2002
Title:
ELECTRICAL POWER BASES DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT B3.8.4 0 11/19/2002
Title:
ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT B3.8.5 1 11/14/2013
Title:
ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTECTION TEXT B3.8.6 2 12/08/2011
Title:
ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING TEXT B3.8.7 2 06/04/2013
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM Report Date: 04/30/14 13 Page 13 of of i~
16 Report Date: 04/30/14
SSES MANUAL Manual Name: TRMI1 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.9.1 0 11/19/2002
Title:
REFUELING OPERATIONS BASES DECAY TIME TEXT B3.9.2 0 11/19/2002
Title:
REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3 0 11/19/2002
Title:
REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.1 0 11/19/2002
Title:
MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10.2 1 03/31/2006
Title:
MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3 0 11/19/2002
Title:
MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT B3.10.4 1 04/17/2008
Title:
MISCELLANEOUS BASES LEADING EDGE FLOW METER (LEFM)
TEXT B3.11.1.1 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION TEXT B3.11.1.2 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS DOSE TEXT B3.11.1.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID WASTE TREATMENT SYSTEM TEXT B3.11.1.4 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.1.5 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION Report Date: 04/30/14 Page 14 Page 14 of of 16
.16 Report Date: 04/30/14
SSES MANUAL
. Manual Name: TRMI Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.11.2.1 1 12/14/2004
Title:
RADIOACTIVE EFFLUENTS BASES DOSE RATE TEXT B3.11.2.2 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES DOSE - NOBLE GASES TEXT B3.11.2.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATES FORM TEXT B3.11.2.4 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES GASEOUS RADWASTE TREATMENT SYSTEM TEXT B3.11.2.5 5 07/03/2013
Title:
RADIOACTIVE EFFLUENTS BASES VENTILATION EXHAUST TREATMENT SYSTEM TEXT B3.11.2.6 1 01/27/2004
Title:
RADIOACTIVE EFFLUENTS BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES TOTAL DOSE TEXT B3.11.4.1 4 06/04/2013
Title:
RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEXT B3.11.4.2 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3.11.4.3 0 11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.1 1 10/04/2007
Title:
LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2 1 12/03/2010
Title:
LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS Report Date: 04/30/14 Page 15 Page 15 of of 16
.16 Report Date: 04/30/14
SSES MANUAL Manual Name: TRM1 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.12.3 0 11/19/2002
Title:
LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS Report Date: 04/30/14 Page i~
Page 16 of of I~.
16 Report Date: 04/30/14
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 23 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION TITLE PAGE 1.0 USE AND APPLICATION ....................................................................... TRM/1.0-1 1.1 Definitions ......................................................................................... T R M/1.0-2 2.0 PLANT PROGRAMS .............................................................................. TRM/2.0-1 2.1 Plant Program s ................................................................................. T R M/2.0-1 2.2 Instrument Trip Setpoint Table .......................................................... TRM/2.0-5 3.0 APPLICABILITY ...................................................................................... TRM/3.0-1 3.0 TRO) - TR for Operation (TRO) Applicability ..................................... TRM/3.0-1 3.0 (TRS) - TR Surveillance (TRS) Applicability ..................................... TRM/3.0-3 3.1 REACTIVITY CONTROL SYSTEMS ....................................................... TRM/3.1-1 3.1.1 Alternate Rod Injection ...................................................................... TRM/3.1-1 3.1.2 CRD Housing Support ............................................................................... 3.1-4 3.1.3 Control Rod Block Instrumentation ............................................................. 3.1-5 3.1.4 Control Rod Scram Accumulators Instrumentation and C heck V alve ...................................................................................... T RM/3.1-9 3.2 CORE OPERATING LIMITS REPORT ................................................... TRM/3.2-1 3.2.1 Core Operating Limits Report ............................................................ TRM/3.2-1 3.3 INSTRUMENTATION .............................................................................. TRM/3.3-1 3.3.1 Radiation Monitoring Instrumentation ................................................. TRM/3.3-1 3.3.2 Seismic Monitoring Instrumentation ................................................... TRM/3.3-4 3.3.3 Meteorological Monitoring Instrumentation ........................................ TRM/3.3-7 3.3.4 TRM Post-Accident Monitoring Instrumentation ................................. TRM/3.3-9 3.3.5 Section Not Used .............................................................................. TRM/3.3-12 3.3.6 TRM Containment Isolation Instrumentation ...................................... TRM/3.3-13 3.3.7 Turbine Overspeed Protection System .............................................. TRM/3.3-17 3.3.8 S ection Not Used .............................................................................. T RM/3.3-19 3.3.9 OPRM Instrumentation ...................................................................... TRM/3.3-22 3.3.10 Reactor Recirculation Pump MG Set Electrical and Mechanical Stops .............................................................................. TRM/3.3-23 3.3.11 MVP Isolation Instrumentation ....................................................... TRM/3.3-25 3.3.12 Water Monitoring Instrumentation ..................................................... TRM/3.3-27 3.4 REACTOR COOLANT SYSTEM ............................................................. TRM/3.4-1 3.4.1 Reactor Coolant System Chemistry ................................................... TRM/3.4-1 3.4 .2 Not Used ........................................................................................... T R M/3.4-6 3.4.3 High/Low Pressure Interface Leakage Monitors ....................... TRM/3.4-9 3.4.4 Reactor Recirculation Flow and Rod Line Limit ................................. TRM/3.4-12 3.4.5 Reactor Vessel Material Surveillances Program ................................ TRM/3.4-13 3.4.6 Reactor Recirculation Single Loop Operation (SLO),
Flow Rate Restriction ...................................................................... TRM/3.4-14 SUSQUEHANNA - UNIT 1 TRM / TOC-1 EFFECTIVE DATE 04/17/2014
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 23 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAIL)
SECTION TITLE PAGE 3.5 EMERGENCY CORE COOLING AND RCIC ................... TRM/3.5-1 3.5.1 A DS Manual Inhibit ........................................................................... TR M/3.5-1 3.5.2 ECCS and RCIC System Monitoring Instrumentation ........................ TRM/3.5-3 3.5.3 Long Term Nitrogen Supply to ADS ........................................................... 3.5-6 3.6 C O NTA INME NT ............................................................................................... 3.6-1 3.6.1 VENTING or PURGING ............................ .......... 3.6-1 3.6.2 Suppression Chamber-to-Drywell Vacuum Breaker Position Indication ........................................................................................... T R M/3 .6-2 3.6.3 Suppression Pool Alarm Instrumentation ................................................... 3.6-3 3.6.4 Primary Containment Closed System Boundaries ............. TRM/3.6-6 3.7 PLANT SYSTEM S ........................................................................................... 3.7-1 3.7.1 Emergency Service Water System (Shutdown) .......................................... 3.7-1 3.7.2 Ultimate Heat Sink and Ground Water Level .................... 3.7-3 3.7.3.1 Fire Suppression Water Supply System ............................................ TRM/3.7-4 3.7.3.2 Spray and Sprinkler Systems .......................... TRM/3.7-8 3.7.3.3 C 02 System s ................................................................................... TR M/3.7-12 3.7.3.4 Halon System s .................................................................................. TRM /3.7-16 3.7.3.5 Fire Hose Stations ........................................................................... T RM /3.7-18 3.7.3.6 Yard Fire Hydrants and Hydrant Hose Houses .................................. TRM/3.7-22 3.7.3.7 Fire Rated Assemblies ...................................................................... TRM/3.7-24 3.7.3.8 Fire Detection Instrumentation ......................................................... TRM/3.7-26 3.7.4 Solid Radwaste System .................................................................... TRM/3.7-35 3.7.5.1 Main Condenser Offgas Hydrogen Monitor ..................... 3.7-38 3.7.5.2 Main Condenser Explosive Gas Mixture .................. ................................... 3.7-39 3.7.5.3 Liquid Holdup Tanks ........................................................................ TRM /3.7-40 3.7.6 ESSW Pumphouse Ventilation ......................................................... TRM/3.7-41 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation ................................................................. TRM/3.7- 42 3 .7.8 S nubbers .......................................................................................... T R M/3 .7-44 3.7.9 Control Structure HVAC .................................................................... TRM/3.7-50 3.7.10 Spent Fuel Storage Pools ................................................................. TRM/3.7-52 3.7.11 Structural Integrity ............................................................................. T R M/3.7-55 TRM I TOC-2 EFFECTIVE-DATE 04/17/2014 SUSQUEHANNA - UNIT UNIT 1I TRM / TOC-2 EFFECTIVE-DATE 04/17/2014
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 23 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION TITLE PAGE 3.8 ELECTRICAL POWER ................................. TRM/3.8-1" 3.8.1 Primary Containment Penetration Conductor Overcurrent Protective Devices .................................. TRM/3.8-1 3.8.2.1 Motor Operated Valves Thermal Overload Protection -
Continuous ................................................................... TRM/3.8-5 3.8.2.2 Motor Operated Valves Thermal Overload Protection -
A utom atic ......................................................................................... T R M/3.8-11 3.8.3 Diesel Generator (DG) Maintenance Activities .................................. TRM/3.8-13 3.8.4 24VDC Electrical Power Subsystem ................................................. TRM/3.8-15 3.8.5 Degraded Voltage Protection ...................................... .................... TRM/3.8-21 3.8.6 Emergency Switchgear Room Cooling .............................................. TRM/3,18-24 3.8.7 Battery Monitoring and Maintenance Program .................................. TRM/3.8-26 3.9 REFUELING OPERATIONS ................................. 3.9-1 3 .9.1 D ecay T ime ................................................................................................ 3:9.-1 3.9.2 C om m unications ........................................................................................ 3.9-2 3.9.3 R efueling P latform ....................................................................................... 3.9-3 3.10 MISCELLANEOUS ................. TRM/3.10-1 3.10.1 Sealed Source Contamination .......................... TRM/3.10-1 3.10.2 MODE 5 Shutdown Margin Test RPS Instrumentation ..................... TRM/3.10-4 3.10.3 Independent Spent Fuel Storage Installation (ISFSI)........................ TRM/3.10-7 3.10.4 Section Not Used ................................................................... TRM/3.10.8 3.11 RADIOACTIVE EFFLUENTS............................. TRM/3.11-1 3.11.1.2 Liquid Effluents Concentration .......................... TRM/311.-1 3.11.1.2 Liquid Effluents Dose ................................ TRM/3.11-4 3.11.1.3 Liquid.Waste Treatment System.................. ....... TRM/3.11-6 3.11.1.4 Liquid Radwaste Effluent Monitoring Instrumentation ........... TRM/3.11-8 3.11.1.5 Radioactive Liquid Process Monitoring Instrumentation ........ TRM/3.11-13 3.11.2 .1 Dose R ate ....................................................................................... T RM/3.11 -17 3.11.2.2 Dose - Noble G ases ........................................................................ TRM /3.11-20 3.11.2.3 Dose - Iodine, Tritium, and Radionuclides in Particulate Form ........................... ................................... TRM/3.11-21 3.11.2.4 Gaseous Radwaste Treatment System ............................................. TRM/3.11-22 3.11.2.5 Ventilation Exhaust Treatment System .................... TRM/3.11-23 3.11.2.6 Radioactive Gaseous Effluent Monitoring Instrum entation ................................................................................... T R M/3.11-25 3.11.3 Total D ose .......................................................................................... TR M/3.11-33 3.11.4.1 Monitoring Program ............................................................................ TRM /3.11-35 3.11.4.2 Land Use Census ................................... TRM/3.11-45 3.11.4.3 Interlaboratory Comparison Program .................................................. TRM/3.11-47 SUSQUEHANNA - UNIT 1 TRM / TOC-3 EFFECTIVE DATE 04/17/2014
", , . . i '.- -. ý '-.: -ý.- !ý ý .
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 23 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION TITLE PAGE 3.12 LOADS CONTROL PROGRAM .............................................................. TRM/3.12-1 3.12.1 Crane Travel - Spent Fuel Storage Pool ................................................. TRM/3.12-1 3.12.2 Heavy Loads Requirements .................................................................... TRM/3.12-3 3.12.3 Light Loads Requirements ...................................................................... TRM/3.12-5 4.0 ADMINISTRATIVE CONTROLS ...................................................................... 4.0-1 4.1 Organization .................................................................................................... 4.0-1 4.2 Reportable Event Action .................................................................................. 4.0-2 4.3 Safety Limit Violation ....................................................................................... 4.0-3 4.4 Procedures and Programs .............................................................................. 4.0-4 4.5 Reporting Requirements .................................................................................. 4.0-5 4.6 Radiation Protection Program .......................................................................... 4.0-7 4.7 Training ............................................................................................................ 4.0-8 TRM/TOC-4 EFFECTIVE DATE 04/17/2014 SUSQUEHANNA - UNIT SUSQUEHANNA -
UNIT I1 TRM / TOC-4 EFFECTIVE DATE 04/17/2014
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 23 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION TITLE PAGE B 3.0 Applicability ....................................................................................... T R M/B 3.0-1 B 3.0 (TRO) - TR for Operation (TRO) Applicability .................................... TRM/B 3.0-1 B 3.0 (TRS) - TR Surveillance (TRS) Applicability ...................................... TRM/B 3.0-9 B 3.1.1 Alternate Rod Injection ...................................................................... TRM/B 3.1-1 B 3.1.2 CRD Housing Support ................................................................................ B 3.1-4 B 3.1.3 Control Rod Block Instrumentation .................................................... TRM/B 3.1-5 B 3.1.4 Control Rod Scram Accumulators Instrumentation and C heck V alve ...................................................................................... T R M/B 3.1-8 B 3.2.1 Core Operating Limits Report (COLR) ........................ B 3.2-1 B 3.3.1 Radiation Monitoring Instrumentation ................................................ TRM/B 3.3-1 B 3.3.2 Seismic Monitoring Instrumentation ................................................... TRM/B 3.3-2 B 3.3.3 Meteorological Monitoring Instrumentation ........................................ TRM/B 3.3-3 B 3.3.4 TRM Post-Accident Monitoring Instrumentation ................................. TRM/B 3.3-4 B 3.3.5 Section Not Used .............................................................................. TRM/B 3.3-9 B 3.3.6 TRM Containment Isolation Instrumentation ...................................... TRM/B 3.3-10 B 3.3.7 Turbine Overspeed Protection System .............................................. TRM/B 3.3-14 B 3.3.8 Section Not Used .............................................................................. TRM/B 3.3-15 B 3.3.9 OPRM Instrumentation ...................................................................... TRM/B 3.3-17 B 3.3.10 Reactor Recirculation Pump MG Set Electrical and Mechanical Stops .............................................................................. TRM/B 3.3-18 B 3.3.11 MVP Isolation Instrumentation ............................................................ TRM/B 3.3-20 B 3.3.12 Water Monitoring Instrumentation ..................................................... TRM/B 3.3-22 B 3.4.1 Reactor Coolant System Chemistry ............................................................ B 3.4-1 B 3.4 .2 Not Used ........................................................................................... T R M/B 3.4-2 B 3.4.3 High/Low Pressure Interface Leakage Monitors ................................ TRM/B 3.4-4 B 3.4.4 Reactor Recirculation Flow and Rod Line Limit ................................. TRM/B 3.4-5 B 3.4.5 Reactor Vessel Material Surveillances Program ......................................... B 3.4-6 B 3.4.6 Reactor Recirculation Single Loop Operation (SLO)
Flow Rate Restriction ....................................................................... TRM/B 3.4-7 B 3.5.1 AD S Manual Inhibit .................................................................................... B 3.5-1 B 3.5.2 ECCS and RCIC System Monitoring Instrumentation ........................ TRM/B 3.5-3 B 3.5.3 Long Term Nitrogen Supply to ADS .................................................. TRM/B 3.5-4 TRM I TOC-5 EFFECTIVE DATE 04/17/2014 SUSQUEHANNA -
UNIT I1 SUSQUEHANNA - UNIT TRM / TOC-5 EFFECTIVE DATE 04/1712014
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 23 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION TITLE PAGE B 3..6.1 VENTING or PURGING ................................................................... TRM/B 3.6-1 B 3.6.2 Suppression Chamber-to-Drywell Vacuum Breaker Position Ind ica tio n .................................................................................................... B 3 .6-3 B 3.6.3 Suppression Pool Alarm Instrumentation ............................................ TRM/B'3.6-4 B 3.6.4 Primary Containment Closed System Boundaries .............................. TRM/B 3.6-6 B 3.7.1 Emergency Service Water System (Shutdown) .......................................... B 3.7-1 B 3.7.2 Ultimate Heat Sink and Ground Water Level .............................................. B 3.7-2 B 3.7.3.1 Fire Suppression Water Supply System ............................................ TRM/B 3.7-3 B 3.7.3.2 Spray and Sprinkler Systems ............................................................ TRM/B 3.7-5 B 3.7.3.3 C02 systems .................................................................................... TRM/B 3.7-7 B 3.7.3.4 Halon Systems .................................................................................. TRM/B 3.7-8 B 3.7.3.5 Fire Hose Stations ............................................................................. TRM/B 3.7-10 B 3.7.3.6 Yard Fire Hydrants and Hydrant Hose Houses .................................. TRM/B 3.7-11 B 3.7.3.7 Fire Rated Assemblies ...................................................................... TRM/B 3.7-12 B 3.7.3.8 Fire Detection Instrumentation .......................................................... TRM/B 3.7-14 B 3.7.4 Solid Radwaste System .................................................................... TRM/B 3.7-15 B 3.7.5.1 Main Condenser Offgas Hydrogen Monitor ................................................ B 3.7-17 B 3.7.5.2 Main Condenser Explosive Gas Mixture ..................................................... B 3.7-19 B 3.7.5.3 Liquid Holdup Tanks ............ .......... ............. B 3.7-20 B 3.7.6 ESSW Pumphouse Ventilation .......................................................... TRM/B 3.7-21 B 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation ................................................................. TRM/B 3.7-22 B 3.7.8 S nubbers ........................................................................................... T R M/B 3.7-24 B 3.7.9 Control Structure HVAC .................................................................... TRM/B 3.7-31 B 3.7.10 Spent Fuel Storage Pools ................................................................. TRM/B 3.7r33 B 3.7.11 Structural Integrity ............................................................................. TRM/B 3.7-36 B 3.8.1 Primary Containment Penetration Conductor Overcurrent Protective Devices ............................................... ... TRM/B 3.8-1 B 3.8.2.1 Motor Operated Valves Thermal Overload Protection -
C ontinuous ........................................................................................ T R M/B 3 .8-3 B 3.8.2.2 Motor Operated Valves Thermal Overload Protection -
A utom atic .......................................................................................... T R M/B 3.8-4 B 3.8.3 Diesel Generator (DG) Maintenance Activities ......................................... t. B 3.8-5 B 3.8.4 24VDC Electrical Power Subsystem.................................................. TRM/B 3.8-6 B 3.8.5 Degraded Voltage Protection .................................................... ........ TRM/B 3.8-16 B 3.8.6 Emergency Switchgear Room Cooling ............................................... TRM/B 3.8-17 B 3.8.7 Battery Monitoring and Maintenance Program .................................. TRM/B 3.8-18 B .3.9.1 Decay T im e ................................................................................................ B 3.9-1 B 3.9.2 C om m unications ........................................................................................ B 3.9-2 SUSQUEHANNA - UNIT 1 TRM / TOC-6 EFFECTIVE DATE 04/17/2014
SUSQUEHANNA.STEAM ELECTRIC STATION PPL Rev. 23 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION TITLE PAGE B 3.9.3 R efueling P latform ...................................................................................... B 3.9-3 B 3.10.1 Sealed Source Contamination .................................................................... B 3.10-1 B 3.10.2 MODE.5 Shutdown Margin Test RPS Instrumentation ...................... TRM/B 3.10-2 B 3.10.3 Independent Spent Fuel Storage Installation (ISFSI) ......................... TRM/B 3.10-4 B 3.11.1.1 Liquid Effluents Concentration .................................................................... B 3.11-1 B 3.11.1.2 Liquid Effl uents Dose ................................................................................. B 3.11-4 B 3.11.1.3 Liquid Waste Treatment System ................................................................ B 3.11-6 B 3.11.1.4 Liquid Radwaste Effluent Monitoring Instrumentation ................................. B 3.11-7 B 3.11.1.5 Radioactive Liquid Process Monitoring Instrumentation .................... TRM/B 3.11-10 B 3.11.2.1 D ose Rate ....................................................................................... TRM /B 3.11-12 B 3.11.2.2 Dose - Noble Gases .................................... B 3.11-16 B 3.11.2.3 Dose - Iodine, Tritium, and Radionuclides in P articulate Form ......................................................................................... B 3.11-18 B 3.11.2.4 Gaseous Radwaste Treatment System .............................................. TRM/B 3.11-20 B 3.11.2.5 Ventilation Exhaust Treatment System .............................................. TRM/B 3.11-21 B 3.11.2.6 Radioactive Gaseous Effluent Monitoring Instrum entation ................................................................................. TR M/B 3.11-24 B 3.11.3 Total D ose ................................................................................................. B 3.11-26 B 3.11.4.1 Monitoring Program ........................................................................... TRM/B 3.11-28 B 3.11.4.2 Land Use C ensus ....................................................................................... B 3.11-34 B 3.11.4.3 Interlaboratory Comparison Program ................................................ TRM/B 3.11-36 B.3.12.1 Crane Travel - Spent Fuel Storage Pool ........................................... TRM/B 3.12-1 B.3.12.2 Heavy Loads Requirements .............................................................. TRM/B 3.12-2 B.3.12.3 Light Loads Requirements ................................................................ TRM/B 3.12-3 TRM1 text TOC 4/23/2014 TOC-7 EFFECTIVE DATE 04/17/2014 SUSQUEHANNA - UNIT SUSQUEHANNA - UNIT I1 TRM // TOC-7 TRM EFFECTIVE DATE 04/17/2014
SUSQUEHANNA STEAM ELECTRIC STATION. PPL Rev. 80 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date TOC TABLE OF CONTENTS 04/17/2014 1.0 USE AND APPLICATION Page TRM / 1.0-1 10/04/2002 Page TRM / 1.0-2 01/21/2014 Page TRM / 1.0-3 10/04/2002 2.0 PLANT PROGRAMS Page TRM / 2.0-1 08/31/1998 1.
Pages TRM / 2.0-2 and TRM /2.0-3 01/28/2005 Page TRM / 2.0-4 06/25/2002 Page TRM / 2.0-5 01/21/2014
-Page TRM / 2.0-6 03/27/2008 Page TRM / 2.0-7 05/15/2008 Pages TRM / 2.0-8 and TRM / 2.0-9 01/07/20'11 Page TRM / 2.0-10 02/02/2010 Page TRM / 2.0-11 11/15/2004 Page TRM / 2.0-12 03/27/2008 Pages TRM / 2.0-13 and TRM / 2.0-14 11/15/2004 Page TRM / 2.0-15 11/15/2005 3.0 APPLICABILITY Page TRM / 3.0-1 04/14/2008 Page TRM / 3.0-2 04/12/2007 Page TRM / 3.0-3 03/15/2002 Page TRM / 3.0-4 11/30/2005 3.1 REACTIVITY CONTROL SYSTEMS Page TRM / 3.1-1 10/31/2007 Pages TRM / 3.1-2 and TRM / 3.1-3 08/31/1998 Pages 3.1-4 and 3.1-5 08/31/1998 Page TRM / 3.1-6 03/22/2006 Page TRM / 3.1-7 04/07/2009 Page TRM / 3.1-8 03/27/2008 Pages TRM / 3.1-9 and TRM./ 3.1-9a 02/18/1999 Page TRM / 3.1-10 02/18/1999 3.2 CORE OPERATING LIMITS REPORT Page TRM / 3.2-1 07/07/1999 Pages TRM / 3.2-2 through TRM / 3.2-54 04/17/2014 3.3 INSTRUMENTATION Pages TRM / 3.3-1 through TRM / 3.3-3 07/16/1999 Page TRM / 3.3-4 and TRM / 3.3-5 10/31/2007 Page TRM / 3.3-6 03/10/2011 SUSQUEHANNA - UNIT 1 TRM / LOES-1 EFFECTIVE DATE 04/17/2014
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 80 LIST OF EFFECTIVE'SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title .Effective Date
'Page TRM / 3.3-7 10/31/2007 Page TRM / 3.3-8 08/31/1998 Pages TRM / 3.3-9 and TRM / 3.3-9a *06/30/2010, Page TRM / 3:3-10 10/31/2007 Pages TRM / 3.3-11 and TRM / 3.3-11 a 06/30/2010 Page TRM / 3.3-12. 03/30/12001 Page TRM / 3.3-13 01/07/2011 Page TRM / 3.3-14 12/14/1:998 Page TRM / 3.3-15 04/11/201.4 Page TRM / 3.3-16 01/07/2011 Page TRM / 3.3-17 06/14/2002 Page TRM / 3.3-18 10/31/2007 Pages TRM / 3.3-19 through TRM / 3.3-21 10/22/2003 Page TRM / 3.3-22 03/27/2008 Page TRM / 3.3-22a 1 1/1,5/2004 Pages TRM / 3.3-22b through TRM / 3.3-22d 03/22/2006 Page TRM'/ 3.3-23 12/03/2004 Pages TRM / 3.3-24 and TRM / 3.3-25 05/16/2003 Page TRM / 3.3-26 10/22/2003 Pages TRM / 3.3-27 and TRM / 3.3-28 04/07/2009 3.4 REACTOR COOLANT SYSTEM Page TRM / 3.4-1 03/31/2006 Pages TRM /3.4-2 through TRM / 3.4-5 10/23/1998 Pages TRM / 3.4-6 through TRM / 3.4-8 04/01/2009 Page TRM / 3.4-9 08/31/1998 Page TRM / 3.4-10 10/31/2007 Page TRM / 3.4-11 08/31/1998 Page TRM / 3.4-12 03/27/2008 Page TRM / 3.4-13 03/3.1/2006 Pages TRM / 3.4-14 and TRM / 3.4-15 04/25/2013 3.5 EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1 01/28/2005 Pages TRM / 3.5-2 and TRM / 3.5-3 08/31/1998 Pages TRM / 3.5-4 and TRM / 3.5-5 10/31/2007 Pages 3.5-6 and 3.5-7 08/31/1998 3.6 CONTAINMENT Page 3.6-1 08/31/1998 Pages TRM / 3.6-2 and TRM / 3.6-2a 04/16/2014 Page 3.6-3 08/31/1998 Page TRM / 3.6-4 01/07/2002 Page 3.6-5 08/31/1998 Pages TRM / 3.6-6 through TRM / 3.6-8 12/31/2002 SUSQUEHANNA - UNIT 1 TRM / LOES-2 SUSQEHANA UNT I RM DATE,/ 04/17/2014 LOS-2EFFECTIVE
- -11. - ý:- ,
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 80 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date 3.7 PLANT SYSTEMS Pages 3.7-1 through 3.7-3 08/31/1998 Page TRM / 3.7-4 03/31/2006 Pages TRM / 3.7-5 04/07/2009 Pages TRM / 3.7-6 through TRM / 3.7-8 08/02/1999 Pages TRM / 3.7-9 and TRM / 3.7-10 04/07/2009 Page TRM / 3.7-11 12/29/1999 Page TRM / 3.7-12 08/02/1999 Page TRM / 3.7.13 04/07/2009 Page TRM I 3.7-14 08/09/2005 Pages TRM / 3.7-15 and TRM / 3.7-16 08/02/1999 Page TRM / 3.7-17 04/07/2009 Page TRM / 3.7-18 08/02/1999 Page TRM / 3.7-19 04/07/2009 Pages TRM / 3.7-20 through TRM / 3.7-22 08/02/1999 Page TRM / 3.7-23 04/07/2009 Page TRM / 3.7-24 03/31/2006 Page TRM / 3.7-25 08/02/1999 Page TRM / 3.7-26 09/25/2012 Page TRM / 3.7-27 11/24/2011 Pages TRM / 3.7-28 through TRM / 3.7-34a 09/25/2012 Page TRM / 3.7-35 03/31/2006 Pages TRM / 3.7-36 and TRM / 3.7-37 02/01/1999 Pages 3.7-38 and 3.7-39 08/31/1998 Page TRM / 3.7-40 03/31/2006 Page TRM / 3.7-41 05/24/2012 Pages TRM / 3.7-41a through TRM / 3.7-41c 05/24/2012 Page TRM / 3.7-42 09/04/2008 Page TRM / 3.7-43 08/31/1998 Pages TRM / 3.7-44 through TRM / 3.7-46 10/05/2006 Page TRM / 3.7-47 06/07/2007 Page TRM / 3.7-48 10/05/2006 Page TRM / 3.7-49 06/07/2007 Pages TRM / 3.7-49a and TRM / 3.7-49b 10/05/2006 Page TRM / 3.7-50 01/21/2014 Page TRM / 3.7-51 08/16/2006 Page TRM / 3.7-52 12/03/2004 Page TRM / 3.7-53
- 04/15/2003 Page TRM / 3.7-54 07/29/1999 Pages TRM / 3.7-55 through TRM / 3.7-57 04/01/2009 SUSQUEHANNA - UNIT I TRM / LOES-3 EFFECTIVE DATE 04/17/2014
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 80 LIST OFEFFECTIVESECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date 3.8 ELECTRICAL POWER Page TRM / 3.8-1 04/02/2002 Page TRM / 3.8-2 01/28/2005 Pages TRM / 3.8-3 and TRM /3.8-4 03/25/20:10 Pages TRM / 3.8-5 and TRM / 3.8-6 04/02/2002 Page TRM / 3.8-7 10/31/2007 Pages TRM / 3.8-8 through TRM / 3.8-10 12/03/2004 Page TRM / 3.8-11 09/03/2004 Page TRM / 3.8-12 12/03/2004 Page TRM / 3.8-13 03/25/2010 Page TRM / 3.8-14 08/31/1998 Pages TRM / 3.8-15 through TRM / 3.8-17 04/02/2002 Page 3.8-18 08/31/1998 Page TRM / 3.8-19 04/02/2002 Page 3.8-20 08/31/1998 Pages TRM / 3.8-21 and TRM / 3.8-22 06/06/1999 Page TRM / 3.8-23 11/07/2013 Pages TRM / 3.8-24 and TRM / 3.8-25 11/30/2011 Page TRM / 3.8-26 05/28/2009 Page TRM / 3.8-27 11/29/2006 Pages TRM / 3.8-28 and TRM / 3.8-29 05/28/2009 3.9 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 08/31/1998 3.10 MISCELLANEOUS Page TRM / 3.10-1 03/31/2006 Pages TRM / 3.10-2 and TRM / 3.10-3 08/31/1998 Page TRM / 3.10-4 08/01/2006 Pages TRM / 3.10-5 and TRM / 3.10-6 03/22/2006 Page TRM / 3.10-7 06/10/2010 Page TRM / 3.10-8 03/27/2008 3.11 RADIOACTIVE EFFLUENTS Page TRM / 3.11-1 03/31/2006 Pages TRM / 3.11-2 and TRM / 3.11-3 08/31/1998 Page TRM / 3.11-4 03/31/2006 Page TRM / 3.11-5 08/31/1998 Page TRM / 3.11-6 03/31/2006 Pages TRM / 3.11-7 and TRM / 3.11-8 08/31/1998 Pages TRM / 3.11-9 and TRM / 3.11-10 10/09/2012 Pages TRM / 3.11-11 and TRM / 3.11-12 08/31/1998 Page TRM / 3.11-13 04/12/2007 TRM / LOES-4 EFFECTIVE DATE 04/17/2014 SUSQUEHANNA - UNIT I1 SUSQUEHANNA - UNIT TRM / LOES-4 EFFECTIVE DATE 04/17/2014
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 80 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL).
Section Title Effective Date Page TRM / 3.11-14 12/03/2004 Pages 3.11-15 and 3.11-16 09/01/1998 Page TRM / 3.11-17 03731/2006 Page 3.11-18 08/31/1998 Page TRM / 3.11-19 08/15/2005 Pages TRM / 3.11-20 and TRM / 3.11-21 03/31/2006 Page TRM / 3.11-22 04/02/2Q02 Page TRM / 3.11-23 11/14/2006 Page TRM / 3.11-24 06/18,/2013 Page TRM / 3.11-25 04/12/2007 Pages TRM / 3.11-26 and TRM / 3.11-27 01/21/2004 Page TRM / 3.11-28 09/08/2009 Page TRM / 3.11-29 12/03/2004 Pages TRM / 3.11.30 through TRM / 3.11.32 01/21/2004 Page TRM / 3.11-33 03/31/2006 Page TRM / 3.11-34 08/31/1998 Page TRM / 3.11-35 03/31/2006 Pages TRM / 3.11-36 through TRM / 3.11-39 11/30/2005 Pages 3.11-40 through 3.11-43 08/31/1998 Page TRM / 3.11-44 08/01/2006 Page TRM / 3.11-45 03/31/2006 Page 3.11-46 08/31/1998 Page TRM / 3.11-47 03/31/2006 3.12 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-3 02/05/1999 Page TRM / 3.12-4 03/14/2008 Page TRM / 3.12-5 02/05/1999 4.0 ADMINISTRATIVE CONTROLS Pages 4.0-1 through 4.0-3 08/31/1998 Page TRM / 4.0-4 12/11/2008 Pages 4.0-5 through 4.0-8 08/31/1998 TRM / LOES-5 EFFECTIVE DATE 04/17/2014 SUSQUEHANNA - UNIT SUSQUEHANNA - UNIT I1 TRM / LOES-5 EFFECTIVE DATE 04/17/2014
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 80 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B 3.0 APPLICABILITY BASES Pages TRM / B 3.0-1 through TRM / B 3.0-3 08/31/1998 Page TRM / B 3.0-4 01/10/2007 Page TRM / B 3.0-5 04/14/2008 Page TRM / B 3.0-6 08/31/1998 Page TRM / B 3.0-7 04/12/2007 Pages TRM / B 3.0-8 through TRM / B 3.0-10 08/31/1998 Pages TRM / B 3.0-11 and TRM / B 3.0-12 03/15/2002 Pages TRM / B 3.0-13 and TRM / B 3.0-14 11/30/2005 Page TRM / B 3.0-15 03/15/2002 B 3.1 REACTIVITY CONTROL SYSTEMS BASES Page TRM / B 3.1-1 07/.13/1999 Page TRM / B 3.1-2 04/16/2014 Page TRM / B 3.1-3 10/31/2007 Page B 3.1-4 08/31/1998 Page TRM / B 3.1-5 11/15/2005 Pages TRM / B 3.1-6 and TRM / B 3.1-7 03/22/2006 Page TRM / B 3.1-8 02/18/1999 B 3.2 CORE OPERATING LIMITS BASES Page B 3.2-1 08/31/1998 B 3.3 INSTRUMENTATION BASES Page TRM / B 3.3-1 01/21/2014 Page TRM / B 3.3-2 03/10/2011 Page TRM / B 3.3-2a 10/31/2007 Page TRM / B 3.3-3 12/11/2008 Page TRM / B 3.3-3a 10/31/2007 Page TRM / B 3.3-4 06/30/2010 Page TRM / B 3.3-5 05/30/2006 Page TRM / B 3.3-6 06/30/2010 Page TRM / B 3.3-7 10/30/2007 Page TRM / B. 3.3-8 06/30/2010 Page TRM / B 3.3-9 10/31/2007 Pages TRM / B 3.3-10 through TRM / B 3.3-12 01/07/2011 Page TRM / B 3.3-13 01/21/2014 Page TRM / B 3.3-14 06/25/2002 Page TRM / B 3.3-14a 10/31/2007 Page TRM / B 3.3-14b 10/31/2007 Pages TRM / B 3.3-15 and TRM / B 3.3-16 10/22/2003 Page TRM / B 3.3-17 03/22/2006 Pages TRM / B 3.3-17a through TRM / B 3.3-17c 03/22/2006 Page TRM / B 3.3-17d 03/27/2008 TRM / LOES-6 EFFECTIVE DATE 04/17/2014 SUSQUEHANNA - UNIT UNIT 11 TRM / LOES-6 EFFECTIVE DATE 04/17/2014
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 80 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Pages TRM / B 3.3-17e and TRM / B 3.3-17f 03/22/2006 Pages TRM / B 3.3-18 and TRM / B 3.3-19 08/03/20.10 Page TRM / B 3.3-20 10/22/2003 Page TRM / B 3.3-21 05/16/2003 Pages TRM / B 3.3-22 and TRM / B 3.3-23 04/07/2009 B 3.4 REACTOR COOLANT SYSTEM BASES Page B 3.4-1 08/31/1998 Pages TRM / B 3.4-2 and TRM / B 3.4-3 04/01/2009 Pages TRM / B 3.4-4 and TRM / B 3.4-4a 10/31/2007 Page TRM / B 3.4-5 10/15/1999 Page B 3.4-6 08/31/1998 Pages TRM / B 3.4-7 and TRM / B 3.4-8 04125/2013 B 3.5 ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2 08/31/1998 Pages TRM / B 3.5-3 through TRM / B 3.5-5 10/31/2007 B 3.6 CONTAINMENT BASES Page TRM / B 3.6-1 07/26/2001 Page TRM / B 3.6-2 02/01/1999 Page B 3.6-3 08/31/1998 Page TRM / B 3.6-4 03/27/2008 Page TRM / B 3.6-5 04/04/2007 Page TRM / B 3.6-6 12/03/2004 Pages TRM / B.3.6-7 through TRM / B 3.6-11 12/31/2002 B 3.7 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 08/31/1998 Page TRM / B 3.7-3 06/10/2010 Page TRM / B 3.7-3a 12/27/2007 Page TRM / B 3.7-4 03/31/2006 Page TRM / B 3.7-5 08/02/1999 Page TRM / B 3.7-6 03/31/2006 Pages TRM / B 3.7-7 and TRM / B 3.7-7a 08/02/1999 Page TRM / B 3.7-8 05/29/2013 Page TRM / B 3.7-9 04/11/2014 Page TRM / B 3.7-10 08/02/1999 Page TRM / B 3.7-1Oa .03/31/2006 Page TRM / B 3.7-11 08/02/1999 Page TRM / B 3.7-11a 03/31/2006 Pages TRM / B 3.7-12 and TRM / B 3.7-13 08/02/1999 Pages TRM / B 3.7-14 and TRM / B 3.7-14a 09/25/2012 TRM/LOES-7 EFFECTIVE DATE 04/17/2014 SUSQUEHANNA - UNIT SUSQUEHANNA -
UNIT 1 1 TRM / LOES-7 EFFECTIVE DATE 04117/2014
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 80 LIST.OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL) re Section Title Page TRM / B 3.7-14b Effective Date 11/24/2011 Pages TRM / B 3.7-15 and TRM / B 3.7-16 02/01/1999 Pages B 3.7-17 through B 3.7-20 08/31/1998 Page TRM / B 3.7-21 05/29/2013 Pages TRM / B 3.7-21a t'hrough TRM /B 3.7-21d 05/24/2012 Pages TRM / B 3.7-21e through TRM / B 3.7-21g 05/2,9/2013 Page TRM / B 3.7-22 and TRM / B 3.7-23 01/30/2008 Page TRM / B 3.7-24 10/05/2006 Page TRM / B 3.7-25 01/21/2014 Pages TRM / B 3.7-26 through TRM / B 3.7-28 10/05/2006 Pages TRM / B 3.7-29 and TRM / B 3.7-30 06/07/2007 Page TRM / B 3.7-30a 10/05/2006 Page TRM / B 3.7-30b .01/21/2014 Page TRM / B 3.7-31 .11/30/2011 Page TRM / B 3.7-32 03/09/2001 Page TRM / B 3.7-33 04/15/2003 Page TRM / B 3.7-34 12/03/2004 Page TRM / B 3.7-35 07/05/2000 Pages TRM / B 3.7-36 through TRM B 3.7-39 04/01/2009 Page TRM / B 3.7-40 04/08/2010 B 3.8 ELECTRICAL POWER BASES Page TRM / B 3.8-1 04/02/2002 Page TRM / B 3.8-2 01/28/2005 Page TRM / B 3.8-2a 03/01/2010 Page TRM / B 3.8-3 04/02/2002 Page TRM / B 3.8-3a 04/02/2002 Page TRM / B 3.8-4 09/03/2004 Page TRM / B 3.8-4a 04/02/2002 Page B 3.8-5 08/31/1998 Pages TRM / B 3.8-6 through TRM / B 3.8-15 04/02/2002 Page TRM / B 3.8-16 ,,11/07/2013 Page TRM / B 3.8-17 11/30/2011 Pages TRM / B 3.8-17a and TRM /B 3.8-17b 11/530/2011 Pages TRM / B 3.8-18 through TRM / B 3.8-20 05/29/2013 Pages TRM / B 3.8-21 and TRM / B 3.8-22 o5/28/2009:
Page TRM / B 3.8-23 05/29/2013 Page TRM / B 3.8-24 05/28/2009 B.3.9 REFUELING OPERATIONS BASES Pages B 3.9-1 through B 3.9-7 08/31/1998 TRM / LOES-8 EFFECTIVE DATE 04/17/2014 SUSQUEHANNA - UNIT UNIT I1 TRM / LOES-8 EFFECTIVE DATE 04/17/2014
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 80 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B 3.10 MISCELLANEOUS BASES Page B 3.10-1 08/31/1998 Pages TRM / B 3.10-2 and TRM / B 3.10-3 03/22/2006 Pages TRM / B 3.10-4 and TRM / B 3.10-5 08/23/1999 Page TRM / B 3.10-6 03127/2008 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 08/30/1998 Page TRM / B 3.11-10 02/01/1999 Pages TRM/B 3.11-11 and TRM/B 3.11-a1 a 04/07/2000 Pages TRM/B 3.11-12 and TRM/B 3.11-13 02/01/1999 Page TRM / B 3.11-14 12/03/2004 Page TRM / B 3.11-15 02/01/1999 Pages B 3.11-16 through B 3.11-19 08/30/1998 Page TRM / B 3.11-20 04/02/2002 Page TRM / B 3.11-20a 04/02/2002 Page TRM / B 3.11-21 05/13/2005 Pages TRM / B 3.11-22 and TRM / B 3.11-23 11/14/2006 Pages TRM / B 3.11-23a and TRM / B 3.11-23b 06/18/2013 Pages TRM / B 3.11-24 and TRM / B 3.11-25 01/21/2004 Pages B 3.11-26 and B 3.11-27 08/30/1998 Pages TRM / B 3.11-28 and TRM / B 3.11-29 11/30/2005 Pages TRM / B 3.11-30 and TRM / B 3.11-31 05/29/2013 Page TRM / B 3.11-32 08/30/1998 Page TRM / B 3.11-33 06/30/2010 Pages B 3.11-34 and B 3.11-35 08/30/1998 Page TRM / B 3.11-36 02/12/1999 B.3.12 LOADS CONTROL PROGRAM BASES Page TRM / B 3.12-1 09/19/2007 Page TRM / B 3.12-2 11/29/2010 Page TRM / B 3.12-3 02/05/1999 TRM1 text LOES 4/23/14 TRM / LOES-9 EFFECTIVE DATE 04/17/2014 SUSQUEHANNA-- UNIT SUSQUEHANNA UNIT I1 TRM / LOES-9 EFFECTIVE DATE 04/17/2014
Core Operating Limits Report (COLR)
PPL Rev. 14 3.2.1 3.2 Core Operating Limits Report (COLR) 3.2.1 Core Operating Limits Report (COLR)
TRO 3.2.1 The Core Operating Limits specified in the attached COLR shall be met.
APPLICABILITY: Specified in the referenced Technical Specifications.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Core Operating Limits not A.1 Perform action(s) described Specified in met. in referenced Technical referenced Specification. Technical Specifications.
TECHNICAL REQUIREMENT SURVEILLANCE SURVEILLANCE FREQUENCY
- NOTE ---------------------------------------- N/A No associated Surveillances. Surveillances are implemented in the applicable Technical Specifications.
SUSQUEHANNA - UNIT 1 TRM / 3.2-1 EFFECTIVE DATE 07/07/1999
PPL Rev. 14 PL-NF-14-O01 Rev. 0 Page 1 of 53 Susquehanna SES Unit I Cycle 19 CORE OPERATING LIMITS REPORT Nuclear Fuels Engineering April 2014 a' 4e,~
P 1-SUSQUEHANNA UNIT 1 TRM/3.2-2 EFFECTIVE DATE 4/17/2014
PPL Rev. 14 PL-NF-14-001 Rev. 0 Page 2 of 53 CORE OPERATING LIMITS REPORT REVISION DESCRIPTION INDEX Rev. Affected No. Sections Description/Purpose of Revision 0 ALL Issuance of this COLR is in support of Unit 1 Cycle 19 operation.
FORM NFP-QA-008-2, Rev. 1 SUSQUEHANNA UNIT 1 TRM/3.2-3 EFFECTIVE DATE 4/17/2014
PPL Rev. 14 PL-NF-14-001 Rev. 0 Page 3 of 53 SUSQUEHANNA STEAM ELECTRIC STATION Unit 1 Cycle 19 CORE OPERATING LIMITS REPORT Table of Contents 1.0 INT RO DUC T ION.................................................................................................... .4 2.0 DE FIN ITIONS ................................................................................................... ....5 3.0 SH UTDO W N MA RG IN ........................................................................................... 6 4.0 AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR) ................... 7 5.0 MINIMUM CRITICAL POWER RATIO (MCPR) ..................................................... 9 6.0 LINEAR HEAT GENERATION RATE (LHGR) ........................................................ 24 7.0 ROD BLOCK MONITOR (RBM) SETPOINTS AND OPERABILITY R E Q UIR E ME NT S ................................................................................................. 32 8.0 RECIRCULATION LOOPS - SINGLE LOOP OPERATION .................................... 34 9.0 PO W ER / FLO W MA P ............................................................................................ 49 10.0 O PR M S ETPO INTS ............................................................................................... 51 11.0 R E F E R E NC E S ............................................................................................................ 52 SUSQUEHANNA UNIT 1 TRM/3.2-4 EFFECTIVE DATE 4/17/2014
PPL Rev. 14 PL-NF-14-001 Rev. 0 Page 4 of 53
1.0 INTRODUCTION
This CORE OPERATING LIMITS REPORT for Susquehanna Unit I Cycle 19 is prepared in accordance with the requirements of Susquehanna Unit 1, Technical Specification 5.6.5. As required by Technical Specifications 5.6.5, core shutdown margin, the core operating limits, RBM setpoints, and OPRM setpoints presented herein were developed using NRC-approved methods and are established such that all applicable limits of the plant safety analysis are met.
SUSQUEHANNA UNIT 1 TRM/3.2-5 EFFECTIVE DATE 4/17/2014
PPL Rev. 14 PL-NF-14-001 Rev. 0 Page 5 of 53 2.0 DEFINITIONS Terms used in this COLR but not defined in Section 1.0 of the Technical Specifications or Section 1.1 of the Technical Requirements Manual are provided below.
2.1 The AVERAGE PLANAR EXPOSURE at a specified height shall be equal to the total energy produced per unit length at the specified height divided by the total initial weight of uranium per unit length at that height.
2.2 The PELLET EXPOSURE shall be equal to the total energy produced per unit length of fuel rod at the specified height divided by the total initial weight of uranium per unit length of that rod at that height.
2.3 FDLRX is the ratio of the maximum LHGR calculated by the core monitoring system for each fuel bundle divided by the LHGR limit for the applicable fuel bundle type.
2.4 LHGRFACf is a multiplier applied to the LHGR limit when operating at less than 108 Mlbm/hr core flow. The LHGRFACf multiplier protects against both fuel centerline melting and cladding strain during anticipated system transients initiated from core flows less than 108 Mlbm/hr.
2,5 LHGRFACp is a multiplier applied to the LHGR limit when operating at less than RATED THERMAL POWER. The LHGRFACP multiplier protects against both fuel centerline melting and cladding strain during anticipated system transients initiated from partial power conditions.
2,6 MFLCPR is the ratio of the applicable MCPR operating limit for the applicable fuel bundle type divided by the MCPR calculated by the core monitoring system for each fuel bundle.
2,7 MAPRAT is the ratio of the maximum APLHGR calculated by the core monitoring system for each fuel bundle divided by the APLGHR limit for the applicable fuel bundle type.
2,8 OPRM is the Oscillation Power Range Monitor. The Oscillation Power Range Monitor (OPRM) will reliably detect and suppress anticipated stability related power oscillations while providing a high degree of confidence that the MCPR safety limit is not violated.
2,9 Np is the OPRM setpoint for the number of consecutive confirmations of oscillation half-cycles that will be considered evidence of a stability related power oscillation.
2,10 Sp is the OPRM trip setpoint for the peak to average OPRM signal.
2.11 Fp is the core flow, in Mlbm / hr, below which the OPRM RPS trip is activated.
SUSQUEHANNA UNIT 1 TRM/3.2-6 EFFECTIVE DATE 4/17/2014
PPL Rev. 14 PL-NF-14-001 Rev. 0 Page 6 of 53 3.0 SHUTDOWN MARGIN 3.1 Technical Specification Reference Technical Specification 3.1.1 3.2 Description The SHUTDOWN MARGIN shall be equal to or greater than:
a) 0.38% Ak/k with the highest worth rod analytically determined OR b) 0.28% Ak/k with the highest worth rod determined by test Since core reactivity will vary during the cycle as a function of fuel depletion and poison burnup, Beginning of Cycle (BOC) SHUTDOWN MARGIN (SDM) tests must also account for changes in core reactivity during the cycle. Therefore, the SDM measured at BOC must be equal to or greater than the applicable requirement from either 3.2.a or 3.2.b plus an adder, "R". The adder, "R", is the difference between the calculated value of maximum core reactivity (that is, minimum SDM) during the operating cycle and the calculated BOC core reactivity. If the value of "R" is zero (that is, BOC is the most reactive point in the cycle) no correction to the BOC measured value is required.
The SHUTDOWN MARGIN limits provided in 3.2a and 3.2b are applicable in MODES 1, 2, 3, 4, and 5. This includes core shuffling.
SUSQUEHANNA UNIT 1 TRM/3.2-7 EFFECTIVE DATE 4/17/2014
PPL Rev. 14 PL-NF-14-001 Rev. 0 Page 7 of 53 4.0 AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR) 4.1 Technical Specification Reference Technical Specification 3.2.1 4.2 Description The APLHGRs for ATRIUMTM-10 fuel shall not exceed the limit shown in Figure 4.2-1.
The APLHGR limits in Figure 4.2-1 are valid for Main Turbine Bypass Operable and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable in Two Loop operation. The APLHGR limits for Single Loop operation are provided in Section 8.0.
SUSQUEHANNA UNIT 1 TRMI3.2-8 EFFECTIVE DATE 4/17/2014
SSES UNIT 1 CYCLE 19 c/)
16.0 ci
, ~ ~ ~ ~ ~ ~~~~ . . . . . . . . . . .
- I I ITT r -I rr I -- I oT--T I I I 1- i I- I - r- I -- I I I I -- I I IF---rF-----I I I I I ....... I 4T-I I -- 4---i--A--rA-7--
I I I I --
i I I I I I I I I I I l I I I I I I I I l l I a l a l l l l I I I
- I I S I I II IIII I I I I I I I I I I I I I I I I I
- I I I I S I I I I I I I I I III I I I I I I I I I I I I I I I
- I I I I I I II IIII I I I I I I I I I I I I I I I I I I I
- I I I I I II I I I I I I I I I I ,I I a =UE l INDTRIIGMPA I I I 14.0 * =* ' I I I I
- I I I I S ii i n. . . . . . . . . . a
-H
- I I I I I IIII I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I l l I I I I I I I I i I I I I I I I I I I II - I I-I rII rII - III - III - III - I- I S I- I - I -- I II I- II I II II I I I II II I I I I I II I - I II I I II *I I I I I I I I I I I I I I Ir -I Ir I I . I I. I I. I.. . . . I - I I I I I I
l I
I I
I I
I I
l I
I I
I I
I I
I I
I I
I I
I I I II I I I II I I
- 'I I I OI III I f I I
I I
r f K R I I fI L t ~ A I ff~ I 'I I I I I
I I
-- - - _ _ _____ ----- I.
___,- I..---------
- I-. -- I- - , - - -- , ------
-- -- - ., -- - , - ..- - .- - - - ,- - .- ..- ..- .. ,-d--- - =--....
12.0 - - - - - - ---------
E I*
I I ! I I I
I I
I Il I I I
I I
I I
I I
I I
I I
I I
I I I I I
I I
I I
I I
I I I !
I I
I I
I I
I I
I I I I I Ll*-
I*
L I IL -I I I I l I I II II
- - I- - - lI - -
I I I I- - - -I ~ll I
-I - -I I
-I - II - -I -II I l I
II i II Ii lI iI ii I I I
i I L ll
~ I L ---
Ii
- i IL -- Il - I LII I I lI I l I
l I
Ii"~.I lI I
I I
I I
I I
I I
I I
II II I
I 4II I
I II I
I
.2 N) cm- 10.
7* ov >u a 10.0 I I I I I I I I I I I I I I I I I I r
m CD
- 8.0 I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
2 I
I I
I I
I I
I I
I I
I I I I
I I I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I I I I I
I I
m"T] I I I I I I I I I I I I I I I I I I I I I I I I a I I I i I m I I
-'T' j I I I I I I I I I I I
I i
I I
I I
I I
I I
I I
I I
I I
I I
I I I I I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
c-Z .c
- I I I
I I
I I
I i I I
m I
I I
I I
I I I I I I a I a m I I I I I I I I I I I I I I I
- I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I no ci
-H no 6.0 C
-4 N) 0 4.0 0 10000 20000 30000 40000 50000 60000 70000 Average Planar Exposure (MWD/MTU)
-D AVERAGE PLANAR LINEAR HEAT GENERATION RATE LIMITVERSUS 0)
AVERAGE PLANAR EXPOSURE - TWO LOOP OPERATION 0CD -
ATRIUMTM-10 FUEL h' :,C 0 FIGURE 4.2-1 U- 013 00
PPL Rev. 14 PL-NF-14-001 Rev. 0 Page 9 of 53 5.0 MINIMUM CRITICAL POWER RATIO (MCPR) 5.1 Technical Specification Reference Technical Specification 3.2.2, 3.3.4.1, 3.7.6, and 3.7.8 5.2 Description The MCPR limit is specified as a function of core power, core flow, average scram insertion time per Section 5.3 and plant equipment operability status. The MCPR limits for all fuel types (ATRIUMTM-10) shall be the greater of the Flow-Dependent or the Power-Dependent MCPR, depending on the applicable equipment operability status.
a) Main Turbine Bypass / EOC-RPT / Backup Pressure Regulator Operable Figure 5.2-1: Flow-Dependent MCPR value determined from BOC to EOC Figure 5.2-2: Power-Dependent MCPR value determined from BOC to EOC b) Main Turbine Bypass Inoperable Figure 5.2-3: Flow-Dependent MCPR value determined from BOC to EOC Figure 5.2-4: Power-Dependent MCPR value determined from BOC to EOC c) EOC-RPT Inoperable Figure 5.2-5: Flow-Dependent MCPR value determined from BOC to EOC Figure 5.2-6: Power-Dependent MCPR value determined from BOC to EOC d) Backup Pressure Regulator Inoperable Figure 5.2-7: Flow-Dependent MCPR value determined from BOC to EOC Figure 5.2-8: Power Dependent MCPR value determined from BOC to EOC The MCPR limits in Figures 5.2-1 through 5.2-8 are valid for Two Loop operation.
The MCPR limits for Single Loop operation are provided in Section 8.0.
ý SUSQUEHANNA UNIT 1 TRM/3.2-i0 EFFECTIVE DATE 4/17/2014
PPL Rev. 14 PL-NF-14-001 Rev. 0 Page 10 of 53 5.3 Average Scram Time Fraction If the average measured scram times are greater than the Realistic Scram times listed in Table 5.3-1 then the MCPR operating limits corresponding to the Maximum Allowable Average Scram Insertion Time must be implemented.
Determining MCPR operating limits based on interpolation between scram insertion times is not permitted. The evaluation of scram insertion time data, as it relates to the attached table should be performed per Reactor Engineering procedures.
SUSQUEHANNA UNIT 1 TRM/3.2-11 EFFECTIVE DATE 4/17/2014
PPL Rev. 14 PL-NF-14-O01 Rev. 0 Page 11 of 53 Main Turbine Bypass I EOC-RPT I Backup Pressure Regulator Operable SUSQUEHANNA UNIT 1 TRM/3.2-12 EFFECTIVE DATE 4/17/2014
SSES UNIT 1 CYCLE 19 c1) 2.2 EGEND 2.1 r- URVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME 2.0 4 4- 4 URVE B: REALISTIC AVERAGE SCRAM INSERTION TIME 1.9 4 4. 4 .4 SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 1.8 USED IN DETERMINING MFLCPR
.E- -0 ILI 1.7 r-W~ 0 CD 5
m~
(.,
1.6 m
Cm 1.5 m
m C=) 1.4
REFERENCE:
T.S. 3.2.2 4-H 1.3 1.2 30 40 50 60 70 80 90 100 110 Total Core Flow (MLB/HR) -0
-D MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW z,n MAIN TURBINE BYPASS / EOC-RPT I BACKUP PRESSURE REGULATOR OPERABLE (0 TWO LOOP OPERATION (BOC TO EOC) X (D -L,
-h a FIGURE 5.2-1 5 a)
CIO
C/) SSES UNIT 1 CYCLE 19 C/) 3.6 niD E
0)
IO 0
(D mr c:)
CD 20 30 40 50 60 70 80 90 100 Core Power (% RATED)
CD -
MCPR OPERATING LIMIT VERSUS CORE POWER MAIN TURBINE BYPASS / EOC-RPT / BACKUP PRESSURE REGULATOR OPERABLE 0CD TWO LOOP OPERATION (BOC TO EOC)
-h:< 0 FIGURE 5.2-2 01p 0
PPL Rev. 14 PL-NF-14-O01 Rev. 0 Page 14 of 53 Main Turbine Bypass Inoperable SUSQUEHANNA Uý IT 1 TRM/3.2-15 EFFECTIVE D7 TE 4/17/2014
c/) SSES UNIT 1 CYCLE 19 c/) 2.2
.C LEGEND 2.1 CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME 2.0 SAFETY ANALYSES ASSUME THAT TWO OR MORE BYPASS VALVES ARE INOPERABLE PER SR 3.7.6.1 OR 3.7.6.2 1.9 30,1.80 USED IN DETERMINING MFLCPR
-H- 1.8 CL
-u CA)* 0. 1.7 -D
- 0. CD 1.6
-m m 1.5
-H F10,136
[-H 1.4 C--
REFERENCE:
T.S. 3.7.6 and 3.2.2 1.3 CJ C-1.2 30 40 50 60 70 80 I0 100 110 Total Core Flow (MLB/HR)
MCPR OPERATING LIMIT VERSUS TOTAL.CORE FLOW CD -n MAIN TURBINE BYPASS INOPERABLE -L I TWO LOOP OPERATION (BOC TO EOC) 0 CD5 FIGURE 5.2-3 hf 0
SSES UNIT 1 CYCLE 19 Vt) 3.6
.C 3.4 3.2 3.0 2.8 E
4-2.6
-u CD 2.4 I--
00I
- 0. CD o
2.2 4N
-q:
2.0 1.8 1.6 N-)
-q~
1.4 1.2 20 30 40 50 60 70 80 90 100 Core Power (% RATED)
CD
-u -
MCPR OPERATING LIMITVERSUS CORE POWER MAIN TURBINE BYPASS INOPERABLE 0(D TWO LOOP OPERATION (BOC to EOC)
FIGURE 5.2-4 -. ,<
(;1 0 0
PPL Rev. 14 PL-NF-14-O01 Rev. 0 Page 17 of 53 EOC-RPT Inoperable SUSQUEHANNA UNIT 1 TRM/3.2-18 EFFECTIVE DATE 4/17/2014
Cr) SSES UNIT 1 CYCLE 19 Cr) 2.2 m LEGEND 2.1 CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME 2.0 4 +
CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME I'
1.9 I .4. I-J SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2
-J 1.8 USED IN DETERMINING MFLCPR CL 1.7 C-0.
CD 0
1.6 m
-Il m 1.5 m
r)
-H m
1.4 CD
-H
REFERENCE:
T.S. 3.3.4.1 and 3.2.2 m
CD 1.3 I,
-4 RJ CD 1.2 I-30 40 50 60 70 80 90 100 110 Total Core Flow (MLB/HR) "13
,I-MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW -.X z EOC-RPT INOPERABLE TWO LOOP OPERATION (BOC TO EOC) 0 CD FIGURE 5.2-5 -I, 0
0 0
c/) SSES UNIT 1 CYCLE 19 c/) 3.6 E
I-i CA)
NJ
- 0. C-
- 0. CD O.
m T1 m
m 4I, 20 30 40 50 60 70 80 90 100 Core Power(% RATED)
MCPR OPERATING LIMITVERSUS CORE POWER (D z EOC-RPT INOPERABLE -n TWO LOOP OPERATION (BOC to EOC) 0 CD FIGURE 5.2-6 *zCD (j) CD "
PPL Rev. 14 PL-NF-14-001 Rev. 0 Page 20 of 53 Backup Pressure Regulator Inoperable SUSQUEHANNA UNIT 1 TRM/3.2-21 EFFECTIVE DATE 4/17/2014
c/)
SSES UNIT 1 CYCLE 19 VJ) 2.2
,CD I I I I EGEND 2.1 4- 4- 4 .I~.
URVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME 2.0 I- + 4 -IL.I URVE B: REALISTIC AVERAGE SCRAM INSERTION TIME 1.9 I 4 -I SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES C~~)
E Zi 1.8 ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 USED IN DETERMINING MFLCPR T- -D 0)
NJ 1.7 I"-
W4 NJ IL NJ CD 1.6 1.5 C-,)
- 1 A B M
1.4 mn
[
REFERENCE:
T.S. 3.7.8 and 3.2.2]
1.3 C=)
108, 1.22 CD 1.2 30 40 50 60 70 80 90 100 110 Total Core Flow (MLB/HR)
-D "13 MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW z 0)
BACKUP PRESSURE REGULATOR INOPERABLE TWO LOOP OPERATION (BOC TO EOC)
-h < C FIGURE 5.2-7 00
SSES UNIT 1 CYCLE 19 E
0, W
a.
100o, 1.351 20 30 40 50 60 70 80 90 100 Core Power(% RATED)
(D MCPR OPERATING LIMIT VERSUS CORE POWER BACKUP PRESSURE REGULATOR INOPERABLE 0CD TWO LOOP OPERATION (BOC to EOC) n 0 FIGURE 5.2-8 OC00D
PPL Rev. 14 PL-NF-14-O01 Rev. 0 Page 23 of 53 Table 5.3-1 Average Scram Time Fraction Table For Use With Scram Time Dependent MCPR Operating Limits Control Rod Average Scram Time to Position (seconds)
Position 45 0.470 0.520 39 0.630 0.860 25 1.500 1.910 5 2.700 3.440 Average Scram Realistic Maximum Insertion Time Allowable SUSQUEHANNA UNIT 1 TRM/3.2-24 EFFECTIVE DATE 4/17/2014
PPL Rev. 14 PL-NF-14-001 Rev. 0 Page 24 of 53 6.0 LINEAR HEAT GENERATION RATE (LHGR) 6.1 Technical Specification Reference Technical Specification 3.2.3, 3.3.4.1, 3.7.6, and 3.7.8 6.2 Description The maximum LHGR for ATRIUMTM-10 fuel shall not exceed the LHGR limit determined from Figure 6.2-1. The LHGR limit in Figure 6.2-1 is valid for Main Turbine Bypass Operable and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable.
To protect against both fuel centerline melting and cladding strain during anticipated system transients initiated from reduced power and flow conditions, power and flow dependent LHGR limit multipliers are provided. The following figures are applicable to EOC-RPT Operable and Inoperable and Backup Pressure Regulator Operable and Inoperable:
a) Main Turbine Bypass Operable Figure 6.2-2: Flow-Dependent LHGR Limit Multiplier Figure 6.2-3: Power-Dependent LHGR Limit Multiplier b) Main Turbine Bypass Inoperable Figure 6.2-4: Flow-Dependent LHGR Limit Multiplier Figure 6.2-5: Power-Dependent LHGR Limit Multiplier The LGHR limit and LHGR limit multipliers in Figures 6.2-1 through 6.2-5 are valid for both Two Loop and Single Loop operation.
SUSQUEHANNA UNIT 1 TRM/3.2-25 EFFECTIVE DATE 4/17/2014
SSES UNIT I CYCLE 19 cz) 16.0 CD I I II I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I II I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I . .. ..
I l I I I . i9 .0 .
I III l Il . .
l I I . .
I I I I I I lI i.
I tI iREiSE EN E I II I tI III I l 3.2.3 i ii I i i
I I T --- --- I t1--- r T--- I--r,----r-1---7I rr r -t- I- T - r r--I- -
I I I / Il I Il I Il I I I I I I I I lI III l Iil l I cz 14.0 I I I I I. . .. .. .. .. .. .1 II I I I I I
.I
.I
.I I
I
.I I
I I I I 1
' . . . . EM NN
. . .D.RX -
I. 1 .--- 0 . ,------ 1-_
- l---l -- l +...
l 8 0 1 34 l l I l i i l l
l l
__ _ _ l
.0~
n E
0 12,0
- __ --L__ --- 18900 13.4 -- it j-q-pi REF_j-j-- RE CE T.S. 3.2.3- -
Fri 4-Cu ..-- IL.- - . - ....
-,1__-1__.1 .-..... . -... .L------ .. 1- ... ---....-- ,. .-- -
ll Il --- Ill - Ir - l- - 4 - -+lll l l l ll I I l l m
CD C I I I lI I lI lI I I lIl IIII l I I I I I I I I lIIl II Il l I I I I l l l Il l l "13 0 "13 4-Cu 10.0 I I
I.
I I
I I
I I
I I
I l I
I l
I I
I I
l l I
I I
I l
I I
I l
I I
I l
I l
' l I
l I
l l
l l
l l
l l
l l
l Il l
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I 1 I
I 1 Il I
1 I
1 1
I 1
1 I
1 1
Ia 1
1 1
I 1
I 1
1 1
I I11I I
I1 I
1 r0 1~ I II I-I - - -I--l--r-l l l-1I III I I II.I I I I I I I I 0 I I I I I I I I i I I I I I I l I I I i I I i I l l l l l llI I lI l l l l lI C I I l I I l l l l l l l l I l l l i I l l I lI lI l l l l lI I l l l Il CD 0 I I l i l l l Il l I l l l l I Il l l l l l Il l l I lI l l l lIlI i l l IllI C, I I l I l l l l lI I I l Il I I l l lI Il l l l lI I i I l l l I l l l l l C*
4-
- I ** I JI
- I. J I
- II
.. III *II * '* ii i~
I Iiiii I ji~
Il J
- l l i iiI Jl *
- iI I i iiI J ' ' 1 ' i ii 1 'b I iii I b IiI J I I J I.& Il Il-- l l ll.. II I 74I 0 ,7I--,1 I" Cu 0
= I I i I I l I I I I I I I lI I I I I I Il I I III lI I I Il 1~
Cu 8,0 I I I I I I I I I I I I I I I I I I I I I T I I I I I I I II I I l I I I I I 0 I I I I I I I I I I I l l l l l l l l lI I l l l l l l I Il l l I I I I I C
n I I
I I
I I
I I
I I'II I
I I
I I
I I
IIIIIl l
l l
I--II l l l
l l
l l
-II l
l I
l I1II l
l l
l l
l l l l
l I
l l
l I7I l
l I
l I
l Il I
l l
l l
I I I l
l l
I l
l l
I l
l i
II-I l
l l
l l
l l
l l
l l
l I
l l
l I
l l I Il I
I I
I I
l l
I I
l l
I I I l I l l l l l l l l l l l l I l l l l l l l l l l l I I m I I I I l I l l l l l I l l l I l l l l l l l l l l I I I mj m~ 6.0 C)
/ I l l / I / /I I lI I I l l I I I I I I I l i I I l l l l oI II I I 4.0 0 10000 20000 30000 40000 50000 60000 70000 80000 Pellet Exposure (MWD/MTU) 6u LINEAR HEAT GENERATION RATE LIMITVERSUS PELLET EXPOSURE (D -n Z ATRIUMTM-10 FUEL N) ITnoq FIGURE 6.2-1
-h :<
.n. 0
PPL Rev. 14 PL-NF-14-O01 Rev. 0 Page 26 of 53 Main Turbine Bypass Operable SUSQUEHANNA UNIT 1 TRM/3.2-27 EFFECTIVE DATE 4/17/2014
V)n SSES UNIT 1 CYCLE 19 c/') 1.10 1 1 1T Q
I -
... I I
-I -
II IIII I -
, II
-- - - -- -I - - - - -- - - - - - -- -
II I I I
I I 1 0 1.00 III
- - - -I - - - -
I I
I I
I I I I I I I I I I I I I I I I I I I I II II* III I IIIIIII I I I IIIIIII I I I II I I IIIIIII I I III I
-- -- -- -- -- I -- -I- - I- - -IIII r - - - - I -- - - - I -- - - -I - - - - -I - - - - - II - - - - - 4,I II-- - -IIIII I I, 4.I 4. -4I. - - I. ' - -
. - -T - - - - - - - -r - - - -
0.90 I I IIIIII I I IIIII I I
I I
I I I III II IIII I I I IlII I IIIIII I I I I II I II!IIII I I I IIII I iiiIiI i i I I II m
I I r ---
IIIII I
--- -------T ---- ------- III I I
I I I I
I I
IIII I I I I 0.80 "4-EIIII I-j,-I--- -- -
--.--- -... - - 4--
-[- -I l
Ij I
I 4......4....
SAFETY.
IJ AN LY .... E I
ASSUME.
I THA I
FOUR.. BY I
AS I Il II II II* I ........
-T1
-J I I IIIIIIIII I I I I CL 0.70 W
II!III!I 4 4 - "- 4 -------------- -
I I I
. I I
........................... I (D 5
USEDI I I I I F-H LL 0.60 I i I i1 iIii I I i I Ii m
I IL .I I I I I I .I II J I IJI 4.
c:: ~.
..-.. -. ..-.. ... - [-....
.. . .. I". .. . 1 IIIIII
. . . "II .. .. I . . .. I1 1.. . .. I" . ...
IIIII I" . ... I. .. . .. I .. .. II .. . .. . . .. r . .. . T. .. . .1". .. . . .. . .
N.) 0.50 ............................... , ..... AF T AN LY E AS UM THA FOU BY AS VA E I I I I I I- I-AR OPRAL 4I 4 -
PE -
SR 3...I AN 37..
IIIIIIIII I iIIII 0.40 ..... ..... ..... ............ .... " ..... "I..... I ............. USE INET R IN G FD RI IIIIIIIII I I I I I I IIIIIIIII I I I I I I 0.30 30 40 50 60 70 80 90 100 110 Total Core Flow (MLB/hr)
-u FLOW DEPENDENT LHGR LIMIT MULTIPLIER MAIN TURBINE BYPASS OPERABLE K)
ATRIUMTM-10 FUEL FIGURE 6.2-2 0 (D W 00
SSES UNIT 1 CYCLE 19 ci:
1.10 cn LEGEND I -I
......94.46, 1.00 m CURVE A: BASE CURVE 1.00 -- -- -- -- -- -- -- -- -- -- -
z 100 1.00o z CURVE B: CORE POWER *26% AND CORE FLOW
- 50 MLBMIHR z
2) u.vu
-- -..-- ..---------- ...i.. ........-... --
...... . ... - - - 4...-------- .--
-- - i- -- A---L
---i-- ---i -----i-4-.-------.4- .4-----,. - . .--- ------------------------------- ------
0.80 -------- - ------- - - - I - - - I I--
--4 I I -I4.I-l. -I I. - 4. - 4 - 4 - 4 II ! IIIII I I I I I I II I I III I I III IIII IIIIII I I
-u CL 0.70 -u I-I SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES I III IIII ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 IIII
-- CD IIIII
REFERENCE:
T.S. 3.2.3, 3.3.4.1, and 3.7.8 .i~.
0O 0.60 II l lII I
'
- I I
I I
I I
I m IL IIIIiI I IIIII II C I I I I I I I USED IN DETERMINING FDLRX L-------- --------
m 0.50 6-- - - - ......
i;IIIII -', --
---. - 4---- .
4'----
l EFEREN---.
4---.S.-
I I
. IIII -
3.3.4.1,-- a I 3.7.8 ' ----
-- jIIIII I I I II F23, 0.4 ___________I II IIII I
I I I 4
I I
I I
I I
4 I I I
m 0 ---- ------- ,. ------.-----.--------- ---- ----- -------- ----- --------- I--------- ------ I - -------
II I !I!IIII I I I I I 0.40 II I-I I-I1 I
I I I I
iI -
I
- i I I I I
I I
I I
I II 1II I I I I I I I I I I I I I I I I I I I I I I I I
- I I I I I I I I 4 I I I I I I 1 0
0.30 20 30 40 50 60 70 80 90 100 Core Power (% RATED)
POWER DEPENDENT LHGR LIMIT MULTIPLIER CD MAIN TURBINE BYPASS OPERABLE ATRIUMTM-10 FUEL 0OCD FIGURE 6.2-3 ht < 6 ul, 0 W 0 ".
PPL Rev. 14 PL-NF-14-001 Rev. 0 Page 29 of 53 Main Turbine Bypass Inoperable SUSQUEHANNA UNIT 1 TRM/3.2-30 EFFECTIVE DATE 4/17/2014
C,) SSES UNIT 1 CYCLE 19 ED C,) 1.10 a
C 1.00
-H 0.90 L-
.2 0.80
-H S 4)
En -0 NJ -u 0.70 En
.2 (D u-0.60 nfl m
m m
-H I: 0.50 rn ED
-H m
0.40 C
A NJ C4 0.30 H-A 30 40 50 60 70 80 90 100 110 Total Core Flow (MLB/HR)
,r-CD z FLOW DEPENDENT LHGR LIMIT MULTIPLIER MAIN TURBINE BYPASS INOPERABLE -n 0
ATRIUMTM-10 FUEL 0 CDI FIGURE 6.2-4 Co0
SSES UNIT 1 CYCLE 19 1.10 m
z z
c:
z a)
CD
-J a, I--
CD 0
0.
a, 0
a, m 0 0~
m
-IT 0
0, 20 30 40 50 60 70 80 90 100 Core Power (% RATED)
POWER DEPENDENT LHGR LIMIT MULTIPLIER (D z MAIN TURBINE BYPASS INOPERABLE (0 ATRIUMTM-10 FUEL hD L-' CD FIGURE 6.2-5 X W 0 0
PPL Rev. 14 PL-NF-14-001 Rev. 0 Page 32 of 53 7.0 ROD BLOCK MONITOR (RBM) SETPOINTS AND OPERABILITY REQUIREMENTS 7.1 Technical Specification Reference Technical Specification 3.3.2.1 7.2 Description The RBM Allowable Value and Trip Setpoints for; a) Low Power Range Setpoint, b) Intermediate Power Range Setpoint, c) High Power Range Setpoint, d) Low Power Range - Upscale, e) Intermediate Power Range - Upscale, and f) High Power Range - Upscale shall be established as specified in Table 7.2-1. The RBM setpoints are valid for Two Loop and Single Loop Operation, Main Turbine Bypass Operable and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable.
The RBM system design objective is to block erroneous control rod withdrawal initiated by the operator before fuel design limits are violated. If the full withdrawal of any control rod would not violate a fuel design limit, then the RBM system is not required to be operable. Table 7.2-2 provides RBM system operability requirements to ensure that fuel design limits are not violated.
SUSQUEHANNA UNIT 1 TRM/3.2-33 EFFECTIVE DATE 4/17/2014
PPL Rev. 14 PL-NF-14-001 Rev. 0 Page 33 of 53 Table 7.2-1 RBM Setpoints Function Allowable Nominal Trip Function 1 Value°) Setpoint Low Power Range Setpoint 28.0 24.9 Intermediate Power Range Setpoint 63.0 61.0 High Power Range Setpoint 83.0 81.0 Low Power Range - Upscale 123.4 123.0 Intermediate Power Range - Upscale 117.4 117.0 High Power Range - Upscale 107.6 107.2
() Power setpoint function (Low, Intermediate, and High Power Range Setpoints) determined in percent of RATED THERMAL POWER. Upscale trip setpoint function (Low, Intermediate, and High Power Range - Upscale) determined in percent of reference level.
Table 7.2-2 RBM System Operability Requirements Thermal Power MCPR
(% of Rated)
_28 and < 90 < 1.76
_90 and < 95 < 1.47
> 95 < 1.70 (2)
Applicable to Main Turbine Bypass Operable and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable.
(3) Applicable to both Two Loop and Single Loop Operation.
SUSQUEHANNA UNIT 1 TRM/3.2-34 EFFECTIVE DATE 4/17/2014
PPL Rev. 14 PL-NF-14-001 Rev. 0 Page 34 of 53 8.0 RECIRCULATION LOOPS - SINGLE LOOP OPERATION 8.1 Technical Specification Reference Technical Specification 3.2.1, 3.2.2, 3.2.3, 3.3.4.1, 3.4.1, 3.7.6, and 3.7.8 8.2 Description APLHGR The APLHGR limit for ATRlUMT-10 fuel shall be equal to the APLHGR Limit from Figure 8.2-1.
The APLHGR limits in Figure 8.2-1 are valid for Main Turbine Bypass Operable and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable in Single Loop operation.
Minimum Critical Power Ratio Limit The MCPR limit is specified as a function of core power, core flow, and plant equipment operability status. The MCPR limits for all fuel types (ATRIUMTM-10) shall be the greater of the Flow-Dependent or the Power-Dependent MCPR, depending on the applicable equipment operability status.
a) Main Turbine Bypass / EOC-RPT / Backup Pressure Regulator Operable Figure 8.2-2: Flow-Dependent MCPR value determined from BOC to EOC Figure 8.2-3: Power-Dependent MCPR value determined from BOC to EOC b) Main Turbine Bypass Inoperable Figure 8.2-4: Flow-Dependent MCPR value determined from BOC to EOC Figure 8.2-5: Power-Dependent MCPR value determined from BOC to EOC c) EOC-RPT Inoperable Figure 8.2-6: Flow-Dependent MCPR value determined from BOC to EOC Figure 8.2-7: Power-Dependent MCPR value determined from BOC to EOC d) Backup Pressure Regulator Inoperable Figure 8.2-8: Flow-Dependent MCPR value determined from BOC to EOC Figure 8.2-9: Power-Dependent MCPR value determined from BOC to EOC SUSQUEHANNA UNIT 1 TRM/3.2-35 EFFECTIVE DATE 4/17/2014
PPL Rev. 14 PL-NF-14-001 Rev. 0 Page 35 of 53 The MCPR limits in Figures 8.2-2 through 8.2-9 are valid only for Single Loop operation.
Linear Heat Generation Rate Limit The LHGR limits for Single Loop Operation are defined in Section 6.0.
RBM Setpoints and Operability Requirements The RBM setpoints and operability requirements for Single Loop Operation are defined in Section 7.0.
SUSQUEHANNA UNIT 1 TRM/3.2-36 EFFECTIVE DATE 4/17/2014
c/) SSES UNIT I CYCLE 19 c/) 16.0 a a aI a a a a a a a a a I e a a aI I a i a a a a a a I l a I a a a a a a a a a a a Ia I a a I a I I a a I a I I a m Ia I a I a I I I I I I I I I a I I-FI. F II FI FI- +[ REFERENCE T.S. 3.4.iand 3.2.i1 14.0 i i i i* a a a a a a a a a I I I I I., , I I I I I I I a a
... ------- F.F '----F--I--F-- F -F --F F --
-- F ---Ft--- f--f---- ---- t---'t---'t---'t---'t--- -- i---It---'I---lt---l--------j l- --- --- 'A...
12.0 E
....... .... .a.. .Io .a..oao.I--r --. . .. - - - - -T - -TIrr T - I-T i -i a. a.. a7 ... . i- i -i- -i -- . .
a_ I I I I I I I I I I I I I I I I
.2 I I I I I I I I I I I I I a I I a a a a I I a a a Ia N ,-0.0
> aauI a
I a
I a
I a
I fIlI a
I laaaaI Ia AI IaaI I I
I I
a rffIl.
I a
I I a
I a
f IS a
fl I
a aa I
a ai I I i
a aI aa aa a
a a
a aaaI a a a
a S
a a I
I a
I II a a
-0 a I I I I I a a a CD
- a. aaaaaaa aaaaaaa ....
a a a a a a a a I a a a a a a a a a a a a a a a a a a a a i a a a a a a a a a a a a a a i a a a a a a a a a a I a a a a a a I a a a aI a Ia a a a a a a a a a a a a a a a a a a a a a I a a a a a a Ia a a I Ia a a a a a a a a a a a a a a a a a I I C--0 8.0 aI i I I a a a a a a a a a a I aI a a a a a a a a a a I
.E8. a
. .aa..
a a a
- ,a--
a
-,a a
- a a
a
-a--,a a
a -
a a
-a--
a a a a
a a -
a a a .
a
- ., a a a a a a a a-- .
a a
a a
. . ,a - -
a a a--- - a,.
a a
- - ,a-. - , a .
a
- a--
a
- a. .
m- 0j a aI a a a a a a a a a a a a a I a a a a a a a a a a a a a I aI a.
a aa a a
a a
.a a
a a
a
.a a
.a a
a a
a L a
a a
a a
a a
a a _ a a
a .
a a
a a
a a
a a
a a
a a
a a'
a a
a a aL a
a a
a ia a
a a
a a
a a
a a
a a
a a]
a a
a a
a a a aa.. aa a1 a a a
a I
a a
a.a.a. i i i i l . ail . a. ai l al al a- al a--a
. . l a a a.. a a . a'- ' - a --- -' - - --a--- -' a - - -' a-a-- a---a'- a. -a-' -'a a a---
- a. a. .a . .a . .a . .a . .a . .a . .a . .a . .a. .a. .a . .a .. a a.. a 0a70 a.
4-1 . a. ra = = - - - ra- = -a--r -a--r a=
-a--r a a= ' - a-' a a""
" " a' a a ' 1 * ' a" " a- - a"'1' a a a a'a1 6.0 ia i i i1 riri l7 4.0 0.0 10000.0 20000.0 30000.0 40000.0 50000.0 60000.0 70000.0 Average Planar Exposure (MWDIMTU)
(D r AVERAGE PLANAR LINEAR HEAT GENERATION RATE LIMIT VERSUS wo z
- 0)
- C") -n AVERAGE PLANAR EXPOSURE - SINGLE LOOP OPERATION 0CD ATRIUMTM-10 FUEL
(-* 0 FIGURE 8.2-1 01,*' 0
PPL Rev. 14 PL-NF-14-O01 Rev. 0 Page 37 of 53 Main Turbine Bypass / EOC-RPT I Backup Pressure Regulator Operable SUSQUEHANNA UNIT 1 TRMI3. 2-38 EFFECTIVE DATE 4/17/2014
SSES UNIT 1 CYCLE 19 c/) 3.6 LEGEND 3.4 + 4-CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME 3.2 t 4-CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME 3.0 1- I-2.8 4. SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2
-1 2.6 IIII CL -u Q0) USED IN DETERMINING MFLCPR I-0
- m. 5o 0L 2.4 CD Q~
2 2.2 Ar m
m c) 2.0 1.8 A B
1.6
REFERENCE:
T.S. 3.4.1 and 3.2.2 1.4 30 40 50 60 70 80 90 100 110 Total Core Flow (MLB/HR)
,I-(0 z MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW (D MAIN TURBINE BYPASS / EOC-RPT/ BACKUP PRESSURE REGULATOR OPERABLE -n SINGLE LOOP OPERATION (BOC to EOC) CD' FIGURE 8.2-2 0, < 0 h, 0
SSES UNIT 1 CYCLE 19 C/) 4.6
~I I::*I:unI' r
4.4 4 +
4.2 An __
23,3.72
__ I _
CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME CURVE C: CORE POWER < 26% AND CORE FLOW< 50 MLBM/HR r23, 3.61 __
3.6 3.4 -- c I SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES E
ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 3.2
-u 3.0 __ _USED IN DETERMINING MFLCPR r-CD 2.8 a.
2.6 26.01,12.40
-71 m 2.4 C"
m 2.2 REEENE 3..A B -1 I100 .92 2.0
1.8 REEEC
T.S. 3.4.1 and 3.2.2ý_
1.6 1.4 20 30 40 50 60 70 80 90 100 Core Power (% RATED)
-u -u
,I-MCPR OPERATING LIMITVERSUS CORE POWER CD z MAIN TURBINE BYPASS I EOC-RPT I BACKUP PRESSURE REGULATOR OPERABLE (0 ;
0CD SINGLE LOOP OPERATION (BOC to EOC)
WCA)
FIGURE 8.2-3 0 0
PPL Rev. 14 PL-NF-14-O01 Rev. 0 Page 40 of 53 Main Turbine Bypass Inoperable SUSQUEHANNA UNIT 1 TRM/3.2-41 EFFECTIVE DATE 4/17/2014
0 CJ)
SSES UNIT 1 CYCLE 19 4.2 II I I LEGEND 4.0 CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM 3.8 INSERTION TIME 3.6 CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME 3.4 3.2 SAFETY ANALYSES ASSUME THAT TWO OR MORE BYPASS E VALVES ARE INOPERABLE PER SR 3.7.6.1 OR 3.7.6.2
-4 0) 3.0 C.~)
r\)
USED IN DETERMINING MFLCPR CL 2.8 0.
r\) W CD IL 2.6 2.4 c-" 2.2 2.0 R E T 43, 3108, 1.65b N) 1.8 -*
REFERENCE:
T.S. 3.4.1,376 and 3.2.2--
1.6 1.4 30 40 50 60 70 80 90 100 110 Total Core Flow (MLB/HR)
MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW z (D
MAIN TURBINE BYPASS INOPERABLE 01 0
SINGLE LOOP OPERATION (BOC to EOC) 0O(D FIGURE 8.2-4 W 0
C/)
SSES UNIT 1 CYCLE 19 4.2 F237 4.141I C/)
Q LEGEND 4.0 CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME 3.8 CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME 26,,..8 3.6o A.~- ________ CURVE C: CORE POWER < 26% AND CORE FLOW < 50 MLBM/HR I -,-,--I I
3.4 - - I 26+/-,3.,38
- 4. 4 ________ - _________________________________________________________________________ I.-
E 4-SAFETY ANALYSES ASSUME THAT TWO OR MORE BYPASS 3.2 VALVES ARE INOPERABLE PER SR 3.7.6.1 OR 3.7.6.2 Q.0 0L..
3.0 F - USED IN DETERMINING MFLCPR CD C.) 2.8 m 2.6 m 26.04, 2.451 m
m C)
-H 2.4 %I.
,- Fn'21 m
Cr 2.2
-H m
I I Cr n 3..,.22-TS.3..1 2.0 REFRECE
REFERENCE:
T.S. 3.4.1, 3.7.6, and 3.2.211 NJ Cr 1.8 I'
20 30 40 50 60 70 80 90 100 Core Power (% RATED)
-u,I-MCPR OPERATING LIMITVERSUS CORE POWER z MAIN TURBINE BYPASS INOPERABLE 0CD SINGLE LOOP OPERATION (BOC to EOC)
FIGURE 8.2-5 0
W)0
PPL Rev. 14 PL-NF-14-O01 Rev. 0 Page 43 of 53 EOC-RPT Inoperable SUSQUEHANNA UNIT 1 TRM/3.2-44 EFFECTIVE DATE 4/17/2014
c/) SSES UNIT 1 CYCLE 19 c/) 4.0 II I L mT- LEGEND 3.8 CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM 3.6 INSERTION TIME CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME 3.4 3.2 SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES E 3.0 ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 CAD 2.8 USED IN DETERMINING MFLCPR CL
-u 0.
0 2.6 CD
(.
0 2.4 2.2 C--)
2.0 1.8 mZ 1.6
REFERENCE:
T.S. 3.4.1, 3.3.4.1, 7and 3.2.210,.4 1.4 30 40 50 60 70 80 90 100 110 Total Core Flow (MLB/HR)
(DJ MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW z EOC-RPT INOPERABLE (0 n~
SINGLE LOOP OPERATION (BOC to EOC) Cn (D
X 0 FIGURE 8.2-6 0 0
C/)
SSES UNIT 1 CYCLE 19 4.6 J:D c_-
4-NJi 0)
W0 IL CD m
-TI m
C-,)
-H m
N-)
CD 1.4 20 30 40 50 60 70 80 90 100 Core Power (% RATED)
-o
,I-
-0 MCPR OPERATING LIMITVERSUS CORE POWER CD z EOC-RPT INOPERABLE "nl SINGLE LOOP OPERATION (BOC to EOC)
FIGURE 8.2-7 01 5 0CD, C
PPL Rev. 14 PL-NF-14-001 Rev. 0 Page 46 of 53 Backup Pressure Regulator Inoperable SUSQUEHANNA UNIT 1 TRM/3.2-47 EFFECTIVE DATE 4/17/2014
0 V,) SSES UNIT 1 CYCLE 19 cz 4.0 rn 3.8 I +
-HD MAXIMUM ALLOWABLE AVERAGE SCRAM 3.6 I + 4- INSERTION TIME 3.4 I 4-I: REALISTIC AVERAGE SCRAM INSERTION TIME 2
3.2 SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 E 3.0 -4 .4. 4-I
.-j USED IN DETERMINING MFLCPR co 2.8 I t *.. I I -u CL r--
0 2.6 CD 5
2.4 m
n 2.2 m
_J30, 1.92L _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
c:) 2.0 m
1.8 R T- B
- REFERENICE: T.S. 3.4.1, 3.7.8, and 3.2. 2 ...
L...........
............. ý084 1.6 N.) 1.4 30 40 50 60 70 80 90 100 110 Total Core Flow (MLB/HR)
-D -n D)ý 1~
MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW BACKUP PRESSURE REGULATOR INOPERABLE SINGLE LOOP OPERATION (BOC to EOC) h~ < C0 0-4* 0 FIGURE 8.2-8
SSES UNIT 1 CYCLE 19 C/1) 4.6 1 1 -
4 4 I at--Cifll 4.4
- 4 4.2 4 4 CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME 4.0 CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME V~)
I-D 3.8
-F273.72- I I CURVE C: CORE POWER <*26% AND CORE FLOW< 50 MLBM/HR P1
.61 3.4 I r.
c 26,3.38 I . I 1 mi 26,3.56 - SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES 3.2 ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2
-o u-3.0 43 11, 2.901 USED IN DETERMINING MFLCPR CD 2.8 ~I~-40, Z.61 r I r I NJ 4 -.----.--- 4 4 +
A P1 0.
x 2.6 2.4 I
4 4
B u
4 4 11 I
1-4 4I 1
+
4 ri P1 4 4 1 4 1 4 4 1100, !.181 C.)
2.2 t ~I I I i 2.0 1.8 T
REFERENCE:
T.S. 3.4.1, 3.7.8, and 3.22.1]IIII 41.
1.6 1.4 20 30 40 50 60 70 80 90 100 Core Power(% RATED)
"U MCPR OPERATING LIMITVERSUS CORE POWER -n BACKUP PRESSURE REGULATOR INOPERABLE CO SINGLE LOOP OPERATION (BOC to EOC) 0 CD FIGURE 8.2-9 h1< 0 0,.* 0 W30
PPL Rev. 14 PL-NF-14-001 Rev. 0 Page 49 of 53 9.0 POWER I FLOW MAP 9.1 Technical Specification Reference Technical Specification 3.3.1.1 9.2 Description Monitor reactor conditions to maintain THERMAL POWER / core flow outside of Stability Regions I and II of the Power IFlow map, Figure 9.1.
If the OPRM Instrumentation is OPERABLE per TS 3.3.1.1, Region I of the Power / Flow map is considered an immediate exit region.
If the OPRM Instrumentation is inoperable per TS 3.3.1.1, Region I of the Power/
Flow map is considered an immediate scram region.
Region II of the Power / Flow map is considered an immediate exit region regardless of the operability of the OPRM Instrumentation.
SUSQUEHANNA UNIT 1 TRM/3.2-50 EFFECTIVE DATE 4/17/2014
PPL Rev. 14 PL-NF-14-O01 Rev. 0 Page 50 of 53 120 ,--171"I 120
Purpose:
I UNIT I I POWER! FLOWMAP APRMSca 110 Trip Setpoin/ 110 InitialI Date'
. . . .. 1 i
]ZIIIIZfIf1144APRM Rod k~c-f--I I 100 100 FFT]Boundary sJ2y 90 80 80 70 70
.P-60 60 0
0-0 E-50 T 0II 50 I
-I-40 40 30 Approx 30 Oed. dum 20 j 20 10 10 0 III 0 0 10 20 30 40 50 60 70 80 90 100 110 Total Core Flow (Mlbm/hr)
(for SLO <75% Pump Speed Use Form GO-100-009-2)
Figure 9.1 SSES Unit 1 Cycle 19 Power/ Flow Map SUSQUEHANNA UNIT 1 TRM/3.2-51 EFFECTIVE DATE 4/17/2014
PPL Rev. 14 PL-NF-14-001 Rev. 0 Page 51 of 53 10.0 OPRM SETPOINTS 10.1 Technical Specification Reference Technical Specification 3.3.1.1 10.2 Description Setpoints for the OPRM Instrumentation are established that will reliably detect and suppress anticipated stability related power oscillations while providing a high degree of confidence that the MCPR Safety limit is not violated. The setpoints are described in Section 2.0 and are listed below:
Sp : 1.11
= 15 S 60 Mlbm / hr SUSQUEHANNA UNIT 1 TRM/3.2-52 EFFECTIVE DATE 4/17/2014
PPL Rev. 14 PL-NF-14-001 Rev. 0 Page 52 of 53
11.0 REFERENCES
11.1 The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC, specifically those described in the following documents:
- 1. XN-NF-81-58(P)(A), Revision 2 and Supplements 1 and 2, "RODEX2 Fuel Rod Thermal-Mechanical Response Evaluation Model," Exxon Nuclear Company, March 1984.
- 2. EMF-2361(P)(A), Revision 0, "EXEM BWR-2000 ECCS Evaluation Model,"
Framatome ANP, May 2001.
- 3. EMF-2292(P)(A), Revision 0, "ATRIUMT M-10: Appendix K Spray Heat Transfer Coefficients," Siemens Power Corporation, September 2000.
- 4. XN-NF-84-105(P)(A), Volume 1 and Volume 1 Supplements 1 and 2, "XCOBRA-T: A Computer Code for BWR Transient Thermal-Hydraulic Core Analysis," Exxon Nuclear Company, February 1987.
- 5. XN-NF-80-19(P)(A), Volume 1 and Supplements 1 and 2, "Exxon Nuclear Methodology for Boiling Water Reactors: Neutronic Methods for Design and Analysis," Exxon Nuclear Company, March 1983.
- 6. XN-NF-80-19(P)(A), Volumes 2, 2A, 2B, and 2C "Exxon Nuclear Methodology for Boiling Water Reactors: EXEM BWR ECCS Evaluation Model," Exxon Nuclear Company, September 1982.
- 7. XN-NF-80-19(P)(A), Volume 3 Revision 2 "Exxon Nuclear Methodology for Boiling Water Reactors Thermex: Thermal Limits Methodology Summary Description," Exxon Nuclear Company, January 1987.
- 8. XN-NF-80-19(P)(A), Volume 4, Revision 1, "Exxon Nuclear Methodology for Boiling Water Reactors: Application of the ENC Methodology to BWR Reloads," Exxon Nuclear Company, June 1986.
- 9. XN-NF-85-67(P)(A), Revision 1, "Generic Mechanical Design for Exxon Nuclear Jet Pump BWR Reload Fuel," Exxon Nuclear Company, Inc.,
September 1986.
- 10. ANF-524(P)(A), Revision 2 and Supplements 1 and 2, "Advanced Nuclear Fuels Corporation Critical Power Methodology for Boiling Water Reactors,"
November 1990.
- 11. NE-092-001A, Revision 1, "Licensing Topical Report for Power Uprate With Increased Core Flow," Pennsylvania Power & Light Company, December 1992 and NRC SER (November 30, 1993).
SUSQUEHANNA UNIT 1 TRM/3.2-53 EFFECTIVE DATE 4/17/2014
PPL Rev. 14 PL-NF-14-001 Rev. 0 Page 53 of 53
- 13. EMF-2209(P)(A), Revision 3, "SPCB Critical Power Correlation," AREVA NP, September 2009.
- 14. EMF-85-74(P)(A), Revision 0, Supplement 1(P)(A) and Supplement 2(P)(A),
"RODEX2A (BWR) Fuel Rod Thermal-Mechanical Evaluation Model,"
Siemens Power Corporation, February 1998.
- 15. EMF-2158(P)(A), Revision 0, "Siemens Power Corporation Methodology for Boiling Water Reactors: Evaluation and Validation of CASMO-4/Microburn-B2," Siemens Power Corporation, October 1999.
- 16. EMF-CC-074(P)(A), Volume 4, Revision 0, "BWR Stability Analysis -
Assessment of STAIF with Input from MICROBURN-B2," Siemens Power Corporation, August 2000.
- 17. NEDO-32465-A, "BWROG Reactor Core Stability Detect and Suppress Solutions Licensing Basis Methodology for Reload Applications," August 1996.
- 18. ANF-913(P)(A), Volume 1 Revision 1 and Volume 1 Supplements 2, 3, and 4, "COTRANSA2: A Computer Program for Boiling Water Reactor Transient Analyses," Advanced Nuclear Fuels Corporation, August 1990.
- 19. ANF-1358(P)(A), Revision 3, "The Loss of Feedwater Heating Transient in Boiling Water Reactors," Framatome ANP, September 2005.
SUSQUEHANNA UNIT 1 TRM/3.2-54 EFFECTIVE DATE 4/17/2014
TRM Isolation Actuation Instrumentation PPL Rev. 4 3.3.6 3.3 Instrumentation 3.3.6 TRM Isolation Actuation Instrumentation TRO 3.3.6 The TRM containment isolation instrumentation for each Function in Table 3.3.6-1 shall be OPERABLE.
APPLICABILITY: As specified in Table 3.3.6-1 ACTIONS NOTES
- 1. Penetration flow paths isolated to comply with Action C may be unisolated intermittently under administrative controls.
- 2. Separate Condition entry is allowed for each channel.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A.1 Place channel in trip. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for channels inoperable Function 2.a I AND 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for Functions other than Function 2.a B. One or more Functions with B.1 Restore isolation capability. 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> isolation capability not maintained.
C. Required Action and C.1 Initiate appropriate 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> associated Completion Time compensatory measures for of Condition A or B not met. the degraded condition.
SUSQUEHANNA - UNIT 1 TRM / 3.3-13 EFFECTIVE DATE 01/07/2011
TRM Isolation Actuation Instrumentation PPL Rev. 4 3.3.6 TECHNICAL REQUIREMENT SURVEILLANCE
NOTES ----------------------------
- 1. Refer to Table 3.3.6-1 to determine which TRSs apply for each TRM Isolation Actuation Instrumentation Function.
- 2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the associated function maintains isolation capability.
SURVEILLANCE FREQUENCY TRS 3.3.6.1 Perform CHANNEL CHECK 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> TRS 3.3.6.2 Perform CHANNEL FUNCTIONAL TEST 92 days TRS 3.3.6.3 Perform CHANNEL CALIBRATION 92 days TRS 3.3.6.4 Perform CHANNEL CALIBRATION 24 months TRS 3.3.6.5 Perform LOGIC SYSTEM FUNCTIONAL TEST 24 months TRS 3.3.6.6 Perform RESPONSE TIME TEST 24 months on a staggered test basis SUSQUEHANNA - UNIT 1 TRM / 3.3-14 EFFECTIVE DATE 12/14/1998
TRM Isolation Actuation Instrumentation PPL Rev. 4 3.3.6 TABLE 3.3.6-1 (Page 1 of 2)
PRIMARY CONTAINMENT ISOLATION INSTRUMENTATION APPLICABLE MODES OR OTHER REQUIRED SPECIFIED CHANNELS PER SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS TRIP SYSTEM REQUIREMENTS VALUE
- 1. Main Steam Line Isolation
- a. Turbine Building Main 1,2,3 2 TRS 3.3.6.2 <200°F Steam Line Tunnel TRS 3.3.6.3 Temperature - High TRS 3.3.6.5
- 2. Primary Containment Isolation
- a. Main Steam Line 1,2,3 2 TRS 3.3.6.1 <21 x full power Radiation - High, High TRS 3.3.6.2 background without TRS 3.3.6.4 hydrogen injection TRS 3.3.6.5 TRS 3.3.6.6(1)
- 3. Shutdown Cooling System Isolation (b)
- a. RHR Flow- High 3,4,5 1(c) TRS 3.3.6.1 < 26,000 gpm TRS 3.3.6.2 TRS 3.3.6.4 TRS 3.3.6.5 (a) Radiation detectors are exempt from response time testing.
(b) Not required when the penetration is isolated from the reactor vessel via manual isolation valve, blind flange, or deactivated auto isolation valve.
(c) Only one trip system required in MODES 4 and 5 when RHR Shutdown Cooling System integrity maintained. System integrity is maintained provided the piping is intact and no maintenance is being performed that has the potential for draining the reactor vessel through the system.
SUSQUEHANNA - UNIT 1 TRM / 3.3-15 EFFECTIVE DATE 04/11/2014
TRM Isolation Actuation Instrumentation PPL Rev. 4 3.3.6 THIS PAGE INTENTIONALLY LEFT BLANK SUSQUEHANNA - UNIT 1 TRM / 3.3-16 EFFECTIVE DATE 01/07/2011
Suppression Chamber-to-Drywell Vacuum Breaker Position Indication PPL Rev. 2 3.6.2 3.6 Containment 3.6.2 Suppression Chamber-to-Drywell Vacuum Breaker Position Indication TRO 3.6.2 The Suppression Chamber-to-Drywell Vacuum Breaker Position Indication shall be OPERABLE APPLICABILITY: MODES 1, 2, and 3 ACTIONS
NOTE Separate condition entry is allowed for each instrument.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more position A.1.1 Verify that the associated 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> indicators of any suppression chamber - drywell suppression chamber - vacuum breaker is closed. AND drywell vacuum breaker inoperable Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OR thereafter A. 1.2 Enter CONDITION B of Immediately LCO 3.6.1.6 AND (continued)
SUSQUEHANNA - UNIT 1 TRM / 3.6-2 EFFECTIVE DATE 04/16/2014
Suppression Chamber-to-Drywell Vacuum Breaker Position Indication PPL Rev. 2 3.6.2 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME A.2 Restore the suppression 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> chamber - drywell vacuum breaker indication to OR OPERABLE status.
At the next outage with containment entry, not to exceed the next refueling outage for in-accessible containment components.
AND Initiate a CR for tracking and trending.
TECHNICAL REQUIREMENT SURVEILLANCE SURVEILLANCE FREQUENCY TRS 3.6.2.1 Observe expected actuation of both valve As required by SR 3.6.1.6.2 position indicators during the Technical Specification Functional cycling.
TRS 3.6.2.2 Perform a CHANNEL CALIBRATION on 24 months each vacuum breaker position indicator.
SUSQUEHANNA - UNIT 1 TRM / 3.6-2a EFFECTIVE DATE 04/16/2014
ATWS-ARI Instrumentation PPL Rev. 2 B 3.1.1 B 3.1.1 Anticipated Transient Without Scram Alternate Rod Injection (ATWS-ARI)
Instrumentation BASES TRO The ATWS-ARI System actuates a scram initiation signal to the Control Rod Drive Hydraulic System (CRDHS) either automatically (on failure to scram as indicated by high reactor pressure or low reactor water Level 2), or manually (by operator action). This function adds negative reactivity, following events in which a scram does not (but should) occur. The ATWS-ARI System is diverse from and redundant to the Reactor Protection System.
(References 1 and 2)
The ATWS-ARI System includes sensors and relays to cause initiation of a reactor scram. When the setpoint is reached, the channels actuate the ATWS-ARI solenoid pilot valves, which vent the scram air header. For the purpose of this requirement, the term OPERABLE shall mean that the system or system component is capable of performing its function as required to provide compliance with 10 CFR 50.62.
The ATWS-ARI consists of two independent trip systems, with two channels of Reactor Steam Dome Pressure High and two channels of Reactor Vessel Water Level Low, Level 2 in each trip system, and manual initiation capability. Each ATWS-ARI trip system is a two-out-of-two logic for each function. Each system must actuate to effect a reactor scram. The ARI trip system shall be considered to be inoperable with the manual trip channel inoperable. The ARI trip system shall also be considered to be inoperable if any other component that is necessary to energize, and maintain energized, the ARI trip system for the period of time necessary to complete a scram via the ARI trip system (nominally 25 sec.) is not OPERABLE.
(continued)
SUSQUEHANNA - UNIT 1 TRM / B 3.1-1 EFFECTIVE DATE 07/13/1999
ATWS-ARI Instrumentation PPL Rev. 2 B 3.1.1 B 3.1.1 Anticipated Transient Without Scram Alternate Rod Injection (ATWS-ARI)
Instrumentation BASES (continued)
ACTIONS The Actions are defined to ensure proper corrective measures are taken in response to the inoperable components. ARI trip system diversity from the reactor protection system is required by the ATWS Rule. The Rule also requires functional redundancy with the Reactor Protection System in order to maximize the advantage of this diversity. Should the ARI trip system be inoperable, the corrective action period is based on this loss of diversity, not on the loss of the function. The redundant and diverse RPS trip system is Tech Spec controlled such that continued operation in the required operating condition is not allowed with loss of the RPS trip functions comparable to the ARI trip functions.
Since the ARI trip system is required only for mitigation of a specific class of ATWS events, and since the purpose of the ARI trip system is to provide diversity where redundancy otherwise exists, then an extended period for corrective action is justified for loss of the ARI trip function.
Unit operation without an OPERABLE ARI trip function is acceptable for a longer period of time than is allowed for the ATWS-RPT system by LCO 3.3.4.2. 14 days is considered to be an adequate period of system repair or component replacement.
TRS The TRSs are defined to be performed at the specified Frequency to ensure that the ATWS-ARI Function is maintained OPERABLE.
ATWS - ARI surveillances are performed consistent with the bases for surveillances for LCO 3.3.4.2 "ATWS-RPT Instrumentation."
The Technical Requirement Surveillances (TRS) are modified by two Notes.
Note 1 states that the TRSs for each ATWS-ARI instrumentation Function are located in the SR column of Table 3.1.1-1.
(continued)
SUSQUEHANNA - UNIT 1 TRM / B 3.1-2 EFFECTIVE DATE 04/16/2014
ATWS-ARI Instrumentation PPL Rev. 2 B 3.1.1 B 3.1.1 Anticipated Transient Without Scram Alternate Rod Injection (ATWS-ARI)
Instrumentation BASES TRS Note 2 modifies the Surveillances to indicate that when a channel is placed (continued) in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided RPS is OPERABLE. Upon completion of the Surveillance, or expiration of the 6 hour6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> allowance, the channel must be returned to OPERABLE status or the applicable Condition entered and Required Actions taken.
REFERENCES 1. 10 CFR 50.62 ATWS Rule
- 2. NEDO-31096-A Response to the ATWS Rule
- 3. NRC Inspection and Enforcement Manual, Part 9900: Technical Guidance, Standard Technical Specification Section 1.0 Definitions, Issue dated 12/8/86.
SUSQUEHANNA - UNIT 1 TRM / B 3.1-3 EFFECTIVE DATE 10/31/2007
Halon Systems PPL Rev. 3 B 3.7.3.4 B 3.7.3.4 Halon Systems BASES TRO The OPERABILITY of the fire suppression Halon systems is one part of ensuring that adequate fire suppression capability is available to confine and extinguish fires occurring in any portion of the facility where safety related equipment is located. The fire suppression system consists of the water supply system, spray and sprinkler systems, C02 systems, Halon systems, fire hose stations, and fire hydrants. The collective capability of the fire suppression systems is adequate to minimize potential damage to safety related equipment and is a major element in the facility fire protection program.
An OPERABLE Halon system will have storage tanks with at least 95% of full charge weight and 90% of full charge pressure.
An OPERABLE Halon system will have storage tanks with at least covered with a blank to keep the Halon System OPERABLE. Removal of any PGCC Floor panel or opening of any PGCC panel door causes the affected PGCC module Halon system to become inoperable if the floor panel or panel door must be left open and unattended or cannot be immediately closed.
The basis for those systems included within the scope of this TRO includes both Safety Related and Safe Shutdown system protection. The Halon systems are described in FPRR.
ACTIONS The Actions are defined to ensure proper corrective measures and compensatory actions are taken in response to the inoperable systems or components.
Hourly Firewatch Patrols shall be completed once each clock hour.
Individual zones on the hourly firewatch patrol shall be toured at intervals (i.e. - zone A and back to zone A) of sixty minutes with a margin of fifteen minutes.
A Continuous Firewatch must remain in the specified area at all times and must patrol the required fire zones in the specified area at least once per fifteen minutes with a margin of five minutes. Areas exist within the plant (continued)
SUSQUEHANNA - UNIT 1 TRM / B 3.7-8 EFFECTIVE DATE 05/29/2013
Halon Systems PPL Rev. 3 B 3.7.3.4 B 3.7.3.4 Halon Systems BASES (continued)
ACTIONS where the posting of a firewatch does not provide acceptable radiological (continued) ALARA practices. For these inaccessible areas, alternate measures should be taken to assure an adequate level of fire protection is maintained. The specified area can be as small as one fire zone or as large as a firewatch can reasonably patrol within the fifteen minute time period. The specified area is limited to two floors of the Control Structure or Reactor Buildings.
The floors must be adjacent or served by an operable elevator.
TRS The TRSs provide assurances that the minimum OPERABILITY requirements of the fire suppression Halon systems are met. An allowance is made for ensuring a sufficient volume of Halon in the Halon storage tanks by verifying the weight and pressure of the tanks. Tank level measurement may be used to confirm full charge weight when supported by engineering analysis.
The Surveillances are modified by a Note to indicate that when a system is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. Upon completion of the test, or expiration of the 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> allowance, the system must be restored to an operable condition, or the applicable Condition entered and 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Required Action(s) completed. The 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> allowance is a reasonable out of service time based on prior plant test performance. This allowance also does not result in an increased risk of a fire. Required Surveillances include those surveillances under other subsections of TRM 3.7.3.
TRS 3.7.3.4.3 The purpose of the flow test is to verify that there are no obstructions/blockages in the Halon system headers or nozzles. The use of air or nitrogen is acceptable for use in the performance of the flow test.
REFERENCES 1. FPRR Section 4.9 SUSQUEHANNA - UNIT 1 TRM / B 3.7-9 EFFECTIVE DATE 04/11/2014