Letter Sequence Other |
---|
|
|
MONTHYEARML14043A4762014-02-24024 February 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near- Term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident Project stage: Other 2014-02-24
[Table View] |
|
---|
Category:Letter
MONTHYEARNL-24-0385, Request for Action Matrix Deviation Due to Recent Events Impacting the Unplanned Scram with Complications Performance Indicator2024-10-31031 October 2024 Request for Action Matrix Deviation Due to Recent Events Impacting the Unplanned Scram with Complications Performance Indicator IR 05000424/20240032024-10-30030 October 2024 – Integrated Inspection Report 05000424/2024003 and 05000425/2024003 NL-24-0392, Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-0022024-10-28028 October 2024 Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-002 NL-24-0386, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks Response to Request for Additional Information2024-10-28028 October 2024 License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks Response to Request for Additional Information NL-24-0366, Core Operating Limits Report, Cycle 26, Version 12024-10-25025 October 2024 Core Operating Limits Report, Cycle 26, Version 1 ML24297A6482024-10-23023 October 2024 5 to the Updated Final Safety Analysis Report, Technical Specification Bases Changes, Technical Requirements Manual Changes, Summary Report and Revised NRC Commitments Report ML24269A2502024-09-26026 September 2024 Acknowledgement of the Withdrawal of the Requested Exemption and License Amendment Request to Remove Tier 1 and Tier 2* Requirements NL-24-0350, Core Operating Limits Report, Cycle 24, Version 22024-09-25025 September 2024 Core Operating Limits Report, Cycle 24, Version 2 NL-24-0369, Withdrawal of License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2 Requirements2024-09-25025 September 2024 Withdrawal of License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2 Requirements ML24243A0072024-09-10010 September 2024 – Correction of Amendment Nos. 223 and 206 Regarding Revision to Technical Specifications to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-14483 NL-24-0337, Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program2024-09-0909 September 2024 Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program ML24102A2642024-09-0909 September 2024 – Exemption Request Regarding Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0013) - Letter ML24249A2942024-09-0606 September 2024 Correction of Amendment Nos. 218 and 201 Regarding Revision to Technical Specifications to Use Online Monitoring Methodology 05200025/LER-2024-002, Manual Reactor Protection System and Automatic Safeguards Actuation Due to an Unexpected Change in Position of a Main Feedwater Pump Minimum Flow Control Valve2024-09-0505 September 2024 Manual Reactor Protection System and Automatic Safeguards Actuation Due to an Unexpected Change in Position of a Main Feedwater Pump Minimum Flow Control Valve IR 05000424/20240052024-08-26026 August 2024 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 and 2 - Report 05000424/2024005 and 05000425/2024005 ML24235A1952024-08-22022 August 2024 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 3 and 4 - Report 05200025/2024005 and 05200026/2024005 IR 05000424/20244012024-08-15015 August 2024 4 - Security Baseline Inspection Report 05000424-2024401, 05000425-2024401, 05200025-2024402, and 05200026-2024403 - Cover Letter NL-24-0299, Exemption Request: Final Safety Analysis Report Update Schedule, Response to Request for Additional Information2024-08-14014 August 2024 Exemption Request: Final Safety Analysis Report Update Schedule, Response to Request for Additional Information 05000425/LER-2024-001, Manual Actuation of the Reactor Protection System Due to a Rod Control Fuse Opening Causing a Misaligned Shutdown Rod2024-08-0909 August 2024 Manual Actuation of the Reactor Protection System Due to a Rod Control Fuse Opening Causing a Misaligned Shutdown Rod ML24218A1842024-08-0707 August 2024 Examination Report and Cover Letter 05200026/LER-2024-001, Manual Reactor Protection System Actuation Due to Procedure Not Optimally Sequenced to Reset the Rapid Power Reduction Signal2024-08-0606 August 2024 Manual Reactor Protection System Actuation Due to Procedure Not Optimally Sequenced to Reset the Rapid Power Reduction Signal ML24212A1442024-08-0101 August 2024 Integrated Inspection Report 05200025/2024002 and 05200026/2024002 IR 05000424/20240022024-07-29029 July 2024 Integrated Inspection Report 05000424/2024002 and 05000425/2024002 IR 05000424/20244042024-07-26026 July 2024 Material Control and Accounting Program Inspection Report 05000424/2024404 and 05000425/2024404 (Cover Letter) NL-24-0126, – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.62024-07-25025 July 2024 – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.6 NL-24-0282, License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements2024-07-25025 July 2024 License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements ML24204A0722024-07-23023 July 2024 Issuance of Amendment No. 225, Regarding LAR to Revise TS 3.7.9 for a one-time Change to Support Nuclear Service Cooling Water Transfer Pump Repairs - Emergency Circumstances NL-24-0286, Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair2024-07-20020 July 2024 Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair ML24191A4562024-07-19019 July 2024 Request for Relief and Alternative Requirements for Squib (Explosively Actuated) Valves First Test Interval NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 ML24194A0342024-07-12012 July 2024 Review of the Refueling Outage 1R24 Steam Generator Tube Inspection Report ML24191A3792024-07-10010 July 2024 – Initial Test Program and Operational Programs Inspection Report 05200026/2024011 NL-24-0227, Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2024-07-0303 July 2024 Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0234, Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-06-28028 June 2024 Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0087, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks2024-06-21021 June 2024 License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks NL-24-0201, Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2024-06-18018 June 2024 Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0243, Registration of Spent Fuel Cask Use2024-06-18018 June 2024 Registration of Spent Fuel Cask Use ML24163A0632024-06-12012 June 2024 2024 Licensed Operator Re-qualification Inspection Notification Letter Vogtle, Units 3 & 4 ML24155A1772024-06-0505 June 2024 Regulatory Audit in Support of Review of the LAR to Revise Emergency Diesel Generator Frequency and Voltage Ranges for Technical Specification 3.8.1, Surveillance Requirements NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24094A1402024-05-16016 May 2024 Staff Response to Request for Revision to NRC Staff Assessment of Updated Seismic Hazard Information and Latest Understanding of Seismic Hazards at the Vogtle Plant Site Following the NRC Process for the Ongoing Assessment of Natural Hazard ML24130A2412024-05-13013 May 2024 Integrated Inspection Report 05200025/2024001 and 05200026/2024001 ML24120A1812024-05-13013 May 2024 Request for Withholding Information from Public Disclosure Responses to NRC Request for Additional Information for Refueling Outage IR24 Steam Generator Tube Inspection Report – Enclosure 2 ML24101A2112024-05-11011 May 2024 Expedited Issuance of Amendment No. 198 Change to Technical Specification 5.5.13, Ventilation Filter Testing Program (VFTP) NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 ML24127A2372024-05-0909 May 2024 Initial Test Program and Operational Programs Inspection Report 05200026/2024010 NL-24-0194, Revised Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03-R1)2024-05-0707 May 2024 Revised Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03-R1) ML24120A2832024-04-30030 April 2024 Project Manager Reassignment 2024-09-09
[Table view] Category:Report
MONTHYEARML24297A6482024-10-23023 October 2024 5 to the Updated Final Safety Analysis Report, Technical Specification Bases Changes, Technical Requirements Manual Changes, Summary Report and Revised NRC Commitments Report ML23325A2022024-01-16016 January 2024 CFR Part 52 Construction Lessons-Learned Report NL-23-0926, Correction of Technical Specification Typographical Error2024-01-12012 January 2024 Correction of Technical Specification Typographical Error ML24004A2192024-01-0808 January 2024 Construction Reactor Oversight Process Performance Metric Report for Calendar Year 2023 ND-23-0025, Compliance with Order EA-12-0492023-08-21021 August 2023 Compliance with Order EA-12-049 ML22348A0932023-07-28028 July 2023 Finding That the Acceptance Criteria in the Combined License Are Met ML22348A0882023-07-25025 July 2023 VEGP Unit 4 - 103g - Basis Document ML23184A0472023-07-0303 July 2023 Dashboard Report 7-3-2023 ML23156A1882023-06-0505 June 2023 Construction Reactor Oversight Process Resources Report June 5, 2023 ML23121A0392023-05-0101 May 2023 Dashboard Report 5-1-2023 ML23003A0412023-01-0303 January 2023 Construction Reactor Oversight Process Resources Report January 3, 2023 ND-22-0817, Enclosures 1 and 2: Proposed Alternative Inspection Requirements for Steam Generator Nozzle to Reactor Coolant Pump Casing Welds and Alternative for Use of Code Case 648-2 for Inservice Inspection2022-11-0404 November 2022 Enclosures 1 and 2: Proposed Alternative Inspection Requirements for Steam Generator Nozzle to Reactor Coolant Pump Casing Welds and Alternative for Use of Code Case 648-2 for Inservice Inspection ND-22-0831, (Vegp), Units 3 and 4, Comments on AP1000 Standard Technical Specifications (STS) Draft NUREG-2194, Revision 12022-10-31031 October 2022 (Vegp), Units 3 and 4, Comments on AP1000 Standard Technical Specifications (STS) Draft NUREG-2194, Revision 1 ML22278A0382022-10-0505 October 2022 Dashboard Report 10-5-2022 ML22215A0962022-08-0303 August 2022 Construction Reactor Oversight Process Resources Report August 3, 2022 ML22214A0072022-08-0101 August 2022 Archives ML20290A2762022-08-0101 August 2022 10CFR52.103(g) Basis Document NL-22-0510, Plants Units 1 and 2, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20212022-07-14014 July 2022 Plants Units 1 and 2, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2021 ML22179A1462022-06-15015 June 2022 Tier 1, Revision 10, Updated Through 04/22/2022 ML22159A1712022-06-0808 June 2022 Construction Reactor Oversight Process Resources Report June 8, 2022 ML22131A0502022-05-11011 May 2022 Construction Reactor Oversight Process Resources Report May 11, 2022 ML22089A0412022-03-30030 March 2022 Construction Reactor Oversight Process Resources Report March 30 2022 ND-22-0003, Report of 10 CFR 50.59 Changes, Tests, and Experiments and 10 CFR 52 Appendix D Departure Report2022-01-0606 January 2022 Report of 10 CFR 50.59 Changes, Tests, and Experiments and 10 CFR 52 Appendix D Departure Report ND-21-1003, Request for Exemption: Applicability of 10 CFR 26.3. Scope, Until Initial Fuel Load - Supplement2021-11-12012 November 2021 Request for Exemption: Applicability of 10 CFR 26.3. Scope, Until Initial Fuel Load - Supplement ND-21-0991, Exemption Request: Applicability of 10 CFR 26.3, Scope, Until Initial Fuel Load2021-11-0505 November 2021 Exemption Request: Applicability of 10 CFR 26.3, Scope, Until Initial Fuel Load ML21280A3042021-10-0707 October 2021 Q 2020 Performance Summary ML21280A3052021-10-0707 October 2021 Q/2020 Performance Summary ML21277A0762021-10-0404 October 2021 Vog 4 Dashboard 10-4-2021 ND-21-0848, Enclosure - Unit 4 Operator Candidates Requesting Credit for Unit 3 Written Examination and Operating Test (Revised)2021-10-0101 October 2021 Enclosure - Unit 4 Operator Candidates Requesting Credit for Unit 3 Written Examination and Operating Test (Revised) IR 05000424/20210052021-08-25025 August 2021 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 and 2 (Report 05000424/2021005 and 05000425/2021005) ND-21-0603, Electrical Construction and Measuring & Test Equipment Control2021-06-25025 June 2021 Electrical Construction and Measuring & Test Equipment Control ML21179A0972021-06-15015 June 2021 to Tier 1 ML21132A0482021-05-12012 May 2021 Construction Reactor Oversight Process Resources Report May 2021 ML21118A1162021-04-28028 April 2021 Emergency Response Data System (ERDS) Data Point Library for Vogtle Unit 3 ND-21-0342, Emergency Response Data System (ERDS) Data Point Library for Vogtie Unit 42021-04-28028 April 2021 Emergency Response Data System (ERDS) Data Point Library for Vogtie Unit 4 ML21090A2092021-03-31031 March 2021 Construction Reactor Oversight Process Resources Report March 2021 ML21040A1672021-02-0909 February 2021 (Vegp), Units 3 and 4, Revision to Westinghouse Non-Proprietary Technical Description of the Flaw Tolerance Evaluation Conducted on the Subject Weldolet Branch Connections ML20358A1822020-12-31031 December 2020 LTR-SDA-20-096-NP, Revision 1, Flaw Tolerance Evaluation to Assess Lack of Inspection Coverage of AP1000 14 X 4 Stainless Steel Weldolets to Pipe Welds ML20343A0672020-12-0202 December 2020 Dashboard Report 12-2-2020 ML20314A0492020-11-0909 November 2020 Construction Reactor Oversight Process Resources November 2020 ND-20-1220, Report of Changes Incorporated Into Revision 6 to the Security Plan, Training and Qualification Plan, and Safeguards Contingencv Plan2020-10-21021 October 2020 Report of Changes Incorporated Into Revision 6 to the Security Plan, Training and Qualification Plan, and Safeguards Contingencv Plan ML20287A1862020-10-13013 October 2020 Construction Reactor Oversight Process Resources October 2020 ML20274A2582020-09-10010 September 2020 Wp on Uswc for AP1000_Revised, Reactor Oversight Process Whitepaper - Modification of the Description of Unplanned Scrams with Complications Performance Indicator to Reflect AP1000 Design ML20191A3832020-08-14014 August 2020 Transition to Reactor Oversight Process for Vogtle Electric Generating Plant, Units 3 and 4 ND-20-0907, Revision to Proposed Alternative Requirements for Preservice Inspection Acceptance of Volumetric Examinations, in Accordance with 10 CFR 50.551(z)(1),(VEGP 3&4-PSI/ISI-ALT-14R1)2020-07-28028 July 2020 Revision to Proposed Alternative Requirements for Preservice Inspection Acceptance of Volumetric Examinations, in Accordance with 10 CFR 50.551(z)(1),(VEGP 3&4-PSI/ISI-ALT-14R1) ND-20-0561, Submittal of Turbine Maintenance and Inspection Program in Accordance with Updated Final Safety Analysis Report2020-07-10010 July 2020 Submittal of Turbine Maintenance and Inspection Program in Accordance with Updated Final Safety Analysis Report ML20189A4292020-07-0707 July 2020 Construction Reactor Oversight Process Resources July 2020 ML20136A4562020-04-30030 April 2020 Updated Flex Plan Nuclear Regulatory Commission Order EA-12-049 Strategies for Beyond Design Basis External Events NL-19-0832, EPRI Technical Report 3002014590, Technical Bases for Inspection Requirements for PWR Steam Generator Feedwater and Main Steam Nozzle-to-Shell Welds and Nozzle Inside Radius Sections.2019-12-31031 December 2019 EPRI Technical Report 3002014590, Technical Bases for Inspection Requirements for PWR Steam Generator Feedwater and Main Steam Nozzle-to-Shell Welds and Nozzle Inside Radius Sections. ML19284B3722019-11-15015 November 2019 Attachment - VEGP U3 Amendment 166 (LAR-19-008) 2024-10-23
[Table view] Category:Technical
MONTHYEARML24297A6482024-10-23023 October 2024 5 to the Updated Final Safety Analysis Report, Technical Specification Bases Changes, Technical Requirements Manual Changes, Summary Report and Revised NRC Commitments Report ML23325A2022024-01-16016 January 2024 CFR Part 52 Construction Lessons-Learned Report ML24004A2192024-01-0808 January 2024 Construction Reactor Oversight Process Performance Metric Report for Calendar Year 2023 ND-23-0025, Compliance with Order EA-12-0492023-08-21021 August 2023 Compliance with Order EA-12-049 ML22348A0882023-07-25025 July 2023 VEGP Unit 4 - 103g - Basis Document ML23156A1882023-06-0505 June 2023 Construction Reactor Oversight Process Resources Report June 5, 2023 ML23121A0392023-05-0101 May 2023 Dashboard Report 5-1-2023 ML23003A0412023-01-0303 January 2023 Construction Reactor Oversight Process Resources Report January 3, 2023 ND-22-0817, Enclosures 1 and 2: Proposed Alternative Inspection Requirements for Steam Generator Nozzle to Reactor Coolant Pump Casing Welds and Alternative for Use of Code Case 648-2 for Inservice Inspection2022-11-0404 November 2022 Enclosures 1 and 2: Proposed Alternative Inspection Requirements for Steam Generator Nozzle to Reactor Coolant Pump Casing Welds and Alternative for Use of Code Case 648-2 for Inservice Inspection ML22278A0382022-10-0505 October 2022 Dashboard Report 10-5-2022 ML20290A2762022-08-0101 August 2022 10CFR52.103(g) Basis Document NL-22-0510, Plants Units 1 and 2, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20212022-07-14014 July 2022 Plants Units 1 and 2, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2021 ML22179A1462022-06-15015 June 2022 Tier 1, Revision 10, Updated Through 04/22/2022 ML22159A1712022-06-0808 June 2022 Construction Reactor Oversight Process Resources Report June 8, 2022 ML22089A0412022-03-30030 March 2022 Construction Reactor Oversight Process Resources Report March 30 2022 ND-22-0003, Report of 10 CFR 50.59 Changes, Tests, and Experiments and 10 CFR 52 Appendix D Departure Report2022-01-0606 January 2022 Report of 10 CFR 50.59 Changes, Tests, and Experiments and 10 CFR 52 Appendix D Departure Report ND-21-0848, Enclosure - Unit 4 Operator Candidates Requesting Credit for Unit 3 Written Examination and Operating Test (Revised)2021-10-0101 October 2021 Enclosure - Unit 4 Operator Candidates Requesting Credit for Unit 3 Written Examination and Operating Test (Revised) ML21179A0972021-06-15015 June 2021 to Tier 1 ML21132A0482021-05-12012 May 2021 Construction Reactor Oversight Process Resources Report May 2021 ND-21-0342, Emergency Response Data System (ERDS) Data Point Library for Vogtie Unit 42021-04-28028 April 2021 Emergency Response Data System (ERDS) Data Point Library for Vogtie Unit 4 ML21118A1162021-04-28028 April 2021 Emergency Response Data System (ERDS) Data Point Library for Vogtle Unit 3 ML21090A2092021-03-31031 March 2021 Construction Reactor Oversight Process Resources Report March 2021 ML21040A1672021-02-0909 February 2021 (Vegp), Units 3 and 4, Revision to Westinghouse Non-Proprietary Technical Description of the Flaw Tolerance Evaluation Conducted on the Subject Weldolet Branch Connections ML20358A1822020-12-31031 December 2020 LTR-SDA-20-096-NP, Revision 1, Flaw Tolerance Evaluation to Assess Lack of Inspection Coverage of AP1000 14 X 4 Stainless Steel Weldolets to Pipe Welds ND-20-1220, Report of Changes Incorporated Into Revision 6 to the Security Plan, Training and Qualification Plan, and Safeguards Contingencv Plan2020-10-21021 October 2020 Report of Changes Incorporated Into Revision 6 to the Security Plan, Training and Qualification Plan, and Safeguards Contingencv Plan ML20274A2582020-09-10010 September 2020 Wp on Uswc for AP1000_Revised, Reactor Oversight Process Whitepaper - Modification of the Description of Unplanned Scrams with Complications Performance Indicator to Reflect AP1000 Design ND-20-0561, Submittal of Turbine Maintenance and Inspection Program in Accordance with Updated Final Safety Analysis Report2020-07-10010 July 2020 Submittal of Turbine Maintenance and Inspection Program in Accordance with Updated Final Safety Analysis Report ML20189A4292020-07-0707 July 2020 Construction Reactor Oversight Process Resources July 2020 ML20136A4562020-04-30030 April 2020 Updated Flex Plan Nuclear Regulatory Commission Order EA-12-049 Strategies for Beyond Design Basis External Events NL-19-0832, EPRI Technical Report 3002014590, Technical Bases for Inspection Requirements for PWR Steam Generator Feedwater and Main Steam Nozzle-to-Shell Welds and Nozzle Inside Radius Sections.2019-12-31031 December 2019 EPRI Technical Report 3002014590, Technical Bases for Inspection Requirements for PWR Steam Generator Feedwater and Main Steam Nozzle-to-Shell Welds and Nozzle Inside Radius Sections. NL-19-0674, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 12019-09-30030 September 2019 Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1 ND-19-0356, Pressurized Thermal Shock (PTS) Evaluation2019-04-10010 April 2019 Pressurized Thermal Shock (PTS) Evaluation ND-19-0665, (VEGP) Units 3 and 4 - WCAP-15927-NP, Design Process for AP1000 Common Q Safety Systems, Revision 7 (Public Version)2019-03-21021 March 2019 (VEGP) Units 3 and 4 - WCAP-15927-NP, Design Process for AP1000 Common Q Safety Systems, Revision 7 (Public Version) ML19038A4632019-02-0707 February 2019 Construction Reactor Oversight Process Resources ML18275A0402018-10-31031 October 2018 Technical Evaluation Report: Use of BADGER and Narwhal to Compute Strainer Failure Probability - Vogtle Units 1 and 2 Nuclear Power Plant NL-18-0684, Fukushima Near-Term Task Force Recommendation 2.1: Seismic Supplemental Information Regarding NEI 12-06. Appendix H. Revision 4. H.4.5 Path 5 Mitigating Strategies Assessment (MSA) Report2018-06-25025 June 2018 Fukushima Near-Term Task Force Recommendation 2.1: Seismic Supplemental Information Regarding NEI 12-06. Appendix H. Revision 4. H.4.5 Path 5 Mitigating Strategies Assessment (MSA) Report NL-14-0639, Revision 5 Pressure and Temperature Limits Report and Unit 2 Revision 5 Pressure and Temperature Limits Report2014-04-22022 April 2014 Revision 5 Pressure and Temperature Limits Report and Unit 2 Revision 5 Pressure and Temperature Limits Report NL-14-0344, Seismic Hazard and Screening Report for CEUS Sites2014-03-31031 March 2014 Seismic Hazard and Screening Report for CEUS Sites ML14043A4762014-02-24024 February 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near- Term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident ML14006A2012014-01-0303 January 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Vogtle Electric Generating Plant, Units 1 and 2, TAC Nos.: MF0714 and MF0715 ML13211A2622013-07-25025 July 2013 SNCV061-RPT-02, Ver. 2.0, Vogtle Unit 2 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 7 of 14 NL-13-1236, SNCV061-RPT-02, Ver. 2.0, Vogtle Unit 2 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 14 of 142013-07-25025 July 2013 SNCV061-RPT-02, Ver. 2.0, Vogtle Unit 2 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 14 of 14 NL-13-1236, SNCV061-RPT-02, Ver. 2.0, Vogtle Unit 2 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 13 of 142013-07-25025 July 2013 SNCV061-RPT-02, Ver. 2.0, Vogtle Unit 2 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 13 of 14 NL-13-1236, SNCV061-RPT-02, Ver. 2.0, Vogtle Unit 2 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 11 of 142013-07-25025 July 2013 SNCV061-RPT-02, Ver. 2.0, Vogtle Unit 2 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 11 of 14 NL-13-1236, SNCV061-RPT-02, Ver. 2.0, Vogtle Unit 2 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 12 of 142013-07-25025 July 2013 SNCV061-RPT-02, Ver. 2.0, Vogtle Unit 2 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 12 of 14 NL-13-1236, SNCV061-RPT-02, Ver. 2.0, Vogtle Unit 2 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 10 of 142013-07-25025 July 2013 SNCV061-RPT-02, Ver. 2.0, Vogtle Unit 2 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 10 of 14 NL-13-1236, SNCV061-RPT-02, Ver. 2.0, Vogtle Unit 2 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 9 of 142013-07-25025 July 2013 SNCV061-RPT-02, Ver. 2.0, Vogtle Unit 2 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 9 of 14 ML13211A2432013-07-25025 July 2013 SNCV061-RPT-02, Ver. 2.0, Vogtle Unit 2 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 9 of 14 NL-13-1236, SNCV061-RPT-02, Ver. 2.0, Vogtle Unit 2 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 6 of 142013-07-25025 July 2013 SNCV061-RPT-02, Ver. 2.0, Vogtle Unit 2 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 6 of 14 ML13211A2592013-07-25025 July 2013 SNCV061-RPT-02, Ver. 2.0, Vogtle Unit 2 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 4 of 14 2024-10-23
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 24, 2014 Mr. C. R. Pierce Regulatory Affairs Director Southern Nuclear Operating Company, Inc.
Post Office Box 1295, Bin- 038 Birmingham, AL 35201-1295
SUBJECT:
VOGTLE ELECTRIC GENERATING PLANT, UNIT 2- STAFF ASSESSMENT OF THE SEISMIC WALKDOWN REPORT SUPPORTING IMPLEMENTATION OF NEAR-TERM TASK FORCE RECOMMENDATION 2.3 RELATED TO THE FUKUSHIMA DAI-ICHI NUCLEAR POWER PLANT ACCIDENT (TAC NO. MF0190)
Dear Mr. Pierce:
On March 12, 2012, the U.S. Nuclear Regulatory Commission (NRC) issued a request for information letter per Title 10 of the Code of Federal Regulations, Subpart 50.54(f) (50.54{f) letter). The 50.54(f) letter was issued to power reactor licensees and holders of construction permits requesting addressees to provide further information to support the NRC staff's evaluation of regulatory actions to be taken in response to lessons learned from Japan's March 11, 2011, Great Tohoku Earthquake and subsequent tsunami. The request addressed the methods and procedures for nuclear power plant licensees to conduct seismic and flooding hazard walkdowns to identify and address degraded, nonconforming, or unanalyzed conditions through the corrective action program, and to verify the adequacy of the monitoring and maintenance procedures.
By letter dated November 27, 2012, as supplemented by letter dated July 25, 2013, Southern Nuclear Operating Company (SNC) submitted its Seismic Walkdown Report as requested in of the 50.54(f) letter for the Vogtle Electric Generating Plant, Unit 2. By letter dated November 25, 2013, SNC provided a response to the NRC request for additional information for the staff to complete its assessments.
C. R. Pierce The NRC staff reviewed the information provided and, as documented in the enclosed staff assessment, determined that sufficient information was provided to be responsive to Enclosure 3 of the 50.54(f) letter. This concludes the NRC's efforts associated with TAC No. MF0190.
Sincerely,
~fa~!
Plant Licensing Branch 11-1 Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-425
Enclosure:
Staff Assessment of Seismic Walkdown Report cc w/encl: Distribution via Listserv
STAFF ASSESSMENT OF SEISMIC WALKDOWN REPORT NEAR-TERM TASK FORCE RECOMMENDATION 2.3 RELATED TO THE FUKUSHIMA DAI-ICHI NUCLEAR POWER PLANT ACCIDENT SOUTHER NUCLEAR OPERATING COMPANY VOGTLE ELECTRIC GENERATING PLANT, UNIT 2 DOCKET NO. 50-425
1.0 INTRODUCTION
On March 12, 2012, 1 the U.S. Nuclear Regulatory Commission (NRC) issued a request for information per Title 10 of the Code of Federal Regulations, Subpart 50.54(f) (50.54(f) letter) to all power reactor licensees and holders of construction permits in active or deferred status. The request was part of the implementation of lessons learned from the accident at the Fukushima Dai-ichi nuclear power plant. Enclosure 3, "Recommendation 2.3: Seismic,"2 to the 50.54(f) letter requested licensees to conduct seismic walkdowns to identify and address degraded, nonconforming, or unanalyzed conditions using the corrective action program (CAP), verify the adequacy of monitoring and maintenance procedures, and report the results to the NRC. of the 50.54(f) letter requested licensees to provide the following:
- a. Information concerning the plant-specific hazard licensing bases and a description of the protection and mitigation features considered in the licensing basis evaluation.
- b. Information related to the implementation of the walkdown process.
- c. A list of plant-specific vulnerabilities identified by the Individual Plant Examination of External Events (I PEE E) program and a description of the actions taken to eliminate or reduce them.
- d. Results of the walkdown including key findings and identified degraded, nonconforming, or unanalyzed conditions.
- e. Any planned or newly installed protection and mitigation features.
- f. Results and any subsequent actions taken in response to the peer review.
1 Agencywide Documents Access and Management System (ADAMS) Accession No. ML12053A340 2
ADAMS Accession No. ML12056A049 Enclosure
In accordance with the 50.54(f) letter, Enclosure 3, Required Response Item 2, licensees were required to submit a response within 180 days of the NRC's endorsement of the seismic walkdown process. By letter dated May 29, 2012, 1 the Nuclear Energy Institute (NEI) staff submitted Electric Power Research Institute (EPRI) document 1025286, "Seismic Walkdown Guidance for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic,"
(walkdown guidance) to the NRC staff to consider for endorsement. By letter dated May 31, 2012, 2 the NRC staff endorsed the walkdown guidance.
By letter dated November 27, 2012, 3 Southern Nuclear Operating Company (the licensee) provided a response to Enclosure 3 of the 50.54(f) letter Required Response Item 2, for Vogtle Electric Generating Plant, Unit 2 (VEGP-2). In addition to the aforementioned letter, the licensee, by letter dated July 25, 20134 , provided an updated submittal to the initial seismic walkdown report. The purpose of the latter submittal was to update and provide information on inaccessible components not completed in the first submittal The NRC staff reviewed the walkdown report and determined that additional supplemental information would assist the NRC staff in completing its review. In letter dated November 1, 2013 5 , the NRC staff requested additional information to gain a better understanding of the processes and procedures used by the licensee in conducting the walkdowns and walk-bys. The licensee responded to the NRC staff request by letter dated November 25, 2013. 6 The NRC staff evaluated the licensee's submittals to determine if the information provided in the walkdown report met the intent of the walkdown guidance and if the licensee responded appropriately to Enclosure 3 of the 50.54(f) letter.
2.0 REGULATORY EVALUATION
The structures, systems, and components (SSCs) important to safety in operating nuclear power plants are designed either in accordance with, or meet the intent of Appendix A to 10 CFR Part 50, General Design Criteria (GDC) 2: "Design Bases for Protection Against Natural Phenomena;"
and Appendix A to 10 CFR Part 100, "Reactor Site Criteria." GDC 2 states that SSCs important to safety at nuclear power plants shall be designed to withstand the effects of natural phenomena such as earthquakes, tornadoes, hurricanes, floods, tsunami, and seiches without loss of capability to perform their safety functions.
For initial licensing, each licensee was required to develop and maintain design bases that, as defined by 10 CFR 50.2, identify the specific functions that an SSC of a facility must perform, and the specific values or ranges of values chosen for controlling parameters as reference bounds for the design.
1 ADAMS Package Accession No. ML121640872 2
ADAMS Accession No. ML12145A529 3
ADAMS Accession No. ML12555A033 4
ADAMS Accession No. ML13211A256 5
ADAMS Accession No. ML133048418 6
ADAMS Accession No. ML13330A531
The design bases for the SSCs reflect appropriate consideration of the most severe natural phenomena that have been historically reported for the site and surrounding area. The design bases also reflect sufficient margin to account for the limited accuracy, quantity, and period of time in which the historical data have been accumulated.
The current licensing basis is the set of NRC requirements applicable to a specific plant, including the licensee's docketed commitments for ensuring compliance with, and operation within, applicable NRC requirements and the plant-specific design basis, including all modifications and additions to such commitments over the life of the facility operating license.
3.0 TECHNICAL EVALUATION
3.1 Seismic Licensing Basis Information The licensee provided information on the plant-specific licensing basis for the Seismic Category I SSCs for VEGP-2 in Section 3.0 of the walkdown reports. Consistent with the walkdown guidance, the NRC staff noted that the report includes a summary of the Safe Shutdown Earthquake (SSE), Operating Basis Earthquake (OBE) and a description of the codes, standards, and methods that were used in the design of the Seismic Category I SSCs for meeting the plant-specific seismic licensing basis requirements.
Based on its review, the NRC staff concludes that the licensee has provided information on the plant-specific seismic licensing basis and a description of the protection and mitigation features considered in the licensing bases evaluation consistent with Section 8, Submittal Report, of the walkdown guidance.
3.2 Seismic Walkdown Methodology Implementation Section 2, Personnel Qualifications; Section 3, Selection of SSCs; Section 4, Seismic Walkdowns and Area Walk-Bys; and Section 5, Seismic Licensing Basis Evaluations, of the walkdown guidance provide information to licensees regarding the implementation of an appropriate seismic walkdown methodology. By letter dated July 18, 2012, 7 the licensee confirmed that it would utilize the walkdown guidance in the performance of the seismic walkdowns at VEGP-2.
The walkdown reports dated November 27, 2012 and July 25, 2013, did not identify deviations from the walkdown guidance.
The NRC staff reviewed the following sections of the walkdown methodology implementation provided in the walkdown report:
- Development of the Seismic Walkdown Equipment Lists (SWELs)
- Implementation of the Walkdown Process
- Licensing Basis Evaluations and Results 7
ADAMS Accession No. ML12192A513
3.2.1 Personnel Qualifications Section 2, Personnel Qualifications, of the walkdown guidance provides licensees with qualification information for personnel involved in the conduct of the seismic walkdowns and area walk-bys.
The NRC staff reviewed the information provided in Section 4 of the updated walkdown report, which includes information on the walkdown personnel and their qualifications. Specifically, the NRC staff reviewed the summary of the background, experience, and level of involvement for the following personnel involved in the seismic walkdown activities: equipment selection personnel, seismic walkdown engineers (SWEs), licensing basis reviewers, IPEEE reviewers, peer review team, and operations staff.
Based on the review of the licensee's submittals, the NRC staff concludes that those involved in the seismic walkdown activities have the appropriate seismic background, knowledge and experience, as specified in Section 2 of the walkdown guidance.
3.2.2 Development of the SWELs Section 3, Selection of SSCs, of the walkdown guidance provides information to licensees for selecting the SSCs that should be placed on the SWELs, so that they can be walked down by qualified personnel.
The NRC staff reviewed the overall process used by the licensee to develop the VEGP-2 base list, SWEL 1 (sample list of designated safety functions equipment), and SWEL 2 (sample list of spent fuel pool related equipment). The licensee stated that the safe shutdown equipment list (SSEL) developed for the Vogtle Nuclear Plant IPEEE Unit 2 was used as the source for Base 1. The NRC staff notes that the SSEL list, which addresses SSCs associated with the reactor safe shutdown functions and as approved by the walkdown guidance, is a valid starting point to develop the plant's base list and SWEL 1.
The overall equipment selection process followed the screening process shown in Figures 1-1 and 1-2 of the walkdown guidance. Based on Attachment 1 of the walkdown report, VEGP-2 SWELs 1 and 2 meet the inclusion requirements of the walkdown guidance. Specifically, the following attributes were considered in the sample selection:
- A variety of systems, equipment and environments
- Major new or replacement equipment
- Risk considerations Due to individual plant configurations and the walkdown guidance screening process followed to select the final SWEL equipment, it is possible that some classes of equipment will not be represented on the SWEL. The walkdown guidance recognizes this is due to the equipment not being present in the plant (e.g., some plants generate DC power using inverters and therefore do not have motor generators) or the equipment being screened out during the screening process (the screening process is described in Section 3 of the walkdown guidance). Based on the
information provided, the NRC staff noted that a detailed explanation was provided justifying cases where specific classes of equipment were not included as part of the SWEL, and concludes that these exclusions are acceptable.
The NRC staff noted that no rapid drain down items were included as part of the SWEL 2, as described in Section 3 of the guidance. In Section 6.2 of the walkdown report, the licensee stated that all piping terminates or has anti-siphon holes ten feet above the fuel; therefore, there are no components that could, upon failure, result in rapid drain-down of the spent fuel pool (SFP) water level to below ten feet above the top of the fuel. After reviewing the information provided in this section, the NRC staff concludes that the licensee provided sufficient information to justify that there are no items which could lead to rapid drain-down of the VEGP-2 SFP.
After reviewing SWELs 1 and 2, the NRC staff concludes that the sample of SSCs represents a diversity of component types and assures inclusion of components from critical systems and functions, thereby meeting the intent of the walkdown guidance. In addition, the NRC staff notes that the equipment selection personnel were appropriately supported by plant operations staff as described in the walkdown guidance.
3.2.3 Implementation of the Walkdown Process Section 4, Seismic Walkdowns and Area Walk-Bys, of the walkdown guidance provides information to licensees regarding the conduct of the seismic walkdowns and area walk-bys for each site.
The NRC staff reviewed Section 7 of the updated walkdown report, which summarizes the results of the seismic walkdowns and area walk-bys, including an overview of the number of items walked down and the number of areas walked-by. The walkdown report states that teams which consisted of at least two qualified SWEs conducted the seismic walkdowns and area walk-bys.
According to the signed seismic walkdown checklists (SWCs) and area walkdown checklists (AWCs), the activities for the initial walkdowns were conducted from August 13, 2012 to September 12,2012. The delayed walkdowns were performed in the 2R16 outage during the spring of 2013. The licensee stated that during the delayed walkdowns of all 28 cabinets that needed additional internal inspections and all 11 inaccessible items, respectively identified in Tables 7-1 and 7-2 of the initial report, were inspected.
The walkdown report does not explicity state that the SWEs discussed their observations and judgments with each other during the walkdowns. Based on a detailed review of the signed checklists and the walkdown report, the NRC staff notes that it is apparent that such interactions took place and that the SWEs agreed on the results of their seismic walkdowns and area walk-bys before reporting the results of their review. Attachments 3 and 4 of the walkdown report provide the completed SWCs and AWCs, documenting the results for each item of equipment on SWEL 1 and 2 and each area containing SWEL equipment. The licensee used the checklists provided in Appendix C of the walkdown guidance report without modification.
The licensee documented cases of potentially adverse seismic conditions (PASCs) in the checklists for further evaluation. Table 8-1 of the walkdown report list the PASCs identified during the seismic walkdowns and the area walk-bys. The table describes how each condition was addressed (e.g., placement in the CAP), its resolution and its current status. Based on the
review of the checklists, the NRC staff was unable to confirm that all the PASCs identified during the walkdowns were included in this table.
By letter dated November 1, 2013, the NRC staff issued two questions in a request for additional information (RAI) in order to obtain additional clarification regarding the process followed by the licensee when evaluating conditions identified in the field during the walkdowns and walk-bys.
Specifically, in RAI 1 the NRC staff requested the licensee to provide further explanation regarding how a field observation was determined to be PASC, and to ensure that the basis for determination was addressed using normal plant processes and documented in the walkdown report. In response to RAI 1, the licensee cites Section 7 of the updated walkdown report and it stated that when a PASC was identified during a walkdown, it was noted on the SWC or the AWC, as applicable and a condition report (CR) was generated to document the finding. In addition, the licensee refers to Section 8, specifically Table 8.1, of the updated walkdown report which includes all PASCs identified and their status. The licensee added that it has a very low threshold for CAs and, therefore all PASCs identified were "conservatively entered into the Plant's CAP per Southern Nuclear expectations in a timely fashion".
After evaluating the licensee's response and reviewing Table 8-1, the NRC staff concludes that the licensee responded appropriately to RAI 1, PASCs were properly identified and documented and summary Table 8-1 is considered complete.
In addition to the information provided above, the NRC staff notes that anchorage configurations were verified to be consistent with existing plant documentation for at least 50 percent of the SWEL items, in accordance with Section 4 of the walkdown guidance.
Based on the information provided in the licensee's submittals, the NRC staff concludes that the licensee's implementation of the walkdown process meets the intent of the walkdown guidance.
3.2.4 Licensing Basis Evaluations and Results Section 5, Seismic Licensing Basis Evaluations, of the walkdown guidance provides information to licensees regarding the conduct of licensing basis evaluations for items identified during the seismic walkdowns as degraded, nonconforming, or unanalyzed that might have potential seismic significance.
The NRC staff reviewed Section 8 of the updated VEGP-2 walkdown report, which discusses the process for conducting the seismic licensing basis evaluations of the PASCs identified during the seismic walkdowns and area walk-bys. The licensee stated that it performed its licensing basis evaluations and resolved PASCs using the CAP. Table 8-1 of the walkdown report lists the key licensee findings, and provides a complete list of the potentially degraded, nonconforming, or unanalyzed conditions. This table also describes a summary of the condition, brief discussion of the analysis, and the actions taken or planned to address these conditions, including the current status of each of the items the licensee entered into the CAP The NRC staff reviewed the CAP entries and the description of the actions taken or planned to address deficiencies. The NRC staff concludes that the licensee appropriately identified potentially degraded, nonconforming, or unanalyzed conditions and entered them into the CAP, which meets the intent of the walkdown guidance.
3.2.5 Conclusion Based on the discussion above, the NRC staff concludes that the licensee's implementation of seismic walkdown methodology meets the intent of the walkdown guidance for personnel qualifications, development of SWELs, implementation of the walkdown process, and seismic licensing basis evaluations.
3.3 Peer Review Section 6, Peer Review, of the walkdown guidance provides licensees with information regarding the conduct of peer reviews for the activities performed during the seismic walkdowns. Page 6-1 of the walkdown guidance identifies the following activities to be conducted during the peer review process:
- Review the selection of the SSCs included on the SWELs
- Review a sample of the checklists prepared for the seismic walkdowns and area walk-bys
- Review the licensing basis evaluations
- Review the decisions for entering the potentially adverse conditions into the CAP
- Review the walkdown report
- Summarize the results of the peer review process in the walkdown report The NRC staff reviewed the information provided in Section 9 of the updated VEGP-2 walkdown report which describes the conduct of the peer review. In addition, the NRC staff reviewed the response to RAI 2. In RAI 2, the NRC staff requested the licensee to provide additional information on the overall peer review process that was followed as part of the walkdown activities. Specifically, the NRC staff requested the licensee to confirm that the activities identified in page 6-1 of the walkdown guidance were assessed and documented in the report.
The licensee was also requested to confirm that any individual involved in performing any given walkdown activity was not a peer reviewer for that same activity. In response to RAI 2, the licensee confirmed that all the activities identified on page 6-1 of the walkdown guidance were included as part of the peer review process and referred to numerous sections of the updated walkdown report where peer review work is discussed, mainly, Sections 4, 7 and 9. The licensee emphasized that no individual performing a given walkdown activity was a peer team member for that same activity.
The NRC staff reviewed the licensee's summary of each of these activities, which included the peer review team members' level of involvement, the peer review findings, and resolution of peer review comments. After reviewing the licensee's submittals, the NRC staff concludes that the licensee sufficiently documented the results of the peer review activities and how these reviews affected the work described in the walkdown report.
Based on the discussion above, the NRC staff concludes that the licensee's results of the peer review and subsequent actions taken in response to the peer review meets the intent of Section 6 of the walkdown guidance.
3.4 IPEEE Information Section 7, IPEEE Vulnerabilities, of the walkdown guidance provides information to licensees regarding the reporting of the evaluations conducted and actions taken in response to seismic vulnerabilities identified during the IPEEE program. Through the IPEEE program and Generic Letter 88-20, "Individual Plant Examination of External Events for Severe Accident Vulnerabilities
- 10 CFR 50.54(f)," dated November 23, 19888 ," licensees previously had performed a systematic examination to identify any plant-specific vulnerabilities to severe accidents.
The licensee provided information on seismic vulnerabilities in Attachment 5 of the walkdown report. Each entry contains the equipment ID number, equipment description, location, outlier description, outlier resolution, and modification status. The licensee stated that a previous walkdown performed in May of 2012 had identified two (2) outliers that were potentially unresolved. The licensee stated that CAP entries were generated and the issues have been resolved. Table 8-1 of the submittal indicates that a CAP entry was issued to address this and the issue has been resolved.
Based on the NRC staff's review of Section 7 of the walkdown report, the NRC staff concludes that the licensee's identification of plant-specific vulnerabilities (including anomalies, outliers and other findings) identified by the IPEEE program, as well as actions taken to eliminate or reduce them, meets the intent of Section 7 of the walkdown guidance.
3.5 Planned Upgrades The licensee did not identify any planned or newly installed protection and mitigation features in the walkdown report.
3.6 NRC Oversight 3.6.1 Independent Verification by Resident Inspectors On July 6, 2012, 9 the NRC issued Temporary Instruction (TI) 2515/188 "Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns." In accordance with the Tl, NRC inspectors independently verified that the VEGP-2 licensee implemented the seismic walkdowns in accordance with the walkdown guidance. Additionally, the inspectors independently performed walkdowns of a sample of seismic protection features. The inspection report dated February 1, 2013, 10 documents the results of this inspection. No findings were identified.
8 ADAMS Accession No. ML031150465 9
ADAMS Accession No. ML12156A052 10 ADAMS Accession No. ML 13003021
4.0 CONCLUSION
The NRC staff concludes that the licensee's implementation of seismic walkdown methodology meets the intent of the walkdown guidance. The NRC staff concludes that, through the implementation of the walkdown guidance activities and, in accordance with plant processes and procedures, the licensee verified the plant configuration with the current seismic licensing basis; addressed degraded, nonconforming, or unanalyzed seismic conditions; and verified the adequacy of monitoring and maintenance programs for protective features. Furthermore, the NRC staff notes that no immediate safety concerns were identified. The NRC staff concludes that the NRC licensee responded appropriately to Enclosure 3 of the 50.54(f) letter, dated March 12, 2012.
C. R. Pierce The NRC staff reviewed the information provided and, as documented in the enclosed staff assessment, determined that sufficient information was provided to be responsive to Enclosure 3 of the 50.54(f) letter. This concludes the NRC's efforts associated with TAC No. MF0190.
Sincerely, IRA/
Robert Martin, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-425
Enclosure:
Staff Assessment of Seismic Walkdown Report cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC RidsOpaMail Resource BRini, EDO Rl, Rll, Rill, RIV LPL2-1 R/F RidsNrrLASFigueroa Resource RidsAcrsAcnw MaiiCTR Resource RidsNroDsea RidsNrrPMVogtle Resource RidsNrrDorllpl2-1 Resource RidsNrrDorl Resource NChokshi, NRO SFianders, NRO LRegner, NRR RKaras, NRO FVega, NRO DJackson, NRO NDiFrancesco, NRR MJardaneh, NRO RidsRgn2MaiiCenter Resource ADAMS A ccess1on No.: ML14043A476 *b>y e-ma1"I d ae t d 2/11/14 OFFICE DORLILPL2-1/PM DORLILPL2-1/LA DSEA/RGS2 NAME RMartin SFigueroa DJackson*
DATE 02/21/14 02/20/14 2/11/2014 OFFICE DORL/LPL2-1/BC DORLILPL2-1/PM NAME RPascarelli RMartin DATE 02/24/14 02/24/14 OFFICIAL RECORD COPY