Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Seismic Aspects of Recommendations 2.3 of Near-Term Task Force Review of Insights from Fukushima Daiichi Accident
ML12192A513
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 07/09/2012
From: Ivey B
Southern Nuclear Operating Co, Southern Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-12-1182
Download: ML12192A513 (2)


Text

B, L "Pete" Ivey Southern Nuclear Vice PrB51dBnt Operating Company. Inc.

Regulatory i\\ffalrs 40 Inverness Center Parkway Post Office 80x 1295 Birrnln9ham, AL 35;~4?

Tel 2059~}21619 Fax 205.992}S?1 SOUTHERN A COMPANY July 09, 2012 Docket Nos.: 50-424 NL-12-1182 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852 Vogtle Electric Generating Plant - Units 1 &2 Southern Nuclear Operating Company's Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f)

Regarding the Seismic Aspects of Recommendations 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Daiichi Accident

References:

1.

NRC Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2. 1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Daiichi Accident, dated March 12,2012

2.

NRC Letter, Endorsement of Electric Power Research Institute (EPRI) Draft Report 1025286, "Seismic Walkdown Guidance,"dated May 31, 2012 Ladies and Gentlemen:

On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued Reference 1 to all power reactor licensees and holders of construction permits in active or deferred status. Enclosure 3 of Reference 1 contains specific Requested Actions, Requested Information, and Required Responses associated with Recommendation 2.3 for Seismic. This letter provides Southern Nuclear Operating Company's (SNC) 120 day response to Reference 1 for Seismic Recommendation 2.3 for Vogtle Electric Generating Plant (VEGP) Units 1 and 2.

For seismic Recommendation 2.3 (walkdowns), Enclosure 3 of Reference 1 states that each licensee will confirm that they intend to use the NRC-endorsed seismic walkdown procedure or provide to the NRC a description of the process that will be used to conduct the walkdowns and to develop the needed information.

SNC confirms that it will use the seismic walkdown procedure (EPRI Report 1025286, "Seismic Walkdown Guidance: For Resolution of Fukushima Near

U. S. Nuclear Regulatory Commission NL-12-1182 Page 2 Term Task Force Recommendation 2.3: Seismic") as endorsed by Reference 2 to conduct the walkdowns and develop the needed information at VEGP.

This letter contains no NRC commitments. If you have any questions, please contact Jack Stringfellow at (205) 992-7037.

Mr. B. L Ivey states he is Regulatory Affairs Vice President of Southern Nuclear Operating Company, is authorized to execute this oath on behalf of Southern Nuclear Operating Company and, to the best of his knowledge and belief, the facts set forth in this letter are true.

Sworn to and subscribed before me this --.!l!!:. day of_---='Jf.:..!:;awj,~I(-_-, 2012.

J 1ttvt~~ 7-iutiJ/uJI.')V otary Public My commission expires: wa4 15; v. /if Respectfully submitted,

~~

B. L Ivey Regulatory Affairs Vice President BLl/CLNllac cc: Southern Nuclear Operating Company Mr. S. E. Kuczynski, Chairman, President &CEO Mr. D. G. Bost, Executive Vice President &Chief Nuclear Officer Mr. T. E. Tynan, Vice President - Vogtle Mr. B. J. Adams, Vice President - Fleet Operations Ms. P. M. Marino, Vice President - Engineering Mr. M. J. Ajluni, Nuclear Licensing Director RType: CVC7000 U. S. Nuclear Regulatory Commission Mr. V. M. McCree, Regional Administrator Mr. P. G. Boyle, NRR Senior Project Manager - Vogtle Mr. L. M. Cain, Senior Resident Inspector - Vogtle State of Georgia Mr. J. H. Turner, Environmental Director Protection Division