Southern California Edison Company P. O. BOX 800 2244 WALNUT GROVE AVENUE ROSEMEAD, CALIFORNIA 91770 M. 0. MEDFORD TELEPHONE MANAGER OF NUCLEAR ENGINEERING (818) 302-1749 AND LICENSING March 23, 1987 U. S. Nuclear Regulatory Commission Attention:

Document Control Desk Washington, D.C.

20555 Gentlemen:

Subject:

Docket No. 50-206 Fourth Edition of the Integrated Living Schedule (ILS)

San Onofre Nuclear Generating Station Unit 1

References:

A. Letter, M. 0. Medford, SCE, to G. E. Lear, NRC, dated October 14, 1986 B. Letter, M. 0. Medford, SCE, to 3. A. Zwolinski, NRC, dated August 29, 1985 The third edition of the ILS was submitted by Reference A. The proposed ILS Program Plan submitted with Reference B specifies that SCE will provide semi-annual updates of the schedules to the NRC. Accordingly, enclosed is the fourth edition of the ILS.

If there are any questions on the enclosure or if you require additional information, please let me know.

Very truly yours, Enclosure cc:

R. F. Dudley, NRR Project Manager, San Onofre Unit 1 J. B. Martin, Regional Administrator, NRC Region V F. R. Huey, NRC Senior Resident Inspector, San Onofre Units 1, 2 and 3 8703310281 870323 PDR ADOCK 05000206 P

PDR' L

Enclosure INTEGRATED LIVING SCHEDULE SAN ONOFRE NUCLEAR GENERATING'STATION, UNIT 1 Fourth Edition March, 1987 Introduction Proposed License Condition 3.J, "Integrated Living Schedule of Backfits,"

requires SCE to follow the ILS Program.Plan ("Plan").

The Plan specifies that periodic schedule updates be submitted to the NRC along with specific information regarding progress in implementing NRC requirements, changes since the previous report, reasons for schedule changes and the expected percentage allocation of resources on regulatory vs. betterment projects. This document is the fourth edition of the ILS which provides that information.

Progress in Implementing NRC Requirements Since SCE's last submittal in October, 1986, SONGS 1 has not had a backfit outage. Work continues on projects scheduled for implementation during the next refueling/backfit outage scheduled for early 1988.

Of the two evaluations scheduled for completion on the Cycle X schedule, we submitted the SPDS design criteria this month. The next milestone for the Supplement 1 to NUREG-0737 projects is the submittal of the Control Room Design Review,Report. The schedule for submittal has been extended from May 1, 1987 to August 14, 1987 due to the unanticipated workload associated with evaluating the SONGS 1 control room and a secondary review of the effort to ensure compliance with NRC review requests.

This has been discussed and agreed with the NRC staff.

Changes Since Last Edition There has been only one new project added to the ILS since our last submittal. This project is the FSA update required by 10 CFR 50.71(e). In accordance with the regulation, this project is due two years after our notification by the Director of NRR of the completion of the Systematic Evaluation Program.

Expected Allocation of Resources for Upcoming Outage The refueling/backfit outage for Cycle X of plant operation is expected to have resources allocated approximately 70% to regulatory projects,and 30% to betterment projects. This allocation reflects a balancing of resource allocation following the last refueling/backfit outage which was approximately 90% regulatory work.

Updated Schedules Schedules A, B and C are attached.

GEH:8209F

ATTACHMENT ILS SCHEDULE A (RULE, REGULATION OR ORDER)

CYCLE X ANTICIPATED TRANSIENTS WITHOUT SCRAM DIVERSE TURBINE TRIP CYCLE XI NONE EVALUATION FSA UPDATE DECEMBER 30, 1988

ILS SCHEDULE B (NRC COMMITMENTS AND OTHER REQUIREMENTS)

CYCLE X AUTOMATION OF THIRD AUXILIARY FEEDWATER PUMP REGULATED INSTRUMENT BUSES INDICATING LIGHTS ON-SITE Toxic GAS SOURCES MODIFICATIONS IN-SERVICE TESTING DIFFERENTIAL PRESSURE INDICATORS MAGNACRAFT RELAY REPLACEMENTS AUTOMATIC VENT SYSTEM FOR BORIC ACID SYSTEM REACTOR CAVITY SAFETY CAGE (OSHA)

CONTROL ROOM HVAC DUCT HEATERS VITAL BUS 4 UNINTERRUPTIBLE POWER SUPPLY CYCLE XI UPGRADE OF CORE EXIT THERMOCOUPLES FOR DETECTION OF INADEQUATE CORE COOLING CONTROL ROOM AND TECHNICAL SUPPORT CENTER HVAC UPGRADES CVCS VALVES MOV-LCV-1100 B, C, D CONTROLS MODIFICATIONS WASTE GAS DECAY TANK MONITORING INSTRUMENTATION STEEL DECKING UNDER TURBINE BUILDING NORTH EXTENSION UNDERVOLTAGE RELAYS FOR PROTECTION FROM DEGRADED GRID VOLTAGE AUTOMATIC TERMINATION OF SAFETY INJECTION PUMPS ON Low RWST LEVEL REMOVAL OF AUTOMATIC REACTOR COOLANT PUMP TRIP ON SAFETY INJECTION ADDITION OF SYNCROCHECK RELAYS TO EMERGENCY DIESEL GENERATORS EVALUATION CONTROL ROOM DESIGN REVIEW AUGUST 14, 1987

ILS SCHEDULE C (BETTERMENT PROJECTS)

CYCLE X NUCLEAR INSTRUMENTATION SYSTEM REPLACEMENT TURBINE VIBRATION DETECTION INSTRUMENTATION MASONILIAN ISOLATION VALVE UPGRADES RADIATION MONITOR SV-99 UPGRADE CYCLE XI CONTROL ROOM INSTRUMENT RACKS REPLACEMENT GEH:8210F