Advises That 830902 Proposed Methodology to Be Used to Develop Integrated Living Schedule for Implementation of Capital Mod Projects,Acceptable W/Two Exceptions Re Integrated Retrofit Schedule & Facility Restart
ML13310B073
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 11/16/1983
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Baskin K
Southern California Edison Co
References
TAC-54376 LSO5-83-11-031, LSO5-83-11-31, NUDOCS 8311230061
Download: ML13310B073 (4)


Text

November 16, 1983 Docket No. 50-206 LS05-83-11-031 Mr. K. Baskin, Vice President Nuclear Engineering and Operations Southern California Edison Company 2244 Walnut Grove Avenue Post Office Box 800 Rosemead, California 91770

Dear Mr. Baskin:

SUBJECT:

PROPOSED METHODOLOGY TO BE USED IN DEVELOPING AN INTEGRATED SCHEDULE FOR RETROFIT Re:

San Onofre Nuclear Generating Station, Unit No. 1 Your letter dated September 2, 1983 forwarded your proposed methodology to be used in developing an "Integrated Living Schedule" for the implementation of capital modification projects for San Onofre Unit No. 1. On October 5, 1983, the NRC staff met with your representatives and consultants to further discuss the proposed methodology. Based on our review we find that the proposed methodology, including the criteria to be used to judge the modifications, as described in Enclosure 1 to your September 2, 1983 letter is acceptable subject to the following considerations.

Integrated Retrofit Schedule As discussed in the October 5, 1983 meeting, the totality of projects to be included in the long-term integrated schedule should be provided for NRC review. Those items that originate from the Systematic Evaluation Program should be specifically identified. Although the staff concludes that the methodology you have proposed is acceptable, the staff intends to review the assumptions and completeness before making a judgement or the final ranking and schedule. With regard to formalizing the schedular commitments, the NRC staff recommends an approach similar to that used for the Duane Arnold Energy Center.

8311230061 831116 PDR ADOCK 05000206 P

PDR 03

Mr. K. Baskin ~-

2 -

November 16, 1983 Restart of San Onofre Unit No. 1 The items to be completed prior to restart could impact the list of long term retrofit items. As you know, a meeting was held on November 8, 1983 during which a number of these items were discussed. In addition to any plant modifications that may be necessary prior to restart, there are a number of actions involving license amendments that will need to be completed. The NRC staff is prepared to work with you to define those steps necessary to resolve the restart issue.

Sincerely, Original signed by Darrell G. Eisenhut, Director Division of Licensing cc:

See next page DISTRIBUTION Docket File NRC PDR Local PDR NSIC ORB #5 Reading DCrutchfield HSmith WPaulson OELD ELJordan JMTaylor ACRS (10)

JHannon CGrimes FMiraglia DEisenhut

  • SEE PREVIOUS PAGE FOR CONCURRENCE q(~2J DL: R 5*

DL: TA*

DL: SEP 0D:

D SA L IR WPaulson:cc JHannon CGrimes DC hfield F

ia D

ut 11/07/83 11/07/83

\\\\/ 9/83

///j/83 f/

/83

{

783

Mr. R. Dietch

- 2 Restart of San Onofre Unit No. 1 The items to be completed prior to restart could impact the list of long term retrofit items. As you know, a meeting to discuss this issue is scheduled for November 8, 1983. In addition to any plant modifications that may be necessary prior to restart, there are a number of actions involving license amendments that will need to be completed. The NRC staff is prepared to work with you to define those steps necessary to resolve the restart issue.

Sincerely, Darrell G. Eisenhut, Director Division of Licensing cc:

See next page DISTRIBUTION Docket File NRC PDR Local PDR NSIC ORB #5 Reading DCrutchfield HSmith WPaulson OELD ELJordan JMTaylor ACRS (10)

JHannon CGrimes FMiraglia DEisenhut DL:

  1. 5 DL: TA DL: SEPB DL: ORB #5 DL: AD/SA DL: DIR WPaulson:cc JHannon CGrimes DCrutchfield FMiraglia DEisenhut 11

/7/83 0 /1/83

/

/83

/

/83

/

/83

/

/83

Mr. K. Baskin 3 -

November 16, 1983 cc Charles R. Kocher, Assistant General Counsel James Beoletto, Esquire Southern California Edison Company Post Office Box 800 Rosemead, California 91770 David R. Pigott Orrick, Herrington & Sutcliffe 600 Montogmery Street San Francisco, California 94111 Harry B. Stoehr San Diego Gas & Electric Company P. 0. Box 1831 San Diego, California 92112 Resident Inspector/San Onofre NPS c/o U.S. NRC P. 0. Box 4329 San Clemente, California 92672 Mayor City of San Clemente San Clemente, California 92672 Chairman Board of Supervisors County of 'San Diego San Diego, California 92101 California Department of Health ATTN:

Joseph 0. Ward, Chief Radiation Control Unit Radiological Health Section 714 P Street, Room 498 Sacramento, California 95814 U.S. Environmental Protection Agency Region IX Office ATTN:

Regional Radiation Representative 215 Freemont Street San Francisco, California 94111 John B. Martin, Regional Administrator Nuclear Regulatory Commission, Region V 1450 Maria Lane Walnut Creek, California 94596