Amend 91 to License DPR-49,revising Plan for Integrated Scheduling of Mods
ML20023C102
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 05/03/1983
From: Vassallo D
Office of Nuclear Reactor Regulation
To:
Iowa Electric Light & Power Co, Central Iowa Power Cooperative, Corn Belt Power Cooperative
Shared Package
ML20023C103 List:
References
DPR-49-A-091, TAC 54376 NUDOCS 8305110039
Download: ML20023C102 (2)


Text

.

fi UNITED STATES

( ), v.,( ( (g NUCLEAR REGULATORY COMMISSION E

WASHING TO N, D. C. 20555 g.g Y

d' o....

IOWA ELECTRIC LIGHT AND POWER COMPANY CENTRAL IOWA POWER COOPERATIVE CORN BELT POWER COOPERATIVE DOCKET NO. 50-331 DUANE ARNOLD ENERGY CENTER AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 91 License No. DPR-49 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Iowa Electric Light and Power Company, et al, dated November 12, 1982 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and fii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

~

8305110039 830503 PDR ADDCK 05000331 P

PDR

0

,2 2.

Accordingly, the license is amended by adding a new paragraph 2.C(6) to read as follows:

^

2.C(6) 1.

The " Plan for the Integrated Scheduling of Plant Modifications for the Duane Arnold Energy Center" (the Plan) submitted on November 12, 1982 (as revised) is approved.

a) The Plan shall be followed by the licensee from'and after the effective date of this amendment.

b)

The licensee is required to maintain current revisions of, and provide reports regarding, schedules associated with the Plan in accordance with the terms of the Plan and failure to do so shall constitute a violation of this license condition.

c)

Changes to dates for completion of items identified in Schedule B do not require a license an.endment.

Dates specified in Schedule A shall be changed only in accor-dance with applicable NRC procedures.

Failure to complete items listed in the ;chedules in accordance with dates there specified shall not consititute a violation of this license condition but may constitute a violation of any regulations, orders or license condition imposing such date.

2.

This license amendment shall be effective until May 3, 1985, subject to renewal upon application by the licensee.

3.

This license amendment is effective as of the date of issuance.

FOR THE NU CAR REGULATORY COMMISSION Domenic B. Vassall, Chief Operating Reactors Branch ~#2 Division of Licensing Date of Issuance: May 3, 1983