Letter Sequence Other |
|---|
|
Results
Other: ML13310A751, ML13310A779, ML13310A780, ML13310B398, ML13310B608, ML13317A291, ML13317A428, ML13317A480, ML13317B022, ML13317B078, ML13324A480, ML13324A499, ML13324A528, ML13324A563, ML13324A573, ML13324A584, ML13330A455, ML13333B119, ML13333B121, ML14079A132, ML20197H540, ML20199E827
|
MONTHYEARML14135A2501982-01-12012 January 1982 Forwards Safety Evaluation of SEP Topic VI-3, Containment Pressure & Heat Removal Capability & VI-2.D, Mass & Energy Release for Possible Pipe Break Inside Containment for Facility.Licensee Analysis Acceptable Project stage: Approval ML13317B0231982-03-0808 March 1982 Advises That Review of Addl Info Re Environ Qualification of Equipment for Nuclear Power Plants Indicates Enough Detailed Info Has Been Received to Support Justification for Interim Safe Operation.Review Ongoing Project stage: Approval ML13317B0221982-03-10010 March 1982 Submits Addl Info Re Environ Qualification Program Beta Radiation Analysis on Equipment Other than Exposed Cable Inside Containment,Per 820201 Request Project stage: Other ML13317B0781982-04-0707 April 1982 Advises That Addl Info Per NRC 820223 Request Re Environ Qualification of Equipment Installed as Part of TMI Requirements Will Not Be Submitted Until 820423 Project stage: Other ML14079A1321982-06-28028 June 1982 Review of Licensees Resolution of Nonproprietary Version of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11,B-60), Technical Evaluation Rept Project stage: Other ML13317A2911982-08-23023 August 1982 Provides Addl Info to Re Beta Radiation Assessment & Environ Qualification of Electrical Equipment. Exposed Cables Are Only Equipment Inside Containment Which Do Not Have Metal Encls Project stage: Other ML13317A4281982-11-18018 November 1982 Informs That Peak Temp & Pressure for Main Steam Line Break Inside Containment Recalculated at 391.5 F & 53.3 Psig Per App B of NUREG-0588.Peak Conditions Will Never Be Less Severe than LOCA post-accident Temp & Pressure Project stage: Other ML13310A7491982-11-30030 November 1982 Forwards Proprietary & Nonproprietary Review of Licensees Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11,B-60). Proprietary Rept Withheld (Ref 10CFR2.790) Project stage: Approval ML13310A7511982-11-30030 November 1982 SER Re Environ Qualification of safety-related Electric Equipment.Licensee Must Provide Plans for Qualification or Replacement of Unqualified Equipment & Schedule for Accomplishing Proposed Corrective Action Project stage: Other ML13317A4801983-01-18018 January 1983 Discusses Status of Environ Qualification of safety-related Electrical Equipment.Justification for Continued Operation for Auxiliary Feedwater Flow Transmitters & Radiation Monitors Provided,Per NUREG-0737 Project stage: Other ML13310A7791983-05-20020 May 1983 Provides Status of Actions Requested in 830401 Clarification of 821120 SER on Environ Qualification of safety-related Electrical Equipment. Equipment Environ Qualification, Technical Evaluation Rept No Longer Considered Proprietary Project stage: Other ML13310A7801983-05-20020 May 1983 Discusses Status of Activities on Environ Qualification of safety-related Equipment,In Response to 10CFR50.49(g).Review of nonsafety-related Equipment Under 10CFR50.49(b)(2) Planned Project stage: Other ML13333B9961984-01-17017 January 1984 Summary of 831220 Meeting W/Util & Impell Corp in Bethesda, MD Re Outstanding Environ Qualification Issues Project stage: Meeting ML13310B3981984-05-0909 May 1984 Requests Addl Info Re Environ Qualification of Equipment Important to Safety,Including All Applicable Justifications for Continued Operation.Response Requested by 840615 Project stage: Other ML13310B6081984-07-30030 July 1984 Requests Extension of Environ Qualification of Electrical Equipment to 851130,per 10CFR50.49(g) & Forwards Nucon Inc Repts, Plant Risk Impact Evaluation of Certain Electrical Equipment & Evaluation of Core Damage Risk.. Project stage: Other ML13333B1211984-07-31031 July 1984 Evaluation of Core Damage Risk Reduction Associated W/ Seismic Mods at San Onofre Nuclear Generating Station,Unit 1, Executive Summary Project stage: Other ML13333B1191984-07-31031 July 1984 Plant Risk Impact Evaluation of Certain Electrical Equipment Project stage: Other ML13333B1501984-09-24024 September 1984 Notification of 841002-04 Meetings W/Util Onsite in San Diego County,Ca to Review Records on Environ Qualification of Electrical Equipment Project stage: Meeting ML13324A4681984-11-0303 November 1984 Forwards Rev 1 to Hot Safe Shutdown Sys Interaction Review, Per 841019 Request for Addl Info to Complete SER for Restart Project stage: Request ML13324A4801984-11-0303 November 1984 Forwards Justification for Continued Operation of Equipment Requiring Environ Qualification,As Part of Efforts to Return Unit 1 to Svc Project stage: Other ML13324A4861984-11-0808 November 1984 Summary of 841026 Meeting W/Util in Bethesda,Md Re Environ Qualification of Electrical Equipment Audit Held on 841002-04.List of Attendees Encl Project stage: Meeting ML13324A4891984-11-0909 November 1984 Forwards Results of NRC & Inel 841002-04 Audit of Environ Qualification of Electrical Equipment.Revised Justification for Continued Operation for Electrical Equipment Discussed at 841026 Meeting Acceptable Project stage: Meeting ML13324A4981984-11-19019 November 1984 Documents Results of 831220 Meeting W/Nrc in Bethesda,Md Re Environ Qualification of safety-related Electrical Equipment.Addl Info Re Environ Qualification Program Encl, Per 840509 Request Project stage: Meeting ML13324A4991984-11-19019 November 1984 Informs of Completion of Environ Qualification of Listed Electrical Equipment,Including Reactor Coolant Temp Detectors & Containment Hydrogen Monitors.Qualification Packages for Equipment Will Be Completed by 850331 Project stage: Other ML13330A4551984-11-26026 November 1984 Grants Extension of Deadline Until 851130 for Installation of Environmentally Qualified Replacement Equipment Important to Safety Project stage: Other ML13324A5281984-12-21021 December 1984 Requests Extension for Environ Qualification of Addl Equipment Items Until 851130.Operation of Facility W/Listed Unqualified Equipment Not Risk to Public Health & Safety. Justifications for Continued Operation Encl Project stage: Other ML13331A7781985-01-16016 January 1985 Requests Payment of Fee for Review of 841221 Application for Extension of Deadline for Environ Qualification of Certain Electrical Equipment Project stage: Approval ML13330A1741985-02-20020 February 1985 Forwards Payment of Fee for 841221 Request for Extension of Environ Qualification Deadline for Certain Equipment Items. Fee Paid Project stage: Request ML13324A5631985-02-26026 February 1985 Submits Certification of Compliance Re Environ Qualification of Electrical Equipment Per 10CFR50.49.Environ Qualification of All Equipment Will Be Completed by 850331 Project stage: Other ML13324A5681985-03-11011 March 1985 Forwards SER Re Environ Qualification of Electric Equipment Important to Safety.Equipment Qualification Program in Compliance w/10CFR50.49.Final Environ Qualification of Electric Equipment Will Be Completed by 850331 Project stage: Approval ML13324A5711985-03-11011 March 1985 SER Supporting Environ Qualification of Electric Equipment Important to Safety,Per Requirements of 10CFR50.49 Project stage: Other ML13324A5731985-03-15015 March 1985 Requests Extension Until 851130 for Environ Qualification Documentation Re Westinghouse Motors for Feedwater Pumps & Paul Monroe Actuators Installed on Valves in Containment Isolation,Spray Sys & Recirculation Sys Project stage: Other ML13324A5841985-03-27027 March 1985 Advises That Util 850315 Request for Extension of Deadline for Environ Qualification of Equipment to 851130 Granted. Request Deemed Timely,Per 10CFR50.49.Good Cause Demonstrated Project stage: Other ML13317B4951986-04-0202 April 1986 Forwards Rev 2 to Vols I & II of San Onofre Nuclear Generating Station,Unit 1,Evaluation of Refueling Water Storage Tank..., Updating Seismic Reevaluation of Tank,Per SEP Topic III-6, Seismic Design Considerations Project stage: Request ML20197H5401986-05-0909 May 1986 Responds to NRC Re Violations Noted in Insp Repts 50-206/85-30,50-361/85-29 & 50-362/85-28.Corrective Actions: Environ Qualification Document Packages Revised Re Cable Insulation,Solenoid Valves & Honeywell Transducers Project stage: Other ML20199E8271986-05-0909 May 1986 Responds to NRC Re Violations Noted in Insp Repts 50-206/85-30,50-361/85-29 & 50-362/85-28.Corrective Actions: Environ Qualification Packages Will Be Revised to Include Addl Mfg Info Re Galite & Prestolite Processes Project stage: Other ML13333A6271987-12-11011 December 1987 Forwards Safety Evaluation Re Util 871016 Submittal of ESFs Single Failure Analyses & 871201,08 & 09 Submittals of Analyses Justifying Operation of Plant for Remainder of Current Operating Cycle.Justification Acceptable Project stage: Approval ML13333A6321987-12-11011 December 1987 Safety Evaluation Supporting Util Justification for Interim Plant Operation Re ESF Single Failure Vulnerability Project stage: Approval ML13316B8971988-02-26026 February 1988 Summary of 880225 Mid Level Mgt Meeting W/Util Re Status of Licensee Root Cause Evaluation of Environ Qualification Problem W/Unit 1,control of Boron Concentration & Focus of NRC Programs Toward Insp of Utils in Future Project stage: Meeting ML13330B2671988-03-11011 March 1988 Informs of Action Planned to Correct Deficiencies in Environ Qualification Program.Work Being Performed Will Result in Equipment Being Qualified for Postulated Harsh Environ Before Restart from Current Maint Outage Project stage: Other ML13330B2801988-03-22022 March 1988 Notification of 880324 Meeting W/Licensee in Region V Ofc to Discuss Environ Qualification Concerns & Corrective Actions to Be Taken by Licensee Before Startup Project stage: Meeting ML13330B2751988-03-22022 March 1988 Confirms 880316 & 18 Telcons Between Ph Johnson & Ma Wharton Re 880324 Mgt Meeting in Region V Ofc to Discuss Facility Environ Qualification Deficiencies & Planned Corrective Actions Before Resuming Operation.Meeting Notice Encl Project stage: Meeting 05000206/LER-1988-001-02, :on 880225,several Components Requiring Environ Qualification Found Omitted from Equipment Qualification Master List.Caused by Inadequate Methodology During List Generation.Installed Equipment Reviewed1988-03-30030 March 1988
- on 880225,several Components Requiring Environ Qualification Found Omitted from Equipment Qualification Master List.Caused by Inadequate Methodology During List Generation.Installed Equipment Reviewed
Project stage: Other ML13330B2851988-03-30030 March 1988 Submits Info Re Environ Qualification of Electrical Equipment.Concludes That Risk Associated W/Any 10CFR50.49(b)(2) Equipment That Might Exists Considered Low & Discrepancies Identified Will Be Promptly Dispositioned Project stage: Other ML13330B2891988-04-0101 April 1988 Describes Util Compliance w/10CFR50.49.Util Believed All safety-related Equipment Was Included on Environ Qualification Master List (Eqml) & Fully Qualified After Returning to Svc from Cycle 9 Refueling Outage.Eqml Encl Project stage: Other ML13330B2981988-04-26026 April 1988 Discusses Plant Comprehensive Program Addressing 10CFR50.49(b)(2) Equipment Environ Qualification.Util Decided to Perform Program on Accelerated Schedule Prior to Unit Restart Project stage: Other ML13330B3091988-05-11011 May 1988 Confirms 880509 Telcon Re Environ Qualification (Eq). Licensee Made Commitment to Provide Ltr Describing Recent EQ Review Effort,Including Description of Program,Review Methods,Findings & Corrective Actions,By 880520 Project stage: Other ML13330B3151988-05-27027 May 1988 Forwards Info to Resolve Discrepancies Identified During Review of Environ Qualification Master List,Including Results of Review of 10CFR50.49b(1) & (2) Equipment.Cables, Including Cables Traversed in Harsh Environs Also Reviewed Project stage: Other ML13316B9161988-06-10010 June 1988 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $150,000.Noncompliance Noted:Listed Electric Components,Required to Be Qualified Per 10CFR50.49(b) Not Included in Master List of Qualified Equipment Project stage: Other ML13330B3431988-06-16016 June 1988 Responds to 880527 near-final Results of Environ Qualification of Electrical Equipment Review.Subj to Successful Completion of Cable walk-downs & Actions Described in Ltr,Returning to Svc Acceptable Project stage: Other 1984-07-31
[Table View] |
Text
Southern California Edison Company P. 0. BOX 800 2244 WALNUT GROVE AVENUE ROSEMEAD. CALIFORNIA 91770 M.O.MEDFORD TELEPHONE MANAGER, NUCLEAR LICENSING February 26, 1985 (818) 302-1749 Director, Office of Nuclear Reactor Regulation Attention:
Mr. Hugh L. Thompson Jr., Director Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C.
20555 Gentlemen:
Subject:
Docket No. 50-206 Environmental Qualification of Electrical Equipment San Onofre Nuclear Generating Station Unit 1 By letter dated December 27, 1984, the NRC staff requested licensees to indicate their compliance with 10 CFR 50.49. Particularly, the letter requested certification that (a) the licensee has in place and is implementing an environmental qualification program that will satisfy the requirements of 10 CFR 50.49 within the currently approved schedule for the plant without further extension; (b) the plant has at least one path to safe shutdown using fully qualified equipment or has submitted a justification for continued operation (JCO) pending full qualification of any equipment not fully qualified; and (c) all other equipment within the scope of 50.49 is either fully qualified or a JCO has been submitted pending full qualification. The purpose of this letter is to provide SCE's certification of compliance for San Onofre Unit 1.
In response to item (a), SCE has in effect an environmental qualification program which satisfies the requirements of 10 CFR 50.49.
The program will be implemented in accordance with the schedule of 10 CFR 50.49 with the exception of those items requiring an extension. Extension requests for a number of equipment items were transmitted to the NRC by letters dated July 30 and December 21, 1984. Both extension requests were approved by the NRC and documented in their letters dated November 26, 1984 and February 12, 1985. In summary, the environmental qualification of all equipment will be completed by March 31, 1985 with the exception of the extension request items which will be completed by November 30, 1985. The San Onofre Unit 1 6502280233 850226 PDR ADOCK 05000206 P
PDR
Mr. Hugh L. Thompson Jr.
-2 Preventive Maintenance Program and maintenance procedures will be revised to comply with the environmental qualification documentation as necessary prior to the required maintenance of the qualified equipment. It should be noted, however, that since we are currently assembling the qualification documents for those equipment items which we believe are qualified, there is the possibility that additional problems could be identified which would necessitate another request for extension. Also as we proceed with the necessary engineering, procurement and construction to replace equipment which cannot be qualified by November 30, 1985, there is the possibility that unforeseen circumstances, such as procurement problems or equipment failures could prevent implementation of a given item, at which time we would be forced to request an additional extension. At this time we know of no such case.
In response to item (b), San Onofre Unit 1 equipment is either qualified or a JCO exists.
For the equipment that is qualified, the documentation demonstrating qualification will be available by March 31, 1985.
For the equipment which is not qualified, it will be replaced by November 30, 1985 as indicated by the extension requests dated July 30, 1984 and December 21, 1984. Justifications for continued operation have been provided for the unqualified equipment items by letter dated November 3, 1984 and the extension request letter dated December 21, 1984.
In response to item (c), JCO's have been provided for all the equipment in the environmental qualification program for San Onofre Unit 1.
The justifications were submitted to the NRC in letters dated November 3 and December 21, 1984. As previously indicated, qualification documentation for equipment will be in place by March 31, 1985 or the equipment will be replaced by November 30, 1985.
It should be noted that the qualification of Regulatory Guide 1.97 equipment is not governed by the 10 CFR 50.49(g) schedule. That equipment will be addressed during the Regulatory Guide 1.97 review process, unless the equipment was previously identified as part of the environmental qualification effort. Previously identified equipment will be qualified in accordance with the above schedules.
Mr. Hugh L. Thompson Jr.
-3 With regard to IE Bulletins and Information Notices, these documents are reviewed and addressed as necessary. IE Bulletin responses are transmitted to the regional office as required.
Information Notices are reviewed and documented in our records.
If you have any questions regarding this matter, please let me know.
Subscribed on this day of 1985.
Respectfully submitted, SOUTHERN CALIFORNIA EDISON COMPANY By:
Vt'.47 M. 0. Medford Manager, Nuclear Icensing Subscribed and sworn to before me this d
da y o f OFFICIAL SEAL C SALLY SEBO NOTARY PUBLIC - CALIFORNIA LOS ANGELES COUNTY Not a r in andfor-the County of
-AP LOANEESCUT' Notary Pu Sa o
for n
o My comm, expires APR 14, 1986 Los Angeles, State of Californi-a My Commission Expires:
t a
i,
/ff cc:
F. R. Huey, NRC Site Inspector