2013 PERRY NUCLEAR POWER PLANT INITAL LICENSE EXAMINATION MISCELLANEOUS CORRESPONDENCE
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 210 LISLE, ILLINOIS 60532-4352 November 16, 2011 Mr. Mark Bezilla Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. 0. Box 97, 10 Center Road, A-PY-A290 Perry, OH 44081-0097
SUBJECT:
CONFIRMATION OF INITIAL OPERATOR LICENSE EXAMINATIONS:
PERRY NUCLEAR POWER PLANT
Dear Mr. Bezilla:
We have received your corporate letter L-11-204, dated July 8, 2010. In that letter, you did not request any changes to the existing initial operator licensing examinations scheduled at the Perry Nuclear Power Plant.
However, we note that you were previously scheduled for an initial operator licensing exam the weeks of February 18 and 25, 2013. This exam has been moved to the weeks of February 25 and March 4, 2013, with an on-site validation scheduled for the week of February 4, 2013.
Similarly, the February 2015 exam date was moved to the weeks of February 9 and 16, 2015, with an on-site validation date scheduled for the week of January 19, 2015. These exams were moved to accommodate resource scheduling.
In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examinations at a mutually acceptable date.
We understand that your staff will develop the examinations. Please inform us at your earliest opportunity if you discover you need to change the scheduled examination date.
A supplementary letter will be sent to the training department approximately 120 days prior to the examination informing the training manager of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to review and conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the training program.
In accordance with 10 CFR 2.930 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records System {PARS) component of NRC's Agencywide Document
M. Bezilla Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-440 License No. NPF-58 cc: Distribution via ListServ'
M. Bezilla Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-440 License No. NPF-58 cc: Distribution via ListServ' DISTRIBUTION:
Amy Snyder RidsNrrPMPerry Resource RidsNrrDorllpl3-2 Resource RidsNrrDirslrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRS III Patricia Buckley Tammy Tomczak ROPreports Resource DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\Ltr 110411 Perry Exam 2011.docx 0 Publicly Available 0 Non-Publicly AvailableO Sensitive 0 Non-Sensitive To receive a copy of this document indicate in the concurrence box ""C =Copy without attach/encl ""E"" =Copy with attach/encl ""N"" =No copy OFFICE Rill k Rill J I I NAME RKWalton:ls ~ HPeterson J/
DATE 10/31/11 ' 11/[f, /11 (If OFFICIAL RECORD COPY
FENOC ~
Perry Nuclear Power Plant 10 Center Road FirstEnergy Nuclear Operating Company Perry, Ohio 44081 Mark B. Bezilla 440-280-5382 Vice President Fax: 44G-280-8029 June 15,2011 L-11-204 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
Perry Nuclear Power Plant Docket No. 50-440, License No. NPF-58 Response to NRC Regulatory Issue Summary 2011-04 Preparation and Scheduling of Operator Licensing Examinations This letter provides the Perry Nuclear Power Plant (PNPP) response to NRC Regulatory Issue Summary (RIS) 2011-04, Preparation and Scheduling of Operator Licensing Examinations. The RIS requested licensees to voluntarily submit a response using NRC Form 536 to provide information for scheduling and preparation of operator licensing examinations.
The proposed Operator Licensing Examination Schedule data, on the enclosed NRC Form 536, reflects the anticipated examination dates and number of examinees for calendar years 2013 through 2016.
There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Anthony E. Mueller Jr.,
Manager, Perry Training Section at (440) 280-5535.
Sincerely, 4
/)1 4 f 1/
t-1 /li~j '?~1/
Enclosure:
I OPERATOR LICENS1NG EXAMINATION DATA, NRC Form 536 cc: Regional Administrator, NRC Region Ill NRC Resident Inspector Office NRC Project Manager Hironori Peterson, NRC Region Ill
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008)
Estimated burden per res~onse to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his information conection is used to plan budgets and resources for operator examinations. Send comments re~arding burden estimate to the Records and FOIA/Privacy Services Branch ( -5 F53), U.S.
OPERATOR LICENSING Nuclear Re~ulatory Commission, Washington, DC 20555-Q001, or bfc internet e-mail to in ocollects@nrc. ov, and to the Desk Officer, Office of In ormation EXAMINATION DATA 0 and Regulatory Affairs, NE B-10202, (3150..0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION PERRY NUCLEAR POWER PLANT m
A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2013 CY 2014 CY 2015 CY 2016 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2013 cv2o14 CY2015 cv2o16 NUMBER OF REACTOR 4 0 6 0 OPERATORS NUMBER OF SENIOR REACTOR 7 0 4 0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 2 0 OPERATORS-UPGRADE 2 0 NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS* LIMITED 0 PROPOSED DATES PRIMARY DATE 02/18/2013 02/09/2015 ALTERNATE DATE 02/25/2013 02/16/2015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2013 CY 2014 PROPOSED -- --
NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 10 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 2 I 0 LISLE, IlliNOIS 60532-4352 July 30, 2010 Mr. Mark Bezilla Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. 0. Box 97, 10 Center Road, A-PY-A290 Perry, OH 44081-0097
SUBJECT:
CONFIRMATION OF INITIAL OPERATOR LICENSE EXAMINATIONS:
PERRY NUCLEAR POWER PLANT
Dear Mr. Bezilla:
In response to your letters dated July 8, 2010 (L-10-210}, and July 22, 2010 (L-10-218) you requested dates for initial operator licensing examinations in 2013 and 2015. You also requested we cancel the initial operator license exam scheduled for January 9, 2012.
In response, we have scheduled an examination for the weeks of February 11 and 18, 2013, with an onsite validation date of January 7, 2013. Additionally, we have scheduled an examination for the weeks of February 9 and 16, 2015, with an onsite validation date of January 12, 2015. We have also canceled the initial operator license examination scheduled for January 9, 2012.
In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.
We understand that your staff will develop the examinations. Please inform us at your earliest opportunity if you discover you need to change the scheduled examination date.
A supplementary letter will be sent to the training department approximately 120 days prior to the examination informing the training manager of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to review and conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the training program.
M. Bezilla In accordance with 10 CFR 2.930 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records System (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-440 License No. NPF-58 cc: Distribution via ListServ
M. Bezilla In accordance with 10 CFR 2.930 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records System (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
!fUr(
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-440 License No. NPF-58 cc: Distribution via ListServ DISTRIBUTION:
Susan Bagley RidsNrrPMPerry RidsNrrDorllpl3-2 RidsNrrDirslrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRS III Patricia Buckley Tammy Tomczak Document Name: G:\DRS\Work in Progress\PER 07_1 0 DRS OL Re Confirmation of License Exam .docx o Publicly Available o Non-Publicly Available o Sensitive o Non-Sensitive To receive a copy of this document, indicate in the box: "C" =Copy without attachmenVenclosure "E" =Copy with attachmenVenclosure "N" =No copy OFFICE Rill IC Rill IN l I NAME RKWalton:co Q'ivJ HPeterson , /J DATE 07/~0/10 071 1!)/10 resicfent rax.* 410-2A080?9 July 28, 2008 L-08-238 10CFR55 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
Perry Nuclear Power Plant Docket No. 50-440, License No. NPF-58 Voluntary Response to NRC Regulatory Issue Summary 2008-16:
Preparation and Scheduling of Operator Licensing Examinations As requested in NRC Regulatory Issue Summary, 2008-16, Preparation and Scheduling of Operator Licensing Examinations, enclosed is the voluntary response concerning the estimated number of candidates to be examined during scheduled examination visits.
The proposed Operator Licensing Examination Schedule data, on the enclosed NRC Form 536, reflects the anticipated examination dates and number of examinees for fiscal years 2009 through 2012.
There are no regulatory commitments contained in this letter or its attachments. If there are any questions concerning this matter, please contact Mr. Jeffrey Lausberg -
Manager, Regulatory Compliance at (440) 280-5940.
Enclosure:
OPERATOR LICENSING EXAMINATION DATA, NRC Form 536 cc: NRC Region Ill NRC Resident Inspector Office NRC Project Manager Nancy L. Salgado, NRR Hironori Peterson, Rill JlJl 2 9 2008
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/31/2008 (8-2005)
Estimated burden per res~onse to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERATOR LICENSING estimate to the Records ~nd FOIA!Priyacy Ser;lces Branch ~T-5 F53), U.S.
Nuclear ReTculatory Commtsslon, Washmgton, DC 20555-000 , or by internet e-mail to In ocollects@nrc.gov, and to the Desk Officer, Office of Information EXAMINATION DATA and Regulatory Affairs, NE B-10202, (3150-0131), Office of Management and Budget, Washmgton, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a p*Hson is not required to respond to the information collection. '
FACILITY NRC REGION Perry Nuclear Power Plant Ill A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2009 CY 2010 CY2011 CY2012 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2009 CY2010 CY2011
-- -- -- CY2012 NUMBER OF REACTOR 1 2 4 12 OPERATORS NUMBER OF SENIOR REACTOR 14 9 9 2 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 2 2 2 1 OPERATORS ** UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS- LIMITED PROPOSED DATES PRIMARY DATE 01/12/2009 05/03/2010 01/03/2011 01/02/2012 ALTERNATE DATE 01/19/2009 05/10/2010 01/10/2011 01/09/2012
- c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2009 CY 2010 PROPOSED --------- ---
NUMBER SEPTEMBER DECEMBER MARCH .JUNE SEPTEMBER DECEMBER MARCH JUNE ESTIMATED NUMBER OF 14 13 14 CANDIDATES NRC FORM 536 (8-2005) PRINTED ON FlECYCLED PAPEF{