ML13130A131

From kanterella
Jump to navigation Jump to search
License Termination Plan Supplemental Information
ML13130A131
Person / Time
Site: Humboldt Bay
Issue date: 05/03/2013
From: Halpin E D
Pacific Gas & Electric Co
To:
NRC/FSME, Document Control Desk
References
HBL-13-008
Download: ML13130A131 (2)


Text

WIPacific Gas and Electric Company' Edward D. Halpin Diablo Canyon Power Plant Senior Vice President Mail Code 104/6 May3 2013 Nuclear Generation

& Chief Nuclear Officer P. 0. Box 56 May 3 2013Avila Beach, CA 93424 PG&E Letter HBL-13-008 o85.545.410o E-Mail: E1H8@pge.com U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Docket No. 50-133, License No. DPR-7 Humboldt Bay Power Plant, Unit 3 Humboldt Bay Power Plant, Unit 3, License Termination Plan Supplemental Information Dear Commissioners and Staff: On April 30, 2013, Pacific Gas and Electric Company (PG&E) submitted PG&E Letter HBL-13-007, License Amendment Request 13-01 "Addition of License Condition 2.C.5,'License Termination Plan,"' to the Humboldt Bay Power Plant (HBPP), Unit 3, license. In that submittal, PG&E included the proposed HBPP, Unit 3, License Termination Plan for NRC review and approval.

PG&E is submitting the following enclosed technical documents to aid in the review of the License Termination Plan: Enclosure 1, "HBPP Historical Site Assessment, 2011 Update," dated July 2011 Enclosure 2, "Instrument Efficiency Determination for Use in Minimum Detectable Concentration Calculations in Support of the Final Status Survey at HBPP," dated June 13, 2012 Enclosure 3, "Gross Activity DCGL in Support of the Final Status Survey at HBPP," dated July 11, 2012 Enclosure 4, "Radionuclide Selection for DCGL Development," dated May 16, 2012 Enclosure 5, "In Situ Object Counting System (ISOCS) as Applied to Scan Requirements in Support of Final Status Survey at HBPP," dated September 26, 2012 PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter.If you wish to discuss the information in the enclosure, please contact Mr. William Barley at (707) 444-0856.I state under penalty of perjury that the foregoing is true and correct.Executed on May 3, 2013.Si nce rely, Edward D. Halpin Document Control Desk May 3, 2013 Page 2 PG&E Letter HBL-13-008 Enclosures cc: HBPP Humboldt Distribution cc/enc: John B. Hickman, NRC Arthur T. Howell, Ill, NRC Region IV Gonzalo L. Perez, California Department of Public Health