Letter Sequence RAI |
---|
|
|
MONTHYEARULNRC-05941, Proposed Revision to Final Safety Analysis Report FSAR-SP Sections 3.7(B) & 3.7(N), Seismic Design (License Amendment Request LDCN 12-0041)2012-12-20020 December 2012 Proposed Revision to Final Safety Analysis Report FSAR-SP Sections 3.7(B) & 3.7(N), Seismic Design (License Amendment Request LDCN 12-0041) Project stage: Request ML13039A0932013-02-0808 February 2013 Acceptance Review Email, License Amendment Request to Revise Final Safety Analysis Report FSAR-SP Sections 3.7(B) and 3.7(N), Seismic Design to Use Regulatory Guide 1.61 Revision 1 Project stage: Acceptance Review ML13120A5232013-05-0202 May 2013 Request for Additional Information, License Amendment Request to Revise Final Safety Analysis Report FSAR-SP Sections 3.7(B) and 3.7(N), Seismic Design, to Use Regulatory Guide 1.61, Revision 1 Project stage: RAI ML13158A0092013-06-0606 June 2013 ULNRC-05998: Proposed Revision to Final Safety Analysis Report FSAR-SP Section 3.7(B) & 3.7(N), Seismic Design (License Amendment Request Ldcn 12-0041) Project stage: Other ULNRC-06033, Proposed Revision to Final Safety Analysis Report FSAR-SP Section 3.7(B) & 3.7(N), Seismic Design, (License Amendment Request LDCN 12-0041)2013-08-29029 August 2013 Proposed Revision to Final Safety Analysis Report FSAR-SP Section 3.7(B) & 3.7(N), Seismic Design, (License Amendment Request LDCN 12-0041) Project stage: Request ML13358A0052014-01-14014 January 2014 Issuance of Amendment No. 207, Revise Final Safety Analysis Report FSAR-SP Sections 3.7(B) and 3.7(N), Seismic Design to Use Regulatory Guide 1.61 Revision 1 Project stage: Approval 2013-05-02
[Table View] |
|
---|
Category:Request for Additional Information (RAI)
MONTHYEARML24066A1932024-03-0707 March 2024 2024 Callaway Plant Notification of Biennial Problem Identification and Resolution Inspection and Request for Information ML23200A2982023-07-19019 July 2023 NRR E-mail Capture - Callaway Plant, Unit 1 - Final Request for Additional Information (RAI) - Request for Approval of Oqam, Revision 36a - EPID L-2023-LLQ-0000 ML23174A1272023-06-23023 June 2023 Cw FFD Document Request List 2023 ML23158A1462023-06-13013 June 2023 Notification of Post-Approval Site Inspection for License Renewal and Request for Information Inspection (05000483/2023010) ML23163A1572023-06-0606 June 2023 In-service Inspection Request for Information ML23096A0072023-04-0505 April 2023 NRR E-mail Capture - Final Request for Additional Information - Callaway Plant, Unit 1 - License Amendment Request to Revise TS 5.5.16 for Permanent Extension of Integrated Leak Rate Testing - EPID L-2022-LLA-0165 ML23080A1382023-03-21021 March 2023 Notification of Inspection (NRC Inspection Report 05000483/2023003) and Request for Information ML23073A0262023-03-13013 March 2023 NRR E-mail Capture - Final - Request for Additional Information - Callaway Plant, Unit 1 - SG Inspection Report Review - EPID L-2022-LRO-0143 ML23037A7092023-02-0606 February 2023 April 2023 Emergency Preparedness Exercise Inspection - Request for Information ML23026A0212023-01-24024 January 2023 NRR E-mail Capture - Final - Request for Additional Information - Callaway Plant, Unit 1 - LAR for Proposed Changes to TS for SFP - ML22287A0952022-10-14014 October 2022 NRR E-mail Capture - Final - Request for Additional Information - Callaway Plant, Unit 1 - License Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications - EPID L-2021-LLA-0177 ML22269A4312022-09-26026 September 2022 November 2022 Emergency Preparedness Program Inspection - Request for Information ML22173A0562022-06-22022 June 2022 Information Request, Security IR 2022402 ML22167A0252022-06-15015 June 2022 NRR E-mail Capture - Final - Request for Additional Information - Callaway Plant, Unit 1 - LAR for Proposed Revision to Radiological Emergency Response Plan Regarding Response & Notification Goals - EPID L-2022-LLA-0024 ML22157A0572022-06-0606 June 2022 Notification of NRC Design Bases Assurance Inspection (Programs) (05000483/2022013) and Request for Information ML22154A0122022-06-0202 June 2022 NRR E-mail Capture - Final - Request for Additional Information - Callaway Plant, Unit 1 - License Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications - EPID L-2021-LLA-0177 ML22151A0512022-05-27027 May 2022 NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - LAR to Change TS 3.4.11 - Reactor Coolant System Pressure and Temperature Limits - EPID L-2021-LLA-0191 ML22137A0292022-05-16016 May 2022 NRR E-mail Capture - Draft - Request for Additional Information - Callaway Plant, Unit 1 - License Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications - EPID L-2021-LLA-0177 ML22096A0232022-04-0505 April 2022 NRR E-mail Capture - Callaway Plant - Final RAIs - License Amendment and Regulatory Exemptions for a Risk-Informed Approach to Address Generic Safety Issue - 191 and Respond to GL 2004-02 (EPIDs L-2021-LLA-0059 and L-2021-LLE-0021) ML21336A6392021-12-0202 December 2021 .05 Sec Doc Request ML21319A0062021-11-30030 November 2021 Supplemental Information Needed for Acceptance of Requested Licensing Actions License Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications ML21258A0382021-09-14014 September 2021 NRR E-mail Capture - Final - Request for Additional Information - Callaway, Unit 1 - LAR to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors- EPID L-2020-LLA-023 ML21159A2352021-06-17017 June 2021 Notification of NRC Triennial Heat Exchanger/Heat Sink Performance Inspection (05000483/2021003) and Request for Information ML21130A5882021-05-11011 May 2021 Supplemental Information Needed for Acceptance of Requested Licensing Actions to Adopt a Risk-Informed Approach to Address GSI-191 and Respond to Generic Letter 2004 02 ML21088A3872021-03-30030 March 2021 Notification of Evaluations of Changes, Tests, and Experiments Inspection (Inspection Report 05000483/2021002) and Request for Information ML21007A1622021-01-0606 January 2021 NRR E-mail Capture - Final - Request for Additional Information - (COVID-19) Callaway Plant, Unit 1 - Additional Request for Exemption from Specific Requirements of 10 CFR Part 26, Fitness for Duty Programs - EPID L-2021-LLE-0242 ML20203M3682020-07-21021 July 2020 NRR E-mail Capture - Draft Request for Additional Information - Callaway Plant, Unit 1 - License Amendment Request - Revision to Technical Specification (TS) 5.3.1 and Deletion of TS 5.3.1.1 and 5.3.1.2 - EPID L-2020-LLA-0046 ML20162A1882020-06-10010 June 2020 Request for Supporting Information for the Callaway SPRA Audit Review - Draft Supplement ML20280A5442020-03-25025 March 2020 Cwy 2020 PIR Request for Information ML20064B6582020-02-27027 February 2020 Second, Third, and Fourth Request for Information for Callaway Dba Teams Inspection 2020011 ML19317E6332019-11-13013 November 2019 Request for Supporting Information for the Callaway SPRA Audit Review ML19107A5152019-04-11011 April 2019 Cwy 2019410 RFI Cyber Security Gap ML19078A2932019-03-18018 March 2019 Notification of an NRC Triennial Fire Protection Baseline Inspection (NRC Inspection Report 05000483/2019010) and Request for Information ML19023A2032019-01-22022 January 2019 Notification of NRC Triennial Heat Sink Performance Inspection (05000483/2019001) and Request for Information ML19009A3442019-01-0909 January 2019 NRR E-mail Capture - Formal Release of RAIs Ref: Callaway Plant Class 1E LAR, L-2018-LLA-0062 ML18355A4882018-12-20020 December 2018 NRR E-mail Capture - Formal Release of RAI Ref: Callaway Plant EAL Changes, L-2018-LLA-0239 ML18331A2052018-11-27027 November 2018 NRR E-mail Capture - Formal Release of RAIs Ref: Callaway Relief Request EPID L-2018-LLR-0051 ML18025B4672018-01-24024 January 2018 NRR E-mail Capture - Request for Extension of Due Date for RAI Response ML17304B1912017-10-31031 October 2017 NRR E-mail Capture - Requests for Additional Information Concerning Callaway License Amendment - Thermal Overload Protection ML17142A1352017-05-19019 May 2017 Notification of NRC Design Bases Assurance Inspection (05000483/2017007) and Initial Request for Information ML17115A0622017-04-25025 April 2017 NRR E-mail Capture - Requests for Additional Information -- Callaway Plant, Unit 1, Technical Specification 5.6.5, Core Operating Limits Report CAC MF8463 ML17038A2292017-02-0707 February 2017 NRR E-mail Capture - RAI Formal Release for Callaway SG Tube Inspection Report, MF8474 ML16111B3222016-04-20020 April 2016 Notification of Evaluations of Changes, Tests, and Experiments, and Permanent Plant Modifications Inspection (05000483/2016007) and Request for Information ML15316A1532015-11-12012 November 2015 Request for Additional Information Email, Relief Request 13R-11 (Pressurizer Welds) from Code Case N-460 Requirements, Third 10-Year Inservice Inspection Interval ML15096A0942015-04-0606 April 2015 Notification of Inspection (NRC Inspection Report 05000483/2015003) and Request for Information ML14353A1172014-12-22022 December 2014 Request for Additional Information, Round 3, License Amendment Request to Revise Final Safety Analysis Report Standard Plant Section 3.6 for High Density Polyethylene (Hdpe) Crack Exclusion ML14294A7752014-10-28028 October 2014 Request for Additional Information, Round 2, License Amendment Request to Revise Final Safety Analysis Report Standard Plant Section 3.6 for High Density Polyethylene (Hdpe) Crack Exclusion ML14203A0632014-07-25025 July 2014 Request for Additional Information, Relief Request I3R-17, Proposed Alternative to ASME Code, Section XI Requirements, Which Extends Rv ISI Frequency from 10 to 20 Years, Third 10-Year ISI Interval ML14178A8232014-07-0101 July 2014 Request for Additional Information, License Amendment Request to Revise Final Safety Analysis Report- Standard Plant Section 3.6 for High Density Polyethylene (Hdpe) Crack Exclusion ULNRC-06117, Callaway Plant, Unit 1, License Revewal Application, Request for Additional Information (RAI) Set 31 Responses2014-04-24024 April 2014 Callaway Plant, Unit 1, License Revewal Application, Request for Additional Information (RAI) Set 31 Responses 2024-03-07
[Table view] Category:Letter
MONTHYEARIR 05000483/20240032024-10-23023 October 2024 Integrated Inspection Report 05000483/2024003 IR 05000483/20240132024-10-21021 October 2024 Design Basis Assurance Inspection (Programs) Inspection Report 05000483/2024013 IR 05000483/20244012024-10-0909 October 2024 Material Control and Accounting Program Inspection Report 05000483/2024401 Public ULNRC-06901, Concurrent Inoperability of Control Room Air Conditioning System Train and Opposite Train Emergency Diesel Generator Results in Condition Prohibited by Technical Specifications Limiting (Letter)2024-10-0101 October 2024 Concurrent Inoperability of Control Room Air Conditioning System Train and Opposite Train Emergency Diesel Generator Results in Condition Prohibited by Technical Specifications Limiting (Letter) ML24247A3042024-09-11011 September 2024 Regulatory Audit Questions for License Renewal Commitments 34 and 35 (EPID L-2024-LRO-0009) - Non-Proprietary IR 05000483/20244032024-08-28028 August 2024 Security Baseline Inspection 05000483-2024-403 IR 05000483/20240052024-08-14014 August 2024 Updated Inspection Plan for Callaway Plant (Report 05000483/2024005) IR 05000483/20253012024-08-0505 August 2024 Notification of NRC Initial Operator Licensing Examination 05000483/2025301 ML24212A2822024-08-0202 August 2024 Regulatory Audit Summary Concerning Review of Request No. C3R-01 for Proposed Alternative to ASME Code, Section XI Requirements for Containment Building Inspections IR 05000483/20240022024-07-18018 July 2024 And Independent Spent Fuel Storage Installation Integrated Inspection Report 05000483/2024002 and 07201045/2024001 ML24185A1032024-07-16016 July 2024 2024 Biennial Problem Identification and Resolution Inspection Report ULNRC-06892, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC00062024-06-26026 June 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC0006 ULNRC-06891, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00052024-06-26026 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0005 ULNRC-06884, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00022024-06-12012 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0002 ULNRC-06886, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00042024-06-12012 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0004 ULNRC-06885, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00032024-06-12012 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0003 ML24144A0492024-06-11011 June 2024 Requests for Relief from ASME OM Code Pump and Valve Testing Requirements for Fifth 120-Month Inservice Testing Interval ML24158A5222024-06-0606 June 2024 Application to Revise Technical Specifications to Adopt Tstf-569, Rev. 2, Revise Response Time Testing Definition (LDCN 24-0008) ML24178A1132024-06-0606 June 2024 Ameren Missouris Intent to Adopt Revision 1 to Amendment 0 of Certificate of Compliance No. 1040 as Applicable to the ISFSI at the Callaway Plant Site ML24143A1632024-05-23023 May 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Storage Canister HGMPC0001 ULNRC-06882, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC00122024-05-16016 May 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC0012 ML24137A2342024-05-16016 May 2024 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Canister HGMPC0011 ML24122A1502024-05-0707 May 2024 Audit Plan to Support Review of Steam Generator License Renewal Response to Commitment Nos 34 and 35 ULNRC-06877, Final Safety Analysis Report Revision OL-27 and Technical Specification Bases Revision 252024-05-0606 May 2024 Final Safety Analysis Report Revision OL-27 and Technical Specification Bases Revision 25 IR 05000483/20244022024-05-0606 May 2024 Security Baseline Inspection Report 05000483/2024402 (Full Report) IR 05000483/20240112024-05-0101 May 2024 NRC Post-Approval Site Inspection for License Renewal (Phase 2) Report 05000483/2024011 ULNRC-06856, CFR 50.59 and 10 CFR 72.48 Summary Report2024-05-0101 May 2024 CFR 50.59 and 10 CFR 72.48 Summary Report ULNRC-06869, Submittal of Callaway, Unit 1, 2023 Annual Radiological Environmental Operating Report2024-04-30030 April 2024 Submittal of Callaway, Unit 1, 2023 Annual Radiological Environmental Operating Report ML24122A1132024-04-30030 April 2024 Submittal of Callaway, Unit 1, 2023 Annual Radioactive Effluent Release Report ULNRC-06876, Registration of Dry Spent Fuel Storage Canister HGMPC00102024-04-25025 April 2024 Registration of Dry Spent Fuel Storage Canister HGMPC0010 ML24108A1082024-04-17017 April 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC0009 ULNRC-06871, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00072024-04-17017 April 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0007 ULNRC-06872, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00082024-04-17017 April 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0008 ULNRC-06866, Submittal of Cycle 26 Commitment Change Summary Report2024-04-17017 April 2024 Submittal of Cycle 26 Commitment Change Summary Report IR 05000483/20240012024-04-16016 April 2024 Integrated Inspection Report 05000483/2024001 IR 05000483/20244042024-04-0909 April 2024 Cyber Security Inspection Report 05000483/2024404 ML24088A3212024-04-0101 April 2024 Notification of Commercial Grade Dedication Inspection (05000483/2024013) and Request for Information ML24086A5132024-03-26026 March 2024 CFR 50.46 Annual Report Regarding ECCS Evaluation Model Revisions ULNRC-06863, Submittal of Annual Exposure Report for 20232024-03-20020 March 2024 Submittal of Annual Exposure Report for 2023 ML24079A1622024-03-19019 March 2024 Re Nuclear Property Insurance Reporting ML24066A1932024-03-0707 March 2024 2024 Callaway Plant Notification of Biennial Problem Identification and Resolution Inspection and Request for Information ULNRC-06852, Owners Activity Reports (OAR-1 Forms) for Cycle/Refuel 262024-03-0505 March 2024 Owners Activity Reports (OAR-1 Forms) for Cycle/Refuel 26 IR 05000483/20230062024-02-28028 February 2024 Annual Assessment Letter for Callaway Plant Report 05000483/2023006 ML24052A3662024-02-26026 February 2024 Regulatory Audit Plan in Support of Proposed Alternative to ASME Code, Section XI Requirements for Containment Building Inspections ULNRC-06858, Completion of License Renewal Activities Prior to Entering the Period of Extended Operation2024-02-21021 February 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operation ML24036A1712024-02-20020 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0079 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ULNRC-06853, Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.7172024-01-29029 January 2024 Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.717 ML24008A0552024-01-19019 January 2024 Acceptance of Requested Licensing Action - Proposed Alternative to the Requirements of the ASME Code (EPID L-2023-LLR- 0061) IR 05000483/20230042024-01-19019 January 2024 – Integrated Inspection Report 05000483/2023004 ML23353A1712024-01-18018 January 2024 Issuance of Amendment No. 237 to Clarify Support System Requirements for the Residual Heat Removal System and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 2024-09-11
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 2,2013 Mr. Adam C. Heflin Senior Vice President and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, MO 65251
SUBJECT:
CALLAWAY PLANT, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION RE: PROPOSED REVISION TO FSAR-SP SECTIONS 3.7(B) AND 3.7(N),
"SEISMIC DESIGN" (TAC NO. MF0407)
Dear Mr. Heflin:
By application dated December 20, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13002A370), to the U.S. Nuclear Regulatory Commission (NRC), Union Electric Company (dba Ameren Missouri, the licensee) submitted a license amendment request to revise a methodology in the licensing basis as described in the Final Safety Analysis Report - Standard Plant (FSAR-SP) to include damping values for the seismic design and analysis of the integrated head assembly that are consistent with the recommendations of NRC Regulatory Guide 1.61, "Damping Values for Seismic Design of Nuclear Power Plants," Revision 1, March 2007.
The NRC staff has determined that additional information, as requested in the enclosure, is needed to complete its review. Please provide a response to the questions by June 7,2013. If circumstances result in the need to revise the requested response date, please contact me at 301-415-2296 or via e-mail at Fred.Lyon@nrc.gov.
Sincerely,
~~a/(
~ F. Lyon, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-483
Enclosure:
As stated cc w/encl: Distribution via Listserv
REQUEST FOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUEST TO REVISE THE LICENSING BASIS FOR SEISMIC DESIGN AS DESCRIBED IN THE FSAR-SP UNION ELECTRIC COMPANY CALLAWAY PLANT, UNIT 1 DOCKET NO. 50-483 By application dated December 20, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13002A370) (Reference 1), to the U.S. Nuclear Regulatory Commission (NRC), Union Electric Company (dbpa Ameren Missouri, the licensee) submitted a license amendment request to revise a methodology in the licensing basis as described in the Final Safety Analysis Report - Standard Plant (FSAR-SP) to include damping values for the seismic design and analysis of the integrated head assembly that are consistent with the recommendations of NRC Regulatory Guide 1.61, "Damping Values for Seismic Design of Nuclear Power Plants," Revision 1, March 2007.
The NRC staff has determined that the additional information requested below is needed to complete its review.
Mechanical and Civil Engineering Branch (EMCB)-Callaway-IHA-RAI-1 In Section 2.2 (paragraph 2, page 4) of Reference 1, the licensee indicated that the weighted average damping value will be used in the analysis of loss-of-coolant accident (LOCA) loads in the Integrated Head Assembly (IHA) design basis. The licensee is requested to clarify whether the LOCA analysis performed for the IHA assembly (1) is a linear elastic analysis, (2) utilizes the response spectrum or time history method, and (3) if a response spectrum method was used, whether the type of spectra utilized is acceleration spectra or displacement spectra for the three orthogonal directions.
EMCB-Callaway-IHA-RAI-2 In Section 3.1 (paragraph 2, page 6) of Reference 1, the licensee indicated that the ductwork part of the IHA structure is not composed of a traditional round or rectangular section. It is also not clear from Figure 2 of the Attachment 1 of Reference 1, what is the cross-sectional shape of the Control Rod Drive Mechanism (CRDM) ductwork inside the IHA shroud. The licensee is requested to describe the cross-sectional shape of the CRDM ductwork inside the IHA shroud.
EMCB-Callaway-IHA-RAI-3 In Section 3.1 (paragraph 4, page 6) of Reference 1, the licensee indicated that there are gaps between the digital rod position indication (DPRI) plates, which transmit seismic loads from the CRDM pressure housings to the seismic frame assembly. The licensee is requested to provide the following additional information: (1) How large are the gaps between the DPRI plates, (2) How are the non-linear effects of the gaps considered in the seismic analysis, (3) Is the Enclosure
- 2 seismic analysis of the IHA assembly a linear analysis, and (4) If it is a linear analysis, how are the impact effects accounted for during the seismic movements and closure of the gaps.
EMCB-Callaway-IHA-RAI-4 In Section 3.3 (paragraph 1, page 8) of Reference 1, the licensee indicated that there will be a net increase in the overall weight of the IHA assembly that is replacing the current lifting rig I platform during the Callaway Replacement Reactor Vessel Closure Head (RRVCH) project.
The licensee is requested to provide the following: (1) the old and new overall weight of the IHA assembly, (2) clarify whether the loads due to additional mass of the IHA assembly are considered in the qualification of (i) the Reactor Vessel supports, (ii) local areas of the IHA assembly support connections with the RRVCH, and (iii) the tie rod connections to the reactor cavity wall, and (3) clarify whether the tie rods of the IHA assembly connected to the reactor cavity wall provide horizontal restraint only, or is there a vertical component.
EMCB-Callaway-IHA-RAI-5 In Section 3.3 (paragraph 2, page 8) of Reference 1, the licensee described the finite element model and analysis of the IHA assembly based on shell and beam elements. The analysis considers the active tie rods. The licensee is requested to respond to the following questions:
(1) Was a mesh sensitivity study performed for convergence of the finite element analysis (FEA) results? (2) What structural analysis finite element program is utilized in the analysis of the IHA assembly, and was that FEA program previously qualified and listed in the Callaway FSAR and used for other components or structures at the Callaway plant, or it is an entirely new computer program? (3) What is the total number of tie rods, and how many of them are active tie rods?
(4) Are the number of active tie rods the same for the Operating Basis Earthquake (aBE) and the Safe Shutdown Earthquake (SSE) seismic analyses?
EMCB-Callaway-IHA-RAI-6 Section 3.3 (paragraph '3, page 8) of Reference 1 provides the aBE and SSE seismic analyses based on envelopes of the building spectra at elevation 2047'-6" and the RRVCH spectra. The licensee is requested to provide (1) what the elevations are for the RRVCH spectra, and (2) whether the elevation 2047'-6" corresponds to the reactor building floor spectra or the internal structure spectra.
EMCB-Callaway-IHA-RAI-7 Section 3.3 (paragraph 2, page 10) of Reference 1 notes that seismic category I components of the IHA assembly were evaluated using acceptance criteria corresponding to the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (B&PV) Code,Section III, Division I, Subsection, 2001 Edition through 2003 Addenda. Please provide clarifications to the following questions: (1) What is the design basis code for the Callaway Plant? (2) Was a code reconciliation performed for using the ASME B&PV Code,Section III for the IHA assembly versus the design basis code? (3) Was the same ASME Code edition used for the non-seismic category I components?
-3 EMCB-Callaway-IHA-RAI-8 of Reference 1 (pages 2, 3, and 4):
The IHA assembly is a complex structure, as shown in Figures 1, 2, and 3 of Attachment 1. The licensee is requested to provide the major overall dimensions and label the major components in Figures 1, 2, and 3. Also, please provide the elevations for all of the major component locations.
May 2,2013 Mr. Adam C. Heflin Senior Vice President and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, MO 65251
SUBJECT:
CALLAWAY PLANT, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION RE: PROPOSED REVISION TO FSAR-SP SECTIONS 3.7(B) AND 3.7(N),
"SEISMIC DESIGN" (TAC NO. MF0407)
Dear Mr. Heflin:
By application dated December 20, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13002A370), to the U.S. Nuclear Regulatory Commission (NRC), Union Electric Company (dba Ameren Missouri, the licensee) submitted a license amendment request to revise a methodology in the licensing basis as described in the Final Safety Analysis Report - Standard Plant (FSAR-SP) to include damping values for the seismic design and analysis of the integrated head assembly that are consistent with the recommendations of NRC Regulatory Guide 1.61, "Damping Values for Seismic DeSign of Nuclear Power Plants," Revision 1, March 2007.
The NRC staff has determined that additional information, as requested in the enclosure, is needed to complete its review. Please provide a response to the questions by June 7,2013. If circumstances result in the need to revise the requested response date, please contact me at 301-415-2296 or via e-mail at Fred. Lyon@nrc.gov.
Sincerely, IRA by Jim Polickoski forI Carl F. Lyon, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-483
Enclosure:
As stated cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC RidsNrrDorlLpl4 Resource CBasavaraju, NRR/DE/EMCB LPLIV Reading RidsNrrLAJBurkhardt Resource MWilhelm. NRR/DE/EMCB RidsAcrsAcnw_MailCTR Resource RidsNrrPMCallaway Resource EBanks, NRR/DE/EMCB RidsNrrDeEmcb Resource RidsRgn4MailCenter Resource ADAMS Accession No'"" ML13120A523 ..email dated OFFICE NRRlDORULPL4/PM NRRlDORLfLPL4/LA NRRlDEIEMCB/BC NRRlDORULPL4/BC I NRRlDORULPL4/PM FLyon (JPolickoski NAME FLyon JBurkhardt AMcMurtray" MMarkley for)