ML13113A279

From kanterella
Jump to navigation Jump to search
Notification of Conduct of Triennial Fire Baseline Inspection (NRC Inspection Nos. 05000269/2013007, 05000270/2013007, 05000287/2013007)
ML13113A279
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 04/22/2013
From: Mark King
NRC/RGN-II/DRS/EB2
To: Gillespie T
Duke Energy Corp
References
IR-13-007
Download: ML13113A279 (16)


See also: IR 05000269/2013007

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

April 22, 2013

Mr. T. Preston Gillespie, Jr.

Site Vice President

Duke Energy Corporation

Oconee Nuclear Station

7800 Rochester Highway

Seneca, SC 29672-0752

SUBJECT: OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3 - NOTIFICATION OF

CONDUCT OF A TRIENNIAL FIRE PROTECTION BASELINE INSPECTION

(NRC INSPECTION REPORT NOS. 05000269/2013007, 05000270/2013007,

05000287/2013007)

Dear Mr. Gillespie:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

staff will conduct a triennial fire protection baseline inspection at the Oconee Nuclear Station,

Units 1, 2, and 3, in July and August 2013. The inspection team will be led by Mr. McKenzie

Thomas, a Senior Reactor Inspector from the NRC Region II Office. The team will be

composed of personnel from the Region II Office. The inspection will be conducted in

accordance with IP 71111.05XT, the NRC's baseline NFPA 805 fire protection inspection

procedure.

On April 17, 2013, during a telephone conversation between Ms. Judy Smith, Oconee Licensing

Engineer, and Mr. Thomas, our respective staffs confirmed arrangements for a three-day

information gathering onsite visit and a two-week onsite inspection. The schedule for the

inspection is as follows:

  • Information gathering visit: June 25-27, 2013
  • Week 1 of onsite inspection: July 22-26, 2013
  • Week 2 of onsite inspection: August 5-9, 2013

The purposes of the information gathering visit are to obtain information and documentation

needed to support the inspection, to become familiar with the Oconee Nuclear Station fire

protection program, fire protection features, post-fire safe shutdown capabilities, plant layout,

and mitigating strategies to address Section B.5.b of NRC Order EA-02-026, Order for Interim

Safeguards and Security Compensatory Measures, dated February 25, 2002, and Title 10 of

the Code of Federal Regulations (10 CFR) 50.54(hh)(2). The types of documents the team will

be interested in reviewing, and possibly obtaining, are listed in Enclosures 1 and 2. Please

contact Mr. Thomas at (404) 997-4673 prior to preparing copies of the materials listed in the

Enclosures. The inspection team will try to minimize your administrative burden by specifically

identifying those documents required for inspection preparation.

T. P. Gillespie, Jr. 2

During the information gathering visit, the team will also discuss the following inspection support

administrative details: office space; specific documents to be made available to the team in their

office space; arrangements for unescorted site access (including, as necessary, radiation

protection training, security, safety and fitness for duty requirements); and the availability of

knowledgeable plant engineering and licensing organization personnel to serve as points of

contact during the inspection.

We request that during the inspection weeks you ensure that copies of analyses, evaluations or

documentation regarding the implementation and maintenance of the Oconee Nuclear Station

fire protection program, including post-fire safe shutdown capability, be readily accessible to the

team for their review. Of specific interest for the fire protection portion of the inspection are

those documents which establish that your fire protection program satisfies NRC regulatory

requirements and conforms to applicable NRC and industry fire protection guidance (i.e., fire

protection compliance assessment documents). For the B.5.b portion of the inspection, those

documents implementing your mitigating strategies and demonstrating the management of your

commitments for the strategies are of specific interest. Also, personnel should be available at

the site during the inspection who are knowledgeable regarding those plant systems required to

achieve and maintain safe shutdown conditions from inside and outside the control room

(including the electrical aspects of the relevant post-fire safe shutdown analyses), reactor plant

fire protection systems and features, and the Oconee Nuclear Station fire protection program

and its implementation.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, under control number

3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,

a request for information or an information collection requirement unless the requesting

document displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosures will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

T. P. Gillespie, Jr. 3

Your cooperation and support during this inspection will be appreciated. If you have questions

concerning this inspection, or the inspection team's information or logistical needs, please

contact Mr. Thomas, the team leader, in the Region II Office at (404) 997-4673, or me at (404)

997-4511.

Sincerely,

/RA/

Michael F. King, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos.: 50-269, 50-270, 50-287

License Nos.: DPR-38, DPR-47, DPR-55

Enclosures:

1. Triennial Fire Protection Inspection Supporting Documentation

2. Mitigating Strategies Supporting Documentation

cc: (See page 4)

_________________________ xG SUNSI REVIEW COMPLETE G FORM 665 ATTACHED

OFFICE RII:DRS RII:DRS

SIGNATURE RA RA

NAME MTHOMAS MKING

DATE 4/19/2013 4/22/2013 4/ /2013 4/ /2013 4/ /2013 4/ /2013 4/ /2013

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

T. P. Gillespie, Jr. 4

cc: General Office

Thomas D. Ray Duke Energy Corporation

Plant Manager Electronic Mail Distribution

Oconee Nuclear Station

Duke Energy Corporation Alicia Richardson

Electronic Mail Distribution Licensing Administrative Assistant

General Office

James A. Kammer Duke Energy Corporation

Design Engineering Manager Electronic Mail Distribution

Oconee Nuclear Station

Duke Energy Corporation Lara S. Nichols

Electronic Mail Distribution Deputy General Counsel

Duke Energy Corporation

Robert H. Guy Electronic Mail Distribution

Organizational Effectiveness Manager

Oconee Nuclear Station David A. Cummings

Duke Energy Corporation Associate General Counsel

Electronic Mail Distribution General Office

Duke Energy Corporation

Terry L. Patterson Electronic Mail Distribution

Safety Assurance Manager

Duke Energy Corporation Division of Radiological Health

Electronic Mail Distribution TN Dept. of Environment & Conservation

401 Church Street

Kent Alter Nashville, TN 37243-1532

Regulatory Compliance Manager

Oconee Nuclear Station Sandra Threatt, Manager

Duke Energy Corporation Nuclear Response and Emergency

Electronic Mail Distribution Environmental Surveillance

Bureau of Land and Waste Management

Judy E. Smith Department of Health and Environmental

Licensing Administrator Control

Oconee Nuclear Station Electronic Mail Distribution

Duke Energy Corporation

Electronic Mail Distribution Senior Resident Inspector

U.S. Nuclear Regulatory Commission

Joseph Michael Frisco, Jr. Oconee Nuclear Station

Vice President, Nuclear Design Engineering U.S. Nuclear Regulatory Commission

General Office 7812B Rochester Hwy

Duke Energy Corporation Seneca, SC 29672

Electronic Mail Distribution

Charles Brinkman

M. Christopher Nolan Director

Director - Regulatory Affairs Washington Operations

General Office Westinghouse Electric Company

Duke Energy Corporation Electronic Mail Distribution

Electronic Mail Distribution

David A. Cummings (acting)

Fleet Regulatory Compliance & Licensing

Manager (cc cont;d - See page 5)

T. P. Gillespie, Jr. 5

(cc contd)

County Supervisor of Oconee County

415 S. Pine Street

Walhalla, SC 29691-2145

W. Lee Cox, III

Section Chief

Radiation Protection Section

N.C. Department of Environmental

Commerce & Natural Resources

Electronic Mail Distribution

Letter to T. Preston Gillespie, Jr. from Michael F. King dated April 22, 2013

SUBJECT: OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3 - NOTIFICATION OF

CONDUCT OF A TRIENNIAL FIRE PROTECTION BASELINE INSPECTION

(NRC INSPECTION REPORT NOS. 05000269/2013007, 05000270/2013007,

05000287/2013007)

DISTRIBUTION:

RIDSNRRDIRS

PUBLIC

RidsNrrPMOconee Resource

Triennial Fire Protection Inspection Supporting Documentation

The documents and information requested below should generally be made available to the

inspection team during the on-site information gathering visit for the team's use both on-site and

off-site during the inspection. Electronic format is the preferred media, except where specifically

noted (The preferred file format is searchable .pdf files). If electronic media is made available

via an internet based remote document management system, then the remote document access

must allow inspectors to download, save, and print the documents in the NRC's regional office.

Electronic media on compact disc or paper records (hard copy) are acceptable. At the end of

the inspection, the documents in the team's possession will not be retained.

Approximately three weeks before the on-site information gathering visit, the following

documents should be made available to the team leader for review in the regional office:

  • Post-fire Nuclear Safety Capability, Systems, and Separation Analysis (request A.1)
  • Fire Hazards Analysis and/or NFPA 805 Design Basis Document (request A.2)

(request A.3)

  • Fire Risk Evaluations (i.e., NFPA 805 Section 2.4.3) (request A.5)
  • Plant Change Evaluations (i.e., NFPA 805 Section 2.4.4) (request A.6)
  • Analysis that demonstrates nuclear safety performance criteria can be achieved and

maintained for those areas that require recovery actions (request A.7)

Based on review of the above seven documents, the team leader will identify a preliminary list of

fire areas being considered for inspection prior to the on-site information gathering visit. During

the information gathering visit, or shortly thereafter, the fire areas selected for inspection will be

determined.

This document request is based on typical documents that a generic plant might have. As such,

this generic document request is not meant to imply that any specific plant is required to have all

of the listed documents. It is recognized that some documents listed below may not be

available for your plant. In addition, the document titles listed below are based on typical

industry document names; your plant specific document titles may vary.

Enclosure 1

A. DESIGN AND LICENSING BASIS DOCUMENTS

A.1 Post-fire Nuclear Safety Capability, Systems, and Separation Analysis.

A.2 Fire Hazards Analysis and/or NFPA 805 Design Basis Document.

A.3 Fire PRA Summary Document or full PRA Document (if summary document not

available).

A.4 NFPA 805 Transition Report, developed in accordance with NEI 04-02.

A.5 Fire Risk Evaluations (i.e., NFPA 805 Section 2.4.3).

A.6 Plant Change Evaluations (i.e., NFPA 805 Section 2.4.4).

A.7 Analysis that demonstrates nuclear safety performance criteria can be achieved and

maintained for those areas that require recovery actions.

A.8 Fire Protection Program and/or Fire Protection Plan.

A.9 LIST of post-fire safe shutdown components (i.e., safe shutdown equipment list).

A.10 Fire Protection System Design Basis Document.

A.11 LIST of applicable NFPA codes and standards and issuance dates (i.e., codes of

record).

A.12 LIST of deviations from (a) NFPA codes of record, or (b) NFPA 805 fundamental fire

protection program and design elements (i.e., NFPA 805, Chapter 3).

A.13 NFPA Compliance Review Report.

A.14 Report or evaluation that compares the fire protection program to the NRC Branch

Technical Position (BTP) 9.5-1 Appendix A.

A.15 COPY of licensee submittals and NRC safety evaluation reports that are specifically

listed in the facility operating license for the approved fire protection program.

A.16 COPY of NRC Safety Evaluation Reports that form the licensing basis for:

  • Post-fire Nuclear Safety Capability.

A.17 COPY of NRC approved exemptions for plant fire protection and post-fire nuclear

safety capability features.

A.18 COPY of exemption requests submitted but not yet approved for plant fire protection

and post-fire nuclear safety capability features.

Enclosure 1

3

A.19 LIST of nuclear safety capability design changes completed in the last three years

(including their associated 10 CFR 50.59 and NFPA 805 plant change evaluations).

A.20 Facility Operating License(s).

A.21 Technical Specifications (electronic format only).

A.22 Technical Requirements Manual (electronic format only).

A.23 Updated Final Safety Analysis Report (electronic format only).

B. GENERAL PLANT DESIGN DOCUMENTS

B.1 Piping and instrumentation diagrams (P&IDs) and legend list for components used to

achieve and maintain nuclear safety performance criteria for: (C-size paper

drawings)

  • Fires outside the main control room; and
  • Fires in areas requiring recovery actions at other than primary control stations.

B.2 P&IDs and legend list for fire protection systems, including fire water supply, water

suppression sprinklers & deluge, and CO2 and Halon systems (C-size paper

drawings).

B.3 AC and DC electrical system single line diagrams, from off-site power down to the

highest safety-related bus level (typically 4kV, EDG bus) (C-size paper drawings).

B.4 Single line diagrams for motor control centers (MCCs) that supply post-fire nuclear

safety component loads (only for selected fire areas) (C-size paper drawings).

B.5 Equipment location drawings which identify the physical plant locations of post-fire

nuclear safety capability equipment (C-size paper drawings).

B.6 Plant layout drawings which identify: (C-size paper drawings)

  • Plant fire area boundaries;
  • Combustible control zone drawings;
  • Areas protected by automatic fire suppression and detection; and
  • Locations of fire protection equipment.

C. CLASSIC FIRE PROTECTION

C.1 Fire protection program implementing procedures (e.g., administrative controls,

surveillance testing, fire brigade).

C.2 LIST of calculations and engineering analyses, studies, or evaluations for the fire

protection system, including the fire water system.

C.3 Hydraulic calculation or analysis for fire protection water system.

Enclosure 1

4

C.4 Last two completed surveillance's of fire protection features in the selected fire areas

(detection, suppression, damper inspections, damper tests, penetration inspections,

barrier inspections, etc.).

C.5 LIST of routine tests, surveillances, and preventive maintenance on fire pumps,

including pump controllers and batteries.

C.6 Last two completed annual fire pump pressure and flow tests.

C.7 Last two completed monthly and/or quarterly fire pump tests.

C.8 Last two completed fire loop flow tests and loop flushes.

C.9 CO2 and Halon initial discharge testing or calculation that determined appropriate

concentrations and soak or hold times can be achieved (only for selected fire areas).

C.10 Last five hot work permits (at power).

C.11 Last five transient combustible permits (at power).

C.12 For Fire Brigade Drills, provide the following:

  • Last drill critique for a drill with off-site fire department support;
  • Summary of any unsatisfactory drill performance items for last three years; and
  • Last unannounced drill critique by a qualified individual independent of the

licensee's staff.

C.13 For fire brigade equipment provide the following:

  • Procedure for inventory and inspection; and
  • Most recent inspection and inventory results.

C.14 Fire brigade medical evaluations and qualifications, including self-contained breathing

apparatus (SCBA) and training lesson plans.

C.15 Electronic copy of the mutual aid agreement for the first-due local fire department

that is currently in effect.

C.16 COPY of the evaluation or analysis of the effects of fire suppression activities on the

ability to achieve the nuclear safety performance criteria (only for selected fire areas),

including:

  • An automatic or manually actuated suppression system, due to a fire in a single

location, will not indirectly cause damage to the success path; and

  • inadvertent actuation or rupture of a suppression system will not indirectly cause

damage to the success path; and

  • demonstration of adequate drainage for areas protected by water suppression

systems;

are credited with keeping water from leaking into fire areas below.

Enclosure 1

5

C.17 Pre-fire plans for the selected fire areas and their adjacent fire areas.

C.18 For Emergency Lighting Units (ELU), provide the following:

  • COPY of performance based emergency light assessments;
  • LIST of Preventive Maintenance tasks, frequencies, and bases;
  • Most recently performed monthly or quarterly functional test;
  • Most recently performed battery discharge performance test, if applicable;
  • ELU battery loading analysis;
  • vendor manual(s) for on-site inspector use;
  • results of black-out testing (if performed);
  • Compensatory measures taken when ELUs are out of service

C.19 Impairment Log (for period of 3 months before the start of inspection), for fire

protection features that are out of service.

C.20 LIST of fire protection screening reviews since the last inspection for recent design

changes, modifications, or temporary modifications (i.e., an NFPA 805 plant change

evaluation that screened out).

C.21 LIST of penetration seal work, re-work, or installation activities, in the last three years.

C.22 LIST of fire wrap work, re-work, or installation activities, in the last three years.

C.23 Fire protection system health reports for the two most recent years.

C.24 Fire protection program health reports for the two most recent years.

C.25 Emergency lighting system health reports for the two most recent years.

C.26 LIST of fire protection system design changes completed in the last three years

(including their associated 10 CFR 50.59 and NFPA 805 plant change evaluations).

C.27 LIST of fire protection system NFPA 805 engineering equivalency evaluations

completed in the last three years.

C.28 Licensee evaluation of industry operating experience, related to the Fire Protection

Program for the three most recent years.

D. ELECTRICAL

D.1 Identify whether the cables in the selected fire areas are predominantly Thermoset or

Thermoplastic. Specifically identify any Thermoplastic cable in the selected fire

areas.

D.2 Nuclear safety circuit coordination analysis for fuse and breaker coordination of

nuclear safety capability components for selected fire areas.

Enclosure 1

6

D.3 Administrative or configuration control procedures that govern fuse replacement (e.g.,

fuse control procedures).

D.4 Maintenance procedures that verify breaker over-current trip settings to ensure

coordination remains functional, for post-fire nuclear safety capability components.

D.5 Electrical system health reports for the two most recent years.

D.6 Last completed surveillance demonstrating operability of those components operated

from the primary control stations.

D.7 Schematic or elementary diagrams for inspector selected circuits to be reviewed (C-

size paper drawings).

D.8 Cable routing for components and equipment credited for post-fire nuclear safety

capability systems and components (only for selected fire areas).

D.9 LIST of post-fire nuclear safety capability system and component design changes

completed, in the last three years.

D.10 List of identified fire induced circuit failure configurations (only for selected fire areas).

E. OPERATIONS

E.1 LIST of calculations and engineering analyses, studies, or evaluations for the nuclear

safety capability methodology.

E.2 LIST of licensed operator Job Performance Measures (JPMs) for operator actions

required to achieve and maintain post-fire nuclear safety performance criteria.

E.3 LIST of non-licensed operator training associated with non-licensed operator actions

to achieve and maintain post-fire nuclear safety performance criteria (including JPMs,

in-field training walkdowns, simulations, or initial qualification).

E.4 Lesson plans for post-fire nuclear safety capability training for licensed and non-

licensed operators.

E.5 For recovery actions, provide the following:

  • Manual Action Feasibility Study;
  • Operator Time Critical Action Program;
  • Time lines for time-critical recovery actions;
  • Time line validations; and
  • Environmental and habitability evaluations for post-fire operator actions

(temperature, smoke, humidity, SCBAs, etc.).

E.6 Thermal hydraulic calculation or analysis determines the time requirements for time-

critical operator manual actions.

Enclosure 1

7

E.7 Operating procedures achieve and maintain nuclear safety performance criteria from

the control room, with a postulated fire in the selected fire areas.

E.8 Operating procedures to achieve and maintain nuclear safety performance criteria

from outside the control room, with a postulated fire in the control room, cable

spreading room, or any area requiring recovery actions (other than recovery actions

performed in the control room or primary control stations).

E.9 For safe shutdown equipment and tools, provide the following:

  • Procedure for inventory and inspection; and
  • Most recent inspection and inventory results.

E.10 LIST of procedures that implement Cold Shutdown Repairs, if applicable.

E.11 For Cold Shutdown Repairs, provide the following, if applicable:

  • Procedure for inventory and inspection (i.e., needed tools, material, etc.); and
  • Most recent inspection and inventory results.

E.12 For Radio communications, provide the following:

  • Communications Plan for fire fighting and post-fire safe shutdown manual actions;
  • Repeater locations;
  • Cable routing for repeater power supply cables;
  • Radio coverage test results; and
  • Radio Dead Spot locations in the plant.

F. ADMINISTRATIVE CONTROL, OVERSIGHT, AND CORRECTIVE ACTION PROGRAMS

F.1 Corrective actions for fire-induced circuit failures includes but not limited to NRC

IN 92-18, both single and multiple spurious actuations for selected fire areas.

F.2 Corrective actions associated with operator actions to achieve and maintain post-fire

nuclear safety performance criteria.

F.3 Self assessments, peer assessments, and audits of fire protection activities for the

last three years.

F.4 Self assessments, peer assessments, and audits of post-fire nuclear safety capability

methodology for the last three years.

F.5 LIST of open and closed condition reports for the fire protection system for the last

three years.

F.6 LIST of fire event analysis reports for the last three years.

F.7 LIST of open and closed condition reports for emergency lighting units for the last

three years.

Enclosure 1

8

F.8 LIST of open and closed condition reports for post-fire nuclear safety capability issues

for the last three years. This includes issues affecting the nuclear safety capability

analysis, fire hazards analysis, NFPA 805 design basis, fire risk evaluations, plant

change evaluations, post-fire operating procedures and/or training, timeline

evaluations for operator actions, and supporting engineering evaluations, analysis, or

calculations.

F.9 LIST of procedures that control the configuration of the fire protection program,

features, and post-fire nuclear safety capability methodology and system design.

Enclosure 1

Mitigating Strategies Supporting Documentation

G. 10 CFR 50.54(hh)(2) MITIGATING STRATEGIES DOCUMENTS

G.1 LIST of all changes to regulatory commitments made to meet the requirements of

Title 10 of the Code of Federal Regulations (10 CFR) 50.54(hh)(2).

G.2 LIST of procedures and guidelines that were revised or generated to implement the

mitigating strategies. These could be extensive damage mitigation guidelines

(EDMGs), severe accident management guidelines (SAMGs), emergency operating

procedures (EOPs), abnormal operating procedures (AOPs), etc.

G.3 A matrix that shows the correlation between the mitigation strategies identified in

Nuclear Energy Institute 06-12, Revision 2, "B.5.b Phase 2 & 3 Submittal Guideline,"

issued December 2006, and the site-specific procedures or guidelines that are used

to implement each strategy.

G.4 LIST of engineering evaluations or calculations that were used to verify the

engineering bases for the mitigating strategies.

G.5 Piping and instrumentation diagrams (P&ID) and legend list or simplified flow

diagrams for systems relied upon in the mitigating strategies. These could be the

type used for training (C-size paper drawings and electronic copy).

G.6 LIST of modification packages or summary descriptions of modifications with

simplified drawings, for necessary facility changes to implement the mitigating

strategies.

G.7 LIST of routine tests, surveillances, and preventive maintenance for equipment and

tools needed to implement 10 CFR 50.54(hh)(2) strategies.

G.8 For equipment and tools needed to implement 10 CFR 50.54(hh)(2) strategies,

provide the following:

  • Procedures for inspection, inventory, testing, and preventive maintenance; and
  • Two most recently completed inspection, inventory, testing, and preventive

maintenance results.

G.9 LIST of 10 CFR 50.54(hh)(2) strategies, if any, which have implementing details that

differ from that documented in the submittals or the safety evaluation report.

G.10 Site general arrangement drawings that show the majority of buildings and areas

referenced in 10 CFR 50.54(hh)(2) documents (C-size paper drawings).

G.11 Training records, training matrix, and lesson plans related to 10 CFR 50.54(hh)(2).

G.12 Copies of memoranda of understanding (MOU) (e.g., with local fire departments)

required to implement any mitigating strategies.

Enclosure 2