12Q0108.50-R-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the LaSalle County Station, Unit 1, Part 2 of 15
ML12353A226
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 11/01/2012
From: Delaney M
Stevenson & Associates
To:
Exelon Generation Co, Office of Nuclear Reactor Regulation
References
RS-12-163 12Q0108.50-R-001, Rev 1
Download: ML12353A226 (56)


Text

12Q0108.50-R-001 Rev. 1 Correspondence No.: RS-12-163 Table C-1. Summary of Seismic Walkdown Checklists COMPONENT Anchorage C O DESCRIPTION Verification AWC COMMENTS PAGE ID Confirmed?

0VC01CA ASSY -FAN, CR HVAC SUPPLY 0A Y 3-19 SWELl C- 7 1AP05E 4160V SWGR 142X N 3-30 SWEL 1 C- 13 1AP06E-9 TRANSFORMER, 136X Y 3-21 SWEL 1 C- 23 1AP15E 480V SWGR 133 N 4-03 SWEL 1 C- 29 1AP19E DIV I 480V SWGR 135X Y 4-19 SWEL 1 C- 35 1AP19E-102B TRANSFORMER, 135X Y 4-19 SWEL 1 C- 39 1AP21E DIV II 480V SWGR 136X Y 3-21 SWELl C-47 1AP71E DIV I 480V MCC 135X-1 N 4-07 SWELl C- 58 1AP73E DIV I 480V MCC 135X-3 Y 4-19 SWEL 1 C- 62 1AP78E DIV II 480V MCC 136X-1 N 3-01 SWEL 1 C- 66 1AP81E DIV II 480V MCC 136X-3 Y 3-21 SWEL 1 C- 72 1B21-AO04C SRV 1B21-F013C ACCUMULATOR N OUTAGE SWEL 1 1B21-F013C C MAIN STEAM LINE SAFETY N/A OUTAGE SWEL 1 RELIEF VALVE 1B21-F013C-A SRV C UMF-1 SOLENOID VALVE 'A' N/A OUTAGE SWEL 1 1B21-F022C C MS INBD ISOL N/A OUTAGE SWEL 1 1B321-F028C C OTBD MAIN STEAM ISOLATION N/A OUTAGE SWELI VALVE 1B21-F028C-VALVE, SOLENOID, O/B MSIV N/A OUTAGE SWEL 1 1B321-F067C C MAIN STEAM OTBD DRAIN LINE N/A OUTAGE SWELI ISOL VALVE lCll-DO01001 CONTROL UNIT CRD HYDRAULIC 26 Y 1-06 SWEL1 C-76 59 lCll-D001089 CONTROL UNIT CRD HYDRAULIC 30 Y 1-06 SWEL 1 C- 80 03 -CONTROL UNIT CRD HYDRAULIC 42 Y 1-05 SWEL 1 C-87 1Cll-D001093 591-5_SWL_1_-_8 59 1C1.1-D001182 CONTROL UNIT CRD HYDRAULIC 34 Y 1-05 SWEL 1 C-95 03 1Cll-D2659-CRD HCU SCRAM WATER N/A 1-06 SWEL 1 C- 101 125 ACCUMULATOR N16 W 10 ICII-D2659-CRD HCU SCRAM INLET VALVE N/A 1-06 SWEL 1 C- 103 126 ICII-D2659-CRD HCU SCRAM OUTLET VALVE N/A 1-06 SWEL 1 C- 105 127 1Cll-D3003-CRD HCU SCRAM WATER N/A 1-06 SWEL 1 C- 107 125 ACCUMULATOR N16 E10 ICII-D3003-CRD HCU SCRAM INLET VALVE N/A 1-06 SWEL 1 C- 109 126 1C11-D3003-1C7 CRD HCU SCRAM OUTLET VALVE N/A 1-06 SWEL 1 C- 111 127 ____1Cll-D3403-CRD HCU SCRAM WATER N/A 1-05 SWEL 1 C- 113 125 ACCUMULATOR N/A 1-05 SWELI 1 I 113 Table C-1 Page 1 of 5 C-2 12Q0108.50-R-001 Rev. 1 Correspondence No.: RS-12-163 COMPONENT Anchorage C O DESCRIPTION Verification AWC COMMENTS PAGE ID Confirmed?

1011-D3403-CRD HCU SCRAM INLET VALVE N/A 1-05 SWEL 1 C- 115 126 1C11-D3403-CRD HCU SCRAM OUTLET VALVE N/A 1-05 SWEL 1 C- 117 127 1C11-D4259-CRD HCU SCRAM WATER 15ACMLTRN/A 1-05 SWEL 1 C- 119 1125 ACCUMULATOR IC11-D4259-CRD HCU SCRAM INLET VALVE N/A 1-05 SWEL 1 C- 121 126 iCiI D4259 CRD HCU SCRAM OUTLET VALVE N/A 1-05 SWEL 1 C- 123 127 1C41-A001 STANDBY LIQUID CONTROL Y 4-01 SWEL 1 C- 125 SOLUTION TANK 1C41-COOIA A STANDBY LIQUID CONTROL Y 4-01 SWEL 1 C-130 PUMP 1DC003E 250V DC BATTERY CHARGER NO. 1 Y 4-19 SWEL 1 C- 135 1 DC005E 250V MCC Y 4-19 SWEL1 C- 139 1DC01E 250VDC BATTERY Y 1-04 SWEL 1 C- 145 lDC02E DIV I 250VDC DISTRIBUTION BUS 1 Y 4-19 SWEL 1 C- 151 lDC12E 125VDC DISTRIBUTION PANEL 112X Y 3-21 SWEL1 C- 157 (in 1DC15E MCC)1DC14E DIV II 125VDC BATTERY Y 3-22 SWEL 1 C- 160 lDC15E DIV II 125VDC DISTRIBUTION BUS Y 3-21 SWEL1 C-165 1B lDC16E 125V DC BATTERY CHARGER NO. Y 3-21 SWEL1 C- 171 1B 1 DG01 1 1A DG COOLING WTR STRAINER N/A 3-27 SWEL1 C- 177 BACKWASH VALVE lDG01A 1A DG COOLER N 3-25 SWEL 1 C- 181 lDG01F 1A DG COOLING WATER STRAINER Y 3-27 SWEL 1 C- 186 lDG01K 1A DIESEL GENERATOR Y 3-25 SWEL1 C- 191 lDG01P 1A DG COOLING WATER PUMP Y 3-27 SWEL 1 C- 199 IDGOIS 1A DG STARTING AIR lDG01S 1AD TRIGARY 3-25 SWEL 1 C- 204 COMPRESSOR PACKAGE 1DG02JA 1A DG A GENERATOR CONTROL Y 3-25 SWEL 1 C- 211 PANEL 1 DG035 LPCS PUMP MOTOR COOLER N/A 4-14 SWEL 1 C- 218 UPSTRM INLET VALVE 1DG03J 1A DG ENGINE CONTROL PANEL Y 3-25 SWEL 1 C- 221 1DG061A ASSY -VALVE, 1A D/G BANK A N/A 3-25 SWEL 1 C- 223 STARTER AIR SUPPLY 1DO005T DG 1A DAY TK Y 3-26 SWEL 1 C- 228 1DO01P PUMP, DIESEL OILTRANSFER Y 3-28 SWEL 1 C- 232 1E12-B001B B RHR HEAT EXCHANGER Y 3-15 SWEL 1 C- 237 Table C-1 Page 2 of 5 C-3 12Q0108.50-R-001 Rev. 1 Correspondence No.: RS-12-163 COMPONENT Anchorage C O DESCRIPTION Verification AWC COMMENTS PAGE ID Confirmed?

1E12-C002B 1B RESIDUAL HEAT REMOVAL PMP Y 3-14 SWEL 1 C- 242 1E12-C300B B RHR SERVICE WATER PUMP Y 4-18 SWEL 1 C- 247 1E12-D300B B RHR SERVICE WATER STRAINER Y 3-27 SWEL 1 C- 251 1E12-F003B B RHR HX OUTLET VALVE N/A 3-18 SWEL 1 C- 257 1E12-F004B B RHR PUMP SUP POOL SUCT ISOL N/A 3-13 SWEL 1 C- 262 VALVE N/A 3_ 13 _____C -_26 B RHR HX STEAM CONDENSING 1E12-F011 BSUP POOLSRETR COLDVALVEGN/A 3-18 SWEL 1 C- 267 SUP POOL RETURN ISOL VALVE 1E12-F024B B RHR PUMP FULL FLOW TEST N/A 3-15 SWEL 1 C- 271 ISOL VALVE B RHR HX STEAM CONDENSING 1E12-F036B RCIC RETURN HDR RELIEF VALVE N/A 3-16 SWEL 1 C- 274 1E12-F048B B RHR HX BYPASS VALVE N/A. 3-18 SWEL 1 C- 277 1E12-F051B B RHR HX RCIC STEAM INLET N/A 3-15 SWEL 1 C- 281 PRESS CONT VALVE 1E12-F055B B RHR HX RCIC STEAM INLET N/A 3-15 SWEL 1 C- 286 HEADER RELIEF VALVE 1 El 2-F068A A RHR HX SERVICE WATER N/A 4-17 SWEL1 C- 290 OUTLET VALVE N/A 4-! 7S L1-2 B RHR HX SERVICE WATER 1E12-F068B OUTLET VALVE N/A 3-14 SWEL 1 C- 294 1E12-N005B B RHR HX SERVICE WATER DSCH N/A 3-18 SWEL 1 C- 298 TEMP ELEMENT 1E12-N007B B RHR HX SERVICE WATER INLET N 3-14 SWEL. C- 301 FLOW_____

___ _1E12-N015B B RHR FLOW N 3-14 SWELl C- 311 1E12-N027B B RHR HX OUTLET TEMPERATURE N/A 3-18 SWEL 1 C- 314 ELEMENT 1E21-C001 LPCS PUMP Y 1-16 SWEL1 C- 317 1E21-N003 LPCS PP DISCH FLOW XMITTER N 1-16 SWEL 1 C- 322 1E22-C001 PMP HI PRESS CORE SPRAY Y 2-03 SWEL 1 C- 326 1 E22-F004 HPCS INJECTION ISOL VALVE N/A 2-01 SWEL1 C- 330 1 E22-F0l15 HPCS PUMP SUP POOL SUCT ISOL N/A 2-04 SWEL1 C- 335 VALVE 1 E22-F023 HPCS FULL FLOW TEST ISOL N/A 2-02 SWEL 1 C- 339 VALVE 1E22-N004 HPCS PUMP DSCH PRESS N 2-03 SWEL 1 C- 345 1E22-N005 HPCS PUMP DSCH FLOW N 2-03 SWEL 1 C- 353 1E51-C001 RCIC PUMP Y 1-16 SWEL1 C- 355 1E51-F013 RCIC INJECTION OTBD ISOL VALVE N/A 1-17 SWEL 1 C- 359 1E51-F031 RCIC PUMP SUP POOL SUCT ISOL N/A 1-25 SWEL 1 C- 361 VALVE I Table C-1 Page 3 of 5 C-4 12Q0108.50-R-001 Rev. 1 Correspondence No.: RS-12-163 COMPONENT Anchorage C O DESCRIPTION Verification AWC COMMENTS PAGE Confirmed?

1E51-F045 RCIC TURBINE STEAM SUPPLY N/A 1-16 SWEL 1 C- 365 VALVE 1E51-N004 RCIC PUMP DSCH PRESS N 1-16 SWEL 1 C- 369 FUEL POOL RHR SUCT SUPPLY 1FC133 HAER RAI VALV N/A 3-13 SWEL 2 C- 380 HEADER DRAIN VALVE 1FC140 FUEL POOL RHR SUCT SUPPLY N/A 3-06 SWEL 2 C- 384 VALVE 1H13-P601 ASSY -PANEL, EMERG CORE COOL N 3-31 SWEL 1 C- 388 SYST 1H13-P602 ASSY -PANEL, RWCU/RX RECIRC N 3-31 SWEL 1 C- 392 CONTROL 1HGO01A H2 RECOMB 1 HGO1A U-i DW SUCT. N/A 3-02 SWEL 1 C- 396 VLV 1 HGO05A H2 RECOMB 1HG01A U-1 SUP POOL N/A 3-10 SWELI C-400 DIS VLV 1HG01A ASSY_-_BLOWER, H2 RECOMBINER N 3-02 SWEL 1 C- 404 1PI-DG094 1A DG A AIR RECEIVER N/A 3-25 SWEL 1 C- 413 1PL33J B/CRHRPUMPROOM Y 3-17 SWEL1 C- 417 VENTILATION PANEL A RHR PUMP ROOM VENTILATION 1PL34J PNLY 4-16 SWELl1 C- 423 PANEL 1 PL35J LPCS PUMP ROOM VENTILATION N 4-14 SWELI C-427 PANEL 1TE-HGO15A HYDROGEN RECOMBINER BLWR N/A 3-02 SWEL 1 C- 431 INL GAS (TE-2A)1 VQ029 DWVENT/PURGE FROM RX BLDG N/A 4-08 SWELI C-435 UPSTRM ISOL 1VQ030 DWVENT/PURGE INLET DWNST N/A 3-07 SWEL 1 C- 439 ISOL VALVE 1VQ031 SUP POOL VENT/PURGE OTLT N/A 3-09 SWELI C-445 UPSTRM ISOL SUP POOL VENT/PURGE OTLT 1VQ032 UPTMIO Y-0F.VDN/A 3-09 iSWEL 1 C- 451 UPSTRM ISOL BYP-20 FT.OVHD 1VQ034 DWVENT/PURGE OTLT UPSTRM N/A 3-06 SWEL 1 C- 458 ISOL 1VQ035 DW VENT/PURGE OTLT UPSTRM N/A 3-06 SWEL 1 C- 462 ISOL BYP 1VQ036 DW VENT/PURGE OTLT DWNST N/A 3-06 SWEL 1 C- 466 ISOL IVQ040 SUP CHBR VENT/PURGE OUTLET N/A 3-09 SWEL 1 C-470 DWNST ISOL VALVE 1VX04C FAN, ESS SWGR DIV-2 VENT Y 3-21 SWEL 1 C- 474 SUPPLY 1VX05C FAN, ESS SWGR DIV-2 BATT ROOM N 3-21 SWEL 1 C- 480_EXH I I I I Table C-1 Page 4 of 5 C-5 12Q0108.50-R-001 Rev. 1 Correspondence No.: RS-12-163 COMPONENT Anchorage C O DESCRIPTION Verification AWC COMMENTS PAGE ID Confirmed?

1VY02C HPCS PUMP ROOM COOLER VENT Y 2-02 SWEL 1 C-486 FAN 1VY03C ASSY_-_FAN, RHR PUMP B/C ROOM Y 3-17 SWEL 1 C- 490 COOLING FAN 1VY04C ASSY--_FAN, LPCS PUMP ROOM Y 4-15 SWEL 1 C- 495 COOLING 1VY05C ASSY -FAN, RHR WS PP A-1B CUBE N 4-23 SWEL 1 C- 499 SUPPLY 1VY06C ASSY -FAN, RHR WS PP A-1 B CUBE N 3-23 SWEL 1 C- 504 SUPPLY N32___-5 1WR029 DW EQUIP RBCCW SUPPLY OTBD N/A 4-09 SWEL 1 C- 509 ISOL VALVE 1WR040 DW EQUIP RBCCW RTN OTBD ISOL N/A 4-03 SWEL1 C- 513 VALVE I II_ I Table C-1 Page 5 of 5 C-6 12Q0108.50-R-001 Rev. 1 Correspondence No.: RS-12-163 Sheet 1 of 6 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: OVC01CA Equipment Class: (10) Air Handlers Equipment

==

Description:==

ASSY -FAN, CR HVAC SUPPLY OA Project: LaSalle 1 SWEL Location (Bldg, Elev, Room/Area):

AB, 786.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments..

Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Minor shrinkage cracking in grout pad judged to be acceptable.

5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage shown on drawings M-1560, Rev. L and M-1591, Sheet 6, Rev. K.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Yes Yes C-7 12Q0108.50-R-001 Rev. 1 Correspondence No.: RS-1 2-163 Sheet 2 of 6 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: OVC01CA Equipment Class: (10) Air Handlers Equipment

==

Description:==

ASSY -FAN; CR HVAC SUPPLY 0A Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixtures judged to be acceptable.

Adjacent masonry column pilaster (Column N-14) with running bond construction judged to be acceptable.

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions 11; Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -9/12/2012 Evaluated by: James Griffith Date: 10/25/2012 Michael Wodarcyk 10125/2012 C-8 12QO108.50-R-O01 Rev. 1 Correspondence No.: RS-12-163 Sheet 3 of 6 Status: FYI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Eauioment Descriotion:

OVCOI CA (10) Air Handlers ASSY -FAN. CR HVAC SUPPLY OA Photos C-9 12Q0108.50-R-001 Rev. 1 Correspondence No.: RS-12-163 Sheet 4 of 6 Status: F- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: OVC01CA Equipment Class: (10) Air Handlers C-10 12Q0108.50-R-001 Rev. 1 Correspondence No.: RS-12-163 Sheet 5 of 6 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: OVCO1CA Equipment Class: (10) Air Handlers C C-1l 12Q0108.50-R-001 Rev. 1 Correspondence No.: RS-12-163 Sheet 6 of 6 Status: [7Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: OVC01CA Equipment Class: (10) Air Handlers C-12 12QO108.50-R-001 Rev. 1 Correspondence No.: RS-12-163 Sheet 1 of 10 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1AP05E Equipment Class: (3) Medium Voltage Switchgear Equipment

==

Description:==

4160V SWGR 142X Project: LaSalle 1 SWEL Location (Bldg, Elev, Room/Area):

AB, 731.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinas.

Additional soace is provided at the end of this checklist for documentinq other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes Minor corrosion of plug welds judged to be acceptable.

4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Viewed anchorage in 10 of 11 switchgear cubicles.

Remaining anchorage in 1 th cubicle could not be viewed due to Operations concerns.

Anchorage viewed in the 10 cubicles was judged to be acceptable; therefore, it is reasonable to conclude that the anchorage in the 11 th cubicle would also be acceptable.

Yes C-13 12Q0108.50-R-001 Rev. 1 Correspondence No.: RS-12-163 Sheet 2 of 10 Status: FY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1AP05E Equipment Class: (3) Medium Voltage Switchgear Equipment

==

Description:==

4160V SWGR 142X Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Overhead light fixture near bus duct at back side of switchgear.

Bus duct is robust; therefore, seismic interaction due to pendulum motion of light during a seismic event is not a concem.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixtures judged to be acceptable.

Adjacent masonry wall to the east of the switchgear is safety-related per drawing A- 186, Rev. AR.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

10 of 11 switchgear cubicles were opened. 11 th cubicle could not be opened due to Operations concems. No adverse seismic conditions were observed in the 10 opened cubicles.Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -9/14/2012 Evaluated by: James Griffith Date: 10/25/2012 Michael Wodarcyk 10/25/2012 C-14 12Q0108.50-R-001 Rev. 1 Correspondence No.: RS-12-163 Sheet 3 of 10 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Equipment

==

Description:==

1AP05E (3) Medium Voltage Switchgear 4160V SWGR 142X C-15 12Q0108.50-R-001 Rev. 1 Correspondence No.: RS-12-163 Sheet 4 of 10 Status: r-ý N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1AP05E Equipment Class: (3) Medium Voltage Switchgear niiinmanfn rct-prinfinn, AIA\ IAIY C-16 12Q0108.50-R-001 Rev. 1 Correspondence No.: RS-12-163 Sheet 5 of 10 Status: F-ý N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1AP05E Equipment Class: (3) Medium Voltage Switchgear C-17 12Q0108.50-R-001 Rev. I Correspondence No.: RS-12-163 Sheet 6 of 10 Status: EI- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1AP05E Equipment Class: (3) Medi um Voltage Switchgear C-18 12Q0108.50-R-001 Rev. 1 Correspondence No.: RS-12-163 Sheet 7 of 10 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: IAP05E Equipment Class: (3) Medium Voltage Switchgear C-19 12Q0108.50-R-001 Rev. 1 Correspondence No.: RS-12-163 Sheet 8 of 10 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1AP05E Equipment Class: (3) Medium Voltage Switchgear 20120914-Lasalle 044 20120914-Lasalle 045 C-20 12Q0108.50-R-001 Rev. 1 Correspondence No.: RS-12-163 Sheet 9 of 10 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1AP05E Equipment Class: (3) Medium Voltage Switchgear C-21 12Q0108.50-R-001 Rev. 1 Correspondence No.: RS-12-163 Sheet 10 of 10 Status: l N U Seismic Walkdown Checklist (SWC)Equipment ID No.: IAP05E Equipment Class: (3) Medium Voltage Switchgear

=md m =fr'jetrr+fn AlnH 4tz\I w\A zo. 1A*W C-22 12Q0108.50-R-001 Rev. 1 Correspondence No.: RS-12-163 Sheet 1 of 6 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1AP06E-9 Equipment Class: (4) Transformers Equipment

==

Description:==

TRANSFORMER, 136X Project:.

LaSalle 1 SWEL Location (Bldg, Elev, Room/Area):

AB, 731.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?Minor lack of thread engagement at 3 of 4 anchors judged to be acceptable.

Transformer sits on base concrete pad. Small gap (approx. 1/2') between base of each anchor trunnion for transformer and top of concrete pad judged to be acceptable.

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage shown on drawing A-186, Rev. AR.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Yes Yes Yes Yes Yes C-23 12Q0108.50-R-001 Rev. 1 Correspondence No.: RS-12-163 Sheet 2 of 6 Status: EI- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1AP06E-9 Equipment Class: (4) Transformers Equipment

==

Description:==

TRANSFORMER, 136X Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Transformer bolted to adjacent switchgear.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixture restrained against movement into transformer by horizontal chains.Adjacent masonry column pilaster (column L-1 O) with running bond construction judged to be acceptable.

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -9/13/2012 Evaluated by: James Griffith Date: 10/17/2012 Michael Wodarcyk 10/17/2012 C-24 12Q0108.50-R-O01 Rev. 1 Correspondence No.: RS-12-163 Sheet 3 of 6 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: IAP06E-9 Equipment Class: (4) Transformers Equipment

==

Description:==

TRANSFORMER, 136X C-25 12Q0108.50-R-OO1 Rev. 1 Correspondence No.: RS-12-163 Sheet 4 of 6 Status: FY N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1AP06E-9 Equipment Class: (4) Transformers 1n:,, I;nm~n* lree-rinftirn TDAMKIC tArl: '1 "IRY j -20120913-Lasalle 007 20120913-Lasalle 008 C-26 12Q0108.50-R-001 Rev. 1 Correspondence No.: RS-12-163 Sheet 5 of 6 Status: F-- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: 1 APo6E-9 (4) Transformers"iF C-27 12Q0108.50-R-001 Rev. 1 Correspondence No.: RS-12-163 Sheet 6 of 6 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: 1AP06E-9 (4) Transformers C-28 12Q0108.50-R-001 Rev. 1 Correspondence No.: RS-12-163 Sheet 1 of 6 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1AP15E Equipment Class: (2) Low Voltage Switchgear Equipment

==

Description:==

480V SWGR 133 Project: LaSalle 1 SWEL Location (Bldg, Elev, Room/Area):

RB, 786.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

Stitch weld on front and rear of cabinets judged to be acceptable.

2. Is the anchorage free of bent, broken, missing or loose hardware?No Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-29 12Q0108.50-R-001 Rev. 1 Correspondence No.: RS-12-163 Sheet 2 of 6 Status: l N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1AP15E Equipment Class: (2) Low Voltage Switchgear EauiDment DescriDtion:

480V SWGR 133 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Switchgear and transformer are connected at the top via tack weld and bolted angle. The switchgear and transformer are also stiff in their long dimensions, therefore interaction of the two items between the top connections and base during a seismic event is judged not to be credible.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixture rigidly mounted and judged to be acceptable Masonry wall adequately restrained; is also short, L-shaped, and with a running bond. Judged to be acceptable.

9. Do attached lines have adequate flexibility to avoid damage?Yes Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: M. Etre & M. Wodarcyk -9/17/2012 Evaluated by: Mark Etre Date: 10/17/2012 Michael Wodarcyk 10/17/2012 C-30 12Q0108.50-R-001 Rev. 1 Correspondence No.: RS-12-163 Sheet 3 of 6 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1AP15E Equipment Class: (2) Low Voltage Switchgear Equipment

==

Description:==

480V SWGR 133 C-31 12Q0108.50-R-001 Rev. 1 Correspondence No.: RS-12-163 Sheet 4 of 6 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1AP15E Equipment Class: (2) Low Voltage Switchgear C-32 12Q0108.50-R-001 Rev. I Correspondence No.: RS-12-163 Sheet 5 of 6 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1AP15E Equipment Class: (2) Low Voltage Switchgear C-33 12Q0108.50-R-001 Rev. 1 Correspondence No.: RS-12-163 Sheet 6 of 6 Status: [FJ N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1AP15E Equipment Class: (2) Low Voltage Switchgear C-34 12QO108.50-R-O01 Rev. 1 Correspondence No.: RS-12-163 Sheet 1 of 4 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1AP19E Equipment Class: (2) Low Voltage Switchgear Equipment

==

Description:==

DIV I 480V SWGR 135X Project: LaSalle 1 SWEL Location (Bldg, Elev, Room/Area):

AB, 710.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinos.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes Yes Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage shown on: Drawing 1E-1-3434, Sheet 1, Rev. BG Drawing IE-0-3070, Rev. AA Specification T-3765 (S&L Standard LS-EF-248, revised 1/5/1987).

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Yes C-35 12Q0108.50-R-001 Rev. 1 Correspondence No.: RS-12-163 Sheet 2 of 4 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1AP19E Equipment Class: (2) Low Voltage Switchgear Equipment

==

Description:==

DIV I 480V SWGR 135X Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Breaker and transformer are bolted together.Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Adjacent masonry column pilaster (column L- 10) with running bond construction judged to be acceptable.

2 points on chain-hung light fixture with open S-hooks: 1) 1 of 2 chains with open S-hook Other chain's S-hook is closed. Fixture cannot fall from this chain point.2) 1 short chain with open S-hook. Fixture has chain supports nearby on both sides of this particular chain point.Light fixture is judged to be acceptable.

9. Do attached lines have adequate flexibility to avoid damage?Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: M. Etre & M. Wodarcyk -9/18/2012 One latched cabinet at front of switchgear was opened. Other cabinets bolted.C-36 12Q0108.50-R-OO1 Rev. 1 Correspondence No.: RS-12-163 Sheet 3 of 4 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Eauioment

==

Description:==

IAP19E (2) Low Voltage Switchgear DIV I 480V SWGR 135X Evaluated by: Mark Etre Date: 10/17/2012 L/ Michaei Wodarcyk 10/l17/2012 Photo$C-37 12Q0108.50-R-OO1 Rev. 1 Correspondence No.: RS-12-163 Sheet 4 of 4 Status: r-ý N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1AP19E Equipment Class: (2) Low Voltage Switchgear C-38 12Q0108.50-R-001 Rev. I Correspondence No.: RS-12-163 Sheet 1 of 8 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1AP19E-102B Equipment Class: (4) Transformers Equipment

==

Description:==

TRANSFORMER, 135X Project: LaSalle 1 SWEL Location (Bldg, Elev, Room/Area):

AB, 710.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorane 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes Minor lack of thread engagement judged to be acceptable.

3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage shown on drawings IE-1-3434, Sheet 1, Rev. BG and drawing 1E-0-3070, Rev. AA.6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-39 12Q0108.50-R-001 Rev. 1 Correspondence No.: RS-12-163 Sheet 2 of 8 Status: FY N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1AP19E-102B Equipment Class: (4) Transformers EauiDment DescriDtion:

TRANSFORMER.

135X Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Overhead chain-hung light fixture prevented from interaction with transformer by short hanging chain, conduit, and chain restraint.

Switchgear is bolted to transformer.

Interaction is therefore not a concern.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Adjacent masonry column pilaster (column L-IO) with running bond construction judged to be acceptable.

9. Do attached lines have adequate flexibility to avoid damage?Yes Yes Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: M. Etre & M. Wodarcyk -9/18/2012 EPN tag not present. Correct item verified by Operations and Engineering.

All cabinets bolted and therefore unopened by walkdown team.Evaluated by: Mark Etre Date: 10/17/2012 Michael Wodarcyk 10/17/2012 C-40 12Q0108.50-R-O01 Rev. 1 Correspondence No.: RS-12-163 Sheet 3 of 8 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1AP19E-102B Equipment Class: (4) Transformers Equipment

==

Description:==

TRANSFORMER, 135X Photos C-41 12Q0108.50-R-O01 Rev. 1 Correspondence No.: RS-12-163 Sheet 4 of 8 Status: r N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: lAPI 9E-1 02B (4) Transformers TQAl'J31AI 20120918-Lasalle 015 C-42 12Q0108.50-R-001 Rev. I Correspondence No.: RS-12-163 Sheet 5 of 8 Status: F-- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: 4APnf9E-1r02B (4) Transformers C-43 12QO108.50-R-001 Rev. 1 Correspondence No.: RS-12-163 Sheet 6 of 8 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1AP19E-102B Equipment Class: (4) Transformers TRANSFORMER, 135X C-44 12Q0108.50-R-O01 Rev. 1 Correspondence No.: RS-12-163 Sheet 7 of 8 Status: [Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1AP19E-102B Equipment Class: (4) Transformers C-45 12Q0108.50-R-001 Rev. 1 Correspondence No.: RS-12-163 Sheet 8 of 8 Status: Fj N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: IAPi 9E-1 02B (4) Transformers 20120918-Lasalle 030 C-46 12Q0108.50-R-OO1 Rev. 1 Correspondence No.: RS-12-163 Sheet 1 of 11 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1AP21E Equipment Class: (2) Low Voltage Switchgear Equipment

==

Description:==

DIV II 480V SWGR 136X Project: LaSalle 1 SWEL Location (Bldg, Elev, Room/Area):

AB, 731.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage shown on: Drawing IE-1-3444, Sheet 1, Rev. A Drawing IE-0-3070, Rev. AA Specification T-3765 (S&L Standard LS-EF-248, revised 1/5/1987).

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-47 12Q0108.50-R-001 Rev. 1 Correspondence No.: RS-12-163 Sheet 2 of 11 Status: F-ý N U Seismic Walkdown Checklist (SWC)Equipment ID No.: IAP21E Equipment Class: (2) Low Voltage Switchgear Eauioment DescriDtion:

DIV II 480V SWGR 136X Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Switchgear is bolted to adjacent transformer.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixtures judged to be acceptable.

Adjacent masonry wall at stairwell is safety-related per drawing A-186, Rev.AR.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -9/12/2012 Evaluated by: James Griffith Date: 10/17/2012

.0A Michael Wodarcyk 10/17/2012 C-48 12Q0108.50-R-001 Rev. 1 Correspondence No.: RS-12-163 Sheet 3 of 11 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1AP21E Equipment Class: (2) Low Voltage Switchgear Equipment

==

Description:==

DIV II 480V SWGR 136X Photos C-49 12QO108.50-R-0o 1 Rev. 1 Correspondence No.: RS-12-163 Sheet 4 of 11 Status: 7 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1AP21E Equipment Class: (2) Low Voltage Switchgear 20120912-Lasalle 244 2012091 2-Lasalle 245 20120912-Lasalle 245 C-50 12Q0108.50-R-001 Rev. 1 Correspondence No.: RS-12-163 Sheet 5 of 11 Status: r-Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1AP21E Equipment Class: (2) Low Voltage Switchgear C-51 12Q0108.50-R-001 Rev. 1 Correspondence No.: RS-12-163 Sheet 6 of 11 Status: F-ý N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1AP21E Equipment Class: (2) Low Voltage Switchgear

'U C-52 12Q0108.50-R-001 Rev. 1 Correspondence No.: RS-12-163 Sheet 7 of 11 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1AP21E Equipment Class: (2) Low Voltage Switchgear C-53 12Q0108.50-R-001 Rev. 1 Correspondence No.: RS-12-163 Sheet 8 of 11 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1AP21E Equipment Class: (2) Low Voltage Switchgear X C-54 12QO108.50-R-001 Rev. 1 Correspondence No.: RS-12-163 Sheet 9 of 11 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1AP21E Equipment Class: (2) Low Voltage Switchgear V II A C-55 12Q0108.50-R-001 Rev. 1 Correspondence No.: RS-12-163 Sheet 10 of 11 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1AP21E Equipment Class: (2) Low Voltage Switchgear C-56 12Q0108.50-R-001 Rev. 1 Correspondence No.: RS-12-163 Sheet 11 of 11 Status: [-7 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1AP21E Equipment Class: (2) Low Voltage Switchgear C-57