RA16-092, Regulatory Commitment Change Summary Report

From kanterella
Jump to navigation Jump to search
Regulatory Commitment Change Summary Report
ML16362A265
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 12/27/2016
From: Vinyard H
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RA16-092
Download: ML16362A265 (2)


Text

LaSalle County Station Exelon Genera t ion ~~ 2601 North 21st Road Marseilles, IL 61341 B15-415-2000 Telephone www.exeloncorp.com RA16-092 10 CFR 50.4 December 27, 2016 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 LaSalle County Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374

Subject:

2015 Regulatory Commitment Change Summary Report Enclosed is the Exelon Generation Company, LLC (EGC), 2015 Regulatory Commitment Change Summary Report for LaSalle County Station. Revisions to docketed correspondence were processed using the Nuclear Energy lnstitute's (NEI) 99-04, "Guidelines for Managing NRC Commitment Changes, 11 Revision 0, dated July 1999.

This letter contains no new regulatory commitments. Should you have any questions concerning this letter, please contact Mr. Guy V. Ford Jr., Regulatory Assurance Manager, at (815) 415-2800.

Respectfully, Harold T. Vinyard Plant Manager LaSalle County Station

Enclosure:

2015 Regulatory Commitment Change Summary Report cc: Regional Administrator - NRC Region Ill NRC Senior Resident Inspector - LaSalle County Station

2015 Regulatory Commitment Change Summary Report Commitment Date of Original Document Original Changed Basis for Change Change Commitment Commitment Commitment Tracking No. Change 15-001 02/19/2015 Letter from R. Krich LaSalle County Deferral of the The impact of deferring LMP-GM-80, (ComEd) to NRC Station shall de- Suppression Chamber Suppression Chamber De-sludging, "Results of the sludge and inspect de-sludging to the until L2R16 in 2017 will not pose a Review of the NRC s the wetwell during next Unit 2 refueling challenge to ECCS suction strainer Safety Evaluation of the next refueling outage (L2R16) in performance under accident the Boiling outage of each Unit 2017. conditions based upon past Water Reactor (L1R08 and L2R08). inspection results, which confirmed Owners' Group If Primary sufficient margins to justify the Report, Utility Containment extension of the cleanup.

Resolution Guidance Foreign Material Assessment of De-Sludging Deferral for Exclusion (FME) from L2R15 was documented in EC Resolution of ECCS controls are 401088.

Suction Strainer demonstrated to be Blockage," dated effective during October 19, 1998. these future inspections, then LaSalle County Station shall perform de-sludging on an alternating refueling outage frequency.

Page 1of1