12Q0108.50-R-002, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the LaSalle County Station, Unit 2, Part 9 of 16
ML12353A217
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 11/01/2012
From: Delaney M
Stevenson & Associates
To:
Exelon Generation Co, Office of Nuclear Reactor Regulation
References
RS-12-163 12Q0108.50-R-002, Rev 1
Download: ML12353A217 (76)


Text

12Q0108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet I of 4 Status: FI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2E51-F045 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Eauipment

==

Description:==

RCIC TURB STM SPLY STOP Project: LaSalle 2 SWEL Location (Bldg, Elev, Room/Area):

RB, 673.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-371 12Q0108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 2 of 4 Status: Y-J N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2E51-F045 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

RCIC TURB STM SPLY STOP Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Adjacent masonry walls are safety-related per drawing A-219, Rev. M.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?.

Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -9/11/2012 Evaluated by: James Griffith Date: 10/19/2012 Michael Wodarcyk 10/19/2012 C-372 12Q0108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 3 of 4 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2E51-F045 Equipment Class: (8) Motor-Operated and Soleno Equipment

==

Description:==

RCIC TURB STM SPLY STOP id-Operated Valves Photos ZUI ZUV11-Lasaiie ul/C-373 12Q0108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 4 of 4 Status: FY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2E51-F045 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Eauioment Desaiotion:

RCIC TURB STM SPLY STOP C-374 12Q0108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 1 of 4 Status: FY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2FC133 Equipment Class: (0) Other Equipment

==

Description:==

FUEL POOL COOLING PUMP SUCT HDR TORHR SYS DRN STOP Project: LaSalle 2 SWEL 2 Location (Bldg, Elev, Room/Area):

RB, 673.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-375 12Qo108.50-R-002 Rev. I Correspondence No.: RS-12-163 Sheet 2 of 4 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2FC133 Equipment Class: (0) Other EauiDment Descriotion:

FUEL POOL COOLING PUMP SUCT HDR TORHR SYS DRN STOP Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixtures judged to be acceptable.

9. Do attached lines have adequate flexibility to avoid damage?Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -9/14/2012 Evaluated by: James Griffith Date: 10/19/2012 Michael Wodarcyk 10/19/2012 C-376 12Q0108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 3 of 4 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2FC133 Equipment Class: (0) Other Equipment

==

Description:==

FUEL POOL COOLING PUMP SUCT HDR TORHR SYS DRN STOP Photos C-377 12Q0108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 4 of 4 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2FC133 Equipment Class: (0) Other Eauinment Descrintion:

FUEL POOL COOLING PUMP SUCT HDR TORHR SYS DRN STOP C-378 12Q0108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 1 of 3 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2FC140 Equipment Class: (0) Other Equipment

==

Description:==

FUEL POOL SYS TO RHR SUCT STOP Project: LaSalle 2 SWEL 2 Location (Bldg, Elev, Room/Area):

RB, 807.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-379 12Q0108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 2 of 3 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2FC140 Equipment Class: (0) Other Equipment

==

Description:==

FUEL POOL SYS TO RHR SUCT STOP Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixtures judged to be acceptable.

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -9/14/2012 Evaluated by: r A James Griffith Date: 10/19/2012 Michael Wodarcyk 10/19/2012 C-380 12Q0108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 3 of 3 Status: [-1 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2FC140 Equipment Class: (0) Other Equipment

==

Description:==

FUEL POOL SYS TO RHR SUCT STOP C-381 12Q.108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet I of 3 Status: FY N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2H13-P601 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

ASSY -PANEL, EMERG CORE COOL Project: LaSalle 2 SWEL Location (Bldg, Elev, Room/Area):

MCR, 768.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Existing foam and sea/ant in bottom of panel prohibit observation of welds between base channel and embedded floor steel. Bolts between panel base and base channel were observed to be acceptable.

Yes Because the control panel anchorage is shown on safety-related drawings IE-C-382 12Q0108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 2 of 3 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2H13-P601 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

ASSY -PANEL, EMERG CORE COOL SYST 2-3465, Rev. Y and IE-1-3466, Rev. F, and the control room maintains a constant climate not subject to excessive moisture, there is no reason to suspect that any of the anchorage welds are missing, damaged, or corroded.Therefore, the anchorage welds can be considered adequate.Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

The control room ceiling diffuser configuration is shown on drawings IE-O-3754A, Rev. A and IE-0-3712, Rev. AA. The ceiling diffusers (egg-crates) are not individually fastened to the tee track supporting structure.

However, as shown in LaSalle Calculation Nos. 777 and 8126-02E0, the ceiling support system is laterally restrained at the control room walls and at the control panel valences, the ceiling support system horizontal displacement is less than 3/8" during a seismic event, and the ceiling support system for the diffusers remains structurally adequate during a seismic event. Therefore, the diffusers' falling through the ceiling support system during a seismic event is judged to be not credible.Overhead light fixtures judged to be acceptable.

9. Do attached lines have adequate flexibility to avoid damage?Yes Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Backs of control panels were open during walkdown.

No adverse seismic conditions were observed.Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -9/14/2012 C-383 12Q0108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 3 of 3 Status: Ij- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2H13-P601 Equipment Class: (20) Instrumentation and Control Panels and Cabinets EauiDment

==

Description:==

ASSY -PANEL. EMERG CORE COOL SYST Evaluated by: James Griffith Date: 10/19/2012 Michael Wodarcyk 10/19/2012 C-384 12Q0108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 1 of 4 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2H13-P602 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Eauipment

==

Description:==

ASSY -PANEL, RWCU/RX RECIRC CONTROL Project: LaSalle 2 SWEL Location (Bldg, Elev, Room/Area):

MCR, 768.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Existing foam and sealant in bottom of panel prohibit observation of welds between base channel and embedded floor steel. Bolts between panel base and base channel were observed to be acceptable.

Yes Because the control panel anchorage is shown on safety-related drawings IE-C-385 12Q0108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 2 of 4 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2H13-P602 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

ASSY -PANEL, RWCU/RX RECIRC CONTROL 2-3465, Rev. Y and 1E-1-3466, Rev. F, and the control room maintains a constant climate not subject to excessive moisture, there is no reason to suspect that any of the anchorage welds are missing, damaged, or corroded.Therefore, the anchorage welds can be considered adequate.Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?

The control room ceiling diffuser configuration is shown on drawings IE-O-3754A, Rev. A and IE-0-3712, Rev. AA. The ceiling diffusers (egg-crates) are not individually fastened to the tee track supporting structure.

However, as shown in LaSalle Calculation Nos. 777 and 8126-02E0, the ceiling support system is laterally restrained at the control room walls and at the control panel valences, the ceiling support system horizontal displacement is less than 3/8" during a seismic event, and the ceiling support system for the diffusers remains structurally adequate during a seismic event. Therefore, the diffusers' falling through the ceiling support system during a seismic event is judged to be not credible.Overhead light fixtures judged to be acceptable.

9. Do attached lines have adequate flexibility to avoid damage? Yes 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Backs of control panels were open during walkdown.

No adverse seismic conditions were observed.Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -9/14/2012 C-386 12Q0108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 3 of 4 Status: -Y- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Fnhlinm~nt DAetyintion:

2H1 3-P602 (20) Instrumentation and Control Panels and Cabinets ASSY -PANEL. RWCU/RX RECIRC CONTROL Evaluated by: (4 James Griffith Date: 10/19/2012 Michael Wodarcyk 10/19/2012 Photos C-387 1200108.50-R-002 Rev. I Correspondence No.: RS-12-163 Sheet 4 of 4 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2H13-P602 Equipment Class: (20) Instrumentation and Control Panels and Cabinets C-388 12Q0108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 1 of 5 Status: L1 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2HGO01A -Equipment Class:- (8) Motor-Operated and Solenoid-Operated Valves EauiDment DescriDtion:

H2 RECOMB 2HGO0A U-2 DW SUCT. VLV Project: LaSalle 2 SWEL Location (Bldg, Elev, Room/Area):

RB, 786.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-389 12Q0108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 2 of 5 Status: FY- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2HGOOIA Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

H2 RECOMB 2HGO1A U-2 DW SUCT. VLV Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: D. Carter & J. Griffith -8/28/2012 Evaluated by: XQJA(.-- David Carter Date: 10/17/2012

ý, 141 James Griffith 10/17/2012 C-390 12Q0108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 3 of 5 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Equipment

==

Description:==

2HGO01A (8) Motor-Operated and Solenoid-Operated Valves H2 RECOMB 2HGO1A U-2 DW SUCT. VLV Photo$C-391 12Q0108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 4 of 5 Status: F- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2HGO01A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves 1A U-2 C-392 12Q0108.50-R-002 Rev.I Correspondence No.: RS-12-163 Sheet 5 of 5 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2HGO01A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

H2 RECOMB 2HGO1A U-2 DW SUCT. VLV C-393 12Q0108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 1 of 4 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2HG005A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

H2 RECOMB 2HGO1A U-2 SUP POOL DIS VLV-OVHD AT 210'Project: LaSalle 2 SWEL Location (Bldg, Elev, Room/Area):

RB, 710.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-394 12Q0108.50-R-002 Rev. 1 Correspondence No.: RS-1 2-163 Sheet 2 of 4 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2HGO05A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Eauioment DescriDtion:

H2 RECOMB 2HG01A U-2 SUP POOL DIS VLV-OVHD AT 210'Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and.masonry block walls not likely to collapse onto the equipment?

Overhead light fixtures judged to be acceptable.

9. Do attached lines have adequate flexibility to avoid damage?Yes Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: D. Carter & J. Griffith -8/29/2012 Evaluated by: David Carter Date: 10/17/2012James Griffith 10/17/2012 C-395 12Q0108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 3 of 4 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2HGO05A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

H2 RECOMB 2HGOIA U-2 SUP POOL DIS VLV-OVHD AT 210'Photos LaSalle 8-29-12 044 C-396 12Q0108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 4 of 4 Status: [] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2HGO05A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves 1A U-2 C-397 12Q0108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 1 of 5 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2HG0IA Equipment Class: (9) Fans Equipment

==

Description:==

ASSY -BLOWER, H2 RECOMBINER Project: LaSalle 2 SWEL Location (Bldg, Elev, Room/Area):

RB, 761.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.

Additional space is provided at the end of this checklist for documentinq other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Grout pad chipped out and formed around handrail holes. Judged to be acceptable.

5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Yes Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-398 12Q.108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 2 of 5 Status: [-1 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2HG01A Equipment Class: (9) Fans Equipment

==

Description:==

ASSY -BLOWER, H2 RECOMBINER Interaction Effects 7. Are. soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixtures judged to be acceptable.

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: D. Carter & J. Griffith -8/28/2012 Evaluated by: Z 0- David Carter Date: 10/17/2012 r" '" James Griffith 10/17/2012 C-399 12Q0108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 3 of 5 Status: YI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2HGO1A Equipment Class: (9) Fans Equipment

==

Description:==

ASSY -BLOWER, H2 RECOMBINER Photos C-400 12Q0108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 4 of 5 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2HGO1A Equipment Class: (9) Fans C-401 12Q0108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 5 of 5 Status: [J N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2HG01A Equipment Class: (9) Fans Eauioment Descrotion:

ASSY -BLOWER. H2 RECOMBINER C-402 12Q0108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 1 of 5 Status: EY N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PI-DG094 Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

2A DG A AIR RECEIVER PRESS Project: LaSalle 2 SWEL Location (Bldg, Elev, Room/Area):

DG, 710.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

Gauge is at end of piping run that emerges from 2DGO8TA receiver tank.Gauge is considered to behave as an in-line component.

2. Is the anchorage free of bent, broken, missing or loose hardware?No Not Applicable
3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of.potentially adverse seismic conditions?

Yes C-403 12Q.108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 2 of 5 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PI-DG094 Equipment Class: (18) Instruments on Racks Eauioment Descriotion:

2A DG A AIR RECEIVER PRESS Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixtures judged to be acceptable.

Adjacent masonry column pilaster with running bond construction judged to be acceptable.

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: D. Carter & J. Griffith -8/28/2012 Evaluated by: Z 0- David Carter Date: 10/17/2012 James Griffith 10/17/2012 C-404 12Q0108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 3 of 5 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Equipment

==

Description:==

2PI-DG094 (18) Instruments on Racks 2A DG A AIR RECEIVER PRESS L C-405 12Q0108.50-R-002 Rev. I Correspondence No.: RS-12-163 Sheet 4 of 5 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PI-DG094 Equipment Class: (18) Instruments on Racks C-406 12Q0108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 5 of 5 Status: r-Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PI-DG094 Equipment Class: (18) Instruments on Racks Eauloment Descrintion:

2A DG A AIR RECEIVER PRESS C-407 1200108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 1 of 4 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PL33J Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

ASSY -PANEL, RHR B/C CUBE VENT Project: LaSalle 2 SWEL Location (Bldg, Elev, Room/Area):

RB, 694.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchoraae 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?Stacked shims under 2 top anchors judged to be acceptable.

3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage shown on IE-2-3508, Rev. AN.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Yes C-408 12Q0108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 2 of 4 Status: FY]I N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PL33J Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

ASSY -PANEL, RHR B/C CUBE VENT Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixtures judged to be acceptable.

Adjacent masonry wall is safety-related per drawing A-223, Rev. N.9. Do attached lines, have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: D. Carter & J. Griffith -8/29/2012 Evaluated by: UJA10-Q 4 7 David Carter Date: 10/17/2012 IPA James Griffith 10/17/2012 C-409 1200108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 3 of 4 Status: Eli N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PL33J Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

ASSY -PANEL, RHR B/C CUBE VENT C-4 10 1200108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 4 of 4 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PL33J Equipment Class: (20) Instrumentation and Control Panels and Cabinets L C-411 12Q0108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 1 of 4 Status: FT] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PL34J Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

ASSY -PANEL, RHR A CUBE VENT Project: LaSalle 2 SWEL Location (Bldg, Elev, Room/Area):

RB, 694.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage verified per drawing IE-2-3507, Rev. BC.6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-412 12..108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 2 of 4 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PL34J Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

ASSY -PANEL, RHR A CUBE VENT Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Masonry wall in vicinity is adequately restrained.

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: M. Etre & M. Wodarcyk -9/17/2012 Evaluated by: Mark Etre Date: 10/19/2012 Michael Wodarcyk 10/19/2012 C-413 12Q0108.50-R-002 Rev 1 Correspondence No.: RS-12-163 Sheet 3 of 4 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PL34J Equipment Class: (20) Instrumentation and Control Panels and Cabinets EouiDment Descriotion:

ASSY -PANEL. RHR A CUBE VENT C-414 12Q0108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 4 of 4 Status: 7 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PL34J Equipment Class: (20) Instrumentation and Control Panels and Cabinets A C-415 12Q0108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 1 of 4 Status: Fjý N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PL35J Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

ASSY -PANEL, LPCS CUBE VENT Project: LaSalle 2 SWEL Location (Bldg, Elev, Room/Area):

RB, 694.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage verified per drawing IE-2-3509, Rev. AJ.6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-416 12Q0108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 2 of 4 Status: Y-ý N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PL35J Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

ASSY -PANEL, LPCS CUBE VENT Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixtures judged to be acceptable.

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: M. Etre & M. Wodarcyk -9/17/2012 Evaluated by: Mark Etre Date: 10/19/2012 Michael Wodarcyk 10/19/2012 C-417 12Q0108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 3 of 4 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PL35J Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

ASSY -PANEL, LPCS CUBE VENT Photos C-418 12Q.108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 4 of 4 Status: F-7 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2PL35J Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

ASSY -PANEL, LPCS CUBE VENT C-419 12Q0108.50-R-002 Rev. I Correspondence No.: RS-12-163 Sheet 1 of 5 Status: YI-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2TE-HGO14A Equipment Class: (19) Temperature Sensors Equipment

==

Description:==

HYDROGEN RECOMBINER GAS INLET (TE-1A)Project: LaSalle 2 SWEL Location (Bldg, Elev, Room/Area):

RB, 761.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-420 12Q-108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 2 of 5 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2TE-HGO14A Equipment Class: (19) Temperature Sensors Equipment

==

Description:==

HYDROGEN RECOMBINER GAS INLET (TE-1A)Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes Flexible conduit could come into contact with instrument line. Operations placed tie-wrap on flexible conduit to prevent interaction.

No longer a seismic interaction concern.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixtures judged to be acceptable.

9. Do attached lines have adequate flexibility to avoid damage?Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could .Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: D. Carter & J. Griffith -8/29/2012 Item confirmed by Operations as shown on drawing M-1 30, Sheet 2.Evaluated by: P-JA/0-k-David Carter Date: 10/17/2012 James Griffith 10/17/2012 C-421 12001.08.50-R-002 Rev 1 Correspondence No.: RS-12-163 Sheet 3 of 5 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2TE-HGO14A Equipment Class: (19) Temperal Eauioment Descriotion:

HYDROGEN I ure Sensors RECOMBINER GAS INLET (TE-1A)L C-422 12Q.108250-R-002 Rev I Correspondence No.: RS-12-163 Sheet 4 of 5 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2TE-HGO14A Equipment Class: (19) Temperature Sensors C-423 1200108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 5 of 5 Status: Fj N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2TE-HGO14A Equipment Class: (19) Temperature Sensors Eauioment Descrnotion:

HYDROGEN RECOMBINER GAS INLET (TE-IA)C-424 12QO108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 1 of 3 Status: FYi N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2VQ029 Equipment Class: (7) Fluid-Operated Valves Equipment

==

Description:==

DWVENT/PURGE FROM RX BLDG UPSTRM ISOL Project: LaSalle 2 SWEL Location (Bldg, Elev, Room/Area):

RB, 740.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-425 12Q0108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 2 of 3 Status: F--Y-- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2VQ029 Equipment Class: (7) Fluid-Operated Valves Eauioment

==

Description:==

DWVENT/PURGE FROM RX BLDG UPSTRM ISOL Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Conduits near valve body. Conduits are flexible and part of the same valve.Judged to be acceptable.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?Yes Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: M. Etre & M. Wodarcyk -9/17/2012 Evaluated by: Mark Etre Date: 10/19/2012 Michael Wodarcyk 10/19/2012 C-426 12Q0108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 3 of 3 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2VQ029 Equipment Class: (7) Fluid-Operated Valves Equipment

==

Description:==

DW VENT/PURGE FROM RX BLDG UPSTRM ISOL C-427 12Q0108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 1 of 6 Status: FY-- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2VQ030 Equipment Class: (7) Fluid-Operated Valves EauiDment DescriDtion:

DWVENT/PURGE FROM RX BLDG DWNST ISOL Project: LaSalle 2 SWEL Location (Bldg, Elev, Room/Area):

RB, 740.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes C-428 12Q0108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 2 of 6 Status: FYj] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2VQ030 Equipment Class: (7) Fluid-Operated Valves EauiDment

==

Description:==

DWVENT/PURGE FROM RX BLDG DWNST ISOL 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of-potentially adverse seismic interaction effects?Yes Yes Yes Other Adverse Conditions

.11 Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team:. D. Carter & J. Griffith.-

8/29/2012 Evaluated by: ,JA/(- David Carter Date: 10/17/2012 James Griffith 10/17/2012 C-429 12Q0108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 3 of 6 Status: EY-I N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2VQ030 Equipment Class: (7) Fluid-Operated Valves Eouinment Descriotion:

DW VENT/PURGE FROM RX BLDG DWNST ISOL Photos C-430 12Q0108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 4 of 6 Status: FYI1 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2VQ030 Equipment Class: (7) Fluid-Operated Valves 01 LaSalle 8-29-12 013 C-431 1200108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 5 of 6 Status: E] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2VQ030 Equipment Class: (7) Fluid-Operated Valves FRC C-432 12Q0108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 6 of 6 Status: [] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2VQ030 Equipment Class: (7) Fluid-Operated Valves C-433 12Q0108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 1 of 4 Status: F-ý N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2VQ031 Equipment Class: (7) Fluid-Operated Valves Equipment

==

Description:==

SUP POOL VENT/PURGE OTLT UPSTRM ISOL Project: LaSalle 2 SWEL Location (Bldg, Elev, Room/Area):

RB, 710.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-434 12Q-108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 2 of 4 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2VQ031 Equipment Class: (7) Fluid-Operated Valves Equipment

==

Description:==

SUP POOL VENT/PURGE OTLT UPSTRM ISOL Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes Approximately 1-1/2" gap between tubing for valve and cable tray supports judged to be acceptable.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Approximately 1-1/2" gap between valve operator and adjacent support auxiliary steel judged to be acceptable.

Comments Seismic Walkdown Team: D. Carter & J. Griffith -8/29/2012 Evaluated by: Z,,- David Carter Date: 10/17/2012 James Griffith 10/17/2012 C-435 12Q0108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 3 of 4 Status: l N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2VQ031 Equipment Class: (7) Fluid-Operated Valves Equipment

==

Description:==

SUP POOL VENT/PURGE OTLT UPSTRM ISOL C-436 12Q0108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 4 of 4 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2VQ031 Equipment Class: (7) Fluid-Operated Valves L C-437 12Q0108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 1 of 4 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2VQ032 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

SUP POOL VENT/PURGE OTLT UPSTRM ISOL BYP Project: LaSalle 2 SWEL Location (Bldg, Elev, Room/Area):

RB, 710.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-438 12Q0108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 2 of 4 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2VQ032 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Eauioment DescriDtion:

SUP POOL VENT/PURGE OTLT UPSTRM ISOL BYP Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block Walls not likely to collapse onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: D. Carter & J. Griffith -8/29/2012 Evaluated by: Q--'.4David Carter Date: 10/17/2012James Griffith 10/17/2012 C-439 12Q0108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 3 of 4 Status: [Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Equipment

==

Description:==

2VQ032 (8) Motor-Operated and Solenoid-Operated Valves SUP POOL VENT/PURGE OTLT UPSTRM ISOL BYP C-440 1200108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 4 of 4 Status: FY N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2VQ032 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Eauinment Descrintion:

SUP POOL VENT/PURGE OTLT UPSTRM ISOL BYP C-441 12Q0108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 1 of 5 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2VQ034 Equipment Class: (7) Fluid-Operated Valves Equipment

==

Description:==

DWVENT/PURGE OTLT UPSTRM ISOL Project: LaSalle 2 SWEL Location (Bldg, Elev, Room/Area):

RB, 786.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-442 12Q0108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 2 of 5 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2VQ034 Equipment Class: (7) Fluid-Operated Valves Equipment

==

Description:==

DWVENT/PURGE OTLT UPSTRM ISOL Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

End of rugged operator approximately 1/2" from cable riser. Both items are robust and judged to be acceptable.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Valve operator hangs under large, well-supported pipe; judged to be acceptable.

Overhead light fixtures judged to be acceptable.

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: D. Carter & J. Griffith -8/28/2012 Evaluated by: ,Q-bQk- David Carter Date: 10/17/2012 James Griffith 10/17/2012 C-443 1200108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 3 of 5 Status: F-7 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2VQ034 Equipment Class: (7) Fluid-Operated Valves Equipment

==

Description:==

DW VENT/PURGE OTLT UPSTRM ISOL C-444 12Q0108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 4 of 5 Status: -IN U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2VQ034 Equipment Class: (7) Fluid-Operated Valves GE OTLT C-445 12Q0108.50-R-002 Rev. 1 Correspondence No.: RS-12-163 Sheet 5 of 5 Status: [-7 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2VQ034 Equipment Class: (7) Fluid-Operated Valves EauiDment Descriotion:

DW VENT/PURGE OTLT UPSTRM ISOL L C-446