NRR E-mail Capture - North Annorth Anna Power Station, Units 2-ACCEPTANCE Review, Temporary Change to Allow Two Inoperable Demand Position Indicators Per Control Bank
ML12144A009
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 05/22/2012
From: V Sreenivas
Plant Licensing Branch II
To: Heacock D
Dominion Generation
References
TAC ME8656
Download: ML12144A009 (2)


Text

NRR-PMDAPEm Resource From: Sreenivas, V Sent: Tuesday, May 22, 2012 8:51 AM To: 'david.heacock@dom.com' Cc: Tom Shaub; Salgado, Nancy; Thorpe, April; Lingam, Siva; Boyle, Patrick

Subject:

NORTH ANNORTH ANNA POWER STATION, UNITS 2-ACCEPTANCE REVIEW, Temporary Change to allow two inoperable demand position indicators per Control Bank (TAC NO ME8656)

By letter dated May 11, 2012, Virginia Electric and Power Company submitted a license amendment request for Temporary Change to allow two inoperable demand position indicators per control bank for North Anna Power Station, Units 2. The purpose of this email is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

If you have any questions, please contact me at 301-415-2597.

V. Sreenivas, PH.D., C.P.M.,

Project Manager, LPL2-1, Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 1

Hearing Identifier: NRR_PMDA Email Number: 380 Mail Envelope Properties (V.Sreenivas@nrc.gov20120522085000)

Subject:

NORTH ANNORTH ANNA POWER STATION, UNITS 2-ACCEPTANCE REVIEW, Temporary Change to allow two inoperable demand position indicators per Control Bank (TAC NO ME8656)

Sent Date: 5/22/2012 8:50:33 AM Received Date: 5/22/2012 8:50:00 AM From: Sreenivas, V Created By: V.Sreenivas@nrc.gov Recipients:

"Tom Shaub" <tom.shaub@dom.com>

Tracking Status: None "Salgado, Nancy" <Nancy.Salgado@nrc.gov>

Tracking Status: None "Thorpe, April" <April.Thorpe@nrc.gov>

Tracking Status: None "Lingam, Siva" <Siva.Lingam@nrc.gov>

Tracking Status: None "Boyle, Patrick" <Patrick.Boyle@nrc.gov>

Tracking Status: None

"'david.heacock@dom.com'" <david.heacock@dom.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 1783 5/22/2012 8:50:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: