Request for Additional Information Related to License Amendment Request to Add Diesel Fuel Oil License Bases and Revise Technical Specifications 3.7.8 and 3.8.3
ML12142A156
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 05/23/2012
From: Thomas Wengert
Plant Licensing Branch III
To: Schimmel M
Northern States Power Co
Wengert T
References
TAC ME6849, TAC ME6850
Download: ML12142A156 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 23, 2012 Mr. Mark A. Schimmel Site Vice President Prairie Island Nuclear Generating Plant Northern States Power Company - Minnesota 1717 Wakonade Drive East Welch, MN 550B9-9642

SUBJECT:

PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 REQUEST FOR ADDITIONAL INFORMATION RELATED TO LICENSE AMENDMENT REQUEST TO ADD DIESEL FUEL OIL LICENSE BASES AND REVISE TECHNICAL SPECIFICATIONS 3.7.B AND 3.B.3 (TAC NOS. ME6B49 AND ME6B50)

Dear Mr. Schimmel:

By letter dated August 11,2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML112240140), as supplemented by letter dated February 21,2012 (ADAMS Accession No. ML12054A057), Northern States Power Company, a Minnesota corporation (NSPM, the licensee), doing business as Xcel Energy, requested approval from the Nuclear Regulatory Commission (NRC) for additional diesel fuel oil license bases and amendments to Technical Specifications 3.7.B, "Cooling Water (CL) System" and 3.B.3, "Diesel Fuel Oi!," for the Prairie Island Nuclear Generating Plant, Units 1 and 2.

The NRC staff is reviewing your submittal and has determined that additional information is required to complete the review. The specific information requested is addressed in the enclosure to this letter. During a discussion with your staff on May 17, 2012, it was agreed that you would provide a response to this request within 45 days of the date of this letter.

The NRC staff considers that timely responses to requests for additional information help ensure sufficient time is available for staff review and contribute toward the NRC's goal of efficient and effective use of staff resources.

M. Schimmel -2 If circumstances result in the need to revise the requested response date, please contact me at (301) 415-4037.

Sincerely, Thomas J. ngert, ior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-282 and 50-306

Enclosure:

Request for Additional Information cc w/encl: Distribution via ListServ

REQUEST FOR ADDITIONAL INFORMATION (RAI)

PRAIRIE ISLAND NUCLEAR GENERATING PLANT. UNITS 1 AND 2 DOCKET NOS. 50-282 AND 50-306 By letter dated August 11,2011, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML112240140), as supplemented by letter dated February 21,2012 (ADAMS Accession No. ML12054A057), Northern States Power Company, a Minnesota corporation (NSPM, the licensee), doing business as Xcel Energy, requested approval from the Nuclear Regulatory Commission (NRC) for additional diesel fuel oil license bases and amendments to Technical Specifications (TS) 3.7.8, "Cooling Water (CL) System" and 3.8.3, "Diesel Fuel Oil," for the Prairie Island Nuclear Generating Plant (PINGP), Units 1 and 2. The NRC staff has reviewed this request and the supplemental response and has determined that the following information is required to complete its review.

Electrical Engineering Branch (EEEB) RAls (regarding the February 21,2012 RAI response)

RAI EEEB-7 In its February 21,2012, letter, the licensee's response to RAI EEEB-1a delineates the flow paths that are available from each of the storage tanks to the day tank of each diesel engine.

Technical Specification (TS) surveillance requirement (SR) 3.8.1.5 requires verification of capability of the fuel oil transfer system to transfer fuel oil from the storage tank to the day tank.

Validate that current plant procedures verify operability of each of the paths delineated in the NSPM response to comply with TS requirements.

RAI EEEB-8 The licensee's response to RAI EEEB-4a states that Section 8.4 of the PINGP Updated Safety Analysis Report (USAR) defines the design-basis worst case accident from the emergency diesel generator (EDG) loading perspective as a large-break loss-of-coolant accident (LBLOCA) concurrent with a loss of offsite power (LOOP). NSPM further states that the basis for EDG load reduction within the first hour of EDG operation during this event is associated with the drain down of the refueling water storage tank (RWST) and the subsequent transfer to the recirculation mode.

The NRC staff notes that the LOOP/LBLOCA event may result in the 'most severe' short term loading of the EDG and may be used to determine the kilowatt rating of the EDG. However, it may not be the most conservative loading from a fuel oil consumption perspective, when some pumps may operate for longer durations depending on the type of break or event. USAR Table 14.7-4 (Unit 2) provides the time durations for RWST low level alarm actuation for various break sizes. According to this Table, the RWST low level is not reached for a 1.5 inch break size and it takes approximately 5467 seconds to reach the low level alarm point following a 2 inch break.

Validate that the calculation of record for fuel oil consumption evaluated events related to different size breaks for LOCA and steam line breaks inside containment for a bounding case.

-2 RAI EEEB-9 The licensee's response to RAI EPTB-1a and -1b states that fuel oil consumption rates were determined based on manufacturer's testing and pre-operational testing records. The test records provide the consumption rates (in units of pounds I [brake horsepower'" hours] for the Unit 1 EDGs or (in units of grams I [kilowatt ." hours]) for the Unit 2 EDGs at various loading conditions. Provide details on the power factor values that were used in the testing program and how the EDG fuel oil consumption calculations accounted for the reactive power required by accident-mitigating eq uipment.

M. Schimmel -2 If circumstances result in the need to revise the requested response date, please contact me at (301) 415-4037.

Sincerely, IRAJ Thomas J. Wengert, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor licensing Office of Nuclear Reactor Regulation Docket Nos. 50-282 and 50-306

Enclosure:

Request for Additional Information cc w/encl: Distribution via listServ DISTRIBUTION:

PUBLIC LPL3-1 R/F RidsNrrDorlLpl3-1 Resource RidsNrrDorlDpr Resource RidsNrrPMPrairielsland Resource RidsNrrLABTully Resource GMatharu, NRR RidsAcrsAcnw_MailCTR Resource RidsOgcRp Resource RidsRgn3MailCenter Resource RidsNrrDeEeeb Resource ADAMS Accession Number: ML12142A156 1< via memo dated 5/7/12 ICE NRRlLPL3-1/PM NRR/LPL3-1/LA NRR/EEEB/BC LPL3-1/BC (A) NRR/LPL3-1/PM

=--+~~--------~~~------~~~--~~--~~~------

TWengert BTuily JAndersen* IFrankl 05/23/12 05/22/12 05/07/12 05/23/12 OFFICIAL RECORD COpy