Letter Sequence Acceptance Review |
---|
|
|
MONTHYEARML1212203002012-04-27027 April 2012 American Society of Mechanical Engineers (ASME) Code, Section XI, Inservice Inspection Program - 10 CFR 50.55a Request Number RR-PTRR-02 Project stage: Request ML1213004912012-05-0909 May 2012 ME8534, E-mail to Licensee for Acceptance of Relief Request RR-PTRR-02 Project stage: Acceptance Review ML12151A4402012-05-18018 May 2012 American Society of Mechanical Engineers (ASME) Code, Section XI, Inservice Inspection Program - 10 CFR 50.55a Request Number RR-PTRR-02, Rev. 1 - Response to NRC Request for Additional Information Project stage: Response to RAI ML12166A2692012-06-22022 June 2012 ME8534-Authorization of Relief Request No. RR-PTRR-02, Revision 1,Recirc Pump Seals Replacement Project stage: Other 2012-05-18
[Table View] |
|
---|
Category:Acceptance Review Letter
MONTHYEARML24008A2622024-01-0808 January 2024 Acceptance Review Determination for Relief Request I5R-12, Concerning Installation of a FSWOL on RPV Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld ML23019A3092023-01-19019 January 2023 Acceptance Review Determination License Amendment Request to Adopt 10 CFR 50.69 Categorization Process ML23019A3032023-01-19019 January 2023 Acceptance Review Determination License Amendment Requets to Adopt TSTF-505 ML22252A1522022-09-0909 September 2022 Acceptance Review Determination Partial Adoption of TSTF-568 to Revise TS 3.3.1 for Primary Containment Oxygen Concentration ML22207A0122022-07-26026 July 2022 Acceptance Review Determination Revision to Alternative Source Term Analysis for Containment Leakage ML22173A0802022-06-22022 June 2022 E-mail Dated 6/22/2022, Acceptance of Requested License Amendment Request to Revise Surveillance Requirements to Reduce Number of Fast Starts of EDGs ML22075A0362022-03-16016 March 2022 Acceptance Review Determination - Relief Request CS-PR-02 Associated with Pump Periodic Verification Test of Core Spray System Pumps, E-mail Dated 3/16/2022 ML21278A6872021-10-0505 October 2021 Acceptance Review Determination - Relief Request GV-RR-10 ML21077A1772021-04-0808 April 2021 Withdrawal of Requested Exemption from Certain Requirement in 10 CFR 50.55a (Epids L-2021-LLE-0014, 0015, & 0016) ML21033A9432021-02-0202 February 2021 Correction to Acceptance of Requested License Amendment to Adopt Technical Specification Task Force Traveler 582 ML20294A4242020-10-20020 October 2020 Acceptance of Requested Licensing Action Relief Requests CTNSP-PR-01 and CS-PR-01 (EPIDs L-2020-LLR-0136 and L-2020-LLR-0137) ML20262H0322020-09-18018 September 2020 Acceptance Email of Requested Licensing Actions Concerning Surveillance Frequency for Excess Flow Check Valve Testing Frequency (EPIDs L-2020-LLA-0188 and L-2020-LLR-0114) ML20262G9372020-09-17017 September 2020 Acceptance of Requested Licensing Action End of Interval Relief Request Associated with the Fourth Ten-Year Inservice Inspection (ISI) Interval ML19339E8542019-12-0505 December 2019 Supplemental Information Needed for Acceptance of Requested Licensing Action Adoption of Risk-Informed Completion Times ML19301C3162019-10-28028 October 2019 Acceptance of Requested Licensing Action Relief Request 2ISI - 014 ML18206A7172018-07-25025 July 2018 Acceptance of Requested Licensing Action Revision to Technical Specification for Primary Containment Oxygen Concentration ML18190A1402018-07-0909 July 2018 Acceptance of Requested Licensing Action Relief Requests I5R-05 and I4R-05 Threads in Flange ML18190A0922018-07-0606 July 2018 Acceptance of Requested Licensing Action Relief Requests I5R-06 and I4R-06 - Use of Encoded Phased Array ML18192B8582018-07-0606 July 2018 L-2018-LLR-0085 - Acceptance Email for RR BWRVIP Requirements 2018-07-06 ML18186A5352018-07-0505 July 2018 Acceptance of Requested Licensing Action Relief Requests I5R-04 and I4R-04 - N-513-4 ML18107A0252018-04-16016 April 2018 Acceptance of License Amendment Request Relocation of Surveillance Requirement Frequencies to Inservice Testing Program ML18071A1582018-03-12012 March 2018 Acceptance of License Amendment Request Concerning Proposed Changes to Remove Boraflex Credit ML17340A9542017-12-0505 December 2017 Acceptance of License Amendment Request Concerning Changes to Safety Limit Minimum Critical Power Ratios for Cycle 17 ML17192A1752017-07-11011 July 2017 Plants, Units 1 and 2; Calvert Cliffs Independent Spent Fuel Storage Installation; Nine Mile Point Nuclear Station, Units 1 and 2; R. E. Ginna - Acceptance of License Amendment Request to Revise Emergency Action Level Schemes ML17167A2192017-06-21021 June 2017 Acceptance of Requested Licensing Action Amendment to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-522 ML17143A0412017-05-23023 May 2017 Acceptance of Requested Licensing Action Amendments to Revise Emergency Action Level ML17143A2642017-05-23023 May 2017 Acceptance of Requested Licensing Action Amendment to Revise Emergency Action Level ML17117A3622017-05-0202 May 2017 Acceptance of Requested Licensing Action Amendment to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-283A, Revision 3 ML17083A3652017-03-31031 March 2017 Acceptance of Requested Licensing Action Relief Request to Utilize Code Case N-702 ML17058A4342017-03-0202 March 2017 Acceptance of Requested Licensing Action Reduce Steam Dome Pressure in Reactor Core Safety Limits ML17019A0532017-01-31031 January 2017 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment to Reduce Steam Dome Pressure in Reactor Core Safety Limits ML17017A1092017-01-24024 January 2017 Acceptance of Requested Licensing Action Partial Length Fuel Rod Burnup ML13022A3252013-01-22022 January 2013 MF0345 - Acceptance of Requested Licensing Action License Amendment Request- Relocation of PT Limit Curves to PTLR ML12222A0292012-08-0909 August 2012 Correction to Acceptance Letter - Nine Mile Point Nuclear Station, Unit No. 1 - License Amendment Request Pursuant to 10CFR 50.90: Adoption of NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generat ML1213004912012-05-0909 May 2012 ME8534, E-mail to Licensee for Acceptance of Relief Request RR-PTRR-02 ML1115905522011-06-0707 June 2011 E-mail from R.Guzman to J.Dosa - Acceptance Review Determination for Request to Revise Emergency Action Levels in Accordance with NEI-99-01 ML1109502922011-04-0505 April 2011 Acceptance Review Determination Relief Request for Repair of CRD Housing Penetrations ML1036103342011-01-0505 January 2011 Acceptance Review Determination of License Amendment Request Revisions to Average Power Range Monitor Instrumentation Operability Requirements TS 3.6.2 ML1012601662010-05-0606 May 2010 E-mail from R. Guzman to J. Dosa Acceptance Review Revised Questions for License Amendment Requesting 14 Day Completion Time Extension for Inoperable EDG ML1011803792010-04-28028 April 2010 Unit No.2 - E-mail from R. Guzman to J. Dosa Acceptance Review for LAR - Inoperable DG 14-Day Completion Time Extension ML1011209872010-04-22022 April 2010 E-mail from R. Guzman to J. Dosa Acceptance Review Determination for LAR to Modify Technical Specifications for Inoperable Snubbers and Add LCO 3.0.8 ML0918906662009-07-0808 July 2009 E-mail from R. Guzman to J. Dosa Acceptance Review Results of NMP2 Extended Power Uprate Application ML0905703152009-02-26026 February 2009 Acceptance Review Constellation and Edf Development - Application for Approval of License Transfers and Conforming License Amendment Request-Calvert Cliffs Nuclear Power Plant 1 and 2, Nine Mile Point Nuclear Station 1 and 2, and R.E. Ginna 2024-01-08
[Table view] Category:E-Mail
MONTHYEARML24008A0592024-01-0808 January 2024 E-mail Dated 1-8-2024 from R. Guzman to R. Reynolds Correct TS Page 204 for License Amendment No. 250 Adoption of TSTF-505 ML24008A2622024-01-0808 January 2024 Acceptance Review Determination for Relief Request I5R-12, Concerning Installation of a FSWOL on RPV Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld ML23268A0022023-09-22022 September 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-264-A, Revision 0 ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC Fleet Request License Amendment Request to Adopt TSTF-580, Revision 1 ML23255A2872023-09-12012 September 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Alternative to Use the Successive Inspection Requirements of BWRVIP-75-A ML23237B3972023-08-24024 August 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Alternative Request to Use Updated BWRVIP Guidelines ML23205A2432023-07-19019 July 2023 NRC Staff Follow-up Question on Audit Question 18 TSTF-505 and 50.69 Regulatory Audit (E-mail Dated 7/19/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23205A2412023-07-11011 July 2023 NRC Staff Follow-up Comments on Audit Questions 6a, 6b, and 6c TSTF-505 and 50.69 Regulatory Audit (E-mail Dated 7/11/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23205A2422023-07-11011 July 2023 NRC Staff Follow-up Comments on Audit Questions 17 and 19 TSTF-505 and 50.69 Regulatory Audit (E-mail Dated 7/11/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23209A7692023-06-14014 June 2023 Draft Audit Results File TSTF-505 and 50.69 (E-mail Dated 6/14/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23209A7672023-06-13013 June 2023 Share File Observations on Response to Question 06 and 22 TSTF-505 and 50.69 (E-mail Dated 6/13/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23163A2292023-06-12012 June 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-580, Revision 1 ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined ML23149A0012023-05-29029 May 2023 Audit Agenda TSTF-505 and 50.69 (E-mail Dated 5/29/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23142A0222023-05-22022 May 2023 Regulatory Audit Questions (PRA) TSTF-505 and 50.69 (E-mail Dated 5/22/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23118A3882023-04-28028 April 2023 Regulatory Audit Questions TSTF-505 and 50.69 (E-mail Dated 4/28/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23104A3472023-04-14014 April 2023 Verbal Authorization for Relief Request I5R-14, Proposed Alternative Associated with N2E Dissimilar Metal Weld Overlay Repair with Laminar Indication ML23093A1782023-04-0303 April 2023 E-mail from T. Loomis to R. Guzman Proposed Alternative to Utilize Specific Provisions of Code Case N-716-3 ML23090A1302023-03-31031 March 2023 Verbal Authorization for Relief Request I5R-11, Proposed Alternative Repair of Recirculation Inlet Nozzle N2E Dissimilar Metal Weld ML23087A2912023-03-28028 March 2023 Request for Additional Information (3/28/2023 E-mail) - Proposed Emergent I5R-11 Alternative Associated with a Weld Overlay on RPV Recirculation Nozzle N2E DM Weld ML23061A0522023-03-0202 March 2023 Request for Additional Information (3/2/2023 E-mail) - Proposed Alternative Associated with a Weld Overlay Repair to the Torus ML23047A3832023-02-15015 February 2023 (2-15-2023 Email from J. Nelson to R. Guzman) Long Island Power Authority and Long Island Lighting Company Request for Threshold Determination ML23033A0142023-02-0202 February 2023 E-mail Dated 2-2-2023 from R.Guzman to R.Reynolds Correction to Error in NMP1 TSTF-505 and 50.69 Audit Plan ML23019A3092023-01-19019 January 2023 Acceptance Review Determination License Amendment Request to Adopt 10 CFR 50.69 Categorization Process ML23019A3032023-01-19019 January 2023 Acceptance Review Determination License Amendment Requets to Adopt TSTF-505 ML23013A3332023-01-13013 January 2023 Acceptance Review Determination Proposed Alternative for Weld Overlay Repair to the Torus ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI ML22342B1462022-11-21021 November 2022 NRR E-mail Capture - Acceptance Review for TSTF 295A ML22314A2262022-11-10010 November 2022 E-mail Dated 11/10/2022 Relief Request Associated with Pump Periodic Verification Tests of Core Spray System Pumps ML22301A0902022-10-28028 October 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-301, Revision 2 ML22252A1522022-09-0909 September 2022 Acceptance Review Determination Partial Adoption of TSTF-568 to Revise TS 3.3.1 for Primary Containment Oxygen Concentration ML22207A0192022-07-26026 July 2022 (E-mail Dated 7/26/2022) Setup of Online Reference Portal for Revision to Alternative Source Term Calculation for MSIV and Non-MSIV Leakage ML22207A0122022-07-26026 July 2022 Acceptance Review Determination Revision to Alternative Source Term Analysis for Containment Leakage ML22200A0782022-07-19019 July 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22194A9412022-07-13013 July 2022 Request for Additional Information Relief Request CS-PR-02 (7/13/2022 e-mail) ML22173A0802022-06-22022 June 2022 E-mail Dated 6/22/2022, Acceptance of Requested License Amendment Request to Revise Surveillance Requirements to Reduce Number of Fast Starts of EDGs ML22075A0362022-03-16016 March 2022 Acceptance Review Determination - Relief Request CS-PR-02 Associated with Pump Periodic Verification Test of Core Spray System Pumps, E-mail Dated 3/16/2022 ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21320A3472021-11-16016 November 2021 Request for Additional Information LAR to Revise TSs to Adopt TSTF-582, Revision 0 ML21306A3312021-11-0202 November 2021 Request for Additional Information Alternative Request GV-RR-10 (11/2/2021 e-mail) ML21301A0672021-10-28028 October 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-541 ML21298A0912021-10-25025 October 2021 E-mail Dated 10/25/2021, Acceptance of Requested License Amendment Request to Adopt Technical Specification Task Force Traveler 582 ML21292A2122021-10-19019 October 2021 NRR E-mail Capture - NRC Notification to the State of New York Regarding a Nine Mile Point Nuclear Station, Unit 2 Amendment - Adopt TSTF-501, Rev. 1 ML21278A6872021-10-0505 October 2021 Acceptance Review Determination - Relief Request GV-RR-10 ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21252A0482021-09-0707 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21215A3502021-08-0303 August 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-554 ML21168A3462021-06-17017 June 2021 Acceptance of Requested Licensing Action License Amendment Request - Adoption of TSTF-501, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (EPID L-2021-LLA-0096) (Email) 2024-01-08
[Table view] |
Text
From: Vaidya, Bhalchandra Sent: Wednesday, May 09, 2012 3:31 PM To: 'Dosa, John J'; 'dennis.vandeputte@cengllc.com' Cc: Hoffman, Keith; Collins, Jay; Tsao, John; Alley, David; Wolfgang, Robert; Wilson, George; Lingam, Siva; Boyle, Patrick
Subject:
ME8534 - ACCEPTANCE OF REQUESTED LICENSING ACTION RE: Relief Request RR-PTRR-02
SUBJECT:
Nine Mile Point Nuclear Station Unit No. 1; Docket No. 50-220 American Society of Mechanical Engineers (ASME) Code,Section XI, Inservice Inspection Program -
10 CFR 50.55a Request Number RR-PTRR-02 (TAC NO. ME8534)
By letter dated April 27, 2012, Pursuant to 10 CFR 50.55a(a)(3)(i), Nine Mile Point Nuclear Station, LLC (NMPNS) requested NRC approval for the application of a proposed alternative to use the provisions of IWA-4132 of the 2004 edition of the ASME Section XI code for the replacement of the reactor recirculation pump seal flange assemblies rotated from stock, for the remainder of the fourth ten-year Inservice Inspection (ISI) Interval for Nine Mile Point Unit 1 (NMP1). The proposed alternative in this request has been incorporated into IWA-4132 of the 2010 edition of the ASME Section XI code.
The purpose of this communication is to provide the results of the NRC staffs acceptance review of this relief request. The acceptance review was performed by the staff of NRC to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Pursuant to Sections 50.55a(a)(3)(i) and 50.55a(a)(3)(ii) of Title 10 of the Code of Federal Regulations (10 CFR), the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety, or that compliance with the specified requirements of Section 50.55a would result in hardship or unusual difficulty without a compensating increase in the level of quality or safety.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.
If you have any questions, please contact me.
Bhalchandra K. Vaidya Licensing Project Manager NRC/NRR/DORL/LPL1-1 (301)-415-3308 (O) bhalchandra.vaidya@nrc.gov